  • 8/12/2019 Newark Pavement Management Analysis

    1/21

    C I T Y O F N E W A R K , O H I O

    Results of Pavement

    Management Analysis

    The goal of the Pavement Management Systemis to give a reasonably accurate model of theroadway system, then identify strategies to

    maintain the system to the level decided uponby the owner.

  • 8/12/2019 Newark Pavement Management Analysis

    2/21

    Data Collection Activities

    Pavement Distress (Surface Condition)

    Pavement Roughness/SmoothnessAcceptance

    Overall Pavement Quality

  • 8/12/2019 Newark Pavement Management Analysis

    3/21

    Pavement Distress

    Surface Distress Index (SDI) by street section

    Surface Distress Rating System is a score that takesinto account:

    Patching (ACC)

    Rippling & Shoving

    Raveling & Streak

    Flushing & Bleeding

    Deformation & Distortions

    Excessive Crown

    Progressive Edge Cracking

    Alligator Cracking

    Potholes

    Map Cracking

    Longitudinal Cracking

    Transverse Cracks

    Wheel Track Rutting

  • 8/12/2019 Newark Pavement Management Analysis

    4/21

    Line Scan ImageScan of Pavement and its Defects

  • 8/12/2019 Newark Pavement Management Analysis

    5/21

    Digitized Scan of the Pavement

  • 8/12/2019 Newark Pavement Management Analysis

    6/21

    Overall Pavement Quality

    The Overall Pavement Quality can be defined bytaking into account the Distress and Roughness.

    Excellent representation of pavement condition

    to predict the performance accurately. Enhances the process of optimizing life cycle

    costs.

  • 8/12/2019 Newark Pavement Management Analysis

    7/21

    Pavement Deterioration and Life Cycle Costs

  • 8/12/2019 Newark Pavement Management Analysis

    8/21

    Pavement Life Cycle Curve

  • 8/12/2019 Newark Pavement Management Analysis

    9/21

    Understanding the PCI Score

  • 8/12/2019 Newark Pavement Management Analysis

    10/21

    Pavement Condition Index Score

  • 8/12/2019 Newark Pavement Management Analysis

    11/21

    Network Split by Functional Classification

  • 8/12/2019 Newark Pavement Management Analysis

    12/21

    PCI Distribution-Asphalt Network

    0

    5

    10

    15

    20

    25

    0 to 10 10 to 20 20 to 30 30 to 40 40 to 50 50 to 60 60 to 70 70 to 80 80 to 90 90 to 100

    PercentageofNetworkbyA

    rea

    Pavement Condition Index (0 to 100)

    Pavement Condition Index (PCI) DistributionAsphalt Network

  • 8/12/2019 Newark Pavement Management Analysis

    13/21

    PCI Distribution-All Streets

    0

    5

    10

    15

    20

    25

    0 to 10 10 to 20 20 to 30 30 to 40 40 to 50 50 to 60 60 to 70 70 to 80 80 to 90 90 to 100

    Percentag

    eofNetworkbyArea

    Pavement Condition Index (0 to 100)

    Pavement Condition Index (PCI) DistributionAll Streets

  • 8/12/2019 Newark Pavement Management Analysis

    14/21

    Pavement Condition Summary

    0

    5

    10

    15

    20

    25

    Very Poor (0 to 25) Poor (25 to 40) Marginal (40 to50)

    Fair (50 to 60) Good (60 to 70) Very Good (70 to85)

    Excellent (85 to100)

    PercentageofNetwork

    byArea

    Pavement Condition Index

    Pavement Condition SummaryUsing Descriptive Terms - All Streets

  • 8/12/2019 Newark Pavement Management Analysis

    15/21

    Year 5 Network PCI Analysis Results

  • 8/12/2019 Newark Pavement Management Analysis

    16/21

    5 Year Annual PCI

  • 8/12/2019 Newark Pavement Management Analysis

    17/21

    Asphalt Price Per Ton

    $0.00

    $10.00

    $20.00

    $30.00

    $40.00

    $50.00

    $60.00

    $70.00

    1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

    Price

    Per Ton

  • 8/12/2019 Newark Pavement Management Analysis

    18/21

    Overall Pavement Quality Analysis

  • 8/12/2019 Newark Pavement Management Analysis

    19/21

    Centerline Miles Paved Per Year

    9.

    1

    12.6

    7

    .9

    7.7

    12.

    7

    12.

    1

    6.

    0

    1.

