BHU BANESWAR DEVELOPMENT AUTHORITYBHUBANESWAR
DA, Bhubaneswar, ,n"p April,202tNoMisc-DP-9/88(pt)To
The Commissioner, BMC, BBSR
The Director of Town Planning, OdishaThe Addl, Digtrict Magistrate, BhubaneswarThe Chief Fire Officer. Cuttack or representative
Sub:-
The Chief Enqineer orRepresentative of. Public Health Enqineering Organization, Odisha
The Representative of Deptt, of Forest & Environment, Govt of Odisha
The Representative of Archaeological Survey of IndiaThe Representative of State Archaeology, OdishaThe Representative of Water Resources Deptt. Govt. of , Odisha
The Representative of Ground Water Survey & Investigation Organization(under Water Resources Deptt.) OdishaThe Representative of Works Deptt. Govt of Odisha
The Reptesentative of National Highway Authority of India (NHAI)The Representative of Electricity Distribution Company (DISCOMS). CESU
The Executive Officer/Representative of Khordha Municipality, Jatni Municipality
and Pipili NACThe CE-cum-Engineer Member, BDA. BBSR
The Sr. Municipal Planner, BMC
The Land Officer. G.A.& P.G. Deptt
Proceeding of the 236th DP&BP Committing meeting.
Sir/Madam,
Enclosed please find herewith the proceeding of the 236th DP&BP Committee
meeting held on 30.03.2021 at 10.30 A.M. in the 1st floor Conference Hall of
Bhubaneswar Development Authority for kind information and necessary action.
Yours faithfully,
Encl: As above.
t)
Memo No BDACopy along with copy of
Government, H & U.D. Department, & Chairman, BDA, Bhubaneswar for klndinformation.
, Dt /o /c7/ z1proceed(ng subn{itted to P.S. to Principal Secretary to
Memo No. l0) / I IBDA., il. /6Copy along with copy of proceedi
Memo No. 0Copy along with copy
BDA for kind information of
DA., Dt. 16/o 7 /7of proceeding forwardedV.C.
/ov/zhg fdnrua/ded
\t
to Sr. Steno to Vice-Chairman,
t )
to all officers Planning Branch,
D.C. Marandi, Investigatorthe proceedings in Guard
/S.O. Planning Branch/ All D.As. Planning Branch, BDA for information and necessaryactlon. They are requested to furnish the compliance to the proceedings pertaining totheir Division immediately
Memo No Ir n
Copy along copy of proceeding forwarded to Sri P.K. Pradhan, Manager, LT.BDA for information and necessary action. He is requested to upload the proceedings inthe BDA website immediately,
Plann
,r, /b/0v/ry
Memo No. /oHO .BDA Dt. /L /oy /2,Copy along *ith copy of proceeding iJn /arded to Sri
for information and necessary action. He is directed to keepFile maintained by him.
1a
n lv')
,-1
I
;
PROCEEDINGS OF THE 236TH D.P. & B.P. COMMITTEE MEETING HELD ON
DT.3O.O3.2O2L AT 10.30 AM IN THE CONFERENCE HALL OF BDA,BHUBANESWAR
(A) BMC RELATED MATTER
ItemNo.1
File No
xxxxxr(Planning cell)
03 20L7xxxxxr
(Planning cell)003 20t7
MBP-BMC.O2.oo72l2o2L
MBP.BMC-02.0060/2021
Subject Matter
Confirmation to the proceedings of theMeeting
Compliance to the proceedings of the 4Meeting
DP & BP Committee
DP & BP Committee
3 Approval for construction of Proposed LB+UB+G+3 StoriedShopping Mall (Commercial) Building over Plot No-132(P),Khata No-268, Mouza- Aiginia in favour of Sri. ChhabindraKumar Pradhan.
The committee approved the proposal subject to compliance of thefollowing:-
1. NOC from PHED towards water supply & sewerage.2. Recommendation towards fire-safety from Fire Prevention
Wing.3. Submit EIDP and deposit External Infrastructure
Development fee.4. The structural plan and structural design is to be vetted and
certified by the Civil Engineering Dept. of any GovernmentEngineering College located in Odisha.
5. Requisite no of recharging pits for Rain water harvesting to beprovided, internal roads shall be made of paver blocks andmicro compost plant shall be set up within the project area fordi of solid waste
Proposal for approval for 2B+S+11 Multi storied residentialapartment and 2B+G+9 storied commercial building overptot No-3 69lL94O 14889, 3691 L94O I 4892, 3691L94O I 489L,3691L94O14893, 3691t94O14894, 3691L94O14895,3691194014890, 3691238L Khata No- 474132L8,474132L8, 4741322Lt 47413220, 47413222, 4741568 inMouza-Patia in favour of Subrat Ku Acharya & Others.
The committee approved the proposal subject to compliance of thefollowing:- ;
1. Submission of revlsed building plan conforming to ODA (P&BS)Rule-2020 with respect to percentage of mixed use, parking,public washroom, Solid Waste Management etc.
2. Submit NOC from PHED towards water supply & sewerage.3. Recommendation towards fire-safety from Fire Prevention
Wing.4. Submit EIDP and deposit External Infrastructure
ment fee.
-t
I
?
t-2.
I
I
I
Ii
I
i
I
II4.
I
I
I
I
I
I
!I
i
i!
I
I
!
l
I
I
5.
