Nuclear power in Japan: Fukushima and after
Richard TanterNautilus Institute for Security and Sustainability
http://www.nautilus.org/about/associates/richard-tanter/publications
Royal Australian Chemical Institute, Health Safety & Environment Group1, at Risk Engineering Society,
1 September 2011
![Page 2: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/2.jpg)
2
Outline
• What happened at Fukushima?• What is the situation at Fukushima now?• What will happen from now on?• What have been the health and environmental consequences?• Why did these events occur?• What is the future of nuclear power in Japan?• What are the implications beyond Japan?
![Page 3: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/3.jpg)
3
1. What happened at Fukushima?
•
![Page 4: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/4.jpg)
4
Nuclear plants and facilities in Japan
![Page 5: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/5.jpg)
5
Nuclear power plants in Japan
![Page 6: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/6.jpg)
6
Unit 4 reactor schematic - NHK
![Page 7: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/7.jpg)
7
Boiling Water reactor System
![Page 8: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/8.jpg)
8
BWR reactor vessel
![Page 9: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/9.jpg)
9
Key sequences at Fukushima No. 1 NPP, 11 March
Pre-quake: – Units 1,2,3 operating; – Units 5 and 6 offline in cold shutdown; – Unit 4 offline; defueled November 2010
14.46 Magnitude 9 earthquake 135 km offshore at – Automatic shutdown of Units 1,2, and 3.– Offsite power is lost. – Emergency diesel generators (EDGs) provide coolant power
15.46 14 metre-tsunami breaches plant seawalls and inundates most of the plant– Emergency generators knocked out– Battery powered pumping system starts; fails by March 12.
19.30 Fuel assemblies in Unit 1 completely exposed
![Page 10: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/10.jpg)
10
Japanese government report to IAEA: Fukushima “worse than meltdown?”
Source: “'Melt-through' at Fukushima? / Govt report to IAEA suggests situation worse than meltdown”, Yomiuri Shimbun, 8 June 2011.
![Page 11: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/11.jpg)
11
Explosions and fires
• March 12: – 15.36 Unit 1 hydrogen explosion destroys upper
structure exposing fuel pond; 4 workers injured• March 14
– 11.01 Unit 3 hydrogen explosion destroys upper structure exposing fuel pond; 6 workers injured
• March 15 – Fire at Unit 4 spent fuel pond– Hydrogen explosion in Unit 2; suspected damage to
wet-well in primary containment.– Explosion at Unit 4 spent fuel pond
![Page 12: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/12.jpg)
12
Spent fuel at Fukushima I NPP
Source: Masa Takubo, cited by David Wright, More on Spent Fuel Pools at Fukushima, All Things Nuclear, March 21, 2010
• March 16– Fire at Unit 4 spent fuel pond
• March 23
– Fire reported at base of heavily damaged Unit 3
![Page 13: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/13.jpg)
13
Fukushima I NPP, 2004
Source: Digital Globe, First Watch, Imagery Report, Japan Earthquake/Tsunami, March 2011
![Page 14: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/14.jpg)
14
Fukushima I NPP, March 12, before explosion of Unit 1
Source: Digital Globe, First Watch, Imagery Report, Japan Earthquake/Tsunami, March 2011
![Page 15: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/15.jpg)
15
March 13, after explosion of Unit 1
Source: Digital Globe, First Watch, Imagery Report, Japan Earthquake/Tsunami, March 2011
![Page 16: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/16.jpg)
16
March 14, 1 minute before explosion of Unit 3
Source: Digital Globe, First Watch, Imagery Report, Japan Earthquake/Tsunami, March 2011
![Page 17: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/17.jpg)
17
March 14, 3 minutes after explosion of Unit 3
Source: Digital Globe, First Watch, Imagery Report, Japan Earthquake/Tsunami, March 2011
![Page 18: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/18.jpg)
18
March 14
![Page 19: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/19.jpg)
19
Seawater pump - March 17
Source: Fukushima Daiichi Nuclear Power Station Photos 16, Cryptome.org
![Page 20: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/20.jpg)
20
Flooded electric equipment room, Unit 6, March 17
Source: Fukushima Daiichi Nuclear Power Station Photos 16, Cryptome.org
![Page 21: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/21.jpg)
21
Potential steam production by radioactive afterheat
Source: Jan Beyea and Frank von Hippel, “Containment of a Reactor Meltdown,” Bulletin of the
Atomic Scientists, August/September 1982
![Page 22: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/22.jpg)
22
BWR nuclear fuel structure
![Page 23: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/23.jpg)
