nuclear power development in europe: rosatom perspective · the content of this presentation is for...
TRANSCRIPT
ROSATOM
Platts 7th Annual European Nuclear Conference
June 25-26, 2012
London
Nuclear Power Development in Europe: Rosatom
perspective
Alexey Kalinin
Head, International Business, Rosatom
CEO, Rusatom Overseas
www.rosatom.ru
Despite the tragic Fukushima accident nuclear energy is expected to grow further
2030
598
652
2020
484
515
2010
374 374
2030
137
150
2020
118 120
2010
113 113
USA and Canada
6
4
6
4
2030
13 12
2020 2010
Latin America
22 22
2030
9,6 9,6
2020 2010
South Africa
2030
94
114
2020
106
114
2010
123 123
Western
Europe
2030
36 38
2020
33 32
2010
25 25
Central
Europe
2030
47 47
2020
34 34
2010
23 23
Russia
Installed capacity GWt, reference scenario
0 0
2030
16
18
2020
11
13
2010
Middle East and
North Africa
2030
51
66
2020
45
62
2010
47 47
4 4
2030
25 26
2020
17 19
2010
India
2030
15 17
2020
10 10
2010
5 5
South-East
Asia
2030
38 38
2020
30 30
2010
19 19
Korea
9 9
2030
120 120
2020
74 74
2010
China
World
Japan
Source: Rosatom 2
-6%
-8%
Rosatom’s scenario after Fukushima
Rosatom’s scenario before Fukushima
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru 3 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Stress-tests worldwide, mainly positive
All Russian designed reactors, including 37 VVER units operating outside Russia, successfully went
through stress-tests
Among those - 18 VVER units in EU
Rosatom active support and confidence in the results
No dramatic consequences for existing fleet
Russia
China Iran
Ukraine
Bulgaria
Czech
Republic
Slovakia
Hungary
Country Operating
Armenia 1
China 2
Iran 1
Russia 17
Ukraine 15
Bulgaria 2
Czech Republic 6
Finland 2
Hungary 4
Slovakia 4
TOTAL 54
VVER Global Fleet
Armenia
Finland
- VVER units
- VVER units in EU
Existing capacities
www.rosatom.ru
Ongoing NPP construction projects
More than 60 units construction still.
4 units under construction in EU (2 VVER).
10 units (all VVER) in neighboring countries are successfully on implementation track.
4
No significant impact on ongoing NPP construction projects implementation
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Mohovce 3-4 NPP (VVER-440)
Olkiluoto 3 NPP (EPR)
Flamanville 3 NPP (EPR)
Khmelnitsk 3-4 NPP (VVER-1000)
Belorussian 1-2 NPP (VVER-1200)
Akkuyu 1-4 NPP (VVER-1200)
Baltic 1-2 NPP (VVER-1200)
www.rosatom.ru 5
Country Plans for new build
Czech Republic 2 units of Temelin NPP. Bid process is underway.
+ 1 unit of Dukovany NPP
Finland Bid process for 2 units is underway
+1 unit under consideration
Hungary 2 units of Paks NPP. Tender to be announced in
2012
United Kingdom 15-20 GW
France 1 unit of Penly NPP.
Poland 6GW. First tender to be announced in 2012
Lithuania 1 unit of Visaginas NPP
Sweden New units construction replacing the old ones
Slovakia 1-2 units of Bohunice NPP
Bulgaria 1 unit of Kozloduy NPP
Romania 2 units of Cernavoda NPP
Slovenia 1 unit Krsko NPP under consideration
Netherlands 1-2 units under consideration
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Countries previously committed to nuclear new build remain optimistic on its
development. More than 50 GW new NPPs envisaged
Planned new build projects
- Planning new build
- Open tender
Russia
Finland
United
Kingdom
Lithuania
Poland Germany
Italy
Switzerland
Bulgaria
Romania
Czech R.
Slovenia
Slovakia
Hungary
Sweden
France
Netherlands
- Ban on new build
www.rosatom.ru
Financial crisis hits nuclear new build
6
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
UK
March 2012: RWE and E.On to sell its stakes in Horizon
CdF mechanism unclearness (EU regulation?)
2
Czech Republic
May 2012: CEZ intends to bring strategic investor to Temelin 3-4 NPP completion
project
3
France
May 2012: AREVA and EdF salaries cut
4
May 2012: Market info that rating agencies intend to downgrade any company
confirming commitment to NPP new build investments
5
June 2012: Moody’s downgraded major global banks
6
Hungary
November 2011: Moody’s downgraded Hungary (national debt raised up to 80% of
GDP)
1
www.rosatom.ru
Financial crisis is a fundamental challenge
7 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
And the industry should make itself ready to meet it
Implications for all:
www.rosatom.ru
Fully Integrated Nuclear Technology Company
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Uranium
production
Uranium
enrichment
Fuel
fabrication
NPP Design,
Engineering
and Construction
Electricity
generation Power equipment
manufacturing
Services and
modernization
8
Anniversary of
Russian Nuclear
Industry
2010
www.rosatom.ru
Rosatom Global Operations
Europe
Finland, Sweden, the Netherlands,
Belgium, Germany, France, Spain, GB,
Switzerland, Czech Republic, Slovakia,
Hungary, Lithuania, Bulgaria, Slovenia
North America
USA, Canada,
Mexico
Latin America
Venezuela, Argentina,
Brazil
CIS
Russia, Ukraine, Kazakhstan,
Belorussia, Armenia
Asia
China, Japan,
South Korea,
Vietnam, India,
Bangladesh,
Mongolia
MENA
Turkey, Libya,
Morocco, Algeria,
Egypt, Iran, Jordan
Australia
5 continents. More than 40 countries.