6
MBP.BMC.O2-oo6Ll 2o2L
BPRUC.o24Ol2O2O
5. The structural plan and structural design is to be vettedcertified by IIT/NIT or any other Institute of GovernmentIndia or State Resource Centre identified by the Odisha StateDisaster Management Authority.
6. Requisite no. of recharging pits for Rain water harvesting to beprovided, internal roads shall be made of paver blocks and microcompost plant shall be set up within the project area for disposalof solid waste.
7. To purchase the FAR in excess of base FAR 2.0 and depositrequisite Shelter fee.
B. NOC from AAI to be submitted.9. Environment clearance to be obtained from SEIAA.10.Submit Patta of kisam Gharabari for the total project area and
en ement of PMO.
Proposal for approval for B+G+10 Multi storied commercialcum resedential building over Plot No-455, Khata No-1593/ L233 in Mouza-Laxmisagar in favour of Sanjay Ku.Pattnaik, Rajib Ku. Pattnaik and Manasi Pattnaik, GPAHolder M/s UTKAL BUILDERS, Ltd., represented by itsManaging Director Sharad Baid.
The committee approved the proposal subject to compliance of thefollowing:-
1. Submission of revised building plan conforming to ODA (P&BS)Rule-2020 with respect to percentage of mixed use, parking,public washroom, Solid Waste Management etc.
2. Submit NOC from PHED towards water supply & sewerage.3. Recommendation towards fire-safety from Fire Prevention
Wing.4. Submit EIDP and deposit External Infrastructure
Development fee.4. The structural plan and structural design is to be vetted and
certified by IiT/NIT or any other Institute of Government ofIndia or State Resource Centre identified by the Odisha StateDisaster Ma nagement Authority.
5. Requisite no of recharging pits for Rain water haruesting to beprovided, internal roads shall be made of paver blocks andmicro compost plant shall be set up within the project area fordisposal of solid waste.
6. To purchase the FAR in excess of base FAR 2.0 and depositrequisite Shelter fee.
7. NOC from AAI to be submitted.9. Submit Patta of kisam Gharabari for the total project area and
engagement q! PMO.
Regularisation of unauthorised construction of ExistingSingle, G+1 & G+2 Storied Institutional buildings over PlotNo-60, 62,66, 67,68t 69,73,75 ,76',77F7r50r289 and other,Khata No,95 in Mouza- Samantapuri, in favour of Sri.Bishnu Charan Sahoo, Controller of Administration CSIR-IMMT,BhubaneswarThe committee after detailed discussion observed that the totalproject area shall be verified on GIS base and the matter shall be
referred to G.A Dept., Government of Odisha for clearance.
2-
II
I
I
I
I
I
I
i
iI
II
-fu
BPRUC-LL7212020
MBP.BMC-02-o2o7l2o2o
MBP.BMC-02.oo57 I 2OL9
BPRUC-2221 2O2O
BPRUC-0381/2019
BPRUC-LO62l 2O2O
BPRUC-LL24l 2O2O
Regularisation of unauthorised construction of existing G+4& B+G+5 Storied Institutional building (Educational) overRevenue Plot No- 1(P) corresponding to IDCO Plot No.381L, Khata No.47411607 at Chandaka Industrial Estate inMouza-Patia , in favour of M/s Navodaya Trust, ChairmainSri Saroj Kumar Sahoo.The committee approved the proposal for regularization of existingbuilding subject to compliance of the following:-
1. Submission of fire-safety certificate from Fire Prevention Wing.2. The structural plan and structural design is to be vetted and
certified by the Civil Engineering Dept. of any Governmentneenn Col located in Odisha
Approval for proposed B+G+3 Storied Institutional buildingover Revenue Plot No.l(pt), Khata No.474lL6O7corresponding to IDCO plot no. 36 and 361L, Mouza-Patia,Chandaka Industrial Estate, in favour of M/S FutureFocus Initiative for Establishment of a Educational Institute(Schoo! with Vocational and Micro Industry PromotionCentre)rBhubaneswar.The committee approved the proposal subject to submission ofrecommendation towards fire-safety from Fire PreventionWing. A proposal shall be submitted to BDA for realignment of theproposed road in the Comprehensive Development Plan ofBhubaneswar Development Plan a rea
Approval for construction of Proposed S+3 CommercialBuilding Plan over Plot No-6781L67414677 & 67814676Khata No-1057/2666, Mouza-Govind Prasad in favour of SriKailash Chandra Jena.The committee approved the proposal subject to submission of
NOCs
Regularisation of unauthorised construction of existing G+2Storied Residential building over Plot No-1L4912L55, KhataNo-506/252 in Mouza- Pandara in favour of Sri.PravakarDas.
ApprovedRegularisation of unauthorised construction of existing G+1Storied Residential building over Plot No-7O613872, KhataNo-795/.3872 in Mouza- Sundarapada in favour of Sri.NiharRanjan Sur and Sri.Dukhiram Sur.
Regularisation of unauthorised construction of existingSingle Storied Residential building over Plot No-1L8712346,Khata No-606/494 in Mouza-Smt.Sumitra Sahoo.
Nakhara in favour of
Regularisation of unauthorised construction of existing G+1Storied Residential building over Plot No-1928, Khata No-1330/2985 in Mouza- Pandara in favour of Smt. AnnapurnaNayak.
8
10.
11.
L2.
iI
I
I
_i
13.
