nc department of transportation information technology plan€¦ · 28/02/2013 · information...
TRANSCRIPT
NC Department of Transportation
Information Technology Plan For 2013-2015 Biennium
By
Randy Barnes
Chief Information Officer
Department of Transportation
Prepared: October 1, 2012
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 2 of 56
Contents 1 EXECUTIVE SUMMARY ........................................................................................................................................ 5
1.1 PURPOSE ............................................................................................................................................................5
1.2 OVERVIEW ..........................................................................................................................................................5
1.3 ABOUT THIS PLAN ..............................................................................................................................................5
1.3.1 Roadmap ........................................................................................................................................................6
2 VISION, MISSION AND VALUES ......................................................................................................................... 10
2.1 OVERVIEW ........................................................................................................................................................10
2.1.1 IT Mission .....................................................................................................................................................10
2.1.1 IT Goals ........................................................................................................................................................10
2.1.2 IT Values ......................................................................................................................................................10
2.2 KEY BUSINESS DRIVERS ....................................................................................................................................10
2.3 GOALS AND ENABLING STRATEGIES ................................................................................................................11
3 AGENCY GOALS, STRATEGIES AND INITIATIVES ................................................................................................ 12
3.1 GOAL 1: PROVIDE STATE OF THE ART TECHNOLOGY SERVICES AND SOLUTIONS IN THE MOST COST EFFECTIVE, HIGHEST QUALITY, AND MOST TIMELY MANNER POSSIBLE. .....................................................................12
3.1.1 Enabling Strategy – Provide a state of the art collaboration experience ....................................................12
3.1.1.1 Initiative: Enterprise Content Management Solution .........................................................................12
3.1.1.2 Initiative: SharePoint Enhancement - Intranet ...................................................................................12
3.1.1.3 Initiative: SharePoint Enhancement - Extranet ...................................................................................13
3.1.1.4 Initiative: Instant Messaging and Video Conferencing .......................................................................13
3.1.1.5 Initiative: Electronic Signature ............................................................................................................13
3.1.1.6 Initiative: Managed User Authorization Capability .............................................................................13
3.1.2 Enabling Strategy – Provide Graphical Information Systems (GIS) Technology Leadership ........................14
3.1.2.1 Initiative: Road Operations and Management Effort (ROME) ............................................................14
3.1.2.2 Initiative: DOT Prioritization 3 (P3) .....................................................................................................14
3.1.3 Enabling Strategy – New System Development ..........................................................................................15
3.1.3.1 Initiative: Law Enforcement Records Management ...........................................................................15
3.1.3.2 Initiative: SmartLink ............................................................................................................................15
3.1.4 Enabling Strategy – Improve Employee Mobility ........................................................................................16
3.1.4.1 Initiative: Upgrade Wireless Infrastructure ........................................................................................16
3.1.4.2 Initiative: Tablet Deployment and Support ........................................................................................16
3.1.4.3 Initiative: Virtual Private Network ......................................................................................................17
3.1.5 Enabling Strategy – Improve Infrastructure Efficiency ................................................................................17
3.1.5.1 Initiative: Desktop Modernization ......................................................................................................17
3.1.5.2 Initiative: Windows 7 Deployment .....................................................................................................17
3.1.5.3 Initiative: Server Virtualization ...........................................................................................................17
3.1.5.4 Initiative: Desktop Virtualization ........................................................................................................17
3.1.5.5 Initiative: Managed Print Services ......................................................................................................18
3.2 GOAL 2: IMPROVE FUNCTIONALITY, QUALITY AND COST EFFICIENCY OF LEGACY SYSTEMS ..........................18
3.2.1 Enabling Strategy –Application Modernization/Replacement ....................................................................18
3.2.1.1 Initiative: Replacement of STARS and SADLS ......................................................................................18
3.2.1.2 Initiative: Complete Implementation of NGSDLS ................................................................................18
3.2.1.3 Initiative: Complete Implementation of MILES ...................................................................................19
3.2.1.4 Initiative: Upgrade of the Traffic Records System ..............................................................................19
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 3 of 56
3.2.1.5 Initiative: Upgrade SPECS ....................................................................................................................19
3.2.1.6 Initiative: Assessment of Legacy Construction Systems .....................................................................20
3.2.2 Enabling Strategy – Legacy Hosting Agreements.........................................................................................20
3.2.2.1 Initiative: SAP/BSIP Hosting Agreement .............................................................................................20
3.3 GOAL 3: DELIVER OUTSTANDING IT SERVICES TO DOT BUSINESS CUSTOMERS AND THE CITIZENS OF NORTH CAROLINA .........................................................................................................................................................20
3.3.1 Enabling Strategy: Simplified end user access to systems ...........................................................................20
3.3.1.1 Initiative: Implement Simplified Sign on .............................................................................................20
3.3.2 Enabling Strategy: Improve customer service delivery by implementing ITSM best practices ...................21
3.3.2.1 Initiative: Determine and implement long-term use of OTRS for DOT help desk functions ...............21
3.3.2.2 Initiative: Expand Use of OTRS ............................................................................................................21
3.3.3 Enabling Strategy: Improve communications with customers ....................................................................21
3.3.3.1 Initiative: IT Customer Survey .............................................................................................................21
3.3.3.2 Initiative: IT Communications .............................................................................................................21
3.4 GOAL 4: INVEST IN EMPLOYEE PROFESSIONAL GROWTH................................................................................22
3.4.1 Enabling Strategy – Provide formal and informal training ..........................................................................22
3.4.1.1 Initiative: Formal training ...................................................................................................................22
3.4.1.2 Initiative: Informal training .................................................................................................................22
3.5 GOAL 5: OPTIMIZE IT GOVERNANCE AND PROCESSES TO MAXIMIZE ORGANIZATIONAL PRODUCTIVITY. .............................................................................................................................................................22
3.5.1 Enabling Strategy – Enhance IT governance ................................................................................................23
3.5.1.1 Initiative: IT Committee Governance ..................................................................................................23
3.5.1.2 Initiative: TRANShare Steering Committee .........................................................................................23
3.5.1.3 Initiative: GIS Technical Advisory Committee (GTAC) .........................................................................23
3.5.1.4 Initiative: Community of Practice/Center of Excellence .....................................................................23
3.5.2 Enabling Strategy – Improve organizational and application productivity ..................................................24
3.5.2.1 Initiative: Enterprise Architecture ......................................................................................................24
3.5.3 Enabling Strategy– Improve risk management, protect DOT and customer assets ....................................24
3.5.3.1 Initiative: Disaster Recovery Data Center Location ............................................................................24
3.5.3.2 Initiative: PCI Compliance ...................................................................................................................25
4 BUSINESS NEEDS .............................................................................................................................................. 25
4.1 SIGNIFICANT UNMET NEEDS ............................................................................................................................25
4.2 OPPORTUNITIES FOR STATEWIDE INITIATIVES ................................................................................................25
APPENDIX A: LIST OF MAJOR IT PROJECTS ................................................................................................................ 27
APPENDIX B: DOT MISSION, GOALS & VALUES.......................................................................................................... 30
APPENDIX C: GLOBAL TRANSPARK AUTHORITY STRATEGIC PLAN ............................................................................. 32
1 EXECUTIVE SUMMARY ...................................................................................................................................... 35
1.1 PURPOSE ..........................................................................................................................................................35
1.2 OVERVIEW ........................................................................................................................................................35
1.3 ABOUT THIS PLAN ............................................................................................................................................36
2 VISION, MISSION AND VALUES ......................................................................................................................... 38
2.1 OVERVIEW ........................................................................................................................................................38
2.2 KEY BUSINESS DRIVERS ....................................................................................................................................38
2.3 GOALS AND ENABLING STRATEGIES ................................................................................................................38
3 AGENCY GOALS, STRATEGIES AND INITIATIVES ................................................................................................ 40
3.1 GOAL 1: PROVIDE IT SUPPORT FOR GTP EMPLOYEES AND CLIENTS FOR DAILY OPERATIONS. .......................40
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 4 of 56
3.1.1 Enabling Strategy Maintain efficient and secure IT infrastructure. .............................................................40
3.2.1 Enabling Strategy Maintain operational infrastructure for Spirit Aerosystems, LCC Aviation, and Greenfield Power. .....................................................................................................................................................40
3.2.2 Enabling Strategy Maintain WEB Sites controlled by the GTP .........................................................................40
3.4.1 Enabling Strategy Maintain availability of Network Storage for GTP staff. .....................................................41
3.5.1 Enabling Strategy Maintain ability to backup and recovery of GTP Servers and Workstations. .....................41
APPENDIX D: STATE PORTS AUTHORITY STRATEGIC PLAN ........................................................................................ 43
1 EXECUTIVE SUMMARY ...................................................................................................................................... 46
1.1 PURPOSE ..........................................................................................................................................................46
1.2 OVERVIEW ........................................................................................................................................................46
1.3 ABOUT THIS PLAN ............................................................................................................................................46
2 VISION, MISSION AND VALUES ......................................................................................................................... 48
2.1 OVERVIEW ........................................................................................................................................................48
2.2 KEY BUSINESS DRIVERS ....................................................................................................................................48
2.3 GOALS AND ENABLING STRATEGIES ................................................................................................................49
3 AGENCY GOALS, STRATEGIES AND INITIATIVES ................................................................................................ 49
3.1 GOAL 1 – PROVIDE IT SUPPORT FOR DAILY BUSINESS OPERATIONS ...............................................................49
3.1.1 Enabling Strategy – Maintain efficient IT infrastructure .............................................................................50
3.5.1.1 Initiative: Expand fiber infrastructure and WiFi at all facilities ...........................................................50
3.5.1.2 Initiative: Replace aging technology equipment and continue deploying virtualization ....................50
3.2 GOAL 2 – SUPPORT ORGANIZATION’S GOAL OF OPERATIONAL EXCELLENCE AND CONTINUOUS IMPROVEMENT .............................................................................................................................................................51
3.2.1 Enabling Strategy – Employ technology effectively to gain operational efficiencies ..................................51
3.5.1.3 Initiative: Implement an integrated Terminal Operating and Billing Software System across all Port Authority terminal facilities .....................................................................................................................51
3.3 GOAL 3 – SUPPORT HOUSE BILL 200 ................................................................................................................52
3.3.1 Enabling Strategy – Leverage State-owned technology and services wherever possible ...........................52
3.5.1.4 Initiative: Implement State Electronic IP Telephony (EIPT) solution ..................................................52
3.5.1.5 Initiative: Migrate externally hosted websites back in-house onto State owned infrastructure .......53
4 BUSINESS NEEDS .............................................................................................................................................. 54
4.1 SIGNIFICANT UNMET NEEDS ............................................................................................................................54
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 5 of 56
1 Executive Summary
1.1 Purpose The purpose of this document is to provide Information Technology Plan for the 2013-
2015 Biennium to the North Carolina State Chief Information Officer (SCIO) as
required by G.S. 147-33.72B. The statute mandates that each agency submit a
technology plan to the SCIO by October 1 of each even-numbered year. Session Law
2011-145, Section 6A2.(d) directed each agency to include any information
technology project, or any segment of a multipart project, costing more than two
hundred fifty thousand dollars ($250,000) in the agency's most recent information
technology plan.
