65% PUBLIC MEETING PRESENTATION NEW HOPE CHURCH ROAD FROM GREEN ROAD TO DEANA LANE Prepared by: Ramey Kemp & Associates November 29 th , 2017

Upload: others

Post on 03-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

65% PUBLIC MEETING PRESENTATION

NEW HOPE CHURCH ROADFROM GREEN ROAD TO DEANA LANE

Prepared by: Ramey Kemp & AssociatesNovember 29th, 2017

Page 2: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

New Hope Church RoadProject Location

NEW HOPE CHURCH ROAD

Page 3: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

New Hope Church RoadPurpose of Project

NEW HOPE CHURCH ROAD

• Widen to add bike lanes in each direction.• Add sidewalks and ramps within project limits.

• Evaluate and replace culvert.• Increase curve radii and correct superelevation in

curve.• Infill sidewalk along the north side of Deana Lane

Page 4: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

New Hope Church RoadProject Challenges

NEW HOPE CHURCH ROAD

• Impacts to Parking Lots and Driveways• Culvert crossing• Underground utility and waterline impacts

Page 5: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

New Hope Church RoadExisting Conditions (New Hope Church Road – looking east)

NEW HOPE CHURCH ROAD

Page 6: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

New Hope Church RoadExisting Conditions (Deana Lane - looking west)

NEW HOPE CHURCH ROAD

Page 7: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

NEW HOPE CHURCH ROAD

Existing New Hope Church Road Looking West

Proposed Lane ConfigurationLooking West

Page 8: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

Typical Section – Two Lane Undivided

NEW HOPE CHURCH ROAD

Page 9: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

New Hope Church RoadCulvert Replacement

• Existing 60” Cross Pipes to be Replaced with 14’ x 6’ Concrete Box

Culvert

NEW HOPE CHURCH ROAD

Existing Cross PipesProposed Box culvert Replacement

Page 10: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

New Hope Church RoadTraffic Management During Construction

NEW HOPE CHURCH ROAD

OBJECTIVES

•Minimize impact to the local residents and commuter traffic.

•Lane closures will be utilized during construction of the culvert when applicable.

•A full road closure will be utilized to install the proposed culvert under the existing pavement location. A detour route will be provided during this time.

Page 11: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

New Hope Church RoadLandscape Treatment

NEW HOPE CHURCH ROAD

OBJECTIVES

•Low Maintenance

•Native and Adaptive Selections

•Provide Streetscape Visual Relief

•Provide Adequate Sight Distance

•Provide Utility Avoidance and Street Light Clearance

•Provide Overhead Clearance Above Walks

SERVICEBERRY

(WOODLAND EDGE ACCENTS)

BALD CYPRESS

(SECONDARY STREET TREE)

BLACK GUM (ACCENT

TREES) MAGNOLIA

(OPEN AREA ACCENTS)

MIAMI CRAPE MYRTLE

(STANDARDS – SMALL

SECONDARY STREET TREE)

NUTTAL OAK

(PRIMARY STREET TREE)

CHINESE PISTACHE

(MEDIUM PRIMARY STREET TREE)

Page 12: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

New Hope Church RoadLandscaping

NEW HOPE CHURCH ROAD

Page 13: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

PROJECT SCHEDULE1st Public Meeting:

2nd Public Meeting:

BPAC Meeting:

Appearance Commission:

City Council:

100% Completed Plans:

Award Construction Contract:

Complete Construction:

Estimated Project Cost:

November 29th 2016

November 29th 2017

December 18th 2017

December 21st 2018

Anticipated Early 2018

Late 2018

Winter 2018-2019

Spring 2020

Construction Cost - $2,140,000 Engineering Services Cost - $353,494.50R/W and Easement Costs – $200,000.00Project TOTAL COST – approx. $2,693,494.50

NEW HOPE CHURCH ROAD

Page 14: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

NEW HOPE CHURCH ROAD

Page 15: NEW HOPE CHURCH ROAD · 2019-11-25 · New Hope Church Road Traffic Management During Construction NEW HOPE CHURCH ROAD OBJECTIVES •Minimize impact to the local residents and commuter

Project Overview&

Questions

NEW HOPE CHURCH ROAD