Approved
-3 -2
- .t 7..1
l
I
I
I
I
II
I
i
!
l
9.
I
II
I
I
I
I
I
I
II
I
I
r
iI
t-II
i
I
l
I
II
I'I
I
I
i
I
I
i
I
I
I
I
I
l
I
!
i
iI
iI
I
I
I
I
I
I
i
I
L4
15.
ANB-L9OO32| 2Ot9
Approval for proposed G+1 Storied Residential bu ildingPlot No-561946 Khata No-353/193 in Mouza- Nuagaonfavour of Mr.PradeeP Kumar Sahoo
BPRUC.LLO I 2O2O
ApprovedRegularisation of unauthorisedStoried Residential buildingKhata No-1330/7L93 in MouzaSabita Swain.
d
RegularisationGround Floor (N/3-163, Kha
construction of existing G+1over Plot No-L4L7 lL322O,- Pandara in favour of Smt.
16
t7
18
19.
2L,
BPRUC.os97 l2o2o
BPRUC.LLL4l2O2O
ANB-2OO524l 2O2O
of unauthorised construction of existingGodown) Commercial building over Plot No-rta No.1426/855 in Mouza- Jaydewihar, in
favour of Smt. Abha Chowdhury
Regularisation of una uthorised construction of existing G+2Storied Residential building over Plot No-1932/9493,Khata
in favour of Smt.No-1330/4063Debahuti Swain.
in Mouza- Pandara,
d
Approval for proposed G+1 StoriedPlot No-54L13557 Khata No-606/
Residential building over1543 in Mouza- Nakhara
ANB-2OO739 I 2O2O
in favour of Mrs,Minati Sahoo.
Proposal for approval of S+3 storied Institutional Buildingover Plot No-11U5, Drawing No-1025 in Mouza-Kharavelnagar in favour of Tiny Toys School Pre-PrimarySchool building (KINDER GARDEN) represented by itsPrincipal Smt. Rupasi Singdgo.
20 BPRUC.o22tl2o2o
ANB.200380/2O2O
The committee approved the proposal subject to compliance of the
following:-1. Submit NOC from PHED towards water supply & sewerage.
2. Recommendation towards fire-safety from Fire Prevention
Wing.3. Submit EIDP and deposit External Infrastructure
Development fee.
Regularisation of unauthorised construction of existing G+2Storied Residential building over Plot No-11441244O , tn
Mouza- Nakhara, in favour of Smt. Srimati Sumati Jena.
Approval for construction of Proposed S+3 StoriedCommercial (Retail Shop) Building over Plot No-145, KhataNo-7O711205, Mouza- Bhimpur in favour of Sri. DinabandhuMohapatra.
The committee approved the proposal subject to compliance of the
following:-1. Submit NOC from PHED towards water supply & sewerage.
4-
.q.|
Approved
Applgved
2. Recommendatlon towards fire-safety from Fire preventionWing.
3. NOC from AAI.4. Submit EIDP and deposit External Infrastructure
Development fee.
Regularisation of unauthorised construction of existing G+2Storied Storied Shop cum Residential Building over plot No-GA'l27rRevenue Plot No-470, Khata No-233 in Mouza-Bapujinagar, in favour of Mr Tapas Pattnaik & ManasPattnaik.
Apploved
Su matterConfirmation to the Proceedings of the 23DP&BP Committee.The committee confirmed the proceedings of 236th meeting ofDP and BP CommitteeCompliance to the Proceedings of the 236DP&BP Committee.NotedApproval of 6 nos of G+2 storied Residential buildingplan over 6 nos of sub-divided plots in Revenue plotbearing No.1110/3317, LLLOl2765 under KhataNo.512/804 & sLZl356 of Mz:Ghangapatna, includedin the BDPA but outside the CDP are in favour ofLalaManoranjan Singh, Director of M/sTissaSkyscrappersPvt.Ltd. (GPA Holder of Smt.NamitaMohanty and Sri Pradeepta Kumar Choudhury)
The committee observed that the existing road can bewidened to 200L0" by taking 100'-0" on either side of thecentre line of the existing road and accordingly the proposalmay be revised and approved leaving the land required for
dening of the existing road
Approval of S+3 storey Residential building plan overPlot No.1576Khata No.501Mz-Raghunathpurjali infavour of Royal Mahanagar Infrastructure andDevelopersAfter detailed discussion, committee approved the proposal inprinciple subject to the following:
(i). The project must adhere to all infrastructurerequirements as per NOC provisions of all linedepartments
(ii). Submission of NOC from CGWA/PHED.(iii). Submission of EIDP
22. BPRUC-0767 I 2O2O
B) BDA RELATED MATTER
Item Ng.L I 2361 BPC
File No.Misc.DP-e/88(pt)
21 236 I BPC Misc.DP-e/88(pt)
3l236lBPC BPBA-525/19
iwl'141236lBPC BPBA.
218s/18
-5-
iII
i
I
i
i
1
lI
i
I
i
I
I
i
I
l
i
I
'iII
I
IIII
I
I
I!
I
I
I
I
I
I
I
s I 236l BPC
61 2361 BPC
7 l236|BPC
Biswal
/-
) PW.LTD , MD Mr. Prafulla Kumar
(iv). Ail the passages around the building shdeveloped with permeable pavers blockabsorption of rain water and seepage in to the
waste
withinApprova! of one S+4 storey Residential Apartment
ground.(v)' Rain water harvesting structure and recharging pitsof adequate capacity shall be Oevetopei' to
minimize the storm water runoff to the drain(v')' Storm water shail be discharged up to the pubricdrain/ disposal point through own arrangement.(vii). Electricity shail be connected in consurtation withCESU.