23
2. What is the situation at Fukushima now?
![Page 24: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/24.jpg)
24
State of Fukushima No. 1 NPP, as of August 30:a. reactors and spent fuel
Source: Status of countermeasures for restoring from the accident at Fukushima Daiichi Unit 1 through 4. As of August 30th, 2011. (Estimated by JAIF)
Unit 1 Unit 2 Unit 3 Unit 4
Core and fuel integrity
Damaged (core melt
Damaged (core melt*
Damaged (core melt
No fuels loaded
RPV structural integrity
Partially damaged and leaking
Unknown Unknown No damage
PCV structural integrity
Damage and leaking suspected
Damage and leaking suspected
Damage and leaking suspected
No damage
Spent fuels in the SFP
292 587 514 1331
Fuel integrity in SFP
Unknown Most spent fuels not damaged
Unknown Most spent fuels not damaged
SFP cooling Function recovered
Function recovered
Function recovered
Function recovered
![Page 25: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/25.jpg)
25
Source: Asahi Shimbun 10 August 2011
![Page 26: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/26.jpg)
26
State of Fukushima No. 1 NPP, as of August 30:b. contaminated water leakage and water storage
• Contamination of huge volumes of sea-water and freshwater injected and sprayed into containment buildings and spent fuel ponds– Some released to sea– Most stored onsite in turbine building basement, etc.– Some stored on floating barges
• Highly radioactive leakages from damaged reactor pressure vessels and containment vessels– into sea and into groundwater
![Page 27: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/27.jpg)
27Source: TEPCO, Survey map of Fukushima Daiichi Nuclear Power Station, August 22, 2011.
State of Fukushima No. 1 NPP, as of August 30:c. Site debris and contamination
![Page 28: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/28.jpg)
28
Key current site operations
• Heat exchange of cooling water to CPV/RPV • Decontamination of radioactive water in containment vessel, in
flooded areas, and in storage– As of 9 August, 42,000 tonnes processed, but 120,000 tonnes
remained on site; expected end-year goal of 200,000 tonnes now unlikely
• Reducing/eliminating onsite radioactive hotspots• Covering all four units with steel and plastic to reduce air-borne
contamination
![Page 29: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/29.jpg)
29
Cold Shutdown Process Behind Schedule
Source: Fukushima Cold Shutdown Process Behind Schedule, NikkeiNet, 17 August 2011
![Page 30: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/30.jpg)
30
3. What will happen from now on?• Units 1-4 to be decommissioned; Units 5-6 unclear• New TEPCO “roadmap” presented to JAEC 31 August
– Plastic covering for Units 1-4 to contain airborne radiation matter
– Cold shut down by January 2012 ….?– By end-2011will start building ground shield between Units 1-4
and sea• 800 metres long and 20 metres deep• possible extension around whole of Units 1-4
• Removal of fuel from spent fuel ponds 1-4• Removal of spent fuel from reactors 1-4• Removal of corium from Units 1,2 and 3 - from RPV and/or CPV
– 10-50 years before attempt at reactor/corium removal possible• Decontamination, dismantling and clean-up …. Sometime in the
future
![Page 31: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/31.jpg)
31
Model of plastic
coverage for Unit 1
Source: TEPCO, Attachment, Outline of the reactor building covering plan of Unit 1 at Fukushima Daiichi Nuclear Power Station, Press Release
![Page 32: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/32.jpg)
32
Unit 1 plastic cover: before and after
Source: TEPCO, Attachment, Outline of the reactor building covering plan of Unit 1 at Fukushima Daiichi Nuclear Power Station, Press Release
![Page 33: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/33.jpg)
33
Seaward-side water shield plan
Source: TEPCO, Attachment, Basic Design of Water Shield Wall at the Seaside, Press Release 31 August 2011, p. 6.