1.2 Overview DOT Information Technology is tasked with ensuring efficient and effective use of
the latest computer and automation technologies and to provide a full range of
information processing services to the Department of Transportation. These
services include new software system development, maintenance of existing
systems, support of all computer software and hardware, technology consultation,
IT training, and end user and customer service support.
Legislation in 2011 incorporated the Global TransPark Authority and the State
Ports Authority as a Type 2 organization under the Secretary of Transportation.
These authorities run separate operations, including IT, but because of the
alignment, their plans have been included as appendices to this document. Specific
questions related to their content should be addressed to the individual preparer.
1.3 About This Plan The Information Technology organization is tasked with providing technology
services to all the divisions of the Department of Transportation. This results in a
wide variety of initiatives across the spectrum of technical skills and functions.
The emphasis of this plan over the next the next biennium will be on deploying
technology to improve productivity and performance and to begin addressing aging
legacy systems. The focus is on enterprise services, such as Enterprise Content
Management, collaboration enabling tools such as SharePoint, Lync and electronic
signature capability, and DMV and Highway systems modernization. With funding
challenges and constraints, it is essential that every dollar spent on technology be
prioritized toward needs of the business and helps the business implement their
strategic plan.
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 6 of 56
1.3.1 Roadmap
Goal Strategy Initiative Description
1. Provide state
of the art
services and
solutions in the
most cost
effective, highest
quality, and most
timely manner
possible.
1.1 Provide a
state of the art
collaboration
experience
1.1.1 Enterprise
Content
Management
solution
Improve document storage,
retrieval, retention and
destruction, as appropriate, by
implementing a state of the art
ECM solution along with the
associated metadata and
business processes.
1.1.2 SharePoint
- Intranet
Improve the current Intranet
deployment of SharePoint to
provide enhanced workflow
and team site capabilities
1.1.3 SharePoint
– Extranet
Improve the current Extranet
deployment of SharePoint to
provide enhanced workflow
and team site capabilities
1.1.4 Instant
messaging and
video
conferencing
Expand the use of these
communication capabilities to
a wider audience in DOT.
1.1.5 Electronic
Signature
Implement electronic
signature capabilities across a
wide variety of business
needs, such as standard
employee forms, electronic
plans, and potentially citizen
facing forms.
1.1.6 Managed
User
Authorization
capability
Provide a mechanism for
external business partners to
manage individual user access
rules through automation.
1.2 Provide GIS
Technology
Leadership
1.2.1 Road
Operations and
Management
Effort (ROME)
Project will replace two
custom-developed systems
(LARS and ARID) with a
COTS solution, empower end
users to perform online editing
and maintenance of their own
data
1.2.2
Prioritization 3
(SPOT3)
Project to improve the ability
of DOT to set road project
priorities using automated
processes. This initiative will
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 7 of 56
Goal Strategy Initiative Description
combine the capabilities of
GIS and SharePoint and the
data from BSIP (SAP) to meet
the business objectives.
1.3 New System
Development
1.3.1 Law
Enforcement
Records
Management
Implement a records
management system that will
support all business functions
of the DMV Law Enforcement
unit, preferably with a COTS
product.
1.3.2 SmartLink Implement state of the art
solution for statewide traffic
management
1.4 Improve
Employee
Mobility
1.4.1 Upgrade
Wireless
Infrastructure
Replace current wireless
infrastructure with new and
expandable capability
1.4.2 Tablet
Deployment and
Support
Working with Business units,
identify business needs for
tablet hardware, assess
technical constraints, deploy
and support selected
1.4.3 Virtual
Private Network
Work with ITS and Verizon to
implement use of virtual
private network for business
unit mobility and security.
1.5 Improve
Infrastructure
Efficiency
1.5.1 Desktop
Modernization
Replace aging desktop
hardware to the extent funding
allows
1.5.2 Windows
7 Deployment
Complete upgrade of all PCs
to Windows/7 operating
system.
1.5.3 Server
Virtualization
Continue server virtualization
1.5.4 Desktop
Virtualization
Investigate opportunities for
desktop virtualization to
improve efficiency and
mobility.
1.5.5 Managed
Print Services
Determine cost saving
opportunities by utilizing the
Managed Print Services
contract.
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 8 of 56
2. Improve
functionality,
quality and cost
efficiency of
legacy systems.
2.1 Application
Modernization/
Replacement
2.1.1
Replacement of
STARS and
SADLS
Develop replacement strategy
and begin initiative to replace
mission critical mainframe
applications that support
Vehicle Registration and
Driver licenses.
2.1.2 Complete
Implementation
of NGSDLS
Complete implementation of
NGSDLS to provide improved
business work flow for Driver
License offices and a secure
driver license credential
2.1.3 Complete
Implementation
of MILES
Complete the final phases of
the new Inspection Services
system that began in FY12-13
2.1.4 Upgrade
the Traffic
Records System
Complete planned upgrades
that began in FY 12-13 and
begin analysis regarding long
term modification necessary
for TRS to remain business
responsive
2.1.5 Upgrade
SPECS
Implement latest version of
SPECS to .NET release.
2.1.6
Assessment of
Legacy
Construction
Systems
Determine long term
replacement strategy for
HiCAMS, SPECS and Asset
Management System
2.2 Legacy
Hosting
Agreements
2.2.1 SAP/BSIP
Hosting
Agreement
SAP/BSIP hosting contract
expires and a new hosting
contract or transition to ITS
will be necessary.
3. Deliver
outstanding IT
services to NC
DOT business
customers and
the citizens of
North Carolina
3.1 Simplify end
user access to
systems
3.1.1 Simplified
Sign-on
Implement technology that
will simply the number of
different user ids and
passwords required for users
to access DOT system
3.2 Improve
customer service
delivery by
implementing
ITSM best
practices
3.2.1 Long-term
use of OTRS for
DOT help desk
functions
Determine and implement
OTRS for long term use for
DOT in areas other than IT.
3.2.2 Expand
use of OTRS
Determine and implement use
of OTRS for Problem,
Configuration and Release
Management
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 9 of 56
3.3 Improve
communications
with customers
3.3.1 IT
Customer
Survey
Implement recommendations
identified by IT survey
3.3.2 IT
Communications
Continue to expand and
improve direct and indirect
communications to DOT users
4. Invest in
employee
professional
growth
4.1 Provide
formal and
informal training
4.1.1 Formal
training
Invest in procurement of
formal training classes as part
software and hardware
acquisition.
4.1.2 Informal
training
Invest in online training
licenses and opportunities for
on the job training and cross
training.
5. Optimize IT
governance and
processes to
maximize
organizational
productivity
5.1 Continue
and enhance IT
governance and
business
alignment
5.1.1 IT
Committee
Governance
Continue participating and
advocacy of the IT
Committee.
5.1.2
TRANShare
Steering
Committee
Continue participation and
advocacy for the TRANShare
Steering Committee.
5.1.3 GIS
Technical
Advisory
Committee
Continue participation and
advocacy for the GIS
Technical Advisory
Committee (GTAC)
5.1.4
Community of
Practice/Center
of Excellence
Continue participation and
advocacy for the COP/COE
and help mature the processes.
5.2 Improve
organizational
and application
productivity
5.2.1 Enterprise
Architecture
Continue development and
implementation of the
Enterprise Architecture
framework
5.3 Improve risk
management,
protect DOT and
customer assets
5.3.1 Disaster
Recovery Data
Center Location
Implement a disaster recovery
data center to support DOT
operations.
5.3.2 PCI
Compliance
Continue and enhance the PCI
environment to support
growing demand
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 10 of 56
2 Vision, Mission and Values
2.1 Overview The North Carolina Department of Transportation (DOT) employs more than 14,000
people who oversee all modes of transportation in North Carolina, including
highways, rail, aviation, ferries, public transit, and bicycle and pedestrian
transportation. The department also oversees North Carolina’s Division of Motor
Vehicles.
The Information Technology mission and goals and strategic plan are in support of the
agency’s mission, goals and strategic plan.
2.1.1 IT Mission
The Information Technology mission is to support the DOT mission of connecting
people and places safely and efficiently, with accountability and environmental
sensitivity to enhance the economy, health and well-being of North Carolina by
delivering innovative, cost effective and reliable technology solutions, services and
processes to DOT and to the citizens of North Carolina.
2.1.1 IT Goals
Provide state of the art technology services and solutions in the most cost
effective, highest quality, and most timely manner possible.
Deliver outstanding IT services to NC DOT business customers and the citizens
of North Carolina.
Invest in employee professional growth.
Optimize IT governance and processes to maximize organizational productivity.
2.1.2 IT Values
Integrity – Earn and maintain trust by responsibly meeting the technology needs
of the agency, acting ethically and holding ourselves accountable for our actions.
Teamwork - Value the differences and diversity of others and foster a
collaborative work environment.
Customer Service – Respond to customers in a professional, timely and
courteous manner
Productivity – Deliver the needed services on time with the most efficient
combination of people and technology.
Quality – Pursue excellence in the delivery of IT services.
2.2 Key Business Drivers The key business drivers that helps provide IT with its strategic direction are:
Collaboration
Geospatial relationships
Operational efficiency
Performance management and data driven decision making
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 11 of 56
2.3 Goals and Enabling Strategies
In order to support the business objectives and comply with legislative mandates the
DOT Information Technology Department has set the following goal and enabling
strategies.
Goal 1: Provide state of the art technology services and solutions in the most cost
effective, highest quality, and most timely manner possible.
Enabling Strategy 1.1: Provide a state of the art collaboration experience
Enabling Strategy 1.2: Provide GIS technology leadership
Enabling Strategy 1.3: New System Development
Enabling Strategy 1.4: Improve Employee Mobility
Enabling Strategy 1.5: Improve Infrastructure Efficiency
Goal 2: Improve functionality, quality and cost efficiency of legacy systems
Enabling Strategy 2.1: Application Modernization/Replacement
Enabling Strategy 2.2: Legacy Hosting Agreements
Goal 3: Deliver outstanding IT services to DOT business customers and the citizens
of North Carolina
Enabling Strategy 3.1: Simplify end user access to systems
Enabling Strategy 3.2: Improve customer service delivery by implementing
ITSM best practices
Enabling Strategy 3.3: Improve Communications with Customers
Goal 4: Invest in employee professional growth.
Enabling Strategy 4.1: Provide formal and informal training opportunities
Goal 5: Optimize IT governance and processes to maximize organizational
productivity
Enabling Strategy 5.1: Continue and enhance IT governance and business
alignment
Enabling Strategy 5.2: Improve organizational and application productivity
Enabling Strategy 5.3: Improve IT risk management
Section 3 describes each goal, the enabling strategy and associated IT initiatives to support the
strategy.
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 12 of 56
3 Agency Goals, Strategies and Initiatives
3.1 Goal 1: Provide state of the art technology services and
solutions in the most cost effective, highest quality, and
most timely manner possible.
DOT IT provides a wide range of business services and solutions to meet the growing
needs and demands of the Department of Transportation. DOT IT is committed to
providing state of the art services and solutions to our customers in a cost effective
manner and using best of breed tools and technologies.
