NIE NETWORKS UPDATE NMS User Group – 2020 - Austin Aaron Watson

Upload: others

Post on 24-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

NIE NETWORKS UPDATENMS User Group – 2020 - Austin

Aaron Watson

Page 2: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

2 nienetworks.co.uk

Agenda

1. Company Introduction

2. The Project

3. Our Network Management System

4. NIE Networks’ Future Plans

User Group Update 2020

Page 3: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

3 nienetworks.co.uk

Company

• NIE Networks owns the electricity transmission and distribution network in Northern Ireland

• Operates the distribution network

• Peak Demand ~1900MW

• Interconnection with Republic of Ireland (ESB) at 275kV and 110kV

• 880,000 customers

• 45,000 km of distribution network

• 86% of the HV distribution network is overhead

• 500MW DC Interconnector with Scotland

• Acquired by ESB group in 2010

User Group Update 2020

Page 4: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

4 nienetworks.co.uk

The Project

User Group Update 2020

Page 5: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

5 nienetworks.co.uk

New Control Desk Layout

User Group Update 2020

After

Page 6: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

6 nienetworks.co.uk

The Pain of the Project

User Group Update 2020

Before

After

Page 7: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

8 nienetworks.co.uk

Benefits

User Group Update 2020

Dispatch

• Dynamic CML Counts included per event line

• More customer detail sent to NMS

• Placeholders for Pro-active customer communications

• Cust Types added to NMS

• Reporting alignment

• Fuzzy call assignment to district

• Asset changes captured per fault

Control

• Further Safety Enhancements

• Improved Control Tool for switching operations

• New SCADA Pending Flag

• Better Management capabilities around DERs.

• Powerflow placeholders implemented

• Generation modelled correctly

• DERMS Dashboard Implemented

• Display micro generation on modelAll Users

• Authentication integrated with Corporate AD

• Improved model functionality

Page 8: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

9 nienetworks.co.uk

Powerflow

User Group Update 2020

Page 9: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

10 nienetworks.co.ukUser Group Update 2020

Page 10: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

11 nienetworks.co.uk

Micro Generation

User Group Update 2020

Page 11: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

12 nienetworks.co.uk

Lessons Learnt

• Make sure and bring the users with you during change

• Leverage your investment in your ‘enterprise solutions’

• More detail in some requirements could of reduced misunderstandings

• Project Resources & Staff Development

• Product Alignment/Product Scoping benefits

• Should have done FAT

• Testing task longer than expected

• Dependencies of GIS changes required

• Staff Communication & Training

• Go-Live Deadline

User Group Update 2020

Page 12: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

13 nienetworks.co.uk

Our Network Management System

General:

• Is a Priority 1 and business critical IT system

• Core to the Network Operations dept.

Control:

• >148k Switching instructions issued via NMS in 2019

• All Planned and Fault HV switching action logged - Real time Network status

• Safety Management – Records all safety docs and Apparatus Operational Restrictions (AORs)

• Safety built into NMS control tool (Avg of 0.8 Switching incident a year)

Dispatch:

• All faults managed through the system

• Feeds other operations systems such as Fault Intranet

• Uses business rules to predict outage failures

User Group Update 2020

User Type Normal Storm

Control 6 10Dispatch 3 24View Only >80 >80

Page 13: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

14 nienetworks.co.uk

110kV Network

User Group Update 2020

Page 14: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

15 nienetworks.co.uk

33kV Meshed Overview

User Group Update 2020

Page 15: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

16 nienetworks.co.uk

33kV Meshed Network

User Group Update 2020

Page 16: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

17 nienetworks.co.uk

Line Styles

Normally Radial Abnormally Parallel

User Group Update 2020

Page 17: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

18 nienetworks.co.uk

Line Styles

Feeder part of a parallel group running radially

User Group Update 2020

Page 18: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

19 nienetworks.co.uk

Line Styles

Line styles and colours are passed from 33kV to 11kV bus

User Group Update 2020

Page 19: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

20 nienetworks.co.uk

Line Styles

User Group Update 2020

Eart

hed

Safe

ty S

ecur

ed

De-

ener

gise

dIs

olat

ed

Page 20: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

21 nienetworks.co.uk

Line Styles

User Group Update 2020

V1.11 V2.3

Page 21: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

22 nienetworks.co.uk

Ring 11kV Substations

User Group Update 2020

Page 22: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

23 nienetworks.co.uk

Control Tool

User Group Update 2020

Page 23: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

24 nienetworks.co.uk

Switch Sheet & Aggregate Actions

User Group Update 2020

Page 24: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

25 nienetworks.co.uk

Job based Extraction & Model Management

User Group Update 2020

Page 25: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

26 nienetworks.co.uk

Job based Extraction & Model Management

User Group Update 2020

Page 26: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

27 nienetworks.co.uk

Pain Points

Infrastructure/Setup

• Minimizing downtime

• Partitioning of the critical services from others

• More guidance on purging NMS tables

• Bandwidth required for remote clients

Interfaces

• More API adaptors for key processes (dispatching, Todo’s, reporting)

Application

• Web Callbacks limitations

• TopVal limitations (filtering & acknowledging correct)

• Inability to display Clues in Lookahead (e.g. Hazards)

• Managing documents,

• Patching problems (Deleting maps, Master devices)

• Impacted customers requires a study mode session

User Group Update 2020

Page 27: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

28 nienetworks.co.uk

Future Plans

Continue working with Oracle on DSO functionality and enhancement requests

User Group Update 2020

Powerflow data load

Operational Mobile App & Service Alert

CNS replacement

Major interface upgrade•SCADA & ihost•HVCH

Version UpgradeCreate an LV ModelDERMSFault Location Analysis Pilot (FLA)

RP7

Page 28: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

29 nienetworks.co.uk

Renewables connected since 2012

User Group Update 2020

Page 29: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

30 nienetworks.co.uk

Generation Decentralisation

User Group Update 2020

Page 30: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

31 nienetworks.co.uk

NIE Networks CVP

DERMS Enhancements

1. Ability to present Powerflow figures per generation type and demand for real and reactive power at Transmission and Distribution Boundary Points.

2. Ability for a pre-logged switching job to run Powerflow and identify any potential violations or warnings depending on expected weather for enhanced Outage Management planning

3. Ability to manage and provide services to the system operator (FFR, SFR, SSRP)

4. Ability to forecast all the above 4 days in advance.

5. Ability to have Active Network Management (ANM) control via NMS.

6. Ability to allocated capacity to customers to ensure no violations on the network.

User Group Update 2020

Page 31: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

32 nienetworks.co.uk

Fast Frequency Response (FFR)

Tripping Tx for demand reduction

User Group Update 2020

Page 32: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

33 nienetworks.co.uk

Slow Frequency Response

User Group Update 2020

Page 33: NMS User Group –2020 -Austin Aaron Watson...NMS User Group –2020 -Austin Aaron Watson 2 nienetworks.co.uk Agenda 1.Company Introduction 2.The Project 3.Our Network Management System

QUESTIONS