(viii). The appricant shail make own arrangement of soridmanagement through micro compost plantthe project premises.---MBP4B-
3s361 L4
E-BPAS OnlineFile-8N8200203
E-BPAS OnlineFile-8N8200135
building over plot No.202 Khata No. 377 1285, Mouza-Kuha in favour of Satyapriyalayas ingh.After detailed discussion, committee a pproved the proposal inprinci ple subject to the following
(i) The project must adhere to all infrastructurerequirements as per NOC provisions of all linedepartmentsSubmission of NOC from CGWA/PHED.(ii)
(iii) Submission of EIDp(iv) All the passages around the buirding shail be
developed with permeable pavers block forabsorption of rain water and seepage in to theground.
(v) Rain water harvesting structure and recharging pitsof adequate capacity shall be developed tominimize the storm water runoff to the drain(vi) Storm water shail be discharged up to the pubricdrainl disposal point through own arrangement.(vii) Electricity shail be connected in consurtation with
. CESU.
(viii) The applicant shall make own arrangement of solidwaste management through micro compost plantwithin the project premises.
i
App roval of S+3 storied Res identia I Building plan overPlot No. B4lL69 and 84 1246, Khata No.55/100 &55/101, Mz-patasahan ipur in favour of MrsSulochanaSahoo.
Approval of B+S+4 , Office (Commercia !) Building ptanover Plot No. 2077, ZOT& & 207814508, KhataNo.729l1085 & Tzslzs5, Mouza -Raghunathpur infavor of Smt. Basantisahoo& Othe rs GPA Holder M/sMason Estate (India
I
I
I
I
I
iI
I
I
81 236 I BPC E-BPAS OnlineFile-8N8200150
i The committee approved the proposal in principle subject to
following(i)
(ii)( iii)(lv)(v)
The project must adhere to all infrastructure
requirements as per NOC provisions of all line
departments.Recommendations from Fire Prevention Wing.
Submission of NOC from CGWA/PHED.
Submission of EIDP
All the passages around the building shall be
developed with permeable pavers block for
absorption of rain water and seepage in to the
ground.
Rain water harvesting structure and recharging pits
of adeqr.late capacity shall be developed tominimize the storm water runoff to the drain
The applicant shall make own arrangement of solid
waste management through micro compost plant
within the project premises.
Electricity shall be connected in consultation with
CESU.
The applicant is to submit Parking plan covering all
provisions under Rule 37 of ODA (P & BS) Rules-
2020.
(vi)
(vii)
(viii)
(ix)
Approval of S+4 storey Residential APartmentBuilding plan over Plot No.250, Khata No.616/L296,Mz-Andilo(extended area of Bhubaneswar) in favourof Mr. Pradyumna Kumar Mohapatrarepresented byGPA holder Sri. Keshab Chandra Pradhan ManagingDirector of M/S OM SHREE INFRATECH PW.LTD.After detailed discussion, committee approved the proposal inprinciple subject to the following:
(i) The project must adhere to all infrastructure
requirements as per NOC provisions of all line
departments' (ii) Submission of NOC from CGWA/PHED.
(iii) Submission of EIDP
(iv) All the passages around the building shall be
developed with permeable pavers block for
absorption of rain water and seepage in to the
ground.(v) Rain water harvesting structure and recharging pits
of adequate capacity shall be developed tominimize the storm water runoff to the drain
(vi) Storm water shall be discharged up to the public
drain/ disposal point through own arrangement.
(vii) Electricity shall be connected in consultation with
CESU.
(viii) The applicant shall make own arrangement of solid
1-
I l
l
llI
II
i
I
I
I
I
I
II
I
iI
I
II
l
I
I
iI
I
I
i
I
I
l
I
I
I
I
i
I
i
I
I
.l
i
I
I
I
I
i
I
I
I
I
I
I
I
I
I
9l236lBPC
LOl236lBPC
E-BPAS onlinefile -
8NB190282
E-BPAS onlinefile-8N8200281
waste management through micro compostwithin the project premises.
(ix) The applicant is to submit Parking plan covering all
provisions under Rule 37 of ODA (P & BS) Rules-
2020.
Approval of S+4 storey Residential AppartmentBuilding plan over Plot No.752,753tKhata No.178, Mz'Gothapatana(extended area of Bhubaneswar)infavou r of SmtYag nyasen iSundarayAfter detailed discussion, committee approved the proposal inprinciple subject to the following:
(i) The project must adhere to all infrastructure
requirements as per NOC provisions of all line
depaftments(ii) Submission of NOC from CGWA/PHED.
(iii) Submission of EIDP
(iv) All the passages around the building shall be
developed with permeable pavers block forabsorption of rain water and seepage in to theground.
(v) Rain water harvesting structure and recharging pits
of adequate capacity shall be developed tominimize the storm water runoff to the drain
(vi) Storm water shall be discharged up to the public
drain/ disposal point through own arrangement.(vii) Electricity shall be connected in consultation with
CESU.
(viii) The applicant shall make own arrangement of solid
waste management through micro compost plant
within the project premises.
