new letter

1
LUCKY CEMENT LIMITED A YUNUS BROTHERS PROJECT INTER OFFICE MEMO Inter Office Memo To: - D.G.M. (Supply Chain) Date: - 04/11/2015 From:- S.D.G.M (Plant) Ref:- LCL/MECH-1/388 Subject :- Site visit of Gresham’s Team at LCL Kindly arrange site visit of Gresham’s Team to LCL to determine all the (capacity of boiler, pressure in lines, waste & steam lines etc.). Prerequisites for installation of boiler for stem generation. The purpose of boiler will be to keep furnace oil pipe lines warm in winter season to avoid dogging. Best regards, __________________ ________ MANAGER (Mech-Mills-01) ________________ Sr.D.G.M. (PLANT) ____________________ __ DIRECTOR OPERATION

Upload: salman-saleem

Post on 29-Jan-2016

213 views

Category:

Documents


0 download

DESCRIPTION

good letter

TRANSCRIPT

Page 1: New Letter

LUCKY CEMENT LIMITEDA YUNUS BROTHERS PROJECT

INTER OFFICE MEMO

Inter Office MemoTo: - D.G.M. (Supply Chain) Date: - 04/11/2015

From:- S.D.G.M (Plant) Ref:- LCL/MECH-1/388

Subject:-

Site visit of Gresham’s Team at LCL

Kindly arrange site visit of Gresham’s Team to LCL to determine all the (capacity of boiler, pressure in lines, waste & steam lines etc.). Prerequisites for installation of boiler for stem generation. The purpose of boiler will be to keep furnace oil pipe lines warm in winter season to avoid dogging.

Best regards,

__________________________ MANAGER (Mech-Mills-01)

________________ Sr.D.G.M.

(PLANT)

______________________DIRECTOR

OPERATION