3.1.1 Enabling Strategy – Provide a state of the art collaboration
experience
During FY11-12, DOT initiated several initiatives focused on collaboration that had
significant inter-relationships, though each initiative had its own technical and
business objectives. To ensure that all the initiatives worked together to meet the
common collaboration objectives, they were grouped together and called TRANShare
by DOT leadership. These efforts included the Enterprise Content Management
project, SharePoint deployment, an electronic plans work group, GIS strategic
initiatives (both business and technical), and the redesign and restructuring of the
department’s Internet web site.
During the next biennium, these initiatives will continue to expand as the agency
addresses the need for improved relationships with external partners, such as
construction companies, municipalities and counties, and key public entities.
Effective and efficient collaboration with these partners is essential to the productivity
of the department. Not only must the department be able to provide static information
to these partners but it must be able to provide interactive and responsive
communications in a way that is easy, straight forward and seamless with other
operations.
3.1.1.1 Initiative: Enterprise Content Management Solution
The ECM initiative will implement an integrated enterprise solution for document
storage, retrieval, retention, and workflow management that will improve DOT
efficiency in the management of documentation (both structured and unstructured)
and implement an integrated search capability using metadata that will allow for
cross platform searching. DOT is implementing the Open Text solution and will
be deploying functional components of this solution that will expand the
capabilities and flexibility of the content repository. Initial phases have focused on
hardware infrastructure, solution module deployment and key business capabilities
such as the definition of metadata components, integration with SharePoint and
cross-platform search requirements. This is a multi-year initiative that will
continue through the next biennium.
3.1.1.2 Initiative: SharePoint Enhancement - Intranet
In FY 11-12, DOT implemented a new Intranet site using Microsoft SharePoint
technology. The Intranet consists of organizational and functional information and
sharing capabilities. It also provides team site capability for defined internal users.
The team site ability has greatly enhanced the collaboration capabilities throughout
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 13 of 56
the department. Team sites are used for IT Projects, construction projects,
business units and any other defined group or team that needs to share information
but restrict access to a select number of users. During the next biennium, DOT
expects to continue expansion of the Intranet capability. Key capabilities that are
planned include enterprise wide search capability, work flow capabilities,
integration with electronic signature capabilities, and integration with the Open
Text archive repository.
3.1.1.3 Initiative: SharePoint Enhancement - Extranet
In FY 11-12, DOT implemented a new Extranet site using Microsoft SharePoint
technology. The purpose of the Extranet is to provide a site that is separate from
the general public website where content specific to business partners can be
provided securely. The Extranet consists of operational and functional information
and sharing capabilities. It also provides team site capability for defined external
users. This will allow for document sharing and collaboration, thereby reducing
the time it takes to complete key business functions, reduce errors, and improve
service. The Extranet also help “declutter” the department’s Internet web site so
that it focuses primarily on providing information to the general public.
3.1.1.4 Initiative: Instant Messaging and Video Conferencing
In FY 11-12, DOT implemented the Microsoft Lync product for instant messaging
and video conferencing. The tools are in use in varying degrees across the
department. During the next biennium, greater emphasis will be placed on
socializing these collaboration capabilities and on maximizing the use of the
technology for cost savings and efficiency purposes.
3.1.1.5 Initiative: Electronic Signature
For several years, the engineering units have been investigating the use of
electronic signature for “sealing” construction plans. This would allow for
electronic sharing of plans and significantly improve the time to complete the
various steps in the review process and still maintain the integrity of the plans.
There are regulatory requirements that dictate what is considered appropriate for
electronically “sealing” plans and we have had representation on the statewide
electronic signature work group under OSC in hopes that the solution will support
DOT’s engineering needs as well. During the next biennium, DOT expects to
implement electronic signature capability on a wide variety of business needs such
as forms, contracts and engineering plans.
3.1.1.6 Initiative: Managed User Authorization Capability
As DOT expands the use of SharePoint and other systems to external partners, the
number of NCID accounts that have to be managed continues to grow
exponentially and the growth is expected to continue significantly as DOT expands
into more areas of collaboration. DOT desires to implement a capability that
would allow for a “user administrator” at each vendor, consulting firm,
MPO/RPO, etc, to manage the NCID accounts and access rules for its employees
or members. The external partner would be responsible for ensuring that only
qualified individuals had access to critical and/or sensitive information and that if
someone leaves a position, they would be responsible for removing access as well.
These are functions that would be nearly impossible for DOT employees to handle
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 14 of 56
due to volume and lack of direct knowledge of changes in personnel, etc. It is the
intent of DOT to continue to use NCID accounts as the primary identifier but to
integrate with preferably a COTS product that will provide this external
management of roles and responsibilities for SharePoint and other system
applications where a number of employees from a single company may need
access to a system.
3.1.2 Enabling Strategy – Provide Graphical Information Systems
(GIS) Technology Leadership
The DOT GIS environment is tightly integrated with the Esri software and DOT IT is
working to implement a robust Transportation GIS suite of products. These product
and deliverables not only benefit DOT in the short term, it also creates a platform to
provide even more ongoing value to the organization through more spatial
empowerment over a broader spectrum of the enterprise.
The vision of DOT IT is to provide the technology leadership necessary to enable
visual “map” access to all related transportation information.
There are seven specific goals in the GIS strategic plan. Those goals are:
Ability to publish spatial data services external to DOT
Empower internal customers to publish their spatial data to the web with
maximum control and timeliness
Make GIS pervasive throughout the enterprise by leveraging new COTS
(somewhat platform agnostic) clients
Provide support for mobile geospatial data, to include location, collection, and
editing
Improved support for the NC Community Base Map Program
Increase GIS services and productivity across the enterprise
Establish and implement a DOT GIS Training Plan in support of the GIS
enterprise goals
3.1.2.1 Initiative: Road Operations and Management Effort
(ROME)
The ROME Project will replace two custom-developed systems (LARS and
ARID) with a COTS solution, empower end users to perform online editing and
maintenance of their own data, integrate multiple systems that currently support
asset management, streamline Federal reporting and implement an enterprise GIS
solution with a common architect, scalable and leverages DOT investments in GIS
technology. This project began in FY 11-12 but is expected to continue into the
next biennium. The project is a joint initiative with Esri, levering the state Ersi
contract.
3.1.2.2 Initiative: DOT Prioritization 3 (P3)
The Prioritization 3 (P3) project began in FY 11012 and will continue with several
improvement phases into the next biennium. This P3 project is actually the third
initiative that has continually improved the ability of DOT to set road project
priorities using automated processes. The Prioritization system supports the
Governor’s Executive Order 2 and Executive Order 3 by providing a data driven
prioritization process which drives the 10 Year Work Program for DOT. A map
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 15 of 56
based approach for the submittal, analysis and publication of the state’s
transportation priorities will streamline the interaction and communication of
project information leading to the best, most cost effective use of limited financial
resources.
This initiative will combine the capabilities of GIS and SharePoint and the data
from BSIP (SAP) to meet the business objectives.
3.1.3 Enabling Strategy – New System Development
3.1.3.1 Initiative: Law Enforcement Records Management
When the MILES initiative first began, implementation of a law enforcement
records management system (LERMS) was part of that project. An attempt was
made to procure an inspection system and LERMS as a package. However,
because of the lack of statewide enterprise architecture compliance, the department
was not able to make an award for this capability in the procurement phase. It was
determined that, due to an expiring inspections hosting contract, it was in the best
interest of the department to separate the LERMS initiative from MILES. At this
time, research and investigation is occurring to determine in more detail what the
business processes and functions are that need to be included in this solution and
what the viable COTS solutions are on the market. DOT has also been discussing
with the Department of Justice the feasibility of leveraging their contract to
implement components of the CSI, Incorporated product suite. At this time, no
decisions have been make.
During the next biennium this initiative will move forward with the
implementation of a new law enforcement-specific case management and records
management workflow and reporting system to support all of the business
functions of the Law Enforcement unit of the Division of Motor Vehicles.
3.1.3.2 Initiative: SmartLink
NC Statewide Transportation Operations Center (STOC) and Regional
Transportation Management Centers (TMC) operators across the state routinely
interface with multiple systems to detect and respond to incidents using Intelligent
Transportation System (ITS) devices. Devices include items such as traffic
cameras, dynamic message signs, speed sensors, video walls, traffic information
management system (TIMS), highway advisory radio, and road weather
information systems. Currently the control of the devices is limited to the region
of the state where the devices are located. There is a need to provide redundant
command and control capability to operate all ITS devices from multiple locations
in the state. In addition, there is a need to integrate all the tools an operator uses to
manage an incident into one application. Tools include items such as NCSHP
CAD feeds, Inrix speed data, incident location, ITS device location, IMAP
location, etc.
A procurement project started in 2011 and a contract was awarded in 2012 for the
purchase and implementation of a solution to meet these objectives. The project
will continue into the next biennium and meet the following goals:
implement a command and control system that provides operators with a
single consistent interface to manage an incident from detection to incident
clearance and to operate all ITS devices for their TMC.
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 16 of 56
provide the capability for regional TMC’s or the STOC to provide backup
support to other TMC’s as needed. For example, after normal operating
hours, one TMC could transfer control of their devices to a TMC that is in
operation 24X7.
Improve multi-agency response to incidents that involve any of the 26
other NC government agencies or local governments. In addition to the
STOC being co-located with the Division of Emergency Management,
State Highway Patrol, Turnpike Authority, and the National Guard, the
goal is to provide a system that can improve the coordinated government
response to any type of emergency or special event (for example hurricane
or flood).
3.1.4 Enabling Strategy – Improve Employee Mobility
The work force at DOT has always been highly mobile though many employees have
not had the benefit of technology while not in the office environment or, more
specifically, at their desk. During the next biennium, greater emphasis will be placed
on providing technology in the hands of more employees, regardless of their physical
location. This will necessitate a variety of initiatives.
3.1.4.1 Initiative: Upgrade Wireless Infrastructure
About 5 years ago, DOT implemented an enterprise wide wireless infrastructure
and currently has deployed over 100 access points across the state. Since the
implementation, technology has matured significantly as has the need for more
wireless deployments. Because of the age of the system, it is difficult to expand
our current footprint and the department believes it is the appropriate time to
replace the current system. During the next biennium, DOT will be investigating a
number of different wireless solutions that will meet our business mobility
objectives and have a new system operational and deployed.
3.1.4.2 Initiative: Tablet Deployment and Support
In FY12, several DOT business units began exploring the use of current tablet
technology for field efforts, such as inspections. A small pilot was undertaken as a
joint effort between IT and Division of Highways to investigate what device would
physically work best and what device and other software would work to meet the
business functional needs. This effort was very successful and proved to have
more business and cost benefits than originally anticipated. Currently a larger
wave of devices are being deployed and it is anticipated that as many as 700 may
be deployed by the end of FY 13.
During the next biennium, IT will focus on the ability to rapidly respond to
deployment needs and to the unique support needs of the table environment. It is
the goal of the department to remain as device agnostic as possible and to not be
tied to specific operating systems so that there is maximum flexibility as the
industry around tablets continue to grow and expand to leverage new capabilities.
For instance new application development will focus on HTML5, rather than an
iOS or Java. However, many of the applications already used at the desktop are
Windows-based and utilization of a state of the art Windows device, when
available, that can meet other functional requirements such as processor speed,
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 17 of 56
battery life, etc., will be strongly considered, so that existing applications can more
easily be access while mobile.
