nomination form – part 2 - acce · acce\(i\)-l&t formwork award 2018. no.2, uvce alumni...

3
No.2, UVCE Alumni Association Building, K R Circle, Bangalore 560 001, INDIA. Telephone: +91-080-22247466 Website: www.acce.in 1 of 3 Pages Nomination Form – PART 2 CONSTRUCTION AND CONTRACTS), CHENNAI C. INCEPTED SINCE: 2001 D. PERIODICITY OF THE AWARD: ANNUAL E. NUMBER OF INIDIVIDUALS WHO HAVE BEEN CONFERRED THIS AWARD THUS FAR: F. General Criteria for selection for the Award: For this award, work executed using any material for formwork for any kind of structure will be considered, primarily focusing on innovativeness, economy, adaptability, ease of usage, repeatability, localization, indigenization, etc. The magnitude and volume of work executed shall not be a criterion for evaluation. The work designed should have been incorporated in the project and project shall not be more than 3 years old as on closing date of filing nomination. The criteria for selection for this award shall be based on the following by giving appropriate weightage for all/some of the following, the discretion for which shall rest with the jury duly constituted for the purpose: 1. Alternatives considered and the reasoning for the selection of the adapted system/design. 2. Innovativeness in the design of formwork. 3. Usage of unconventional support systems. 4. Effective usage of locally available material to achieve the desired results. 5. Effective usage of material and/or technology for cost saving/economy, including recycling/reuse of an existing material, without compromising on the quality of the finish. 6. Development of a new system resulting in patenting the same. 7. Effective development of forms and features without additional external intervention either for aesthetics or architectural requirements. 8. Development of additional skill set for the personnel deployed in the usage of the system. 9. Intrinsic knowledge enhancement because of the usage of the system for the personnel. 10. Ease of usage of the system in comparison with other considered alternatives. 11. Scalability of the locally available talent for the execution of the same. 12. Additional training required for the execution of the developed system. 13. Probable shortcomings identified in the design stage, for which the design was modified before execution. 14. Unlisted shortcomings experienced during execution, and the remedial measures initiated to overcome the same. 15. Development of an alternative to an existing patented system. A. SHORT TITLE OF THE AWARD: ACCE(I) – L & T FORMWORK AWARD 2018 B. INSTITUTED BY: LARSEN & TOUBRO LIMITED, ECC DIVISION (ENGINEERING

Upload: vuongdiep

Post on 21-Apr-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Nomination Form – PART 2 - ACCE · ACCE\(I\)-L&T FORMWORK AWARD 2018. No.2, UVCE Alumni Association Building, K R Circle, ... 21. System adopted, a development of an Individual

No.2, UVCE Alumni Association Building, K R Circle, Bangalore 560 001, INDIA.

Telephone: +91-080-22247466 Website: www.acce.in 1 of 3 Pages

Nomination Form – PART 2

CONSTRUCTION AND CONTRACTS), CHENNAI C. INCEPTED SINCE: 2001

D. PERIODICITY OF THE AWARD: ANNUAL

E. NUMBER OF INIDIVIDUALS WHO HAVE BEEN CONFERRED THIS AWARD THUS FAR:

F. General Criteria for selection for the Award:

For this award, work executed using any material for formwork for any kind of structure will be considered, primarily focusing on innovativeness, economy, adaptability, ease of usage, repeatability, localization, indigenization, etc.

The magnitude and volume of work executed shall not be a criterion for evaluation.

The work designed should have been incorporated in the project and project shall not be more than 3 years old as on closing date of filing nomination.

The criteria for selection for this award shall be based on the following by giving appropriate weightage for all/some of the following, the discretion for which shall rest with the jury duly constituted for the purpose:

1. Alternatives considered and the reasoning for the selection of the adapted system/design. 2. Innovativeness in the design of formwork. 3. Usage of unconventional support systems. 4. Effective usage of locally available material to achieve the desired results. 5. Effective usage of material and/or technology for cost saving/economy, including recycling/reuse of an existing

material, without compromising on the quality of the finish. 6. Development of a new system resulting in patenting the same. 7. Effective development of forms and features without additional external intervention either for aesthetics or

architectural requirements. 8. Development of additional skill set for the personnel deployed in the usage of the system. 9. Intrinsic knowledge enhancement because of the usage of the system for the personnel. 10. Ease of usage of the system in comparison with other considered alternatives. 11. Scalability of the locally available talent for the execution of the same. 12. Additional training required for the execution of the developed system. 13. Probable shortcomings identified in the design stage, for which the design was modified before execution. 14. Unlisted shortcomings experienced during execution, and the remedial measures initiated to overcome the

same. 15. Development of an alternative to an existing patented system.

