NCSX Engineers at IPP Department Device Assembly. First I will introduce my self: Name: K-H. Oelgemöller, Dipl.-Ing. Age: 48 Years - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller2007.10.09

NCSX Engineers in IPP11.10.2007 – 12.10.2007

Dokumentennummer

Max-Planck-Institut für Plasmaphysik

Device Assembly

NCSX Engineers at IPP

Department Device Assembly

Page 2: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller2007.10.09

NCSX Engineers in IPP11.10.2007 – 12.10.2007

Dokumentennummer

Max-Planck-Institut für Plasmaphysik

Device Assembly

First I will introduce my self: Name: K-H. Oelgemöller, Dipl.-Ing. Age: 48 Years Position: Head Device Assembly

Experience: Planning, Engineering and Assembly Parts of Refinery-, Power- and Steel-Plants

In Project W7-X: since June 2004

Page 3: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller NCSX Engineers in IPP, 2007.10.11 3

Device Assembly Max-Planck-Institut für Plasmaphysik

UnternehmungWENDELSTEIN 7-X

All projects are limited to the same borderlines:

1. Time

2. Money

3. Quality

To ensure the finishing the Project W7-X within the approved limits we have installed the following Structure in “Device Assembly”

Page 4: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller2007.10.09

NCSX Engineers in IPP11.10.2007 – 12.10.2007

Dokumentennummer

Max-Planck-Institut für Plasmaphysik

Device Assembly

1. Process-/ Work- planning

1.1 Every Monday we discuss the up-dated 4-week-time-schedule with all involved people. We present the milestones for the required parts or actions, 4-weeks in future. The responsible officers has to confirm the delivery date of their parts or actions.

Page 5: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller2007.10.09

NCSX Engineers in IPP11.10.2007 – 12.10.2007

Dokumentennummer

Max-Planck-Institut für Plasmaphysik

Device Assembly

1.2 Out of the confirmed 4-week-time-schedule we generate every Thursday the detailed Week-Planning (Manpower and Equipment) for the next week.

Page 6: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller2007.10.09

NCSX Engineers in IPP11.10.2007 – 12.10.2007

Dokumentennummer

Max-Planck-Institut für Plasmaphysik

Device Assembly

2. Assembly

On base of the Process-/ Work- planning and the “QAAP” ( Quality Assurance Assembly Plan, (detailed work break down structure)) the responsible crew is doing and controlling the work packages.

Page 7: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller2007.10.09

NCSX Engineers in IPP11.10.2007 – 12.10.2007

Dokumentennummer

Max-Planck-Institut für Plasmaphysik

Device Assembly

Process planning, SchedulingRecource planning, DocumentationHübschmann, Pasyutina, Schwarzkopf, Wiegand Storage/Magazine Consumables Bormann*, Steffen*Procurements Pasyutina Metrology Bräuer, Endler, Hillmann*, E. Lorenz, Junge, J. Müller, Poncet*, Radau, Siche Welding Control Holluba*; LahrShift Manager ModrowMounting stand leader Domscheit, Domscheit, JassmannManagement of component preparation Bau*, Günther, Höchel, Ihrke*, Jung, Neuner*, Raatz*, Reinke, SchinkelService NankemannAssembly Anders*, Bertram*, Bulgrin*, Goericke*, Jacobs*, Klagge*, Kullok, Kuse*, Langer*, Spreeberg*, Stolpe*, Terkowski, Wulf*, Ziemann*Vacuum Technology Ahmels, Braun, Dutz, Grote, Kuck, Rademann, W. Schneider, Schweitzer, VolzkeFurther external not named manpower

*person assigned from other divisions or External

ASSEMBLY

L. Wegener

Secretary H. Nothnagel

ONE-SITE CO-ORDINATION

S. Gojdka

DEVICE ASSEMBLY

K.H. Oelgemöller *

PERIPHERY

R. Krampitz

ASSEMBLY TECHNOLOGY

F. Hurd*

For your overview this slide shows the Organisation diagram of Assembly with their Sub-divisions. One of them “Device Assembly”with its groups.

Page 8: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller NCSX Engineers in IPP, 2007.10.11 8

Device Assembly Max-Planck-Institut für Plasmaphysik

UnternehmungWENDELSTEIN 7-X

In answering the question, “What is my Job in the Assembly Wendelstein W7-X”?

Equal a soccer-team:

I’m the “trainer”

Page 9: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller NCSX Engineers in IPP, 2007.10.11 9

Device Assembly Max-Planck-Institut für Plasmaphysik

UnternehmungWENDELSTEIN 7-X

Thank you!

Page 10: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller NCSX Engineers in IPP, 2007.10.11 10

Device Assembly Max-Planck-Institut für Plasmaphysik

UnternehmungWENDELSTEIN 7-X 1.7 Work packages:

1. Component preparation

1.1. Coils, 80 days additional work out of changes and Collisions

1.2 Plasma Vessel, Instrumentation, Cooling- pipe work, Multi-Layer isolation

1.3. Support-Structure, 20 days additional work out of changes and Collisions Instrumentation.

2. Mounting Stand

2.1 MST IA / IB Half-Modul-Assembly

2.2 MST II Modul-Assembly

2.3 MST III-IVa-IV Final Modul Assembly

2.4 MST V Port Assembly

In all Mounting Stands will be worked in a 2 shift system (06:00 am to 02:25 pm; 02:00 pm to 10:25 pm). The overlap is to discuss the work packages are done and must be done. Also problems. At the overlap always a member of the Planning department is involved.

Page 11: NCSX Engineers at IPP  Department Device Assembly

K.-H. Oelgemöller NCSX Engineers in IPP, 2007.10.11 11

Device Assembly Max-Planck-Institut für Plasmaphysik

UnternehmungWENDELSTEIN 7-X Shift organization:

Mounting-Stand-leader

Crew-leader Crew-leader Crew-leader

5 Mechanic 5 Mechanic 5 Mechanic