The emphasis for tablet deployment is on ensuring that the business needs can be
supported by the tablet devices and that tablets are not purchased just as a device,
but as part of a business process objective, since not all business processes can be
accomplished with the tablet.
3.1.4.3 Initiative: Virtual Private Network
With the expansion of the mobile work force using devices such as cell phones,
tablets and other cellular devices, having secure access to the DOT network as
easily as possible is critical. DOT is working with ITS and Verizon to implement
a virtual private network on the Verizon cellular system that will be used by field
staff and mobile resources. There are other cost savings options as well. DOT is
currently piloting the use of cellular capabilities from fueling pumps to gather data
that is normally obtained via dial up modems. Other options that are likely to be
explored during the next biennium are cameras and mobile traffic signs.
3.1.5 Enabling Strategy – Improve Infrastructure Efficiency
3.1.5.1 Initiative: Desktop Modernization
Modernize the desktop by replacing old hardware and upgrade software to current
versions. Due to significant budget shortages over the past 3-4 years, the average
age of DOT PC equipment is older than desired. A concerted effort will be made
in the next biennium to get the age of the equipment to 4 years or less to the
maximum degree possible.
3.1.5.2 Initiative: Windows 7 Deployment
Deployment of Windows/7 operations system began in FY11-12 and continues in
FY12-13. It is hoped that the deployment will be complete prior to the end of FY
13. However, given the number of devices that must be upgraded, the geographic
distribution of our users, resource availability and the need to procure new
hardware to replace older equipment that will not support Windows/7, this
initiative may extend into FY13-14.
3.1.5.3 Initiative: Server Virtualization
Virtualize the servers in the DOT datacenter to gain efficiencies and reduce costs
began several years ago. To date, 535 virtual server instances have been
implemented on 41 physical servers. There are an additional 225 physical servers,
a large number of which will be virtualized. This effort has continued in concert
with mission critical projects and the agency’s network segmentation initiative and
will likely continue into FY13-15. Server virtualization is the strategic direction of
DOT and is utilized whenever feasible.
3.1.5.4 Initiative: Desktop Virtualization
DOT anticipates looking more closely at virtual desktop opportunities in the next
biennium to help reduce costs, mostly related to support resources, and to provide
more mobility for employees.
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 18 of 56
3.1.5.5 Initiative: Managed Print Services
In 2012, DOT began the analysis to determine what opportunities might exist for
cost savings related to Managed Print Services. An assessment is currently
underway by both contract vendors and it is anticipated that transition to MPS for
some of the DOT office locations will occur in FY 13-15.
3.2 Goal 2: Improve functionality, quality and cost efficiency of
legacy systems While we work to deliver state of the art technology and work on the next generation
of key applications, we must ensure that legacy applications continue to deliver value
to our business customer and to constantly investigate the appropriate replacement of
legacy systems when appropriate in the life cycle of the application and the business
functions.
3.2.1 Enabling Strategy –Application Modernization/Replacement
DOT has a large number of existing applications that support a wide variety of
business processes. During the next biennium, it will be necessary to make functional
enhancements to these systems to meet growing business requirements and potentially
to allow for integration with some of the strategic initiatives mentioned herein.
3.2.1.1 Initiative: Replacement of STARS and SADLS The Appropriations Act of 2011 mandated the replacement of the State Titling and
Registration System (STARS) and State Driver License System (SADLS). The
goals of the new system include improving business processes; enhancing delivery
of services for citizens, businesses, DMV staff, state and federal agencies, and
external entities requiring information from or providing information to the DMV;
to consolidate customer data such as transaction history, payment history, vehicle
and driver data, and other information from separate applications; and deliver
simple, secure, complete, and accurate information. It is expected that DOT will
attempt to leverage existing COTS or MOTS software products on the market and
to migrate off the mainframe environment.
During the next biennium it is expected that the planning for this very large
initiative, along with a roadmap and funding strategy, will be completed and the
initial phase of the “build” phase will have begun, including the procurement of a
base software product. This is a multi-year initiative with many stakeholders,
citizen impacts and business process considerations so it is essential that care is
given to the approach and the timeline.
Because there are a number of other inter-related DMV systems, such as Liability
Insurance Tracking System (LITES) and Traffic Records System (TRS), the plan
will incorporate more than just STARS and SADLS, and will address how these
related systems will be maintained or replaced as well.
3.2.1.2 Initiative: Complete Implementation of NGSDLS
The first phase of the Next Generation Secure Driver License System (NGSDLS)
is scheduled for full implementation by the end of FY 12. However, there remain
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 19 of 56
several functional components that will be developed and deployed as part of a
phase 2 implementation, which will occur during the FY13-15 biennium. The
purpose of the NCSDLS is to provide North Carolina with a state of the art
credential that will counter growing threats of fraud, identity theft and terrorism,
and comply with state and federal legislation to protect citizens and provide a more
secure means of issuing driver licenses and ID cards. It will also provide
improved functionality and flexibility to driver license examiners and citizens
related to the driver license issuance process, including more capabilities available
via the internet and the ability for the DMV to take payments in the driver license
offices via credit and/or debit cards.
3.2.1.3 Initiative: Complete Implementation of MILES
The majority of the functionality required for the new inspection services system
(MILES) will be completed during FY 12-13. However, based upon the success of
the initial phases and the timing of the subsequent deployments, this project could
extend into FY 13-14. This system is being provided by Systech as a COTS
solution and will provide a modern platform hosted by DOT to support the
inspection (safety and emission) program, thereby eliminating the need for the
VerizonBusiness hosted solution and the recurring fees paid to VerizonBusiness
for their service. This increases the revenues to the department and provides
greater flexibility of the business to implement. The implementation will also
provide greater platform flexibility for inspection station owners. Today stations
must purchase expensive analyzer hardware but, when completed, the new system
will operate on any web based device including tablets, greatly improving
flexibility and reducing costs for the stations.
3.2.1.4 Initiative: Upgrade of the Traffic Records System
The TRACS system is currently being upgraded with the latest release of software,
TRACS10 and is based on the TraCS from the National Model, found at
www.tracsinfo.us. Additionally, this system has many separate and somewhat
disjointed parts. During the next biennium, as the strategy for mainframe
application replacement is addressed, how the department receives and manages
traffic record data is likely to be transformed. It is expected that some type of
initiative related to this system will be undertaken in conjunction with the larger
initiative.
3.2.1.5 Initiative: Upgrade SPECS
The current deployment of the Specifications Proposals Contract Systems
(SPECS) uses older technology but there is an upgrade available that utilizes .NET
and is more closely compliant with DOT’s enterprise architecture technologies.
This production is acquired from the American Association of State Highway and
Transportation Office (AASHTO) - https://www.infotechfl.com/products/trns-port.php. The SPECS system is a mission critical application that is used for
bidding on road construction projects. The planning and preparation for the
upgrade is underway and it is anticipated that the project will be initiated before
the end of FY 12-13 and continue into FY 13-15.
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 20 of 56
3.2.1.6 Initiative: Assessment of Legacy Construction Systems
There several systems used by the construction units within DOT that utilize dated
technologies and that have been in operation for 10 years or longer. During the
next biennium, IT will work with the related business units and executive
management to develop a long term plan for the modernization and/or replacement
of these systems consistent with the overall business objectives of the department.
The plan will include the prioritization of the initiatives against other critical
initiatives, business cases, risks, cost considerations and timelines. The systems
initially expected to be assessed are Highway Construction and Materials System
(HiCAMS), SPECS, and Asset Management System (AMS).
3.2.2 Enabling Strategy – Legacy Hosting Agreements
3.2.2.1 Initiative: SAP/BSIP Hosting Agreement
An outsourcing hosting contract for DOT’s SAP/BSIP environment has been in
place for about 10 years with Xerox/ACS. Discussions have been underway for
several years with ITS to determine how BSIP could be moved onto the state
infrastructure at ITS. The initial costs and concerns regarding operational risks
have delayed the project and it will be necessary to continue the outsource
arrangement with Xerox into FY 13/14. During the next biennium, DOT must
resolve the hosting location and either move the environment to ITS or issue a
competitive procurement to obtain a third party provider with SAP hosting
experience.
3.3 Goal 3: Deliver outstanding IT services to DOT business
customers and the citizens of North Carolina
3.3.1 Enabling Strategy: Simplified end user access to systems
3.3.1.1 Initiative: Implement Simplified Sign on
One of the primary issues reported by DOT users is the need to manage multiple
user ids. While NCID is used widely for our external applications, internal
applications that have been in place for some time have disparate sign on criteria.
There are inhibitors to having a single sign on, but collapsing the ids so that they
are consistent and can be used across, to the maximum degree possible, all DOT-
access applications, is the goal.
In 2012, DOT IT began an effort to simplify the user ids used throughout the
department. The first step is the alignment of the employee Active Directory (AD)
accounts with their NCID account. We have begun conversations with ITS NCID
staff to work through an integration that will allow the AD and NCID password
synchronization to occur when the password for either id is changed. DOT is also
pursuing the implementation of an SAP tool that will allow for the use of the
employee’s AD account to sign into BSIP without losing the integrity of the
internal SAP id already in use. Significant progress has been made to date but
additional work will occur into FY 13-15 to complete this initiative.
The simplified sign-on approach capability will reduce the lost productivity due to
forgotten ids and passwords and reduce the number of calls to the DOT service
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 21 of 56
desk for password resets. This issue was one of the most prevalent comments
received in the most recent IT Customer Survey.
3.3.2 Enabling Strategy: Improve customer service delivery by
implementing ITSM best practices
3.3.2.1 Initiative: Determine and implement long-term use of
OTRS for DOT help desk functions
In FY 12-13, DOT has begun implementation of OTRS for Change Management
and Incident Management (Service Desk ticketing). If the deployment of OTRS
proves successful, further expansion may be considered in the next biennium to
support internal support help desks deployed throughout DOT, such as the STARS
Help Desk and the SADLS Help Desk used by personnel in the DMV field offices.
These groups currently use access database tools that are limited in capabilities.
OTRS would provide a more robust and flexible solution.
3.3.2.2 Initiative: Expand Use of OTRS
Once OTRS is stable for use in Change Management and Incident Management,
further deployment for use in Problem management, configuration management
and Release management so that the processes used by DOT IT are more
formalized and a tool is available for information sharing and documentation.
3.3.3 Enabling Strategy: Improve communications with customers
3.3.3.1 Initiative: IT Customer Survey
In early FY 12-13, IT issued a survey to all DOT users requesting feedback on the
services provided and recommendations for improvement. The results were
positive but some constructive suggestions were provided. Several of the
initiatives in this strategic plan are in direct alignment with the survey results, such
as replacing aging computers, upgrading operating systems, and providing
convenient mobility. Also consistent with the survey results is the improvements
anticipated by the deployment of OTRS for Incident Management. The goal
would be to provide the ability for end users to look up the status of their tickets.
IT will issue another survey in early FY14-15.