9
in uranium enrichment
in new NPPs construction
nuclear fleet globally, 25,2 GWe
installed capacity
in uranium deposits
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
leader in key segments
Africa
Namibia, South
Africa, Tanzania
www.rosatom.ru
Key figures - 2011
275 000 people Number of employees
Net income
Revenue
30 nuclear units Simultaneous implementation
10 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Rosatom is the responsible vendor ready to meet the challenges of the evolving market
11 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Rosatom
Integrated Solution
Energy Solution
Knowledge, skills,
human capital
Industrial
Solution
Financial
Solution
Regulation,
Infrastructure and
Public acceptance
Personnel education & training (incl.
traineeship on NPP sites),
R&D base development,
NPP operation experience exchange
BOO projects implementation;
State credits,
Partnership projects
NPP equipment manufacturing,
service & works localization,
Technology transfer,
Certification of local suppliers,
participation in Rosatom third
countries projects
Creation and development of
regulatory base
NFC facilities construction,
SNF & RW management,
Social-political programmes support
Modern NPP design (Gen III+)
NPP construction and life cycle management support
(fuel, services, modernization)
Operation & maintenance
- basic principle
www.rosatom.ru
Customized
solutions
for clients
individual
needs
Rosatom financial solution
12
Interstate
Financing
Strategic
Investors Equity financing
Low-risk equity financing after NPP launch
Dividend oriented portfolio investors
Russian
State
Banks
Project financing of up to 85% of Russian supply
State guarantees
Interest rate subsidies
Export
Credit
Agencies
Large debt financing related to the delivery amount
Guarantees for commercial credits for equipment supply
Institutional
Investors
Significant project share credit upon availability of state guarantees or suppliers guarantee
Equity financing
Loan guarantees
Competences in NPP construction and operation
Market
Financing 10-15% of the project debt
financing
Financial credit instruments, securities
Project surety bonds, risk sharing mechanisms
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru 13
• Project value – $ 20 bn.
• Implementation period – 2011-2021
• Legal basis – Intergovernmental Agreement of May 12, 2010
• Reactor design – NPP-2006 (VVER-1200)
• Total capacity – 4 800 MW (4 units)
• PPA period –15 years, fixed price terms
Project highlights
• First NPP project in Turkey
• Sound Russian and Turkish State encouragement
• Strong support to Turkey with regulatory system
establishment and personnel training
• The project is implemented in close cooperation
with Turkish partners, involvement of Turkish
suppliers mainly in civil construction
• International investors are welcome to join the
project with up to 49% Akkuyu SPV stake
Key parameters
Site – Akkuyu, province Mersin, Turkey
Turkey
Akkuyu is the first
Rosatom’ foreign NPP
project configured on BOO
principles
Akkuyu NPP project profile
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Thank You for Attention!
Alexey Kalinin
Head, International Business, Rosatom
CEO, Rusatom Overseas
E-mail: [email protected]
Phone: +7 (499) 949-25-37
14
www.rosatom.ru 16
Meets all current Russian and international safety
standards and the IAEA requirements
Widely referenced by utilities
EUR certified
Hurricanes, tornadoes
Earthquakes
Airplane crash
Tsunamis, floods
Protection from outer impacts
Rosatom Generation III+ NPP Design
Forefront of nuclear technology –
Generation 3+ reactor
Proven and mature solutions –
1400 reactor years of total
operating time
A high level of internal safety gained
through evolution of design
Most demanded capacity suitable
for various grid conditions – 1000-
1200 MWe
Long – run facility – design lifetime
of the main equipment: 60 years
High performing source of supply –
availability factor ≈ 92 %
What is VVER? (Water-Water Power Reactor)
Outside explosions
Snow load
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru 17
Nuclear Icebreaker Fleet - #1 nuclear fleet in the world
- Assures stable functioning of Northern Sea Route
Fast Reactors (Gen IV) - #1 fast neutron reactor in the world
- #1 operating fast neutron reactor in the world
- Broad development programme
Nuclear Innovation – Variety of Applications
Small and Medium Size Reactors - Variety of different designs with referent parameters
- #1 floating NPP in the world is being built
- #1 successful public-private partnership for developing SMR
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Radiation Technologies - Isotope production
- Nuclear medicine
- Irradiation facilities
www.rosatom.ru
More than 25% of revenue is
generated by overseas assets More than 50% of revenue
comes from global operations
Rosatom is among Top 3
nuclear companies
(by revenue in key segments)
18
Rosatom in 2020
Localize all business segments operations in key markets
Establish multiple alliances and partnerships with global and local players
Benefit from global talents and local workforce
Source, develop and transfer technologies to maintain global leadership
Take full advantage of global capital market
Ensure business transparency as a key operating standard
Key Actions
2020 Targets
Globalization of operations is the key priority
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru 19
Promotion of Rosatom global development is implemented by Rusatom Overseas
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Rosatom overseas NPP & RR new build projects development
Rosatom global marketing management and
marketing offices network development and operation
Key Activities of Rusatom Overseas
Management of Rosatom Globalization program