nss special access · railways, bridges, heritage, sports stadia and retail. 2. nss systems have...

34
NSS Special Access Design and installation of the world’s most innovative special access scaffolding systems

Upload: others

Post on 06-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

NSS Special AccessDesign and installation of the world’s most innovative special

access scaffolding systems

Page 2: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Unique capability in special access and protections systems in live environments.

z NSS has 50 years’ experience in innovation special access scaffolding systems.

z CEO, Colin Butt, founded the NSG group of access companies in 1971 which became the 5th largest scaffolding company in the UK.

z NSS has international clients in construction and civil engineering, military, power generation, aviation, railways, bridges, heritage, sports stadia and retail.

2

Page 3: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

NSS systems have addressed the world’s most challenging access problems

z Virtually eliminates the risk of falling components and loose materials.

z Provides a safe zone beneath the working area. z 10 times faster than conventional tube and fittings. z Most of the work is carried out at ground level prior to

lifting the beams into position. z Our manufacturing ability enables us to modify and add

to equipment very quickly.3

Page 4: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Marina Bay Sands Hotel Skypark, Singapore

Soffit access scaffolding erected 200m above ground.

4

Page 5: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Marina Bay Sands Hotel Skypark, Singapore

2.5m wide cantilevered platform that swivelled round the final radius.

5

Page 6: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Marina Bay Sands Retail Canopy, Singapore

Curved, tracked and stepped access platform, profiled to the glazing surface.

6

Page 7: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Marina Bay Sands Retail Canopy, Singapore

Rig built at ground level and winched into position.

7

Page 8: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Kings Cross Station,London, UK

Travelling, mobile special access system, 96m long with arched 37m span, suspended from the station roof on tracks for roof renovation.

8

Page 9: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Al Sadd Stadium,Doha, UAE

Lightweight, tracked mobile deck for soffit access, erected in just 5 days.

9

Page 10: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Al Sadd Stadium,Doha, UAE

Profiled, non-slip deck.

10

Page 11: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Expo Hall, Dubai, UAE

Tracked, mobile access platforms for reinstallation of essential services after a major fire, erected in 8 days.

11

Page 12: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Mirdiff Mall, Dubai, UAE

Tracked access scaffolding platform at high level for insulation of all services and ceiling soffit.

12

Page 13: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

NAS Arena, Dubai, UAE

Mobile access platforms.

13

Page 14: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Chek Lap Kok Airport,Hong Kong, China

Tie-arched, tracked 37m contoured span, for access to soffit panels.

14

Page 15: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Toyota, UK

Platform with ladder access.

15

Page 16: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Millfield School, Street, UK

Modular tracked special access platform for reglazing the roof of Millfield School’s Olympic-size swimming pool.

16

Page 17: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Marylebone Station, London, UK

Crash deck for re-roofing erected in 4 weeks.

17

Page 18: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Marylebone Station, London, UK

Crash deck covered with nonslip waterproof plywood for a clear, safe, and gap-proof platform.

18

Page 19: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Southport Station, UK

Access deck, completed in 20 working nights.

19

Page 20: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Southport Station, UK

20

Page 21: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Aberdeen Station, UK

Temporary, mobile roof, showing under-sheeting and lighting.

21

Page 22: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Aberdeen Station, UK

Rainwater was diverted along sheeting and guttering system to drains.

22

Page 23: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Tsing Ma, China

Mobile tracked suspended aluminium rigs 36m x 15m.

Providing access for 5m gap between sections.

23

Page 24: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Ting Kau, Hong Kong, China

2.5m wide, 27m span travelling platforms.

Cantilevered 10m from the existing tracking to the bridge parapet.

24

Page 25: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Saadiyat Bridge Abu Dhabi, UAE

27m span underslung scaffold deck to give access for concrete finishing of the bridge.

25

Page 26: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Dee Bridge Crossing

Tracked aluminium rig, cantilevered 3m on the underside to carry 700kg testing weight.

26

Page 27: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Metro, Dubai, UAE

Underslung access scaffolding deck for concrete Metro track finishing.

27

Page 28: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Metro, Dubai, UAE

28

Page 29: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Details of main bridge beam components.

29

Page 30: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Using additional end frames and plan diagonal brace frames form a box pair.

Stand a couple of frames up and connect them together with a clip in end frame.

Join the main frames together using spigots and self retaining pins.

u

w

v

30

Page 31: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Extend the box truss to the desired length with additional main frames, spigots, end frames and plan diagonal brace frames.

x

31

Page 32: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Add box trusses to the desired width and correctly space with end frames and plan diagonal brace frames for rigidity.

y

32

Page 33: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

Finally add deck panels and edge protection to complete the platform

z

33

Page 34: NSS Special Access · railways, bridges, heritage, sports stadia and retail. 2. NSS systems have addressed the world’s most challenging access problems z Virtually eliminates the

NSS Special Access LtdHead office: International House, Aviation Park, Flint Rd, Saltney Ferry, Cheshire CH4 0GZ, United Kingdom

+44 1244 533966Offices in the UK, UAE and Hong Kong

www.nssspecialaccess.com

Mr Colin Butt, [email protected]

+44 7802 277377

Mr Tony Doyle, General [email protected] +44 7976 108155