3.3.3.2 Initiative: IT Communications
During the next biennium, IT will continue to work on the improvement of
communications to the end users and the business units. This includes
communication of events that may have an impact on daily operations, such as
network outages, as well as personal communications regarding specific end user
incidents. While there is a great deal of communications occurring, there is still a
need for greater emphasis to ensure that information is getting to all layers of the
organization. It was also clear from the survey comments that not all users know
what services are being provided by IT. There will be an improved effort during
the next biennium to utilized SharePoint Intranet and team sites to improve the
information available to DOT employees.
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 22 of 56
3.4 Goal 4: Invest in employee professional growth The ability of IT to deliver quality service is solely dependent on the quality of the
employees within the IT divisions. While DOT has an excellent technical staff, it is
important that the department continues to invest in the technical and professional
growth of the employees, especially as the economy strengths and more opportunities
external to DOT become available.
3.4.1 Enabling Strategy – Provide formal and informal training
Training is an essential component of employee success and satisfaction. Finding
opportunities to provide both formal and informal training is critical to continued
growth of the organization. In 2012, DOT implemented a formalized training plan for
all employees and both formal and informal training are included in the plans for IT
employees.
3.4.1.1 Initiative: Formal training
A focus will be placed on identifying and purchasing formal training as part of the
purchase of software products and hardware appliances. This is an excellent
opportunities to obtain the skills necessary to successfully implement the new
technology and the training services can often be obtained on site and on the job
when the products/appliances are being installed…and at a more cost effective
price.
Depending on funds availability, formal classroom training both off site and on
site will be provided for key skills. Where feasible, onsite training that provides
opportunities for more employees at a reduced cost will be obtained.
3.4.1.2 Initiative: Informal training
During the current biennium, DOT has invested in online training licenses for a
large number (approximately 25%) of employees. These licenses are good for a
full year and employees are able to consume as many training course and related
materials as they desired. Managers are encouraged, when feasible, to provide
work hours for employees to take advantages of this opportunity and to work with
the employees to determine what courses are most advantageous for career growth.
Continued use of the online training service, SkillSoft, will continue significantly
into the next biennium.
On the job training is a key opportunity for all DOT employees. As opportunities
for growth are identified, employees are assigned new responsibilities and
encouraged to expand their technical knowledge by working with fellow
employees to develop new skills.
3.5 Goal 5: Optimize IT governance and processes to
maximize organizational productivity. Faced with an environment that has budget and staffing reductions and a continual
increasing demand from the business to invest in new projects to support business
growth, IT needs to ensure the budget is being spent to meet the strategic needs of the
business. IT also needs to improve the time to deliver projects and initiatives. To help
meet this goal, IT is working with the business to improve the governance and
communications and IT created the application Enterprise Architecture initiative.
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 23 of 56
3.5.1 Enabling Strategy – Enhance IT governance
See the below initiatives that support the strategy to improve governance and business
alignment.
3.5.1.1 Initiative: IT Committee Governance
The IT Governance Committee is a joint partnership between the business and IT.
The committee is made up of key business leaders and the DOT CIO. The focus of
this committee is to foster management communication and provide governance
and prioritization of IT policies, projects and initiatives.
3.5.1.2 Initiative: TRANShare Steering Committee
To help coordinate and facilitate the implementation of the various collaboration
initiatives, including those that are IT related, an oversight committee of DOT
executive leadership was formed. While each project proceeds under its own
oversight, the TRANShare steering committee allows for the formal reconciliation
of conflicts and overlapping functional questions, such as what technology will be
used for workflow as a standard. This is another instance where IT and business
leadership coordinate the various initiatives that have a common objective.
3.5.1.3 Initiative: GIS Technical Advisory Committee (GTAC)
The GTAC was formed in 2011 as a cross-functional committee of GIS users and
IT to set the strategic direction of GIS within DOT. This committee continues to
meet and strengthen the strategic planning effort to provide prioritization and
consistency regarding how GIS technology will be used within DOT and what the
major initiatives need to be to support this strategy. This committee reports to the
TRANShare Steering Committee to also ensure that GIS remains consistent with
the other collaborative initiatives in the department.
3.5.1.4 Initiative: Community of Practice/Center of Excellence
The TRANShare initiatives have necessitated the formation of two operational
level groups that have a significant impact on the organizational oversight of the
initiatives and that will continue to operate after the projects have competed.
These organizations are focused on ensuring the use of these enterprise services in
a manner consistent with the strategic direction of the department and with the
operational authority to ensure standards are adhered to throughout the department.
The end user organization that is focused on functionality and standards is the
Community of Practice (COP). The COP has membership from all key sections of
the department, including non-voting IT members, and is chaired by a business
user. The Center of Excellence (COE) is a technical group that is made up of key
technology representatives whose responsibility it is to deliver the technical
solutions that make up TRANShare. The COE is chaired by an IT Director and is
focused on resolving potential technical conflicts related to resources, functionality
and timing.
Both committees report routinely to the TRANShare steering committee on status
and to escalate key issues that need attention.
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 24 of 56
3.5.2 Enabling Strategy – Improve organizational and application
productivity
Define and implement an Enterprise Architecture (EA) process to document and
application architecture.
3.5.2.1 Initiative: Enterprise Architecture
Improve the translation of business vision and strategy into effective solutions to
Simplify application technologies and portfolios,
Reduce cost and improve application maintainability and
Facilitate reuse wherever possible.
During FY 11/13, a great deal of work was completed on the Enterprise
Architecture. Enterprise Business Architecture (EBA) describes the structure of
the DOT enterprise in terms of its capabilities, business processes, and business
information. The Enterprise Technology Architecture (ETA) is a disciplined
approach for documenting the enterprise’s current, emerging and retiring
technology components in order to achieve IT Plan Strategic Drivers. Both the
EBA and the ETA are documented in Blueprints. EA processes like the
Architecture Assurance Life Cycle (AALC) ensure compliance with the EA and
help us to achieve DOT’s mission goals and business objectives through the
efficient and effective delivery of IT solutions.
During the past year, the ETA has been the focus and critical blueprints have been
defined: Platform and Infrastructure Blueprint, Integration, Interface, and
Interoperability Blueprint, Components Blueprint, and Access and Delivery
Blueprint.
During the next biennium, the effort will move to the EBA functions. Work has
already begun with the IT Committee to form a work group that can begin
identifying and documenting the business capabilities that will support the
Enterprise Architecture. The IT Committee members have been extremely
supportive of this enterprise approach and have a definite appreciation of the
potential efficiencies and cost savings that can be obtained. 3.5.3 Enabling Strategy– Improve risk management, protect DOT
and customer assets
The current IT datacenter does not have a verifiable or testable disaster recovery plan.
This enabling strategy will protect DOT assets in the event of disaster requiring
relocation of datacenter services. In addition, in FY 11-13, DOT implemented a PCI
compliance environment to support financial payment processing. The next biennium
will require expansion of the PCI environment as more and more services will be
delivered that will take credit or debit card payments.
3.5.3.1 Initiative: Disaster Recovery Data Center Location
DOT has maintained a data center operation for a number of years in one of the
DOT facilities in Raleigh, NC. This facility has had several audit review and
maintains a secure, robust environment for most of the distributed processing
system used by DOT. This environment has UPS, generator backup, required
security and appropriate redundancy to ensure stable delivery of services.
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 25 of 56
In FY 12-13, DOT identified a geographically distant location at an existing DOT
division office that had sufficient floor space and environmentals to support the
disaster recovery requirements for the existing data center. Limited renovations
are underway to implement necessary security controls at the facility and the
implementation of hardware at the location is expected before the end of FY12-13.
This implementation is utilizing existing hardware, for the most part, as servers
that have served as redundancy will be deployed to the new location and only
minimal purchases will be required, primarily related to network components and
some storage. The implementation of the DR location will allow for greater
reliability of systems in the event of a disaster or critical failure at the primary
location, including something as simple as hardware failure. The use of existing
division facilities and existing hardware components significantly reduced the
implementation and recurring costs of providing a DR site for the mission critical
systems operated out of the DOT data center.
3.5.3.2 Initiative: PCI Compliance Payment Card Industry (PCI) Compliance initiative is intended to identify the
changes to applications, infrastructure, process and practices to comply with the
PCI data security standard for IT products and services. DOT completed the initial
PCI compliance project in 2011. However, more and more applications are
moving to use credit and debit cards, while necessitate expanding the PCI
environment. In 2013, DMV will begin taking payments via credit and debit cards
in the Driver License Offices and the License Plate Agencies. It is expected that
over 3 million transactions will be processed annually using bank cards in the first
year and is likely to grow. Recurring monitoring and annual audits are a key
component of maintaining PCI compliance and DOT has a full time compliance
officer that is responsible for the PCI compliancy status. Penalties can be
significant if DOT fails to maintain compliance or if there be a breach of bank card
data. Ensuring the security of bank card data is a primary objective of IT.
4 Business Needs
4.1 Significant Unmet Needs There are no significant unmet needs. However there are a number of initiatives that
must be delayed or are not able to be completed as rapidly as would be ideal because
of limited resources, primarily personnel related.
4.2 Opportunities for Statewide Initiatives 1. One of the key initiatives related to DOT’s collaboration objective is a user
managed interface to NCID that provide roles based authorization for business
customers and is capable of being utilized by non-sophisticated users. Such a
capability could be utilized by many agencies that do authorizations for
business related customers.
2. Improvements related to statewide procurement could greatly reduce the costs
of time and resources to agencies.
a. More term contracts that allow for expedient purchases of commodity-
type hardware and software.
b. Increase in agency level authorization limits above $25,000
Information Technology Plan For 2012-2014 Biennium
Department of Transportation Page 26 of 56
c. More resources to improve turnaround and approval of purchases that
required statewide approval
3. There is a new PCI compliant process for “card present” transactions that
encrypts the credit card information at the swipe device called Point to Point
Encryption (P2PE). This technology removes the need for much of the
expensive PCI compliant infrastructure currently required when handling “card
present” transactions. Common Payment Services does not currently support
this capability, though they have been discussion the opportunity with their
software vendors. Enabling CPS to process P2PE transaction could save
agencies millions of dollars, depending on the number of locations affected.
Department of Transportation Page 27 of 56
Appendix A: List of Major IT Projects The table below lists the major projects that are greater than $250,000 and maps each project to overall goals and strategies.
Project Name Short Description
Related Goals
and Strategies Summary of Anticipated Benefits
Approximate
Timeframe
DOT EIPT DOT EIPT System Upgrade - IVR Goal 2.1
Upgrade telephone system to a newer, technically
compliant and maintainable telephone system. Phase I
sites: DMV Headquarters, Bladen County DMV Call
Center, DOT IT Help Desk and Roadside
Environmental, Communication Office/Call Center in
the Transportation Building.
6 mo.
ECM Enterprise Content Management System Goal 1.1
Implement an integrated enterprise solution for project
collaboration, document storage, and workflow
management. Improve DOT efficiency in management
of documentation; enable the flexible creation of
workflows to route documents through internal and
external collaboration and approval processes.
6 mo.
ARPS Automated Routing and Permitting System
Upgrade Goal 2.1
Implement an automated routing system that provides a
faster and more efficient system for issuing
oversize/overweight permits.
2 yrs.