(ix) The applicant is to submit Parking plan covering all
provisions under Rule 37 of ODA (P & BS) Rules-
2020.
Approval of S+4 storied Residential Apartmentbgilding plan over plot No.- LO47l29l6,KhataNo.-5381143, Mouza Pradhansahi, in favour of Sri.Suvendu Das M/s Subha Construction and Developers.The committee approved the proposal in principle subject to
following.(r) Submission of NOC from CGWA/PHED.
(ii) Submission of EIDP
(iii) All the passages around the building shall be
developed with permeable pavers block for
absorption of rain water and seepage in to the
ground.(iv) Rain water harvesting structure and recharging pits
of adequate capacity shall be developed tominimize the storm water runoff to the drain.
licant shall make own arrangement of solid(v) The app
-B-
!
trl2s6lBPC
L2l236lBPC
L3l236lBPC
waste management through micro compost plant
within the project premises.
The applicant is to submit Parking plan covering all
provisions under Rule 37 of ODA (P & BS) Rules-
2020.The alignment of the proposed 200L0" extended
CDP Road shall be modified taking into account the
existing road alignment.The approach to the plot is through a private
kutcha road. The status of the road shall be
verified. The road shall be handed over to the
concerned Gram Panchayat.
Revised proposal for approval of 4 Block of 2B+S+23multistoried Residential Apartment building (MIGcategory) and one S+4 storied Club building over plotNo.372,3941L539, 392,398,3991L54, 542,etc andKhata No.428/48, 428127, 428150 etcMouza-Bomikha! in favour of M/s Shuvam Construction (P)Ltd, and M/s Attik Construction (P) Ltd, M/s BC
Constructions Sri Sanjeev Kumar Mishra, Sri SanjayKumar Mishra &Banalata Mishra represented throughM/s Shuvam Construction (P) Ltd, owner and GPAHolder, ShashipravaMohakhud, Jyoti PrakashBehera&Bijay Kumar Behera.Approved subject to compliance of the conditions specified inthe proceedings vide agenda item no.4l234lBPC of 234nDP&BP Committee.Regularization of the existing (28+G+4) retai! andcommercial Building (showroom, convention hall,hotel & Restaurant) over G.A. allotted plot No.170r171& tTOlA corresponding to Revenue plotNo.12201122L,L222,in favor of SmtPramilaSarangi
,smtLeenaChatarjee,Smt.SheenaRath through G.P.A
holders M/s Shuvam Construction (p) Ltd. Director Sri
Kantilal Patel.,MzBapuji Nagar, Bhubaneswar.After detailed discussion, committee approved the proposal in
principle subject to the following:(i). Submission of NOC from FPW before issuance of
occupancy certificate(ii). Submission of NOC from BMC
Regularization of the existing (B+S+4) Commercial(Lodging) Building over plot' No.1290 l L495,Mz AshokNagar, Bhubaneswar in favor of M/s ShuvamConstruction (p)Ltd. Represented, through its DirectorSri Kantilal Patel.After detailed discussion, committee approved the proposal inprinciple subject to the following:
(i). Submission of NOC from FPW before issuance ofoccupancy certificate
(vi)
(vii)
(viii)
BPBA-RV.289 I 20
BPRUC.L8421 20
BPRUC-t9o4l t9
I
I
l
I
I
I
i
l
II
I
i
II
I
I
I
I
II
i
I
I
I
1
I
lI
i
I
I
I
1
-7-
Ii
lI
I
I
I
l
I
I
i
1
I
I
I
I
I
I
I
l
i
I
I
W
L*l 4Jr, l ct?L
ts I 2361 BPC
t6l236lBPC
t7 l236lBPC
T PRUC-sO/19
BPRUC-s90/18
BPRUC.3OLl 20
LPBA-s26/19
Reg ularization of existing B+G+3 storiedhouse-cum-Residential buildi ng undertaken overNo.248l 2375 Khata No.474 l56l in Mouza- Patia ifavour of Sri pramod Kumar Sahoo&Saroj KumarSahooAfter detailed discussion, committee approved the proposal inprinciple subject to submission of N earances.Regularization of existingG+3 storied Residentialwith commercial bui lding undeftaken over plotNo.39O/2536 Khata No.616/1380 Mouza-Andilo(Extended area of Bhu baneswar) in favour of Mr.KhetramohanRana
Approved
Regula on of existing (B+S+6) library Buildingand existing (S+9) hostel Build ing Plan over plotNo.68,68/A16g/B,g1,gL I L,gLl B & 92 Revenue plot No32o13370(p),318/3370 & 318/3371 KhataNo.474l L6O7,Mz- patia in favour of R.N Das. (KIITSecretary).
After detailed discussiol,.gommittee approved the proposar rnprinciple subject to the following: 7t vltvr
(i). Submission of Noc from Fpw before issuance ofoccupancy certificate
(v) Rain water harvesting structure and recharging pitsof adequate capacity shall be developed tominimize the storm water runoff to the drain
(ii). Submission of structural vetting certificateApproval of sub-division ( lay-out plan) over Plot No.286 Khata No.100, in Mouza- Ranasinghpur in favourof Sri Pra nab Kumar Senapati through GpA hotder SriBishnu Prasad Rath., pa rtner Su nshine Infratech
After detailed discussion,.committee approved the proposar inprinciple subject to the following:(i) The project must ldhere to ail infrastructure
requirements as per NOC provisions of all linedepartments
(ii) Submission of EIDp(iii) Internar Road, area under community facirity and
open spaces shall be free gifted to concerned locarbody.
