1 Traffic Engineering & Planning September 2018 NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY IMPROVEMENTS - BETWEEN PRINCE ST AND UNION ST -

Upload: others

Post on 16-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

1

Traffic Engineering & PlanningSeptember 2018

NORTHERN BLVD SAFETY, ACCESSIBILITY, AND

LIVABILITY IMPROVEMENTS

- BETWEEN PRINCE ST AND UNION ST -

Page 2: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot

OVERVIEW

• Previous Projects

• 2018 Northern Blvd Street Improvement

Project (SIP)

• 2018 SIP Implementation Schedule

2

Page 3: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 3

1PREVIOUS PROJECTS

Page 4: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 4

DOWNTOWN FLUSHING

MOBILITY AND SAFETY IMPROVEMENT PROJECT (2011)

Before

(3-Year Avg)

After

(3-Year Avg)

Change

(Percent)

Crashes with

Injuries31.3 20.1 -36%

Total

Injuries34.7 26.4 -24%

Pedestrian

Injuries13.7 9.8 -28%

Bicycle

Injuries2.3 0.3 -87%

Vehicle

Occupant

Injuries

18.7 16.3 -13%

• Along Northern Blvd between Prince St and Union St

Original Report & Before and After 3yr-Crash Comparison

Page 5: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot

MAIN ST SIDEWALK WIDENING CAPITAL PROGRAM (2017)

After

Before

23’ sidewalk24’ sidewalk

16’ sidewalk

16’ sidewalk

Page 6: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 6

DOWNTOWN FLUSHING

MOBILITY AND SAFETY IMPROVEMENT PROJECT

• The Downtown Flushing improvement project induced

the Main St sidewalk widening capital program. Both

projects substantially improved mobility and safety in

Downtown Flushing.

• 2018 Northern Blvd SIP plans to further enhance safety,

accessibility and livability for the community in the

downtown Flushing with concrete works, painted

markings and pedestrian signal installations.

Page 7: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 7

22018 NORTHERN BLVD

STREET IMPROVEMENT PROJECT (SIP)

Page 8: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 8

PROJECT PROCESS

Preliminary Site Visit with CB7 and CM Koo

Office

2017-2018 SIP Development

Design Plan

& Internal/ External

Coordination

2018 SIP Implementation

(Summer- fall 2018)

Future (2019 & 2020 SIPs)

Capital Project

Page 9: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 9

2018 NORTHERN BLVD SIP

Improvements

• Convert north and east crosswalks to high visibility at

Prince St.

• Provide new west crosswalk and pedestrian signal

from /to bridge at Prince St.

• Provide a concrete refuge island at east crosswalk at

Prince St.

• Provide new crosswalk and pedestrian signal at Main

St.

• Widen existing median and enhance pedestrian

safety at Prince and Union Sts.

• Modify signal timing at Main Street to

reduce/eliminate bus queues.

• Provide Split LPI(Leading Pedestrian Interval) signal

phase for crossing pedestrian at Union St. LPI

typically gives pedestrians a 3–7 second head start,

and enhance the visibility and right-of-way over

turning vehicles of pedestrians.

• Relocate a bus stop at southeast corner from

Northern Blvd to Union St.

Proposed

Page 10: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 10

PROPOSED IMPROVEMENTS (1)

Provide concrete refuge island and

widen center median

Page 11: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 11

PROPOSED IMPROVEMENTS (2)

Provide a crosswalk and

pedestrian signals

Page 12: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 12

PROPOSED IMPROVEMENTS (3)

Multiple pedestrian routes utilizing

median walkway

Page 13: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 13

PROPOSED IMPROVEMENTS (4)

Install crosswalk and pedestrian signal for

conflict free pedestrian crossings

Page 14: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 14

PROPOSED IMPROVEMENTS (5)

Provide temporary curb extension for pedestrian crossings

Page 15: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 15

PROPOSED IMPROVEMENTS (6)

Redesign center island and increase

signal timing for WB Northern Blvd buses

Page 16: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 16

PROPOSED IMPROVEMENTS (7)

Widen a west median, provide a split LPI phase and

relocate a bus stop (Q13 & Q28)

Page 17: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 17

32018 SIP IMPLEMENTATION SCHEDULE

Page 18: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 18

SCHEDULE

i. Transportation analysis/Data Collection/Engineering Review-

Winter/Spring 2018

ii. Stakeholder Briefing - Summer 2018

iii. Implementation – Summer through fall 2018

iv. Potential Capital Plan - TBD

Page 19: NORTHERN BLVD SAFETY, ACCESSIBILITY, AND LIVABILITY ......2018 SIP Implementation (Summer- fall 2018) Future (2019 & 2020 SIPs) Capital Project. nyc.gov/dot 9 2018 NORTHERN BLVD SIP

nyc.gov/dot 19

Questions?

THANK YOU!

NYC DOT NYC DOT nyc_dot NYC DOT