MILES Motor Vehicle Inspection and Law Enforcement
System Goal 2.1
Replace the existing contract terminating Oct. 2012. Improve
system functionality, reduce duplication, utilize data more
effectively and improve reporting capabilities. 6 mo.
Trip Permits Trip Permits Goal 1.3
Automate issuance and workflow tracking of trip
permits. Improve ability of the Highway Patrol to
identify permit abusers and increase truck license and
fuel tax collections.
2 yrs.
Card Access
Upgrade
Access Control. Alarms, and Badge Making
Software Goal 2.1
Integrates existing access control and badge
management equipment, improve workflow, improve
system reliability, improve reporting capability.
1 yr.
TraCS 10 TraCS Software Upgrade to Release 10.0 Goal 2.1
Upgrade the TraCS software current supported release,
add functionality support requested by NC Highway
Patrol and police departments, implement an Incident
Location Tool.
6 mo.
Department of Transportation Page 28 of 56
Project Name Short Description
Related Goals
and Strategies Summary of Anticipated Benefits
Approximate
Timeframe
PayLine Pay Line Service Replacement Goal 1.3
Replace the current, manual pay line information request
services for registered vehicle information, with an
automated, customer-centric, “self-service” product.
Begun,
completion 2013
HB1779 HB 1779 Vehicle Property Tax Collection Goal 2.1
Improve the vehicle property tax collection rates for NC
counties by requiring the payment of the vehicle
property taxes with the vehicle registration renewal
Begun,
completion mid-
2013
DMV SSR DMV STARS/SADLS Replacement Strategy,
Planning & Assessment Goal 2.1
Improve the business processes for citizens, businesses,
NCDMV staff, state and federal agencies and external
entities. Consolidate customer data from separate
applications and reduce the operational and maintenance
costs.
Begun, multi-year
project (3-5)
ROME Road Operations and Management Effort Goal 1.2 Implement an advanced transportation data model as
part of an overall GIS technology roadmap.
Begun, multi-year
project
SPOT3 Prioritization 3.0 Goal 1.2
Automate the processes for scoring and ranking cost
estimates, improve visibility of project data to partners
and taxpayers, enhance automation and flexibility for
creating and modifying scoring criteria without
requiring IT assistance, provide a map-based, spatial
view of project data, provide a “framework” for the
future.
Begun, 1-2 year
project, in phases
SmartLink NCSmartlink II Goal 1.3
Project to provide a common/single interface command
and control system for all of the intelligent
transportation devices operated by DOT.
Begun, multi-year
project
LERMS Law Enforcement Records Management System Goal 1.3
Replace antiquated and disparate systems to improve
effectiveness of License and Theft unit operations.
Reduce costs and duplication of work and data entry.
To begin in 2013,
12-18 month
project
BSIP Hosting SAP/BSIP Hosting Goal 2.2
Transition DOT’s SAP hosting contract to a new
environment and hardware at the selected hosting site,
re-platforming it from Solaris/Oracle if needed
Begun, 18-24
month project
Department of Transportation Page 29 of 56
Project Name Short Description
Related Goals
and Strategies Summary of Anticipated Benefits
Approximate
Timeframe
Enterprise Grants
Management Enterprise Grants Management Goal 1.3
Implement a single enterprise application to advertise,
receive, evaluate, manage and report on Federal and
State projects and grants.
Begun, multi-year
statewide
enterprise project
NGSDLS Next Generation Secure Driver License System Goal 2.1
Counter growing threats of fraud, identity theft and
terrorism, and comply with state and federal legislation
to protect citizens and provide a more secure means of
issuing driver licenses and ID cards.
Begun,
completion 2013
LITES Audit LITES Audit – Long Term Solution Goal 2.1 Upgrade the LITES application to improve compliance
with fiscal policy and general statute.
Begun,
completion 2013
TCMS Toll Collection Management System Goal 1.3
Project to provide a toll collection and tracking system
that is accurate, efficient, effective, safe and secure for
the NCTA and its customers, is scalable solution able to
handle thousands of motorist transactions each day and
can collect and account for revenue across multiple toll
projects operated under the umbrella of a single TCMS.
Begun and in
production, and
expansion per
tolling
prioritization
Global TransPark Authority Page 30 of 56
Appendix B: DOT Mission, Goals & Values
Global TransPark Authority Page 31 of 56
Global TransPark Authority Page 32 of 56
Appendix C: Global TransPark Authority Strategic Plan
Global TransPark Authority Page 33 of 56
NC Global TransPark Authority
Information Technology Plan For 2012-2014 Biennium
By
Levia Williamson
Facilities/Information Technology Director
NC Global Transpark Authority
Prepared: August, 29, 2012
Information Technology Plan For 2012-2014 Biennium
Global TransPark Authority Page 34 of 56
Contents 1 EXECUTIVE SUMMARY ...................................................................................................................................... 35
1.1 PURPOSE ..........................................................................................................................................................35
1.2 OVERVIEW ........................................................................................................................................................35
1.3 ABOUT THIS PLAN ............................................................................................................................................36
2 VISION, MISSION AND VALUES ......................................................................................................................... 38
2.1 OVERVIEW ........................................................................................................................................................38
2.2 KEY BUSINESS DRIVERS ....................................................................................................................................38
2.3 GOALS AND ENABLING STRATEGIES ................................................................................................................38
3 AGENCY GOALS, STRATEGIES AND INITIATIVES ................................................................................................ 40
3.1 GOAL 1: PROVIDE IT SUPPORT FOR GTP EMPLOYEES AND CLIENTS FOR DAILY OPERATIONS. .......................40
3.1.1 Enabling Strategy Maintain efficient and secure IT infrastructure. .............................................................40
3.2.1 Enabling Strategy Maintain operational infrastructure for Spirit Aerosystems, LCC Aviation, and Greenfield Power. .....................................................................................................................................................40
3.2.2 Enabling Strategy Maintain WEB Sites controlled by the GTP .........................................................................40
3.4.1 Enabling Strategy Maintain availability of Network Storage for GTP staff. .....................................................41
3.5.1 Enabling Strategy Maintain ability to backup and recovery of GTP Servers and Workstations. .....................41
Information Technology Plan For 2012-2014 Biennium
Global TransPark Authority Page 35 of 56
1 Executive Summary
1.1 Purpose
The purpose of this document is to provide Information Technology Plan for the 2012-
2014 Biennium to the North Carolina State Chief Information Officer (SCIO) as
required by G.S. 147-33.72B. The statute mandates that each agency submit a
technology plan to the SCIO by October 1 of each even-numbered year. Session Law
2011-145, Section 6A2.(d) directed each agency to include any information
technology project, or any segment of a multipart project, costing more than two
hundred fifty thousand dollars ($250,000) in the agency's most recent information
technology plan.
1.2 Overview
North Carolina Global TransPark (“GTP”), the 2,500 acre aerospace, logistics and
industrial complex owned by the State of North Carolina and overseen by the North
Carolina Global TransPark Authority and the Secretary of Transportation, meets
essential 21st century business needs of manufacturers and logistics service providers
in today’s global economy by providing shovel-ready sites and pre-zoned land with all
infrastructure and multi-modal transportation resources in place for companies that
rely on coordinated logistics of air, marine, rail and ground transportation.
The GTP was planned as a manufacturing and logistics hub to invigorate the economy
of Eastern North Carolina, unlocking the resources and potential of the region through
access to global markets, much as the railroad did almost a century earlier by
providing improved access to the Northeast. Like the Research Triangle Park before
it, the GTP was designed by the State to attract businesses to North Carolina by
creating a planned business park. Located between the established Raleigh-Durham
growth epicenter and the emerging coastal region, the GTP is developing an industrial
cluster by leveraging the regional labor force and concentrating firms at a centralized
location.
The GTP IT department provides technical support for GTP personal and GTP clients
connected to the Transpark’s WAN. The IT Department is responsible for
maintaining Server and Workstation operating systems, applications, and peripheral
devices (printers, copiers, and scanners) connected to the GTP network at three
distinct locations.
The DOT Logistics Division is currently developing a comprehensive logistics
strategic plan for the state, encompassing the North Carolina Department of
Transportation, the State Port Authority and the Global TransPark . As the GTP is one
of the core facilities in the state’s logistics operations, this plan has been developed as
part of and will be coordinated with the overall logistics plan. The synergies of the
Information Technology Plan For 2012-2014 Biennium
Global TransPark Authority Page 36 of 56
operations of the DOT, NCSPA and GTP will provide opportunities for improved
coordination, reduced operating costs and better logistics management for the public.
1.3 About This Plan
This IT plan is a roadmap that lists the IT Department strategies and goals with
specific IT Department responsibilities.
Goal Strategy Initiative Description
Goal 1 Strategy 1.1 Initiative
1.1.1
Maintain accurate AD
database and End Point
Security.
Provide IT
support for
GTP employees
and Clients for
daily
operations.
Maintain efficient and
secure IT infrastructure.
Initiative
1.1.2
Ensure access to
controlled areas (Main
Frame, IDFs, and Server
rooms) is limited to
authorized (or escorted
when required) personnel
only.
Strategy 1.2 Initiative
1.2.1
Ensure timely updates of
Server Operating
Systems.
Maintain current
applications in use.
Initiative
1.2.2
Ensure timely updates of
Workstation Operating
Systems, and
Applications.
Goal 2 Strategy 2.1 Initiative
2.1.1
Provide redundant fiber
connectivity for GTP
Sites, and Clients.
Provide IT
support for
GTP Sites,
Clients and
Devices.
Maintain operational
infrastructure for Spirit
AeroSystems, LCC
Aviation, and Greenfield
Power.
Initiative
2.1.2
Ensure fiber connectivity
for Spirit AeroSystems,
Lenoir Community
College GPS unit and
Greenfield Power Sunny
WebBox.
Strategy 2.2
Maintain WEB Sites
controlled by the GTP
(NCGTP.com,
JetKinston.com and
NCCompositeCenter.com.
Initiative
2.2.1
Ensure timely updates to
all WEB Sites.
Initiative
2.2.2
Ensure WEB Sites are
accessible and Links are
operational and accurate.
Information Technology Plan For 2012-2014 Biennium
Global TransPark Authority Page 37 of 56
Goal Strategy Initiative Description
Goal 3
Enhance
Existing
Security
Mechanisms
and
Infrastructure
Strategy 3.1
Maintain a robust firewall
and intrusion detection
system.
Initiative
3.1.1
Daily review of the
Firewall logs for
tampering and
unauthorized access.
Strategy 3.2
Maintain strict access
control of the GTP
network from outside the
LAN/WAN.
Initiative
3.1.2
Ensure VPN access is
authorized and used only
by GTP personnel who
require such access.
Goal 4
Provide
adequate NAS
that is readily
available to
GTP
employees.
Strategy 4.1
Maintain availability of
Network Storage for GTP
staff as needed.
Initiative
4.1.1
Ensure authorized access
to File and Archive
servers for file sharing
and storage.
Goal 5
Provide reliable
-accurate
Backup and
Recovery
capability of
GTP Servers
and
Workstations.
Strategy 5.1
Maintain ability to backup
and recovery Server and
Workstation Images.
Initiative
5.1.1
Ensure adequate NAS is
available, accessible, and
accurate.