(iv) All the passages around the buirding shail bedeveloped with permeable pavers block forabsorption of rain ryater and seepage in to theground.
(vi) Drainage shall be dischargeddisposal point through own arra
up to the publicngement.
-10 -
L8l236lBPC LPBA-o2s6l 20
(vii) The applicant shall make own arrangement of solidwaste management through micro compost plantwithin the project premises.
Approval of subdivisional of lay-out PIan with 17 Nosof (G+2) residential Building and S+4 storiedresidential apartment Building over plotNo.356,353,351 Khata No.529/140,5291t49,M2matiapada (extended area of BBSR) in favour ofAmaresh Parida,GPA holder TriveniPa nigra h i& othersAfter detailed discussion, committee approved the proposal inprinciple subject to the following:
(i) The project must adhere to all infrastructurerequirements as per NOC provisions of all linedepartments
(ii) Submission of EIDP(iii) Submission of Waste Management Plan,
Construction & Demolition Plan, Landscape Plan
and Services Plan etc.(iv) Submission of Parking plan covering all provisions
under Rule 37 of ODA (P & BS) Rules- 2020. ,
(v) Internal Road, area under Community facilitv andopen space shall be free gifted to concerned local
body.(vi) Provision of cycle tracks to be given within the
premises connecting the approach road.(vii) Proper access to be given to the open space area.(viii) All the passages around the building shall be
developed with permeable pavers block forabsorption of rain water and seepage in to theground.
(ix) Rain water harvesting structure and recharging pits
of adequate capacity shall be developed tominimize the storm water runoff to the drain
(x) Drainage shall be discharged up to the public
(xi)
(xii)
(xiii)
(xiv)
disposal point through own arrangement.Electricity shall be connected in consultation withCESU.
The applicant shall make own arrangement of solidwaste management through micro compost plantwithin the project premises.
Provision of DUs for EWS/UG to be given or Shelterfee to be deposited in lieu of the same as perprovision of HFA Policy. ',
Provision of public washroom complexes are to beprovided and to be earmarked on site plan. Suchcomplexes shall be built as per the provisions ofRule No.- 50 of ODA (P & BS) Rules- 2020.
*//-
I
II
I
I
I
I
I
I
I
I
i
(xv) The alignment of the proposed 200'-0" extended
CDP Road shall be modified taking into account the.
\,;,
existing road alignment'
t9l236|BPC BPBA-1318/18
Approval of S+3 storeYplot No.48/1012 KhSaradeipur in favour ofApprovedRegularizationBuilding PlanMz.Jokalandi
Approval of G+1 storeYPIot No.L27617L38,
Commercial building Plan overata No.25L1527 in Mouza-ShantilataParida
20 l236|BPC BPRUC.32931 20
of existing G+2 storiedover Plot No.LO I 470rKhatain favour of Phanindra
ResidentialNo.9/440, inKumar Das
Mohapatra submitted under scheme for regularizationof Deviation/Unauthorized Construction,2019The committee decided that the construction made within the
approved plan shall remain as such within the road affected
area. Any unauthorized construction made within the affected
area can't be considered for compounding'However, if the applicant removes the unauthorized
construction within the affected area deviation other paft of
the buildi can be considered for ularization
2L I 2361 BPC
22l236lBPC
23l236|BPC
24l236|BPC BPRUC-oLzl L9
Approval of G+t storeYPlot No.3941992 &395Andilo in favour of Mr. SekhArif.
roved
Residential Building Plan overl99L Khata No.31U493 Mz-
Residential building Plan overKhata No.22351259 l4z'
2sl236lBPC BPBA.RV-87sl,.8
PatharaGadia in favour of Subash Chandra Pradhan'
Approved
Regularization of G+1 storied ShoP-cum-resid
building plan proposed over plot No'17\243,16\269
underkhataNo.S0/44,80/65Mouza-Nakhaurpatnainfavou r of Pa ra meswarMoha Patra.
Approved
Regularization of G+l storey Residential building Planover Plot No .64611168 SubPlot No.58, Khata
No.299/88, Mz-Saleswar (extended area ofBhubaneswar) in favourScheme for RegulariConstruction, 2019.
of Batabhadra Pal. Underzation of Unauthorized
ApprovedApproval of single storeY Residential Building Plan
over Plot No.1354/1593(S ub Plot No-18) Khata
No.328/92 Mz-JagannathPrasad,infavour iof
Smt.sunmun Panda.
