no child left behind (nclb) title programs 2012-2013
DESCRIPTION
No Child Left Behind (NCLB) Title Programs 2012-2013. Deer Park Independent School District. High Achievement of Students. Collaboration and Design of Effective Strategies. Appropriate Documentation for Use of Federal Funds. Goals for 2012-2013. - PowerPoint PPT PresentationTRANSCRIPT
No Child Left Behind (NCLB) Title Programs
2012-2013
Deer Park Independent School District
Goals for 2012-2013
Our Deer Park ISD Goals for 2012-2013 focus on the following elements:
• An increase in collaboration for the benefit of students• An adherence to the mandates of the Title Programs• A maintenance of documentation that supports the
implementation of effective programs and strategies
High Achievement of Students
Collaboration and Design of Effective Strategies
Appropriate Documentation for Use of Federal Funds
What are the Title Programs in our
District?• Title IA: Improving Academic
Achievement of the Disadvantaged• Title IIA: Teacher/Principal Training • Title IIIA: English Language
Acquisition
Title I, Part AImproving the Academic
Achievement of the Disadvantaged
• The purpose of this grant is to support the academic achievement of at-risk students.
• Title I funds can only be used on desig-nated Title I campuses.
Contact: Donna Yost 832-668-7124
How Does a Campus Qualify for the Title I Program?
• A campus qualifies for Title I
status if at least 35% of the students who reside in the campus attendance area participate in the Free/Reduced Meal Program.
Two Types of Title I Campuses:Targeted-Assisted - At least 35% of the students participate in the Free/Reduced Meal Program Schoolwide – At least 40% of the students participate in the Free/Reduced Meal Program
Major Difference Between Targeted-Assisted and Schoolwide Campuses:In a Targeted-Assisted Program, the funding can only be used on those students who are identified as “at-risk.” Detailed records on expenditures must be maintained per student group.In a Schoolwide Program, all students on that campus are considered to be “at risk,” therefore, the funding can be used for all students on that campus.
DPISD Campuses that have qualified for Federal Title I Funding: Bonnette Junior High
Carpenter ElementaryDabbs ElementaryDeepwater ElementaryDeepwater Junior High Early Childhood Center Parkwood ElementarySan Jacinto Elementary
At this time, all of our Title I Campuses are designated “schoolwide.”
Limitations on Expenditures
• Title I Campuses receive extra money to assure that the needs of “at risk” students are met.
• Title I, Part A funds must be used to “Supplement, not Supplant” funds which would ordinarily be provided by the district for all students.
• The expenditure of these funds must follow federal guidelines.
• Title I regulations require that all stakeholders, including administrators, teachers, and parents participate in developing the campus budget and that the budget is based on needs identified by the campus needs assessment.
Allowable Expenditures might be….
Unallowable Expenditures might be…
Leveled Books or Manipulatives
Sports Equipment
Teacher/Teacher Aide Salaries
Laminators
Teacher Training for Balanced Literacy
Chucky Cheese Field Trip
Extra Duty Pay for Tutorials
Needs Assessment• Written Comprehensive Needs Assessment –
Campus Level, then District Level – MUST BE COMPLETED IN THE SPRING
Priorities based on program evaluation data:• discipline data, • graduation rates, • dropout rates, • retention rates, • parent/staff/student survey results, • PBMAS results, • TAKS/TELPAS/AMAO results, • other local data sources
Title I regulations require that all stakeholders, including
administrators, teachers, and parents participate in developing the Need Assessment.
District/Campus Planning
Use the Comprehensive Needs Assessment Data to Develop:
• Campus and District Improvement Plans• Campus and District Parental Involvement
Policies• School-Parent Compact• Program and Budget Decisions• District will consult with Private, Non-Profit
Schools within district boundaries.
The planning documents are to be approved by the
appropriate stakeholders in the spring. This process
can be coordinated across local, state, and federal program requirements.
Program RequirementsTen (10) components of a schoolwide program:1) Comprehensive Needs Assessment2) Schoolwide Reform Strategies that use Effective Methods
and Instructional Strategies, that are based on scientifically-based research and include strategies to address needs of all children, especially at-risk; programs which include counseling, pupil and mentoring services which provide information on college and career choices
3) Instruction by Highly-Qualified (HQ) Teachers4) Provide High Quality and ongoing Professional Development5) Strategies to attract Highly-Qualified Teachers
Program Requirements Continued
6) Strategies to increase parental involvement7) Plans for transition from early childhood programs to
local elementary school programs8) Include teachers in decision-making regarding the
results of academic assessments to improve student achievement
9) Provide effective, timely, remedial instruction10) Coordination between federal, state, and local
services and programs
Consolidated Federal Application
• The application is to be discussed and approved by the appropriate stakeholders at a meeting in late May or early
June.• The application abstract for each of the Title programs must
reflect the priorities developed in the campus plans. • The application is completed and submitted to the Texas
Education Agency (TEA) by June 30, in order to continue expending funds for summer activities, including salaries.
• The Notice of Grant Award (NOGA) is the document which reflects the TEA’s approval of the district plan for expenditures and program objectives. The NOGA also notifies the district of the amounts approved for each of the Title programs.
How Does the District Determine the Distribution of
Title I Funds to Each School/Campus?
• The TEA allocates funds to the district based on a number of factors, including Children’s Health Insurance Program, Free/Reduced Meal Program, Medicaid, and other indicators of poverty. The district uses the Free/Reduced Meals count to allocate funds to the campuses, because this is the most uniform measure available to a school district.
• The share of Title I funding for each school is calculated by
dividing the amount of Title I funds available by the total number of low income students residing in the district to determine the per pupil allocation.
• The total entitlement for each campus is then determined
by multiplying the per pupil allocation by the number of eligible students.
How are Funds for Other Title Programs
Allocated?• Funds derived from Title IIA and
Title IIIA are available for use as needed on all campuses in the District.
School-Parent Partnership
• Program Implementation involves cooperative efforts between parents and the schools.
• Schools are bound by the federal guidelines to implement the activities which are set forth in the consolidated federal application.
Parent Involvement• Parents must sign the Parent-School
Compact.• Parents must be informed and involved
in all the planning processes.• Schools must document parent
conferences, planning sessions, meetings, workshops, program evaluations, and any other types of parent involvement.
Parent InvolvementContinued
• Proof of invitation—how and to whom sent• Sign-In Sheets with roles of attendees—
parent, teacher, principal, etc.• Agendas• Minutes of the Meeting(s)• All documents must be titled and dated at the
top.• All parent communication must be in an easily
understandable language and format.
Compliance Reports• The compliance reports provide a check of what was
actually done compared to what the district/campus(es) indicated they were going to do on the consolidated federal application.
• These compliance reports are due in the summer after the school year is completed.
• If the district has not complied, either in performance or submissions, the district could be placed into an intervention through the Performance-Based Monitoring Analysis System (PMBAS). This is not a good thing!!
• If the reports are late, the district will miss all ICR indicators, which will place the district into a serious stage of PBMAS intervention by TEA.
Title IIATeacher and Principal
Training and Recruitment (TPTR)
• The purpose of this grant is to improve teacher and administrator quality. These funds may also be used to reduce class size.
Contact: Donna Yost 832-668-7124
Title IIIAEnglish Language
Acquisition
• This grant provides funds for goods and services to support the English Language Learner. These funds are used for services not provided by the state mandated bilingual program.
Contact: Patricia DeLaCruz 823-668-7129
JUST DO THE RIGHT THING!!
Corey Green, NCLB Programs, TEA