![Page 34: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/34.jpg)
34
Seaward-side water shield - schematic cross-section(piles: 1 metre diameter, 14-22 mm. thick, 22-23 metres deep)
Source: TEPCO, Attachment, Basic Design of Water Shield Wall at the Seaside, Press Release 31 August 2011, p. 6.
![Page 35: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/35.jpg)
35
Fukushima No.1 NPP hydrology (pre-quake data)
Source: TEPCO, Attachment, Basic Design of Water Shield Wall at the Seaside, Press Release 31 August 2011, p. 7.
![Page 36: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/36.jpg)
36
Cross-section of hydrology model (pre-quake data)
Source: TEPCO, Attachment, Basic Design of Water Shield Wall at the Seaside, Press Release 31 August 2011, p. 7.
![Page 37: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/37.jpg)
37
Underground water trajectory modelling schematic
Source: TEPCO, Attachment, Basic Design of Water Shield Wall at the Seaside, Press Release 31 August 2011, p. 8.
![Page 38: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/38.jpg)
38
Anticipated underground water levels with seaside-ward water shield in place
Source: TEPCO, Attachment, Basic Design of Water Shield Wall at the Seaside, Press Release 31 August 2011, p. 8.
![Page 39: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/39.jpg)
39
The corium issue: corium lava flow at Chernobyl
Source: “Corium”, Tohoku Earthquake & Nuclear Crisis, 3 April 2011, at http://quakerad.blogspot.com/2011/04/corium.html
![Page 40: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/40.jpg)
40
The corium issue: corium “elephant’s foot uranium fuel flow in Chernobyl NPP basement
Source: “Corium”, Tohoku Earthquake & Nuclear Crisis, 3 April 2011, at http://quakerad.blogspot.com/2011/04/corium.html
![Page 41: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/41.jpg)
41
The corium issue:Three Mile Island NPP Core End-
State Configuration
Source: “Corium”, Tohoku Earthquake & Nuclear Crisis, 3 April 2011, at http://quakerad.blogspot.com/2011/04/cor
ium.html
![Page 42: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/42.jpg)
42
4. What have been the health and environmental consequences?
• Immediate injuries and deaths• Longterm radiation illness and mortality• Temporary social disruption from accident
consequences– social, economic, psychological
• Longterm social consequences– How many former residents can never go back?
![Page 43: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/43.jpg)
43
Schematic of 31 August accident at cesium
decontamination equipment: two workers drenched
Source: TEPCO, 1 September 2011
![Page 44: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/44.jpg)
44
Ionising radiation maximum permissible dose limits (courtesy Prof. Tilman Ruff, Nossal Institute for Global Health)
• Average background radiation: 2-3 mSv/y; half due to radon gas• General population: 1 mSv
– Japan: women regulated at 5 mSv over 3 mo– 1 mSv/y ~ 0.11 microSv/h
• Radiation workers:– 100 mSv over 5 y with no more than 50 mSv in any year
• ICRP recommendations accidents/emergencies: – In lower part of 1-20 mSv range for public – Workers – 100 mSv, ICRP up to 500 for volunteers in emergency
rescue operations– Post-Fukushima Japan:
• 250 mSv/y workers• 20 mSv for public including children
• Codex Alimentarius Commission food recommendations based on max 1 mSv/y assuming contaminated food max 10% of diet
![Page 45: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/45.jpg)
45Source:AREVA
Fukushima radiation releases, 11-20 March 2011
(courtesy Prof. Tilman Ruff, Nossal Institute for Global Health)
![Page 46: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/46.jpg)
46Source: TEPCO, Survey map of Fukushima Daiichi Nuclear Power Station, August 22, 2011.
