nfpa technical committee on fire hose nfpa 1961 ......nfpa technical committee on fire hose nfpa...

26
NFPA Technical Committee On Fire Hose NFPA 1961 Minutes Task Group Update Underwriters Laboratory November 15 th - 16 th 2016 Tuesday, November 15 th , 2016 Meeting called to order at 8:07 AM by Chairman Andrew Ellison. Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot and Dan Gorham of the Fire Protection Research Foundation. Jacqueline Wilmot passed around the Committee List and asked attendees to make any necessary corrections. Also passed around an attendance list and asked that attendees check off their names and asked that guests add their names. Attendees Andrew Ellison, Chair Jason Goodale, Secretary Jacqueline Wilmot, Staff Liaison Principals Bill Betz Toby Mathews Christopher Budzinski Michael Mayer Jonathan Cares David Quick Thomas Farruggia Marc Radecky Brian Fink Jason Riggenbach James Glatts John Stacey William Graves Tim Vanderlip Jeff Hebenstreit David Walsh Jayme Kahle Samuel Wu Duane Leonhardt Voting Alternates Stephen Jackson Nicholas Nava Alternates Jonathan Larrabee Guests Jesse Edwards, All American Hose Daniel Gorham, Fire Protection Research Foundation David Walsh, Boston Fire Department

Upload: others

Post on 06-Aug-2020

41 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

NFPA Technical Committee

On Fire Hose

NFPA 1961

Minutes – Task Group Update Underwriters Laboratory

November 15th - 16th 2016

Tuesday, November 15th, 2016

Meeting called to order at 8:07 AM by Chairman Andrew Ellison.

Introductions made by the Chair, committee members, NFPA Staff Liaison, Jacqueline Wilmot

and Dan Gorham of the Fire Protection Research Foundation.

Jacqueline Wilmot passed around the Committee List and asked attendees to make any necessary

corrections. Also passed around an attendance list and asked that attendees check off their names

and asked that guests add their names.

Attendees

Andrew Ellison, Chair

Jason Goodale, Secretary

Jacqueline Wilmot, Staff Liaison

Principals

Bill Betz Toby Mathews

Christopher Budzinski Michael Mayer

Jonathan Cares David Quick

Thomas Farruggia Marc Radecky

Brian Fink Jason Riggenbach

James Glatts John Stacey

William Graves Tim Vanderlip

Jeff Hebenstreit David Walsh

Jayme Kahle Samuel Wu

Duane Leonhardt

Voting Alternates

Stephen Jackson Nicholas Nava

Alternates

Jonathan Larrabee

Guests

Jesse Edwards, All American Hose

Daniel Gorham, Fire Protection Research Foundation

David Walsh, Boston Fire Department

Page 2: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

Motion and second to accept, the Previous Meeting Minutes from the Second Draft Meeting

(Denver, CO), succeeded.

Jacqueline Wilmot also reviewed the Annual 2018 Revision Cycle dates:

Final date for Second Draft meeting - 11/8/2017

Posting of Second draft and TC ballot - 12/20/2017

Final date for Ballot Return - 1/10/2018

Final Second Draft posted - 1/24/2018

Closing Date for Notice of Intent To Make a

Motion

- 2/21/2018

Issuance of Consent Document (if no NITMAMs) - 4/29/2018

NFPA Association Meeting - 6/4‐7/2018

Issuance of Document (if NITMAMs were

submitted)

- 8/14/2018

The following Task Groups were given 1 hour of time to break out into working groups to discuss

the status of the group.

a. Radiative Test Task Group

b. Conductive Test Task Group

c. Task Group on New Document Request – Guide for Selection of Fire Hose, Appliances &

Nozzles

d. Task Group on Combination of NFPA 1964/1965

e. Task Group on Education & Training Coordination Letter

f. Ultra-High Pressure Fire Hose Task Group

Task Group Chairs provided Task Group Reports to the Technical Committee.

a. Task Group on New Document Request – Guide for Selection of Fire Hose, Appliances &

Nozzles (Reported by Task Group Chair David Quick):

The purpose of this task group is to complete the new document request form and

letter to the NFPA Standards Council to demonstrate the need for a Guide for

Selection of Fire Hose, Appliances& Nozzles. The document request form and

letter was shared with the Technical Committee and comments made by

committee members were incorporated.

b. Task Group on the Combination of NFPA 1964 & 1965 (Reported by Jonathan Larrabee):

The purpose of this task group is to combine NFPA 1964 and NFPA 1965.NFPA

1965 will be incorporated into NFPA 1964 since the revision cycle for NFPA

1964 comes up first. A pdf of the combination of the documents was sent to the

committee members two weeks before this meeting to be reviewed. The first

revisions in NFPA 1964 are not included in the combination document, but will

Page 3: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

be if no second revisions are made to remove the first revisions. All other work

has been completed. A conference call is being scheduled for late January

2017/early February 2017. Task Group dismissed.

c. Task Group on the Education & Training Coordination Letter (Report by Bill Betz):

A letter has been developed and shared with the Technical Committee to be sent

to the Staff Liaison of other NFPA Technical Committees (NFPA 100, NFPA

1403, NFPA 1500, NFPA 1700, NFPA 1710, NFPA 1720, NFPA 1901) to make

them aware of the thermal resistance of fire hose and the current work by the

Technical Committee on Fire Hose. Task Group Members will submit public

inputs and public comments on related documents to address the general

comments of the letter. This task group will continue to work on submitting

public input of related documents and work with the staff liaisons of those

documents to determine the location of where the public inputs belong with the

various documents.

d. Task Group on Ultra-High Pressure Fire Hose (Reported by Jason Goodale):

The purpose of this task group is to develop language on ultra high pressure hose

to be incorporated into NFPA 1961. This task group will continue to work with

the NFPA Library to review older editions of NFPA 1961 to use the latest

language as a starting point.

e. Task Group on Conductive Test Methods (Reported by Nick Nava):

The purpose of this task group is to review existing conductive test methods to be

incorporated into NFPA 1961. This task group needs to determine if current fire

hose can be sent out and tested to BS 6391 to determine if it can pass this test.