Information Technology Plan For 2012-2014 Biennium
Global TransPark Authority Page 38 of 56
2 Vision, Mission and Values
2.1 Overview
The NC Global TransPark will be a strategic center for advanced manufacturing,
logistics and related research and development to fulfill its mission as an economic
engine for the region and the state. The GTP will utilize its unique competitive
advantages, including multimodal transportation options, freight handling and storage
capability, and integrated education and training programs and facilities to grow well-
paying jobs and investments. Aerospace and defense, advanced materials,
agribusiness, security and emergency response will be target sectors for job creation.
The mission of the GTP IT department is to provide technical support for GTP
personal and GTP clients connected to the Transpark’s WAN. The IT Department is
responsible for maintaining Server and Workstation operating systems, applications,
and peripheral devices (printers, copiers, and scanners) connected to the GTP network
at three distinct locations.
2.2 Key Business Drivers
The key driver for the GTP Information Technology Department is to support the
GTP’s mission to enhance the economic well-being of North Carolinians by providing
multimodal capabilities for global commerce.
2.3 Goals and Enabling Strategies
In order to comply with legislative mandates and support GTP’s objectives the
Information Technology Department has set the following goal and enabling
strategies.
Goal 1: Provide IT support for GTP employees and Clients for daily operations.
Enabling Strategy 1.1: Maintain efficient and secure IT infrastructure.
Goal 2: Provide IT support for GTP Sites, Clients and Devices.
Enabling Strategy 2.1: Maintain operational infrastructure for Spirit
AeroSystems, LCC Aviation, and Greenfield Power.
Enabling Strategy 2.2: Maintain WEB Sites controlled by the GTP (NCGTP.com,
JetKinston.com and NCCompositeCenter.com.
Goal 3: Enhance Existing Security Mechanisms and Infrastructure
Enabling Strategy 3.1: Maintain a robust firewall and intrusion detection system.
Information Technology Plan For 2012-2014 Biennium
Global TransPark Authority Page 39 of 56
Enabling Strategy 3.2: Maintain strict access control of the GTP network from
outside the LAN/WAN.
Goal 4: Provide adequate NAS that is readily available to GTP employees.
Enabling Strategy 4.1: Maintain availability of Network Storage for staff
Goal 5: Provide reliable - accurate Backup and Recovery capability of GTP
Servers and Workstations.
Enabling Strategy 5.1: Maintain ability to backup and recovery Server and
Workstation Images.
The following section describes each goal, the enabling strategy and associated IT
initiatives to support the strategy.
Information Technology Plan For 2012-2014 Biennium
Global TransPark Authority Page 40 of 56
3 Agency Goals, Strategies and Initiatives
3.1 Goal 1: Provide IT support for GTP employees and Clients for daily operations.
The GTP IT Department has the primary responsibility to support GTP employees and
GTP clients as they perform day-to-day operations.
3.1.1 Enabling Strategy Maintain efficient and secure IT infrastructure.
The IT Department Maintains an efficient and secure IT infrastructure by
maintaining an accurate Active Directory database – ensuring only authorized
access to GTP resources. The IT Department also maintains End Point Security
applications on all Servers and Workstations to keep the GTP network free of
viruses.
3.2 Goal 2: Provide IT support for GTP Sites, Clients and Devices.
The GTP IT Department has the primary responsibility to ensure the GTP Fiber
Infrastructure is operational in order to support the needs of GTP and Client facilities.
The GTP WEB Sites, NCGTP.com, JetKinston.com and NCCompositeCenter.com are
included under this responsibility.
3.2.1 Enabling Strategy Maintain operational infrastructure for Spirit
Aerosystems, LCC Aviation, and Greenfield Power.
The GTP IT Department is currently working a project to establish fiber
redundancy to the GTP network in order to provide backup connectivity for all
GTP Sites, Clients and Devices.
3.2.2 Enabling Strategy Maintain WEB Sites controlled by the GTP
The GTP IT Department maintains the GTP WEB Sites in-house, ensuring timely
updates to WEB Server Operating Systems, as well as WEB Server content.
3.3 Goal 3: Enhance existing Security mechanisms and Infrastructure.
The GTP IT Department has the primary responsibility to ensure the GTP Fiber
Infrastructure is operational in order to support the needs of GTP and Client facilities.
The GTP WEB Sites, NCGTP.com, JetKinston.com and NCCompositeCenter.com are
included under this responsibility.
3.3.1 Enabling Strategy Maintain a robust firewall and intrusion detection
system.
Information Technology Plan For 2012-2014 Biennium
Global TransPark Authority Page 41 of 56
The GTP IT Department ensures the security of the GTP network through the use and
daily review of Firewall, Application, Security, and System logs for tampering or
unauthorized access.
3.3.2 Enabling Strategy Maintain strict access control of the GTP LAN/WAN
network.
The GTP IT Department maintains strict control of the GTP network by controlling
VPN access and limiting such access to only GTP personnel who require such access.
3.4 Goal 4: Provide NAS capability that is readily available to GTP employees.
The GTP IT Department ensures adequate Network Storage is available and easily
accessed by GTP personnel for workspace needs and collaboration.
3.4.1 Enabling Strategy Maintain availability of Network Storage for GTP staff.
The GTP IT Department ensures file and archive space is available to GTP employees,
and such space is accessible to only those individuals with authorized access.
3.5 Goal 5: Provide reliable, accurate Backup and Recovery capability of GTP
Servers and Workstations.
The GTP IT Department ensures adequate Network Storage is available for Server and
Workstation imaging for a more rapid recovery of a failed or faulty system.
3.5.1 Enabling Strategy Maintain ability to backup and recovery of GTP Servers
and Workstations.
The GTP IT Department ensures GTP has adequate Network Storage for Server and
Workstation images and rotates on site storage, with off-site storage to negate the
chance of losing reimaging ability due to a catastrophic event.
North Carolina State Ports Authority Page 42 of 56
Appendix C.A: List of Major IT Projects
This purpose of this section is to provide list of major IT projects and applications
(>$250,000) that are in progress or planned in this biennium. The table below maps
each project to overall goals and strategies.
Project Name Short Description Related Goals
and Strategies
Summary of Anticipated
Benefits
Approximate
Timeframe
NONE
North Carolina State Ports Authority Page 43 of 56
Appendix D: State Ports Authority Strategic Plan
North Carolina State Ports Authority Page 44 of 56
North Carolina State Ports
Authority
Information Technology Plan For 2013-2015 Biennium
By
Carey Gibson
Director of Information Technology,
NC State Ports Authority
Prepared: October, 2012
Information Technology Plan For 2012-2014 Biennium
North Carolina State Ports Authority Page 45 of 56
Contents 1 EXECUTIVE SUMMARY ...................................................................................................................................... 46
1.1 PURPOSE ..........................................................................................................................................................46
1.2 OVERVIEW ........................................................................................................................................................46
1.3 ABOUT THIS PLAN ............................................................................................................................................46
2 VISION, MISSION AND VALUES ......................................................................................................................... 48
2.1 OVERVIEW ........................................................................................................................................................48
2.2 KEY BUSINESS DRIVERS ....................................................................................................................................48
2.3 GOALS AND ENABLING STRATEGIES ................................................................................................................49
3 AGENCY GOALS, STRATEGIES AND INITIATIVES ................................................................................................ 49
3.1 GOAL 1 – PROVIDE IT SUPPORT FOR DAILY BUSINESS OPERATIONS ...............................................................49
3.1.1 Enabling Strategy – Maintain efficient IT infrastructure .........................................................................50
3.1.1.1 Initiative: Expand fiber infrastructure and WiFi at all facilities ...........................................................50
3.1.1.2 Initiative: Replace aging technology equipment and continue deploying virtualization ....................50
3.2 GOAL 2 – SUPPORT ORGANIZATION’S GOAL OF OPERATIONAL EXCELLENCE AND CONTINUOUS IMPROVEMENT .............................................................................................................................................................51
3.2.1 Enabling Strategy – Employ technology effectively to gain operational efficiencies ..............................51
3.2.1.1 Initiative: Implement an integrated Terminal Operating and Billing Software System across all Port Authority terminal facilities .....................................................................................................................51
3.3 GOAL 3 – SUPPORT HOUSE BILL 200 ................................................................................................................52
3.3.1 Enabling Strategy – Leverage State-owned technology and services wherever possible .......................52
3.3.1.1 Initiative: Implement State Electronic IP Telephony (EIPT) solution ..................................................52
3.3.1.2 Initiative: Migrate externally hosted websites back in-house onto State owned infrastructure .......53
4 BUSINESS NEEDS .............................................................................................................................................. 54
4.1 SIGNIFICANT UNMET NEEDS ............................................................................................................................54
Information Technology Plan For 2012-2014 Biennium
North Carolina State Ports Authority Page 46 of 56
1 Executive Summary
1.1 Purpose
The purpose of this document is to provide the Information Technology Plan for the
2012-2014 Biennium to the North Carolina State Chief Information Officer (SCIO) as
required by G.S. 147-33.72B. The statute mandates that each agency submit a
technology plan to the SCIO by October 1st of each even-numbered year. Session Law
2011-145, Section 6A2.(d) directed each agency to include any information
technology project, or any segment of a multipart project, costing more than two
hundred fifty thousand dollars ($250,000) in the agency's most recent information
technology plan.
1.2 Overview
The Executive Management team along with board members from NCSPA and
NCDOT are jointly developing a strategic plan for the 2012-2014 Biennium. The
business plan includes vision, mission, values, objectives, and business strategies to
achieve the desired vision. This IT plan links the business strategies with IT initiatives
and an overall IT strategy which enables the business strategy.
1.3 About This Plan
This IT plan is a roadmap that aligns the specific IT projects with the NCSPA
Strategic Plan. The following table summarizes the goals, enabling strategies, and the
supporting IT projects. The next section describes each major strategy, goal, and
initiative in detail.
Information Technology Plan For 2012-2014 Biennium
North Carolina State Ports Authority Page 47 of 56
Roadmap
Goal Strategy Initiative Description
Goal 1
Provide IT
support for daily
business
operations
Strategy 1.1
Maintain
efficient IT
infrastructure
Initiative 1.1.1 Expand fiber infrastructure and
WiFi at all facilities
Initiative 1.1.2 Replace aging technology
equipment and continue
deploying virtualization
Goal 2
Support
Organization’s
goal of
operational
excellence and
continuous
improvement
Strategy 2.1
Employ
technology
effectively to
gain operational
efficiencies
Initiative 2.1.1 Implement an integrated
Terminal Operating and Billing
Software System across all
Port Authority terminal
facilities
Goal 3
Support HB 200
Strategy 3.1
Leverage State-
owned
technology and
services
whenever
possible
Initiative 3.1.1 Implement State Electronic IP
Telephony (EIPT) solution
Initiative 3.2.3 Migrate externally hosted
websites back in-house onto
State owned infrastructure
Information Technology Plan For 2012-2014 Biennium
North Carolina State Ports Authority Page 48 of 56
2 Vision, Mission and Values
2.1 Overview
The North Carolina State Ports Authority has terminal facilities in Wilmington and
Morehead City as well as inland terminals in Charlotte and Greensboro. North
Carolina's Ports have the capability and capacity to serve as competitive alternatives to
ports in neighboring states. Owned and operated by the Ports Authority, North
Carolina's port system combines modern facilities and abundant capacity with the
commitment to excel in service to our customers, without taxpayer subsidy.