![Page 47: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/47.jpg)
47
US Fukushima radiation monitoring, to April 29
(courtesy Prof. Tilman Ruff, Nossal Institute for Global Health)
![Page 48: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/48.jpg)
48
Zoning criteria Belarus 1991
kBq/m2 Individual dose (mSv)
Zone
>1480 >5 Priority resettlement
555-1480 <5 Secondary resettlement
185-555 >1 Resettlement rights
37-185 <1 Periodic radiation monitoring
ICRP 111, 2009
![Page 49: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/49.jpg)
49
Applying Chernobyl evacuation criteria to Fukushima
• Red and most yellow is > Chernobyl relocation zone (>1480 kBq/m2)
• Rest of yellow, green, light blue and some dark blue is > Chernobyl dose reduction zone
• Cs 137 T1/2 =30 years
(courtesy Prof. Tilman Ruff, Nossal Institute for Global Health)
![Page 50: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/50.jpg)
50
Protective measures
• Evacuation for est ext >50 mSv– 20 vs 80 km; late – still ongoing to ?end June
• Sheltering – for ext est >10mSv, esp 20-30 km zone • Acceptance increased exposures• Stable iodine – appears not used?
– initial evacuation completed by time instruction issued VII-9 GOJ IAEA subm 6.11)
• Food and water monitoring and restrictions• Local monitoring• Remediation – including local initiative eg schools• Long-term health assessment planned – details sparse
![Page 51: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/51.jpg)
51
Killing them softly: radiation exposure limits for workers and children
• International Commission on Radiological Protection recommendation for workers:
– maximum permissible annual dose of 20 mSv averaged over five years– no more than 50 mSv in any one year.
• Japanese worker exposure standard:– Pre-crisis: 100 mSv p.a– Post-crisis “emergency” exposure limits: 250 mSv p.a.
• Resignation of Kosako Toshiso, Tokyo University, – Appointed Special Advisor to Cabinet, March 16; resigned 29 April – Reported METI now discussing 500 mSv emergency exposure limit for
workers– Refused to approve promulgation of children’s exposure level at “3.8 µSv
per hour” on the basis of “20 mSv per year”
• See Tilman Ruff, Children of Fukushima need our protection, The Age
![Page 52: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/52.jpg)
52
MEXT data on Cesium-137 soil contamination, 29-30 August
Sources: “34 spots top Chernobyl evacuation standard”, Daily Yomiuri Online, 31 August 2011; original data: MEXT: http://radioactivity.mext.go.jp/
“According to a soil contamination map submitted at a study meeting of the Education, Culture, Sports, Science and Technology Ministry, six municipalities recorded more than 1.48 million becquerels of cesium 137 per square meter--the standard used for forced resettlement after the 1986 Chernobyl accident.”
![Page 53: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/53.jpg)
53
Social effects
• Short- and medium-term evacuation • Loss of livelihood• Damage to deep cultural roots• No return zones• Compensation
![Page 54: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/54.jpg)
54
Nuclear labour - the return of the nuclear gypsies
• Pre-crisis Fukushima NPP 1 labour force– Regular employees (seisha’in 正社員 )= 1,1,08– Contract employees (hiseisha’in 非正社員 ) = 9,195 [“day labourers”]
• 2009 worker radiation exposure at Fukushima No. 1 NPP– “of those who received a dose between 5 and 10 millisieverts (mSv), there
were 671 contract laborers against 36 regular employees. – “Those who received between 10 and 15 mSv were comprised of 220 contract
laborers and 2 regular workers, while 35 contract workers and no regular workers were exposed to a dose between 15 and 20 mSv”
• Post-crisis nuclear gypsy recruitment– More than 2,000 workers now onsite; – TEPCO planning to raise to 3,000– Recruited by construction company:
- jobs advertised for “10,000 yen for three hours work per day”• Paul Jobin, “Dying for TEPCO? Fukushima’s Nuclear Contract
Workers”, Japan Focus, http://www.japanfocus.org/-Paul-Jobin/3523
![Page 55: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/55.jpg)
55
6. Why did this happen?
• Levels of cause• immediate/proximate causes :
– Earthquake plus tsunami– Remediation efforts generating new problems (e.g.
contaminated water)• Immediate failures in risk assessment and management
– E.g. sea-wall height known to be inadequate since 2008– E.g. subsequent discovery of five active fault lines
immediately offshore
![Page 56: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/56.jpg)
56
Distant/ultimate causes
• Gradations of strength/salience• Japanese nuclear industrial regulation and safety
regimes• TEPCO as a repeat offender/rogue company
• Weakness of Japanese political structures
![Page 57: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/57.jpg)
57
7. What is the future of nuclear power in Japan?
![Page 58: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/58.jpg)
58
The forgotten side of Japan as a nuclear power: as many planned NPP as succeeded were abandoned due to widespread and long-lasting local opposition.