A. SHORT TITLE OF THE AWARD: ACCE(I) – L & T FORMWORK AWARD 2018

B. INSTITUTED BY: LARSEN & TOUBRO LIMITED, ECC DIVISION (ENGINEERING

ajith tester
Typewritten text
ACCE(I)-L&T FORMWORK AWARD 2018
Page 2: Nomination Form – PART 2 - ACCE · ACCE\(I\)-L&T FORMWORK AWARD 2018. No.2, UVCE Alumni Association Building, K R Circle, ... 21. System adopted, a development of an Individual

No.2, UVCE Alumni Association Building, K R Circle, Bangalore 560 001, INDIA.

Telephone: +91-080-22247466 Website: www.acce.in 2 of 3 Pages

16. Enhancement of the number of repetitive cycles of usage in comparison with the existing systems. 17. Need for usage of any specialized equipment for the assembly and dismantling of the adapted system. 18. Has this system been tried/used earlier, upon which improvements have been incorporated for this project –

if yes, please provide details of the earlier attempts. 19. Recipient of any special recognition/awards earlier from other Organization/s. 20. Expression of willingness to share knowledge about this system, with the engineering fraternity for the

betterment of the community in particular and our Country in general. 21. System adopted, a development of an Individual or a team. Please provide details. 22. If the system was a collaborative effort by various stake holders, please provide details of all the entities

involved in the development of the system. 23. Desired finish been a result exclusively due the deployment of the system adapted, or was there a contribution

from the used material also. 24. Special materials/admixtures used in the development of Concrete for this work. 25. Submission of any other relevant information pertaining to the award.

G. NOTE:

1. Please attach this along with Nomination Application Form – Part 1. 2. Use separate sheets to give detailed explanations against each query. 3. Attach as many photographs as possible for better presentation and understanding. 4. Attachment of Video of the work being executed is also permitted. 5. Submit one Hard Copy of along with Soft copies - Five CD/DVD containing the same information as provided in the Hard copy. 6. Please adhere to the same sequence and format of presentation as listed below.

H. General information:

1. Name of the Applicant/Organization: ☐ 2. Name of the Project for which submission is being made: ☐ 3. Location of the Project: ☐ 4. Name of the Client: ☐

I. Award specific information:

1. Name/s of the Designer/s who designed the Formwork: ☐ 2. Name/s of the Contractor/s who executed the work: ☐ 3. List of all Sub-contractor/s associated with the execution of the formwork job: ☐ 4. Names of the personnel involved in the execution of the project at site: ☐ 5. Project specific requirements for the design of Formwork: ☐ 6. Salient design concepts which in your opinion had a major bearing on the formwork design:

a. Architectural: ☐ b. Structural: ☐ c. Execution: ☐

7. Materials used and the need for the choice of the specific material: ☐ 8. Scaffolding design – salient points:

a. Scaffolding system adapted: ☐ b. Sketches and photographs of the system proposed and adapted:

Page 3: Nomination Form – PART 2 - ACCE · ACCE\(I\)-L&T FORMWORK AWARD 2018. No.2, UVCE Alumni Association Building, K R Circle, ... 21. System adopted, a development of an Individual

No.2, UVCE Alumni Association Building, K R Circle, Bangalore 560 001, INDIA.

Telephone: +91-080-22247466 Website: www.acce.in 3 of 3 Pages

9. Brief about all the specialized equipment’s used the project – pertaining to formwork and shuttering: 10. Brief on the de-molding agents used, if any: 11. Description of the execution, handling and de-shuttering operations: 12. Type of Concrete used: 13. Type of finish intended: 14. Type of finish obtained: 15. Issues faced during execution, not considered for during design stage: 16. Was the choice of the type, system and intended finish help in better quality of finish and reduction in overall cost

of the project? If so, please elaborate: 17. Report/s on failure/s if any: 18. Action taken report on overcoming the shortcoming in either the design or execution: 19. References for such works having been carried out earlier elsewhere and anybody else: 20. Is it a patented system, or generic? 21. Was it conceptualized, designed, developed and executed in-house? 22. If the answer to the previous question is yes, is it being patented? 23. If it was a collaborative effort, the roles and accountability for the intended finish from each of the stake holders,

the names of the individuals who contributed for the same and the exact details of their role in the work executed. 24. Type and nature of concrete used to achieve the desired results. 25. Any other relevant information or features, which in your opinion would make this nomination the best suited for

the award.