NIE NETWORKS UPDATENMS User Group – 2020 - Austin
Aaron Watson
2 nienetworks.co.uk
Agenda
1. Company Introduction
2. The Project
3. Our Network Management System
4. NIE Networks’ Future Plans
User Group Update 2020
3 nienetworks.co.uk
Company
• NIE Networks owns the electricity transmission and distribution network in Northern Ireland
• Operates the distribution network
• Peak Demand ~1900MW
• Interconnection with Republic of Ireland (ESB) at 275kV and 110kV
• 880,000 customers
• 45,000 km of distribution network
• 86% of the HV distribution network is overhead
• 500MW DC Interconnector with Scotland
• Acquired by ESB group in 2010
User Group Update 2020
4 nienetworks.co.uk
The Project
User Group Update 2020
5 nienetworks.co.uk
New Control Desk Layout
User Group Update 2020
After
6 nienetworks.co.uk
The Pain of the Project
User Group Update 2020
Before
After
8 nienetworks.co.uk
Benefits
User Group Update 2020
Dispatch
• Dynamic CML Counts included per event line
• More customer detail sent to NMS
• Placeholders for Pro-active customer communications
• Cust Types added to NMS
• Reporting alignment
• Fuzzy call assignment to district
• Asset changes captured per fault
Control
• Further Safety Enhancements
• Improved Control Tool for switching operations
• New SCADA Pending Flag
• Better Management capabilities around DERs.
• Powerflow placeholders implemented
• Generation modelled correctly
• DERMS Dashboard Implemented
• Display micro generation on modelAll Users
• Authentication integrated with Corporate AD
• Improved model functionality
9 nienetworks.co.uk
Powerflow
User Group Update 2020
10 nienetworks.co.ukUser Group Update 2020
11 nienetworks.co.uk
Micro Generation
User Group Update 2020
12 nienetworks.co.uk
Lessons Learnt
• Make sure and bring the users with you during change
• Leverage your investment in your ‘enterprise solutions’
• More detail in some requirements could of reduced misunderstandings
• Project Resources & Staff Development
• Product Alignment/Product Scoping benefits
• Should have done FAT
• Testing task longer than expected
• Dependencies of GIS changes required
• Staff Communication & Training
• Go-Live Deadline
User Group Update 2020
13 nienetworks.co.uk
Our Network Management System
General:
• Is a Priority 1 and business critical IT system
• Core to the Network Operations dept.
Control:
• >148k Switching instructions issued via NMS in 2019
• All Planned and Fault HV switching action logged - Real time Network status
• Safety Management – Records all safety docs and Apparatus Operational Restrictions (AORs)
• Safety built into NMS control tool (Avg of 0.8 Switching incident a year)
Dispatch:
• All faults managed through the system
• Feeds other operations systems such as Fault Intranet
• Uses business rules to predict outage failures
User Group Update 2020
User Type Normal Storm
Control 6 10Dispatch 3 24View Only >80 >80
14 nienetworks.co.uk
110kV Network
User Group Update 2020
15 nienetworks.co.uk
33kV Meshed Overview
User Group Update 2020
16 nienetworks.co.uk
33kV Meshed Network
User Group Update 2020
17 nienetworks.co.uk
Line Styles
Normally Radial Abnormally Parallel
User Group Update 2020
18 nienetworks.co.uk
Line Styles
Feeder part of a parallel group running radially
User Group Update 2020
19 nienetworks.co.uk
Line Styles
Line styles and colours are passed from 33kV to 11kV bus
User Group Update 2020
20 nienetworks.co.uk
Line Styles
User Group Update 2020
Eart
hed
Safe
ty S
ecur
ed
De-
ener
gise
dIs
olat
ed
21 nienetworks.co.uk
Line Styles
User Group Update 2020
V1.11 V2.3
22 nienetworks.co.uk
Ring 11kV Substations
User Group Update 2020
23 nienetworks.co.uk
Control Tool
User Group Update 2020
24 nienetworks.co.uk
Switch Sheet & Aggregate Actions
User Group Update 2020
25 nienetworks.co.uk
Job based Extraction & Model Management
User Group Update 2020
26 nienetworks.co.uk
Job based Extraction & Model Management
User Group Update 2020
27 nienetworks.co.uk
Pain Points
Infrastructure/Setup
• Minimizing downtime
• Partitioning of the critical services from others
• More guidance on purging NMS tables
• Bandwidth required for remote clients
Interfaces
• More API adaptors for key processes (dispatching, Todo’s, reporting)
Application
• Web Callbacks limitations
• TopVal limitations (filtering & acknowledging correct)
• Inability to display Clues in Lookahead (e.g. Hazards)
• Managing documents,
• Patching problems (Deleting maps, Master devices)
• Impacted customers requires a study mode session
User Group Update 2020
28 nienetworks.co.uk
Future Plans
Continue working with Oracle on DSO functionality and enhancement requests
User Group Update 2020
Powerflow data load
Operational Mobile App & Service Alert
CNS replacement
Major interface upgrade•SCADA & ihost•HVCH
Version UpgradeCreate an LV ModelDERMSFault Location Analysis Pilot (FLA)
RP7
29 nienetworks.co.uk
Renewables connected since 2012
User Group Update 2020
30 nienetworks.co.uk
Generation Decentralisation
User Group Update 2020
31 nienetworks.co.uk
NIE Networks CVP
DERMS Enhancements
1. Ability to present Powerflow figures per generation type and demand for real and reactive power at Transmission and Distribution Boundary Points.
2. Ability for a pre-logged switching job to run Powerflow and identify any potential violations or warnings depending on expected weather for enhanced Outage Management planning
3. Ability to manage and provide services to the system operator (FFR, SFR, SSRP)
4. Ability to forecast all the above 4 days in advance.
5. Ability to have Active Network Management (ANM) control via NMS.
6. Ability to allocated capacity to customers to ensure no violations on the network.
User Group Update 2020
32 nienetworks.co.uk
Fast Frequency Response (FFR)
Tripping Tx for demand reduction
User Group Update 2020
33 nienetworks.co.uk
Slow Frequency Response
User Group Update 2020
QUESTIONS