Source: courtesy Citizens Nuclear Information Centre, Tokyo
![Page 59: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/59.jpg)
59
Nuclear facilities: actual Nuclear projects abandoned
Source: CNIC, 原子力市民年鑑 2008 年
![Page 60: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/60.jpg)
60
Nuclear power plants in operation as of end-August
![Page 61: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/61.jpg)
61
Source: Japan's NPP Status before and after the earthquake as of August 29, 2011, Japan Atomic Industry Forum
6 months after Fukushima three-quarters of Japan’s nuclear power plants offline or shut-down
![Page 62: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/62.jpg)
62
Source: Japan's NPP Status before and after the earthquake as of August 29, 2011, Japan Atomic Industry Forum
Nuclear Power Plants in
operation, as of 4 September
2011
Hokkaido Electric Power
Tomari-3 Kashiwazaki Kariwa-1 Kashiwazaki Kariwa-5
Tokyo Electric Power (TEPCO)
Kashiwazaki Kariwa-6 Mihama-2 Takahama-2 Takahama-3
Kansai Electric Power
Ohi-2
Chugoku Electric Power
Shimane-2
Shikoku Electric Power Ikata-2 Genkai-1 Kyushu Electric Power Genkai-4
![Page 63: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/63.jpg)
63
Nuclear Power Plants in operation, as of 4 September, 2011
Hokkaido Electric Tomari-3
Tokyo Electric Power (TEPCO)
Kashiwazaki Kariwa-1
Kashiwazaki Kariwa-5
Kashiwazaki Kariwa-6
Kansai Electric Power
Mihama-2
Takahama-2
Takahama-3
Ohi-2
Chugoku Electric Power Shimane-2
Shikoku Electric Power Ikata-2
Kyushu Electric PowerGenkai-1
Genkai-4
Source: Japan's NPP Status before and after the earthquake as of August 29, 2011, Japan Atomic Industry Forum
![Page 64: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/64.jpg)
64
![Page 65: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/65.jpg)
65
Energy requirements and supply options
![Page 66: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/66.jpg)
66
What is the future of nuclear power in Japan?
• Expansion of output from remaining thermal and hydroplants.
• Note only 13 NPP online at present.
• Great success of energy conservation and efficiency measures in Tokyo and Tohoku
– E.g. TEPCO capacity fell from 64,000 MW to 56,400 MW; but peak summer demand has been 49,000MW
• Spotlight on utility regional monopolies and regional “islands”
• Alternative energy pathways:– Energy efficiency– Renewable energy– Distributed generation
• Note: all three require construction of smart grids
![Page 67: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/67.jpg)
67
The utilities as islands
![Page 68: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/68.jpg)
68
Smart grids
![Page 69: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/69.jpg)
69
Japan effects: nuclear power mortally wounded
• Nuclear politics in Japan– Grassroots opposition– Nuclear alliance - makers, utilities, METI, LDP/DJP– JAEC
• Revolt– Release of previously suppressed information
• Safety• Costs• spent fuel cul de sac
– Politicians will never again trust the nuclear alliance to keep them safe– Public trust
• likelihood of corruption revelations over Fukushima NPP I – design and construction and operation
– the failure of the plutonium project: Rokkasho reprocessing facility and the fast breeder reactors
– >> support for “once-through” NPP process as first step.– Non-nuclear energy producers
![Page 70: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/70.jpg)
70
The nuclear alliance, utilities nuclear manufacturers and the bureaucracy• TEPCO will be bankrupt before the clean-up is complete• Nationalisation as risk displacement onto tax-payers• The clean-up bonus for anyone by TEPCO
• Power companies as fiefdoms; • power grids as islands
• Industry restructuring:– Mitsubishi Heavy Industry and Hitachi nuclear division merger– MHI and other nuclear companies also reviewin non-nuclear divisions– Rapid expansion of solar industries.
