nir summer-fall 2011 bulletin

5
 SUMMER ± FALL 2011 BULLETIN Neighbors for Improved Roads Neighborsforim provedroads.wo rdpress.com 227-3770 Summer-Fall  2011  I HOPE THE WARM WEATHER BRINGS ALL OF YOU OUT TO MEET YOUR  NEIGHBORS!!! 

Upload: bonnieah

Post on 07-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

8/4/2019 Nir Summer-fall 2011 Bulletin

http://slidepdf.com/reader/full/nir-summer-fall-2011-bulletin 1/5 

SUMMER ± FALL 2011 BULLETIN

Neighbors for Improved RoadsNeighborsforimprovedroads.wordpress.com

227-3770

Summer-Fall

 2011 I HOPE THE WARM WEATHER BRINGS ALL OF YOU OUT TO MEET YOUR

 NEIGHBORS!!! 

8/4/2019 Nir Summer-fall 2011 Bulletin

http://slidepdf.com/reader/full/nir-summer-fall-2011-bulletin 2/52 

SUMMER - FALL 2011 BULLETIN

Neighbors for Improved RoadsNeighborsforimprovedroads.wordpress.com

227-3770

Hello Dear Neighbors! 

YOUR MAINTENANCE FEE OF $60.00 PER  Y EAR IS FOR GENERAL MAINTENANCEFORBOTH KRR AND PHASE 2.

Once again, without sounding monotonous, this is very important to ourNeighborhood for our roadsto be considered Good Roads.

Once again this is our Details for Road Phase 2:

YOU¶RE PATRONAGE AND THE GENEROUS DONATIONS FROM ALL OUR NEIGHBORS WILL HELP ENSURE THE START ANDCOMPLETION OF ROAD PHASE 2.

Without every ones help all we will be able to do is the maintenancfor KRR.  Please help with the continuation of our  ROADIMPROVEMENTS!!! 

Road Phase 2 Details

Starting at the end of Kings Ranch Road (KRR), we will go up West on Lane Ranch Road (LRR) 100correct water direction. LRR will be widened to 26¶ to match KRR. There will be a 24´ 40¶ culvert runnEast to West across the lower section of KRR to direct the water flow to LRR. At KRR and LRR there be a 36´ 40¶ culvert to move the water to South side of LRR.

New water gullies will be constructed down LRR to South Hutchinson Road (SHR) and continue down L100¶ to maintain the water flow.

Another double 36´ 40¶ culvert will be used across SHR west to east to transfer the water flow down the r

of LRR. Water gullies will go down both sides of SHR to East Mustang Trail (EMT).

All culverts will have entry and exit basins with rip rap and pans as was done on KRR.

The finished project will be covered with AB as a finish.

³HELP WANTED FOR PH ASE 2 W ORK´. A ny one who would be willing todonate their time, labor, or any t y pe of heav  y equipment to use for the PH ASE2 work would be greatl y appreciated!!

8/4/2019 Nir Summer-fall 2011 Bulletin

http://slidepdf.com/reader/full/nir-summer-fall-2011-bulletin 3/53 

SUMMER - FALL 2011 BULLETIN

Neighbors for Improved RoadsNeighborsforimprovedroads.wordpress.com

227-3770

PH ASE 2 DONORS and MAINTENANCE CONTRIBUTIONS:

 HONOR ROLLUpdate! 

Ra y Bouton& Barbara Ranieri Dave & Maril yn Coddington Nicholas& Maria Glamann Dan & BonnieHove y  & A nne Dolloff Austin Allshouse Jeanette & Thomas CanterJim Hazen Dan & Marge Randolph

Mr. & Mrs. Bruce Craig Charlie & Joan Greene

Bruce & Georgia McKellar Llo y d Trachten burgKevin Ta y lor & Julie Butler Don & Glenda D y erCaroline Frankl yn Mr. & Mrs. Leon Gordon Laurel & Jewell Bigelow Bill & Pat TurnerPatrick Brannas Tom Davis

James & Agnes Blang y  Gar y FossJack & Ingrid Dolson Beth Mallett & Ruben EscobedHope Wiltfong Bob & Corrine WellsKevin Quint Valerie RiceMarcia Nelson Dan & Kath y Van Vorst

Mar y Frances Clinton Paul & Jud y LaneerSteve Ho y t Tom PlunkettDiane Pashle y  Jim & Dianne Daughter y  James & Jacqueline Olson David & Ella ScottKen Whitcomb John & Paula Murph y  

Edgar McMahon Sam RidenourA ndrew & Jol ynn Farr David Madden & Mar y Guile (DesertHigh Stabl

Ga y le Slover

Thank you all so much for your generous contributions. You are true patrons and citizenIt is a pleasure to have so many fine folks as neighbors. 

8/4/2019 Nir Summer-fall 2011 Bulletin

http://slidepdf.com/reader/full/nir-summer-fall-2011-bulletin 4/54 

SUMMER - FALL 2011 BULLETIN

Neighbors for Improved RoadsNeighborsforimprovedroads.wordpress.com

227-3770

UPDATE ON OUR R O AD MAINTENANCE:

In Jul y  The Kings Ranch Road (KKR) maintenance Cost $380.00. Due to high traffic, monsoon season, high winds, and speeders the maintenance for KKR will be done ever y tw(2) months through the monsoon season. 

A special thanks to Ray Bouton for volunteering to drive the water truck and all thtime spent doing this for N.R.I.

Also, thanks to all the neighbors who helped with the sandbagging on the corner oJay Kay & KKR to avoid flooding from the Monument Fire. Approximately 1,000sandbags were used. 

³Engineer¶s Corner´ 

Please Take NOTE:

Monsoon Season is here!When it rains the roads get slippery! Please driveslow and cautiously!

Speed Kills Roads! After the road is graded and smoothed, don¶t forget to keeyour speed to 25 mph. The faster the speed the faster the road falls apart!This costs everyone money and it is irritating to drive on a rough road!

CAUTION!!

Sandbags are to prevent flooding from the Monument Fire!!

³SPECIAL ANNOUCEMENT´!!

Anyone living in the vicinity of the Samuel/Jay Kay intersection, the work tobe done on it will cost $800.00. ANY& ALL contributions to have this donewould be GREATLY APPRECIATED!!

SUMMER - FALL 2011 BULLETIN

8/4/2019 Nir Summer-fall 2011 Bulletin

http://slidepdf.com/reader/full/nir-summer-fall-2011-bulletin 5/55 

Neighbors for Improved Roads

Neighborsforimprovedroads.wordpress.com

227-3770

³Got questions or better still need to know where to send your checks?´ 

CALL: Charlie Greene

520-227-3770

MAKE CHECKS OUT TO:  N.I.R.

MAIL CHECKS TO: Charlie Greene

10810 S. Samuel Road

Palominas, AZ 85615 

CURRENT ROAD COMMITTEE MEMBERS: 

Charlie Greene, Treasurer Lloyd Trachtenberg

Don Dyer Bonnie Hovey, SecretaryValerie Rice

Without all our great neighbors help and donations, our road toda y would nhave been possible!!

 A great job well done!! 

 And Remember!

Your Support is our success!

Thank you!

N.I.R.