noh dieselfuel drow

Upload: sam

Post on 07-Jul-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/18/2019 NOH DieselFuel Drow

    1/35

    Presented by:

    Mark Drow

    David Eoff

    DIESEL FUEL OIL SYSTEMS

  • 8/18/2019 NOH DieselFuel Drow

    2/35

    AGENDA

  • 8/18/2019 NOH DieselFuel Drow

    3/35

    MARK DROW

  • 8/18/2019 NOH DieselFuel Drow

    4/35

    DAVID EOFF

  • 8/18/2019 NOH DieselFuel Drow

    5/35

    ABOUT PREFERRED UTILITIES

    • Preferred Utilities: Fuel Oil Handling • Preferred Instruments: Boiler Controls • W.N. Best: Combustion Systems

    • Preferred Engineering: Nuclear Outage Support

  • 8/18/2019 NOH DieselFuel Drow

    6/35

    ABOVEGROUND VS. UNDERGROUND

  • 8/18/2019 NOH DieselFuel Drow

    7/35

    ABOVEGROUND OVERVIEW

    UL142 UL2085

  • 8/18/2019 NOH DieselFuel Drow

    8/35

    UNDERGROUND OVERVIEW

  • 8/18/2019 NOH DieselFuel Drow

    9/35

    HYPOTHETICAL PROJECT EXAMPLE

  • 8/18/2019 NOH DieselFuel Drow

    10/35

    FUEL LOAD CALCS: START HERE

  • 8/18/2019 NOH DieselFuel Drow

    11/35

    TRICK QUESTION

  • 8/18/2019 NOH DieselFuel Drow

    12/35

    OTHER FUEL LOAD CONSIDERATIONS

  • 8/18/2019 NOH DieselFuel Drow

    13/35

    DAY TANKS

  • 8/18/2019 NOH DieselFuel Drow

    14/35

    DAY TANK SIZE

  • 8/18/2019 NOH DieselFuel Drow

    15/35

    MULTIPLE DAY TANKS

    • If a pump set is supplying more than one day tank, a flowcontrol manifold (fill valve) will be required on each day tank.

    • If any tank calls for oil, the pumps are energized and theflow control manifold for that tank is opened.

    • Fill valves usually have a manual bypass.

    • Sometimes fill valves are motorized ball valves withopen/close limit switches.

    Sidenote: A similar strategy maybe used when returning fuel fromday tanks to multiple bulk storage

    tanks…

  • 8/18/2019 NOH DieselFuel Drow

    16/35

    CONTROL STRATEGY OVERVIEW

    Supply

    ReturnContainment

    High

    Pump stop

    Pump Star t

    Low

    Control Panel

    ContainmentLeak Detector

    • If a pump set is supplying more than one day tank, a flow control manifold (fill valve) will be required on eachday tank.

    • If any tank calls for oil, the pumps are energized and the flow control manifold for that tank is opened.

    • Fill valves usually have a manual bypass.• Sometimes fill valves are motorized ball valves with open/close limit switches.

  • 8/18/2019 NOH DieselFuel Drow

    17/35

    DAY TANK CONTROLS

  • 8/18/2019 NOH DieselFuel Drow

    18/35

    LEAK DETECTION

    LEAK DETECTION

    • Required in tank interstitial spaces.

    • Recommended in pump set leak basins.

    • Required in containment piping.

    • A good idea anywhere oil is likely to leak and accumulate.

    Note: NFPA code is mute on how many leak detectors are required in containment piping.

  • 8/18/2019 NOH DieselFuel Drow

    19/35

    PUMPS

    Pump Sizing Rule of Thumb: 4:1 ratio, or pumps running 25% of the time

  • 8/18/2019 NOH DieselFuel Drow

    20/35

    TYPICAL PIPING ARRANGEMENT

    Main Oil Tank

    Emerg. Gen.

    with RuptureBasin

    Day Tank

    Pump

    Supply

    Return

    Fill

    Vent

    Suction

    GENERATOR

    LOOP

    PUMPS SIZED FOR

    CONSUMPTION

    PLUS SAFETY

    FACTOR

  • 8/18/2019 NOH DieselFuel Drow

    21/35

    ALTERNATE PIPING ARRANGEMENT

    Main Oil Tank

    Emerg. Gen.

    with RuptureBasin

    Day Tank

    Pump

    Supply

    Return

    Fill

    Vent

    Suction

    PUMPS SIZED FOR

    PUMP RATE PLUS

    SAFETY FACTOR

  • 8/18/2019 NOH DieselFuel Drow

    22/35

  • 8/18/2019 NOH DieselFuel Drow

    23/35

    VALVES – OTHERS

  • 8/18/2019 NOH DieselFuel Drow

    24/35

    PLC CONTROLS

  • 8/18/2019 NOH DieselFuel Drow

    25/35

    ELIMINATE PROBLEMS BEFORE THEY HAPPEN

  • 8/18/2019 NOH DieselFuel Drow

    26/35

    GEN FLOW VS. CONSUMPTION

  • 8/18/2019 NOH DieselFuel Drow

    27/35

    HOT AREAS

  • 8/18/2019 NOH DieselFuel Drow

    28/35

    COLD AREAS

  • 8/18/2019 NOH DieselFuel Drow

    29/35

    FUEL FILTRATION

  • 8/18/2019 NOH DieselFuel Drow

    30/35

    PIPE SIZING

  • 8/18/2019 NOH DieselFuel Drow

    31/35

    SUCTION PIPING

  • 8/18/2019 NOH DieselFuel Drow

    32/35

  • 8/18/2019 NOH DieselFuel Drow

    33/35

    REMOTE FILL PORTS

  • 8/18/2019 NOH DieselFuel Drow

    34/35

    PUMC PIPE SIZING PROGRAM

  • 8/18/2019 NOH DieselFuel Drow

    35/35

    THANK YOU!