• Export policies and possibilities after Fukushima– Japan in world nuclear industry competition
• The Jordan deal• The Vietnam deal
– Cf Korea– Cf France– Cf China– Russia
![Page 71: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/71.jpg)
71
Structure of nuclear safety regulation - pre-Fukushima
Source: Japan Nuclear Energy Safety Organization, Roles of the Nuclear and Industrial Safety Agency and the Nuclear Safety Commission
![Page 72: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/72.jpg)
72
Oversight process - - pre-
Fukushima
Source: Japan Nuclear Energy Safety Organization, Roles of the Nuclear and Industrial Safety Agency and the Nuclear Safety Commission
![Page 73: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/73.jpg)
73
Nuclear emergency response - on paper
Source: Japan Nuclear Energy Safety Organization, Roles of the Nuclear and Industrial Safety Agency and the Nuclear Safety Commission
![Page 74: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/74.jpg)
74
Oversight process - - pre-
Fukushima
Source: Japan Nuclear Energy Safety Organization, Roles of the Nuclear and Industrial Safety Agency and the Nuclear Safety Commission
![Page 75: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/75.jpg)
75
Regulatory changes
• Dismissal of senior METI and NISA personnel• Replacement of NISA• Cabinet ratification of reduction of role of nuclear
energy in national energy policy• Revision of costing procedures in comparative
evaluations of energy sources to include accident compensation, clean-up, and full decommissioning costs.
![Page 76: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/76.jpg)
76
Multiple investigations
PM Kan announced investigation principles and goals:• To abide by the three principles of independence, openness and
comprehensiveness.• the committee will:1. be independent of the existing nuclear administration. 2. release all its facts and findings to the public and the international
community, and 3. examine not just the accident’s technical aspects, but also the effect
of existing systems and institutional cultures in causing it.
Japan Atomic Energy Commission: • suspends deliberations on national Framework for Nuclear
Energy Policy• Demands accident investigations include 1) efforts to restore
control at Fukushima Daiichi, (2) efforts toward regional development, (3) investigations into the cause of the accident, (4) confirmations of safety, and (5) the release of information.
![Page 77: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/77.jpg)
77
Corruption, collusion and impunity in the nuclear state-corporate-scientific complex
• GE corruption and impunity in the original construction of Fukushima No. 1 BWRs Mk I and II
– Exim Bank indemnification required for nuclear export licence– Korean corruption experience with GE/Bechtel BWR import– Japan?
• TEPCO 2002 mea culpa over hundreds of unreported or mis-represented incidents– 2011: ongoing suppression of faults data– More information on suppression of design problems: sesimology
• Amakudari and Amaagari: the revolving door between bureaucracy, regulators and industry
• Four decades of intimidation of critics, including senior politicians• The Kan government as a break?
– ‘Kan said "the myth of the safety of nuclear energy" was prevalent among government and utility officials.’ (Japan Times, April 30, 2011)
![Page 78: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/78.jpg)
78Nuclear power plants - 2008 - CNIC
![Page 79: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/79.jpg)
79
Public opinion: April-August 2011, Mainichi Shimbun
Source: Updated Graphs - Public Opinion Survey by Japanese Mass Media (April – August, 2011), Japan Atomic Energy Forum, 23 August 2011
![Page 80: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/80.jpg)
80
Public opinion: April-August 2011
Source: Updated Graphs - Public Opinion Survey by Japanese Mass Media (April – August, 2011), Japan Atomic Energy Forum, 23 August 2011
![Page 81: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/81.jpg)
81
Available from:
http://www.nautilus.org/about/associates/richard-tanter/publications
Nautilus Institute early response reports on on Fukushima
![Page 82: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/82.jpg)
82
Real world alternative energy pathways
• Energy efficiency
• Renewable energy
• Distributed generation
![Page 83: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/83.jpg)
83
Corruption, collusion and impunity in the nuclear state-corporate-scientific complex
• GE corruption and impunity in the original construction of Fukushima No. 1 BWRs Mk I and II
– Exim Bank indemnification required for nuclear export licence– Korean corruption experience with GE/Bechtel BWR import– Japan?