    6

    6.

    6

    4.

    1

    3.

    7 4.

    8 5.

    7 6.

    4

    9.

    2

    13.

    7

    9.

    7

    8.

    3

    4.

    9

    4.

    8

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    1011

    12

    13

    14

    15

    16

    1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

    Non-ODOT Funded ODOT Funded

    Miles

  • 8/12/2019 Newark Pavement Management Analysis

    20/21

    Pavement Funding Sources

    CI, SGT, LPPT CDBT CI, SGT, LPPT CDBG

    Year CI, SGT, LPPT CDBG OPWC Local Match Local Match Federal-LCATS Total incl. Match Total incl. Match Funding Total

    1994 215,260.00$ 89,286.00$ 34,500.00$ 81,668.00$ 249,760.00$ 89,286.00$ 420,714.00$

    1995 350,444.00$ 119,458.00$ 74,750.00$ 245,981.00$ 425,194.00$ 119,458.00$ 790,633.00$

    1996 128,459.00$ 177,535.00$ 128,459.00$ 177,535.00$ 305,994.00$

    1997 55,779.00$ 342,643.00$ 55,779.00$ -$ 398,422.00$

    1998 407,074.00$ 130,189.00$ 220,301.00$ 318,000.00$ 627,375.00$ 130,189.00$ 1,075,564.00$

    1999 384,429.00$ 128,761.00$ 384,429.00$ 128,761.00$ 513,190.00$

    2000 219,479.00$ 87,671.00$ 219,479.00$ 87,671.00$ 307,150.00$

    2001 961,306.00$ 961,306.00$ -$ 961,306.00$

    2002 258,306.00$ 94,243.00$ 270,381.00$ 573,916.00$ 528,687.00$ 94,243.00$ 1,196,846.00$

    2003 201,879.00$ 211,883.00$ 170,358.00$ 413,762.00$ -$ 584,120.00$

    2004 383,311.00$ 287,827.00$ 185,537.00$ 671,138.00$ -$ 856,675.00$

    2005 453,955.00$ 287,309.00$ 612,378.00$ 741,264.00$ -$ 1,353,642.00$

    2006 626,970.00$ 87,689.00$ 626,970.00$ 87,689.00$ 714,659.00$

    2007 653,505.00$ 264,040.00$ 225,000.00$ 850,000.00$ 917,545.00$ 225,000.00$ 1,992,545.00$

    2008 920,385.00$ 65,581.00$ 498,404.00$ 920,385.00$ 65,581.00$ 1,484,370.00$

    2009 975,284.00$ 136,377.00$ 714,824.00$ 975,284.00$ 136,377.00$ 1,826,485.00$

    2010 1,103,615.00$ 25,000.00$ 534,760.00$ 1,103,615.00$ 25,000.00$ 1,663,375.00$

    2011 801,392.00$ 73,740.00$ 572,542.00$ 86,802.00$ 347,208.00$ 888,194.00$ 73,740.00$ 1,881,684.00$

    2012 620,462.00$ 820,337.00$ 750,000.00$ 1,440,799.00$ -$ 2,190,799.00$

    2013 748,246.00$ 76,000.00$ 457,224.00$ 350,000.00$ 1,205,470.00$ 76,000.00$ 1,631,470.00$

    2014 -$ -$ -$ -$

  • 8/12/2019 Newark Pavement Management Analysis

    21/21

    Pavement Funding Sources

    498,4

    04

    714,8

    24

    534,7

    60

    572,

    542

    425,

    194

    627,3

    75

    384,4

    29

    961,3

    06

    528,6

    87

    413,

    762

    671,

    138

    741,

    264

    626,

    970

    917,5

    45

    920,

    385

    975,2

    84

    1,

    103,6

    15

    888,

    194

    1,

    440,7

    99

    1

    ,205,4

    70

    24

    5,9

    81

    318,0

    00

    573,

    916 6

    12,

    378

    850,

    000

    347,2

    08

    750,

    000

    350,0

    00

    $200,000

    $300,000

    $400,000

    $500,000$600,000

    $700,000

    $800,000

    $900,000

    $1,000,000

    $1,100,000

    $1,200,000

    $1,300,000

    $1,400,000

    $1,500,000

    $1,600,000

    $1,700,000

    $1,800,000

    $1,900,000

    $2,000,000

    $2,100,000

    $2,200,000

    1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

    OPW TI,CI, SGT, LPT,& Match CDBG & Match LCATS