BPBA.RV.7Ll L9
BPRUC.04941 L8
BPRUC.682120
Approved
-/2 -
1- .,
26l236lBPC BPRUC-
27l236|BPC
28l236lBPC
Regularization of G+2 storey Residential buildi ng1576 I 2019 constructed over Plot No,37 Khata No.255 29(SubPlot No.04) Mz-Botanda (extended area of
Bhubaneswar) in favor of Rajendra Kumar prusty andMamataPrusty submitted under ..Scheme forregularization of Unauthorizedl DeviationConstructionr20l,g"
BPRUC-15751 2OL9
Regularization of G+2 storey Residential buildingconstructed over plot No.37l9l3 Khata No.23U5g6(Sub Plot No.05) Mz-Botanda (extended area ofBhubaneswar) in favor of ManasRanjan das submittedunder "Scheme for regularization of Unauthorized/Deviation Construction,ZOLS"
ApprovedBPRUC-Ls79 I 2OL9
Approval of G+2 existiiover Plot No.37(p) SubMz-Botanda in favor of B
ng Residential Building planPlot No.10, Khata No.255/29hupendra Kumar Dhakad. ,
building planno-27012838,favor of
29l236|BPC
30 I 2361 BPC
3tl 2361 BPC
32l236lBPC
33l236lBPC
E-BPAS OnlineFile-8N8200109
E-BPAS OnlineFile-BNB20O123
E-BPAS OnlineFile-8N8200151
E-bpas online- 8N8200175
E-BPAS OnlineFile-BN8200185
No.- 378/ 9 23l 25 23 KhataBadaraghunathpurin
Approval of G+2 storey Residential build ing plan overHal Plot No.-856, Khata No.-535 and Mouza-Gothapatna, in favour of Smt. RenubalaKar
dApproval of G+2 storey Residential building plan overPlotNo.-9o9|2946,KhataNo.-616/1883,MouzaAndilo, in favour of Mr.Biswabhusan Karan&RumaliTripathy.
ApprovedApproval of G+lstoried ResidentialoverPlotMouza-
E-BPAS OnlineFile-8N8200193
Mrs.AsantiBehera.
A rovedApproval of G+1 storied Residential Building planover Plot No. 6019591406, Khata No.96/31g, Mz.Gelapur in favour of Ashok Kumar paul
AApproval of G+1 storied Residential building ptan overPlot no. -691420 & 691422, Khata no-B0l262 &801264, Mouza-Nakhaurpatna in favor ofSmt.BanajalataNayak.
Approval of single storied Residential buitding planover Revenue Plot No. -gl,1.l3SZS, Khata No.-384|LSL7, Mouza-UttarmundaMuhanin favor of Mr,rNanda Kishore Swain.
34l236lBPC
d
-/e -
I
I
I
I
I
I
I
Ii
I
1
i
I
i
I
I
L-
I
'riesidential BuiApproval of G+
iZu gotg I 43s8, Khata No'983/ 1
fAVOUT Of MUNNA KUMAR
lding207,
over Plot No.Mz-BenuPur in
I
!3sl236lBPc
Appl_o1e{
36l236lBPc E-BPAS OnlineFile-8N8200261
Approval of G+2sto rey Residen tiat UuitOing Plan over
Hal Plot No.-6a312779, Sub Plot no-13, KhataNo.-
6L6l 1688 and Mouza Andilo, in favour of
Mr.Sa ntosh Ku' Subudhi
37l236lBPC BPAS Online Approval of G+2 storeY Residen
File-8N8200279
Plot No.-860/ 2L85, Khata No'- 6tG1962, Mouza
Andilo, in favour of Mrs. SuPravaSahoo'
rprov€d
E-bpas onlineFile -8N8200243
\l
38l236lBPc E-bpas online-8N8200287
tiat Uuilaing Plan over
Approvalover PlotLingiPur inRefused
Approval of G+2 storeY Residential building Plan over7&18, Khata No.-
favour of Mrs.Plot No.-57LlLO 58, Sub-Plot No-1
2661L277, Mz AnantaPur, in
d
lpproval of G+1 storeYResidentia I building Plan over
Plot No.492l1035, Khata No.529/269 Mz-
MatiaPada2in favour of Mr. Naresh Kumar Matania
Approvedstoried Residential Bu ilding Plan
Approva I of G+1over Plot No. 24L, Khata No.165/ 4661 Mz-
KrushnaPurinfavour ofSUSANTA KUMAR PAL
PRASANTA KUMAR PAL &
Approval of ProPosed (G+ 1) Residenti al Building over
Revenue Plot No-224814420, Sub Plot No-A, Khata
No-648/ L428, Mouza-Jajarsinginfavour of Sri. Raja
Kishore Pal
rovedG+2 Residential Bui laing over Plot No.
ApprovalzLL1562, Khata No.231/ 205, Mz-Botanda in favour of
SUKANTA BEHERA
Approved
I of G+2 storey Residential building Plan over
oi C+r storied ResidentialNo. 133/3812, Khata No'7
favour of Mrs' SunandaNaYa
Building Plan3112239, Mz-k
39l236lBPc
40 l236lsPc
4L l236lBPC
42l236lBPC
E-BPAS OnlineFile-8N8200290
E-BPAS OnlineFile-8N8200319
E-bpas online
- 8N8200320
E. BPAS
Online File-8N8200324
E-bpas online
- 8N8200332
of43l236|BPC
E-BPAS Online Approva
File-8N8200333
Plot No i6071860, Sub Plot No.- 222, KhataNo.-
2991t57, MouzaSasmitaBarik.
-14
44l236lBPcSaleswar, in favour of Smt.
JitaliAParajitaBehera'
I
I
I
ri
I
4sl236|BPC E-BPAS OnlineFile-8N8200385
46l236lBPC E-BPAS OnlineFile-BN8200389
47l236|BPC E-BPAS OnlineFile-8N8200433
481 236 I BPC E-BPAS OnlineFile-8N8200434
4e l236lBPC E.BPAS OnlineFile-8N8210163
sol2s6lBPC E-BPAS OnlineFile-8N8210174
sLl236lBPC E-BPAS OnlineFile-8N8210145
szl236lBPC PLANNING07l2o
Approval of G+2storey Residential building plan overPlot No.-6521199L, KhataNo.-616174L, Mz - Andilo,in favour of Mr.Jagannath Nanda.
