ncsx engineers at ipp department device assembly
DESCRIPTION
NCSX Engineers at IPP Department Device Assembly. First I will introduce my self: Name: K-H. Oelgemöller, Dipl.-Ing. Age: 48 Years - PowerPoint PPT PresentationTRANSCRIPT
K.-H. Oelgemöller2007.10.09
NCSX Engineers in IPP11.10.2007 – 12.10.2007
Dokumentennummer
Max-Planck-Institut für Plasmaphysik
Device Assembly
NCSX Engineers at IPP
Department Device Assembly
K.-H. Oelgemöller2007.10.09
NCSX Engineers in IPP11.10.2007 – 12.10.2007
Dokumentennummer
Max-Planck-Institut für Plasmaphysik
Device Assembly
First I will introduce my self: Name: K-H. Oelgemöller, Dipl.-Ing. Age: 48 Years Position: Head Device Assembly
Experience: Planning, Engineering and Assembly Parts of Refinery-, Power- and Steel-Plants
In Project W7-X: since June 2004
K.-H. Oelgemöller NCSX Engineers in IPP, 2007.10.11 3
Device Assembly Max-Planck-Institut für Plasmaphysik
UnternehmungWENDELSTEIN 7-X
All projects are limited to the same borderlines:
1. Time
2. Money
3. Quality
To ensure the finishing the Project W7-X within the approved limits we have installed the following Structure in “Device Assembly”
K.-H. Oelgemöller2007.10.09
NCSX Engineers in IPP11.10.2007 – 12.10.2007
Dokumentennummer
Max-Planck-Institut für Plasmaphysik
Device Assembly
1. Process-/ Work- planning
1.1 Every Monday we discuss the up-dated 4-week-time-schedule with all involved people. We present the milestones for the required parts or actions, 4-weeks in future. The responsible officers has to confirm the delivery date of their parts or actions.
K.-H. Oelgemöller2007.10.09
NCSX Engineers in IPP11.10.2007 – 12.10.2007
Dokumentennummer
Max-Planck-Institut für Plasmaphysik
Device Assembly
1.2 Out of the confirmed 4-week-time-schedule we generate every Thursday the detailed Week-Planning (Manpower and Equipment) for the next week.
K.-H. Oelgemöller2007.10.09
NCSX Engineers in IPP11.10.2007 – 12.10.2007
Dokumentennummer
Max-Planck-Institut für Plasmaphysik
Device Assembly
2. Assembly
On base of the Process-/ Work- planning and the “QAAP” ( Quality Assurance Assembly Plan, (detailed work break down structure)) the responsible crew is doing and controlling the work packages.
K.-H. Oelgemöller2007.10.09
NCSX Engineers in IPP11.10.2007 – 12.10.2007
Dokumentennummer
Max-Planck-Institut für Plasmaphysik
Device Assembly
Process planning, SchedulingRecource planning, DocumentationHübschmann, Pasyutina, Schwarzkopf, Wiegand Storage/Magazine Consumables Bormann*, Steffen*Procurements Pasyutina Metrology Bräuer, Endler, Hillmann*, E. Lorenz, Junge, J. Müller, Poncet*, Radau, Siche Welding Control Holluba*; LahrShift Manager ModrowMounting stand leader Domscheit, Domscheit, JassmannManagement of component preparation Bau*, Günther, Höchel, Ihrke*, Jung, Neuner*, Raatz*, Reinke, SchinkelService NankemannAssembly Anders*, Bertram*, Bulgrin*, Goericke*, Jacobs*, Klagge*, Kullok, Kuse*, Langer*, Spreeberg*, Stolpe*, Terkowski, Wulf*, Ziemann*Vacuum Technology Ahmels, Braun, Dutz, Grote, Kuck, Rademann, W. Schneider, Schweitzer, VolzkeFurther external not named manpower
*person assigned from other divisions or External
ASSEMBLY
L. Wegener
Secretary H. Nothnagel
ONE-SITE CO-ORDINATION
S. Gojdka
DEVICE ASSEMBLY
K.H. Oelgemöller *
PERIPHERY
R. Krampitz
ASSEMBLY TECHNOLOGY
F. Hurd*
For your overview this slide shows the Organisation diagram of Assembly with their Sub-divisions. One of them “Device Assembly”with its groups.
K.-H. Oelgemöller NCSX Engineers in IPP, 2007.10.11 8
Device Assembly Max-Planck-Institut für Plasmaphysik
UnternehmungWENDELSTEIN 7-X
In answering the question, “What is my Job in the Assembly Wendelstein W7-X”?
Equal a soccer-team:
I’m the “trainer”
K.-H. Oelgemöller NCSX Engineers in IPP, 2007.10.11 9
Device Assembly Max-Planck-Institut für Plasmaphysik
UnternehmungWENDELSTEIN 7-X
Thank you!
K.-H. Oelgemöller NCSX Engineers in IPP, 2007.10.11 10
Device Assembly Max-Planck-Institut für Plasmaphysik
UnternehmungWENDELSTEIN 7-X 1.7 Work packages:
1. Component preparation
1.1. Coils, 80 days additional work out of changes and Collisions
1.2 Plasma Vessel, Instrumentation, Cooling- pipe work, Multi-Layer isolation
1.3. Support-Structure, 20 days additional work out of changes and Collisions Instrumentation.
2. Mounting Stand
2.1 MST IA / IB Half-Modul-Assembly
2.2 MST II Modul-Assembly
2.3 MST III-IVa-IV Final Modul Assembly
2.4 MST V Port Assembly
In all Mounting Stands will be worked in a 2 shift system (06:00 am to 02:25 pm; 02:00 pm to 10:25 pm). The overlap is to discuss the work packages are done and must be done. Also problems. At the overlap always a member of the Planning department is involved.
K.-H. Oelgemöller NCSX Engineers in IPP, 2007.10.11 11
Device Assembly Max-Planck-Institut für Plasmaphysik
UnternehmungWENDELSTEIN 7-X Shift organization:
Mounting-Stand-leader
Crew-leader Crew-leader Crew-leader
5 Mechanic 5 Mechanic 5 Mechanic