• TEPCO 2002 mea culpa over hundreds of unreported or mis-represented incidents– 2011: ongoing suppression of faults data– More information on suppression of design problems: sesimology
• Amakudari and Amaagari: the revolving door between bureaucracy, regulators and industry
• Four decades of intimidation of critics, including senior politicians• The Kan government as a break?
– ‘Kan said "the myth of the safety of nuclear energy" was prevalent among government and utility officials.’ (Japan Times, April 30, 2011)
![Page 84: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/84.jpg)
84
Key questions for Japan
• Five key questions for Japan:
• Will serious liberalisation of nuclear energy production help?
• Are the utilities locked into nuclear trajectory?
• Are the nuclear manufacturers (Mitsubishi, Hitachi and Toshiba) locked into nuclear power?
• Can an elected government gain control of nuclear policy?
• Can an elected government force the abandonment of the plutonium economy?
• Can a Japanese government breakthrough politically to direct new energy policy?
![Page 85: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/85.jpg)
85
What does this mean for the rest of us?
![Page 86: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/86.jpg)
86
Collective international regulation for nuclear safety• Notice international responses from China, Korea and United States
– Very slow release of US data and imagery
• IAEA: Why so silent?
– Mission statement: conflict of interest:
• Promoting nuclear power
• Regulating nuclear power
– Capture by major nuclear states and public-private nuclear alliance
• IAEA lack of effective powers
• Liability regime limitations– The farce of the Convention on Nuclear Safety
![Page 87: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/87.jpg)
87
Convention on Nuclear Safety• Need for fundamental challenge to nuclear sovereignty embedded in
Convention on Nuclear Safety– CNS parties last week deferred Fukushima review meeting till
August 2012
• IAEA on the Convention:• “The Convention is an incentive instrument. It is not designed to ensure
fulfillment of obligations by Parties through control and sanction but is based on their common interest to achieve higher levels of safety which will be developed and promoted through regular meetings of the Parties. The Convention obliges Parties to submit reports on the implementation of their obligations for "peer review" at meetings of the Parties to be held at the IAEA. This mechanism is the main innovative and dynamic element of the Convention.”
– http://www-ns.iaea.org/conventions/nuclear-safety.asp
![Page 88: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/88.jpg)
88
Global civil society response ?
• Energy and climate change interconnection central:– Need for parallel and inter-linked responses
• No energy regime is without costs• Global public right to information and transparency
– Intelligence information access.• Rebuilding of transnational networks
![Page 89: Nuclear power in Japan: Fukushima and after](https://reader036.vdocuments.site/reader036/viewer/2022081516/56813fae550346895daa92ee/html5/thumbnails/89.jpg)
89
• EnerWebWatch's Special Nuclear Situation in Japan– http://www.enerwebwatch.eu/webwatch?page=EarthQuake&id=update17
• The Fukushima Project: SimplyInfo– http://www.simplyinfo.org/
• Andrew DeWit and Iida Tetsunari, The “Power Elite” and Environmental-Energy Policy in Japan, Asia-Pacific Journal/Japan Focus
– http://japanfocus.org/-Andrew-DeWit/3479
• After the Deluge: Short and Medium-term Impacts of the Reactor Damage Caused by the Japan Earthquake and Tsunami (co-author with David Von Hippel, Kae Takase and Peter Hayes), Special Report, Nautilus Institute for Security and Sustainability, March 17, 2011
– http://www.nautilus.org/about/staff/richard-tanter/publications
• The Path from Fukushima: Short and Medium-term Impacts of the Reactor Damage Caused by the Japan Earthquake and Tsunami on Japan’s Electricity System (contributing author with David Von Hippel, Kae Takase and Peter Hayes), Nautilus Institute for Security and Sustainability, April 11, 2011
– http://www.nautilus.org/about/staff/richard-tanter/publications
• TEPCO Country after Fukushima, Arena Magazine, June 2011 [footnoted version]– http://www.nautilus.org/about/staff/richard-tanter/publications