Approved
Approval of G+2 storey Residential building plan overPlot No.-555/3095 13328, KhataNo.-6L612497, Mz -Andilo, in favour of Mr.Saroj KumarSahoo&SupriyaSahoo.
Approved
Approval of G+2 storey Residential building plan overPlot No.63/1532lL686,Khata wo.SgZlr2LMz-Chhatabar(extended area of Bhubaneswar) in favourof Mrs. Kasturi Jena
Approval of G+2 storey Residential building plan overPlot No.63/1532lL694,Khata No.392/1Z9Mz-Chhatabar(extended area of Bhubaneswar) in favourof Mrs. RanushreeTarai
of S+2 Residential building plan overPlot No.-73l1135, KhataNo.-2991753, MouzaSateswar, in favour of Mr.RakeshSamat.
Approved
Approval of Proposed (S+2) Residential Building ofMr. Mahendra Kumar Senapati, Revenue PIot No-L34O14841, Sub Plot No-E, Khata No-526/2580,Mouza - M u ku nd pra sad, B h u ba neswa r, Dist- Khord ha.
ApprovedApproval of G+2storey Residential building plan overplot No.-L62l2247,KhataNo.-615/1031, MouzaAndilo, in favour of Smt. Krishna Nandy.
A rovedfssue of NOC in favour of Territora Manager, (Retail)Bhubaneswar, Bharat Petroleum Corporation Ltd foropening of a new Retail Outlet over PlotNo.546(p),574(p),548,549,550(p) Khata No.2333Mouza-Ghatikia, Tahsi!-Bhubaneswar PS-Kha nda giri Dist- Khu rda.
The committee deferred the proposal with the observationsthat the applicant shall revise the plan in confirmation withthe provisions of ODA (P&BS) Rules, 2020.
/5
t..I
I
I
Approved
s3l236lBPC E-BPAS OnlineFile-8N8210005
Approval of ProPosed Industrial Building over
s4l236lBPC BPBA.RN-22681 L8
IDCO Ptot No(s).- 29,42, 28lA-L to 28/A-3, 28lB td " \1't'
281D, 431 Ato 43lC & 431 D-1 to 43lD-3, Revenue PlotNo.-2291L639, Khata No.-560, Mouza-Chhatabar,Dist-Khurda in favour of M/S Excetlence Engimac Pvt.
Ltd., Director Mrs. Arati AgrawalRftei Oetail discussion committee decided to approve the
project subject to the following conditions:' i. Required Affidavits and Undertakings to be submitted.
ii. Required Noc with reference to provision of External
Infrastructure development from IDCO to be
submitted.
iii. Fire Safety Recommendation from Fire Prevention
Wing to be submitted.
iv. All open parking shall be constructed with permeable
materialandprovisionofrainwaterharvestingandgroundwaterrechargingshallbeprovidedforsuchparking area.
V'Provisionofpublicwashroomcomplexesaretobeprovided in addition to the other mandatory sanitary
requirementswithintheplotandtobeearmarkedonsite plan. Such complexes shall be built as per the
provisions of Rule No'- 50 of ODA (P & BS) Rules-
2020.
vi. Green Building norms regarding water conseruation
and management, solar energy utilization, energy
efficiency and waste management shall be mandatorily
provided as per Rule No.- 51 of ODA (P & BS) Rules-
2020.
vii. Rooftop solar Energy Installation shall be provided as
per Rule No.- 48 of ODA (P & BS) Rules- 2020'
viii. The applicant is to submit waste Management Plan,
Construction&DemolitionPlan,LandscapePlanandSeruices Plan etc.
ix. Parking plan covering all provisions under Rule 37 of
ODA (P & BS) Rules- 2020.
Regularization of existing construction of 16 blocks ofG+4 storied,L2 blocks of B+G+4 storied residentialBuilding and G+2 storied of Commercial Building overPlot No. 585, 505, 554,557,, 586, 581, 558, 552, 603,
583, 602,604,583 & 5841 761, Khata No. Khata No.
243, 225, L6L, LLB,97, L44, 27, L95, 22O J6,70 in
Mouza- GovindaPur in favour of Sri Debiduta Mishra
(MD),S.J Developers and housing (p) Ltd'
After detailed discussion, committee approved the proposal in
principle subject to the following:(i) The project must adhere to all infrastructure
requirements as per NOC provisions of all line
departments
-/6 *t
,
t:'(ii)(iii)(iv)
(v)
(vii)
Submission of NOC from CGWA/PHED.
Submission of NOC from FPW
All the passages around the building shall bedeveloped with permeable pavers block forabsorption of rain water and seepage in to theground,
Rain water harvesting structure and recharging pitsof adequate capacity shall be developed tominimize the storm water runoff to the drainStorm water shall be discharged up to the public
drainl disposal point through own arrangement.Electricity shall be connected in consultation withCESU.
(vi)
(viii) The applicant shall make own arrangement of solidwaste management through micro compost plantwithin the project premises.
(ix) Provision of cycle track within the premises
connecting to the approach road(x) The applicant is to submit Parking an.
VICE.C AN, BDA
-17 -
-0v