new shipbuilding project · pdf filenew shipbuilding project management navgathi marine...

16
NEW SHIPBUILDING PROJECT MANAGEMENT Navgathi Marine Design & Constructions Pvt. Ltd.

Upload: vuongdan

Post on 30-Jan-2018

229 views

Category:

Documents


6 download

TRANSCRIPT

NEW SHIPBUILDINGPROJECT MANAGEMENT

Navgathi Marine Design & Constructions Pvt. Ltd.

ABOUT US

• Three years young and growing fast

•Client interest as a primary driving force

•Handling prestigious projects like VLOO

• Blend of youth and experience

• Focus on developing innovative solutions

WHAT WE OFFER

•Concept Design of Ships

• Shipyard Assessment

•Contract Specification Analysis

• Plan Approval

•New Shipbuilding Supervision

CONCEPT DESIGN OF SHIPS

•Our Design team can conceptualize Clients ideas to a design for initial discussions

SHIPYARD ASSESSMENT

Analysis of

• Shipyard facilities,

•Quality standards,

• Track record

CONTRACT SPECIFICATION ANALYSIS

•Our Technical team, with New Shipbuilding and Operations experience,

can provide a detailed review on the contact specification

PLAN APPROVAL

• Key stage in Shipbuilding where it is

possible to incorporate Client standards

in to the project

•Our Technical team can execute approval

process

NEW SHIPBUILDING SUPERVISION

• Site team - Site manager, Hull,

Coating, Machinery, Electrical

•Naval Architects, Welding Engineers,

M a r i n e E n g i n e e r s , C h e m i c a l

Engineers, Electrical Engineers

•Nationality - Indian, Korean, or other nationality

CURRENT PROJECTSNine 320,000 TDW VLOO at Hyundai Heavy Industries, S.Korea

ParticularsParticulars

Length 340 m

Breadth 60 m

Depth 31 m

Draft 22.28 m

Deadweight 320,000 T

Speed 15.5 Kn

Holds Five center hold (Ore/Oil) + Ten wing tanks (Oil) + Ten wing tanks (Ballast)

Main Engine Hyundai Wartsila 7RT-FLEX 82 T 31,640 KW @ 80 rpm

Classification LR +100A1 ORE & OIL CARRIER, ESP, SHIPRIGHT (SDA,FDA, CM), LMC, UMS, IGS, COW, LI

CURRENT PROJECTS

Nine 320,000 TDW VLOO at Hyundai Heavy Industries, S.Korea

Four 37,000 TDW Bulk Carrier at Hyundai Mipo Dockyard, S.Korea

CURRENT PROJECTS

ParticularsParticulars

Length 186 m

Breadth 27.8 m

Depth 15.6 m

Draft 10.9 m

Deadweight 37,000 T

Speed 14.8 Kn

Holds Five center hold (Bulk) + Ten wing tanks (Ballast)

Main Engine Hyundai-B&W 6S46MC-C8 7,860 KW @ 129 rpm

Classification DNV +1A1, Bulk Carrier ESP, BC-A, Grab [20], CSR, E0, BIS, TMON, BWM-E(S), DG-B

CURRENT PROJECTS

Four 37,000 TDW Bulk Carrier at Hyundai Mipo Dockyard, S.Korea

Two 260,000 TDW VLOC at Hyundai Heavy Industries, S.Korea

CURRENT PROJECTS

ParticularsParticulars

Length 330 m

Breadth 57 m

Depth 26.5 m

Draft 18.8 m

Deadweight 2,63,000 T

Speed 14.9 Kn

Holds Five center hold (Bulk) + Ten wing tanks (Ballast)

Main Engine Hyundai-Wartsila 6RT FLEX 82T 27,120 KW @ 80 rpm

Classification LR +100A1, ORE CARRIER, ESP, SHIP RIGHT (SDA, FDA, CM), ACS(B), L1, IWS, LMC, UMS

Two 260,000 TDW VLOC at Hyundai Heavy Industries, S.Korea

CURRENT PROJECTS

PROJECTS STARTING NEXT YEAR

Two 80,000 TDW Bulk Carrier at Sungdong Shipyard, S.Korea

CONTACT

III/131, Kalamassery,

Kochi - 683104

India

T: +91-484-6492607, F: +91-484-2543609

P.K. Mohammad

E: [email protected]

M: +91-9497793296

TMT Site Office, Hyundai Heavy Industries,

Ulsan - 682792

S.Korea

T: +82-52-250-6730

Sandith Thandasherry

E: [email protected]

M: +82-1091450692

Navgathi Marine Design & Constructions Pvt.

E: [email protected]

W: www.navgathi.com