The decision was made to use the current UL 19 hot block test method but at

higher starting temperatures. The Fire Protection Research Foundation can

provide some level of support to coordinate a “blind” study of manufacturers to

bring results back to the Technical Committee. A conference call will be

scheduled on December 12th to discuss updates.

f. Task Group on Radiative Test Methods (Reported by Tim Vanderlip and Michael Aubuchon via

phone)

The purpose of this task group is to develop radiative test methods to be incorporated

into NFPA 1961. Thus far, this task group reviewed NFPA 1971 & 1981, ATSM

documents, and ISO documents. The Technical Committee discussed the need to

consider a test method using hose pressurized with air vs. water due to capabilities of

testing laboratories. The advantages and disadvantages of using radiant heaters with

air-pressurized hose and crib-fire type exposure with water-pressurized hose were

thoroughly discussed. In the end, a straw poll determined there are more pros to

utilizing radiant panel test pressurized with air than cons compared to the discussed

crib test with fire hose being pressurized with water. This task group will request the

Research Foundation to perform a radiative panel test with a 3-foot section of hose

filled with air at 100 psi at 30kW/m2.

Page 4: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

An update on the Fire Protection Research Foundation Project titled: “Fire Fighter Equipment

Operational Environment: Evaluation of Thermal Conditions” was provided by Dan Gorham

Technical Committee took a break to observe a Fire Test by the UL Firefighter Safety Research

Institute.

Technical Committee reconvened and discussed the potential conductive and radiative test

methods.

Meeting adjourned at 4:35PM on 11/15/16.

Wednesday, November 16th, 2016

Meeting called to order at 8:00 AM by Chairman Andrew Ellison

Technical Committee witnessed fire hose tests 8:00AM-10:00AM

Debrief from Dan Madrzykowski, 10:00-10:30am

A discussion on the available timeline was held to determine if the Technical Committee has the

time and expertise to develop a repeatable and reproducible test method for NFPA 1961.

Monthly conference calls will be conducted to provide updates on the progress made by the

remaining task groups.

Next in-person meeting is scheduled for March/May of 2017.

Meeting adjourned at 1PM by Chairman Ellison.

Page 5: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR DISTRIBUTED WITHOUT

PERMISSION OF UNDERWRITERS LABORATORIES INC. UL and the UL logo are trademarks of UL LLC © 2016.

NFPA 1961

Radiant Heat Test Method

Development

November 15, 2016

Jeff Hebenstreit

Principal Engineer – Fire Suppression Products

Page 6: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Target Test Condition

Radiant Heat

• 30 kw/m2

Pressure

• 120 psi

Hose condition

• Pressurized with Water (flowing)

2

Page 7: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Determine Proper Fuel Load

Radiant Heat

• 30 kw/m2

Wood Cribs

• Various sizes commonly used

• Will cribs alone be adequate

Other ideas to increase heat flux

3

Page 8: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Wood Crib Specifications

– UL 711 for rating/testing fire extinguishers

4

Page 9: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Wood Crib Diagram

5

Page 10: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

1A Crib

6

Page 11: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

3A Crib

7

Page 12: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Determine Fuel Load for Target Heat Flux

1A crib & 3A Crib

• Cribs alone did not produce enough heat flux

Plume Diverter

• 1A Crib w Plume Diverter (OSB closet)

• Enough heat flux but not steady state

3A Crib with Plume Diverter

• More steady state

8

Page 13: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Hose #1 – Air Filled

9

Page 14: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Hose #1 – Air Filled

10

Page 15: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Radiant Heat Fire Hose Testing

11

Page 16: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Test Set Up

3A Crib with Plume Diverter

• Diverter – OSB lined with concrete board

Steady state burn after about after 3 min

• Holds steady state for 10 min

Hose approximately 2 ft away from crib

12

Page 17: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

3A with Cement Board Lined Diverter

13

Page 18: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

3A with Cement Board Lined Diverter

14

Page 19: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Hose #5 – Water Pressurized

15

Page 20: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Hose #5 - Water Pressurized

16

Page 21: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Hose #5 - Water Pressurized

17

Page 22: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.18

Page 23: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Post Test Hose

19

Page 24: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Live Demonstration

Heat Source

• 3A crib

• Plume Diverter Lined with Concrete Board

• Heptane Pan Ignition

• Achieve Steady State Burn / Heat Flux

• Hose – 2ft from Crib

Hose

• 10 ft length

• 1st hose – Filled with Air

• 2nd hose – Pressurized with Water

20

Page 25: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

COPYRIGHT © 2016 UL LLC. ALL RIGHTS RESERVED. THIS DOCUMENT MAY NOT BE REPRODUCED OR

DISTRIBUTED WITHOUT PERMISSION OF UNDERWRITERS LABORATORIES INC.

Research Staff

UL Firefighter Safety Research Institute

• Dan Madrzkowski

• Jack Regan

• Robin Zevotek

• Paul Courtney

• Keith Stakes

• Building 11 Crew

21

Page 26: NFPA Technical Committee On Fire Hose NFPA 1961 ......NFPA Technical Committee On Fire Hose NFPA 1961 Minutes – Task Group Update Underwriters Laboratory November 15th - 16th 2016

THANK YOU.