The mission of the North Carolina State Ports Authority is to grow the economy of the
State of North Carolina by supporting and improving the state’s global logistics
network.
2.2 Key Business Drivers
The current economic environment, global commerce, legislative mandates, national
security priorities, and maritime industry trends are drivers that have a fundamental
role in shaping the strategic direction of the Ports Authority. The IT goals and
enabling strategies in this plan are aligned with and geared towards supporting the
Agency in fulfilling its goals and vision.
Global Economic Conditions
The Authority’s operating expenses are funded through receipts generated by port
business. Due to the downturn of the economy over the past several years, the Ports
Authority has implemented cost-efficient business processes as well as more effective
information technology. Shipping and trucking companies are looking for port
terminals that provide logistical and cost saving advantages. Streamlined business
processes and more efficient technology can significantly reduce costs for the
Authority. These savings can then be translated into a competitive advantage through
lower-cost/value-add services to existing and potential customers.
House Bill 200
Per Section 6A.2.(f) of House Bill 200 states that State agencies developing and
implementing information technology projects/applications shall use the State
infrastructure to host their projects. Projects/applications currently hosted outside the
State infrastructure shall be returned to State infrastructure not later than the end of
any current contract. By October 1, 2011, the State Chief Information Officer shall
report to the Joint Legislative Oversight Committee on Information Technology
regarding projects currently hosted outside State infrastructure and a schedule to return
those projects to State infrastructure.
Information Technology Plan For 2012-2014 Biennium
North Carolina State Ports Authority Page 49 of 56
Port Industry & Automation
Automation is a major driver of technology in the port industry. Real time, accurate
inventory status, improved operating efficiencies, and best total value (cost) are all key
decision factors for shippers locating at ports.
Post 9/11 security requirements
America’s ports are not only critical to our economy, but to national security as well.
Since the terrorist attacks on September 11th
, 2001, security has become an engrained
part of our culture. Federal and State minimum-security requirements in the
transportation industry have caused an exponential increase in spending on security
related technologies. Although there have been numerous federal and state grant
programs over the past decade to assist with the cost of implementing these added
security measures, the on-going cost of maintaining this technology is the burden of
the entity.
2.3 Goals and Enabling Strategies
In order to comply with legislative mandates and support business objectives the
Information Technology Department has set the following goal and enabling
strategies.
Goal 1 – Provide IT support for daily business operations
Enabling Strategy 1.1– Maintain efficient IT infrastructure
Goal 2 – Support Organization’s goal of continuous improvement and operational
excellence
Enabling Strategy 2.1 – Employ technology effectively to gain further market
advantages and operational efficiencies
Goal 3 – Support House Bill 200
Enabling Strategy 3.1 – Leverage State- owned technology and services whenever
possible
The following section describes each goal, the enabling strategy and associated IT
initiatives to support the strategy.
3 Agency Goals, Strategies and Initiatives
3.1 Goal 1 – Provide IT support for daily business operations
The mission of the North Carolina State Port Authority Information Technology
Department (IT) is to provide first class support of business applications to the
organization and its customers, implement relevant and cost effective technologies to
Information Technology Plan For 2012-2014 Biennium
North Carolina State Ports Authority Page 50 of 56
meet business needs, promote continuous improvement of accurate and timely
information, and align IT initiatives with current business objectives.
3.1.1 Enabling Strategy – Maintain efficient IT infrastructure
Because the Ports Authority is a receipts based agency and receives no
appropriations to fund operating expenses, managing costs is paramount to the
success of the business. As a result IT must use prudent management of
technology infrastructure investments to ensure maximized return on investment
before obsolescence.
3.5.1.1 Initiative: Expand fiber infrastructure and WiFi at all
facilities
Many of our facilities have staff located in areas that have limited or no fiber
or Wifi access to network resources. Through Port Security Grant funding, in
2012/2013 it is now possible to service these areas with the installation of
fiber/Wifi as applicable.
3.5.1.2 Initiative: Replace aging technology equipment and
continue deploying virtualization
In order to minimize losses during the worst of the recent recession,
maintenance on much of the technology infrastructure was deferred where
possible. The Authority is now in the position of having to replace equipment
that is at or has exceeded end-of-life and support.
Virtualization has facilitated a more efficient equipment replacement strategy
through the creation of a centralized server and desktop infrastructure from
which can run multiple virtual machines on a single physical machine.
Virtualization also provides the flexibility to deploy servers, desktops, and
applications quickly for increased scalability. Coupling virtualization with the
centralized data storage of a Storage Area Network (SAN) reduces total cost of
ownership (TCO) associated with energy consumption and annual hardware
maintenance.
Virtualization lowers TCO significantly due to:
Less physical hardware means reduced capital expenditures
GREEN IT - lower power consumption and cooling requirements
Rapid deployment of applications and virtual desktops/servers
facilitates quick turn-around on system failures
Disaster recovery and bare-metal recovery of critical systems takes
minutes/hours instead of hours/days
Improved efficiency due to and due to increased Server/Desktop-to-
admin personnel ratio
Information Technology Plan For 2012-2014 Biennium
North Carolina State Ports Authority Page 51 of 56
The Authority began implementing virtualization in 2009 using VMware.
Aging servers/desktops continue to be replaced with ThinClients or
ZeroClients and virtual machines where applicable.
3.2 Goal 2 – Support organization’s goal of operational
excellence and continuous improvement
The vision of the North Carolina State Ports Authority is to be busy, growing,
productive; owning the North Carolina market and competitive in markets beyond. A
key requirement to attain this vision is to be an operationally excellent and a
continuously improving organization. The Ports Authority needs to employ
technology effectively to gain further market advantages and operation efficiencies.
3.2.1 Enabling Strategy – Employ technology effectively to gain
operational efficiencies
There are several opportunities for IT to contribute to higher efficiency and lower
costs; implementing better technology, consolidation of hardware/software
resources where possible, and better access to pertinent information for everyone
in the organization.
The strategic direction for the past 4 years has been to reduce the number of
disjointed IT systems that do not communicate without labor intensive integration
and maintenance. This causes increased administrative needs, loss of productivity
and efficiency, and hinders IT’s ability to provide accurate and timely information
to the business.
3.5.1.3 Initiative: Implement an integrated Terminal Operating
and Billing Software System across all Port Authority terminal
facilities
A single system for the management of container and general cargo operations
as well as a comprehensive billing system is the optimal solution to support the
strategic direction of the business as identified in this plan. Such a solution
will allow the Authority to meet current business requirements and future
forecasted market growth. Listed below are some benefits of this initiative:
Improve employee efficiency and increase productivity through automation
and better cargo inventory management/tracking
Provide flexibility for rapid response to new customer requirements and
business challenges.
Reduce system support requirements allowing IT staff to focus more on
business needs.
Implementation of this initiative is divided into 3 phases:
Information Technology Plan For 2012-2014 Biennium
North Carolina State Ports Authority Page 52 of 56
Phase 1: Deployment of cargo management functionality at
Wilmington general terminal and port-wide billing – Completed in
May, 2012.
Phase 2: Deployment of cargo management functionality at Morehead
City general terminal – Currently underway (estimated completion
FY2013/Q3)
Phase 3: Deployment of containerized cargo management functionality
at Wilmington container terminal and Charlotte inland terminal -
Estimated completion FY2014/Q4
3.3 Goal 3 – Support House Bill 200
The General Assembly of North Carolina passed House Bill 200 and it became law
July 1st, 2012. HB200 states that State agencies developing and implementing
information technology projects/applications shall use the State infrastructure to host
their projects. Projects/applications currently hosted outside the State infrastructure
shall be returned to State infrastructure not later than the end of any current contract.
The goal of the Ports Authority Information Technology department is to support any
business initiatives and programs recommended or required by the law.
3.3.1 Enabling Strategy – Leverage State-owned technology and
services wherever possible
Utilizing State owned and provided technology services and SAAS solutions
where applicable keeps the Authority in compliance with HB 200 and also
supports goal 3.2 above by reducing TCO associated with supporting an in-house
system, and benefits the State as a whole by minimizing system redundancies
across state agencies. On July 1st, 2011, the NC State Ports Authority was
transferred under the NC Department of Transportation. As a result of that
transfer, the Ports Authority migrated to the NCDOT financial accounting system
which has reduced our TCO associated with supporting the previous in-house
financial system.
3.5.1.4 Initiative: Implement State Electronic IP Telephony
(EIPT) solution
The Ports Authority is not currently on the State’s ESAP network. If the Ports
were to migrate to the ESAP network under the NCDOT VRF it would
facilitate synergistic resource sharing between the two agencies and provide
the necessary path to implement the State’s electronic IP telephony (EIPT)
services.
Migrating to ESAP will require extensive planning and coordination by Ports
Authority, NCDOT and ITS staff. Our plan is to engage NCDOT and ITS in
Information Technology Plan For 2012-2014 Biennium
North Carolina State Ports Authority Page 53 of 56
the Spring of 2013 to begin the ESAP migration process followed by the
implementation of EIPT.
Implementing the State’s EIPT services would provide the following benefits
to the Authority:
Having a centralized call management solution provides outside
agencies a quick and automated way of reaching appropriate personnel
to address specific needs
Emergency information can be quickly placed on main or targeted
lines, allowing quick addition of public notices to incoming calls
Intercom features could be used for global or targeted notifications
across multiple sites and potentially agencies utilizing the same VOIP
solution within the State
Call groups/pickup allow calls to be routed to several locations and can
be picked up by multiple individuals
Instant multi-line conferencing ability allows an immediate way to
conference calls together from inside and outside the agency without
having to schedule conference calls through a third party vendor
Handsets can be forwarded to appropriate personnel inside and outside
of agency, on demand without making requests to have features added
to various lines.
3.5.1.5 Initiative: Migrate externally hosted websites back in-
house onto State owned infrastructure
The Ports Authority currently hosts its websites externally and is currently
working with the existing hosting provider to migrate this back in-house before
the existing contract terminates in June of 2013.
Department of Transportation Page 54 of 56
4 Business Needs
4.1 Significant Unmet Needs
Due to time and resource constraints, the Ports Authority is in need of an affordable
work-order and asset management system as well as a document management
solution. We are currently looking at an open-source BI toolset to replace our existing
system that will provide at least the same functionality at less/no cost.
Department of Transportation Page 55 of 56
Appendix A: List of Major IT Projects
This purpose of this section is to provide list of major IT projects and applications
(>$250,000) that are in progress or planned in this biennium. The table below maps
each project to overall goals and strategies.
Project Name Short Description Related Goals
and Strategies
Summary of
Anticipated
Benefits
Approximate
Timeframe
Port
Warehouse
Inventory
Management
System
Replace custom in-
house inventory &
manual billing
system
3.2 Better inventory
management as well
as providing
foundation for pre-
planning and
introduction of RDT
scanning
functionality
Phase I
(Wilmin
gton
General
Terminal
)–
Complet
e
Phase II
(Morehe
ad City
Terminal
s) – 8
months
Department of Transportation Page 56 of 56