NATIONAL MIG MANAGEMENT UNIT PROGRAMMEMANAGEMENT PROCESSES AND PROCEDURES
Note: The Management Processes and Procedures document is aworking document to be revised as and when required.
2
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
CONTENTS
1. INTRODUCTION 5
2. PRINCIPLES AND OBJECTIVES OF THE MUNICIPALINFRASTRUCTURE GRANT 52.1 KEY PRINCIPLES 52.2 MIG PROGRAMME OBJECTIVES 6
3. INSTITUTIONAL ARRANGEMENTS 73.1 AT MUNICIPAL SPHERE – THE DEVOLUTION OF RESPONSIBILITY TO THE LOWEST LEVEL 73.2 AT PROVINCIAL SPHERE 73.3 RESPONSIBILITY MATRIX 7
4. CONDITIONS APPLIED TO THE MIG 174.1 PRINCIPLES RELATING TO THE SETTING OF CONDITIONS 17
4.1.1 Division of Revenue Act 174.1.2 Cross-cutting conditions 174.1.3 Sector specific conditions 18
5. COMMUNICATION FLOW AND INTERACTION PROCEDURES 205.1 INTERACTION 20
5.1.1 Interaction between the National MIG Unit, ProvincialMIG Management Unit, PMUs and Municipalities 20
5.1.2 Interaction between PMU, Municipality and project consultant/s 215.2 MEETINGS 21
5.2.1 Provincial Progress Meetings 215.2.2 National quarterly workshops 225.2.3 Ad-hoc Meetings 22
6. MIG PROJECT LIFE CYCLE6.1 PRELIMINARY PHASE6.2 PRE-IMPLEMENTATION PHASE6.3 IMPLEMENTATION PHASE6.4 OPPERATION AND MAINTENANCE
7. GENERIC REPORTING MECHANISMS, FORMATS AND PROCEDURES 267.1 DIVISION OF REVENUE ACT – MONTHLY REPORTING 26
7.1.1 Recipient Municipalities 267.1.2 PMUs 26
3
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
7.1.3 Provincial Programme Management Unit 277.1.4 National MIG Unit 277.1.5 dplg – Chief Financial Officer 27
7.2 MONTHLY PROGRESS REPORT 287.2.1 Recipient Municipalities 287.2.2 PMU 287.2.3 Provincial Programme Management Unit 297.2.4 National MIG Unit 29
7.3 QUARTERLY KPI REPORT 397.4 ANNUAL REPORT 30
8. MIG NATIONAL FUND ADMINISTRATION SYSTEM 318.1 MUNICIPAL INFRASTRUCTURE GRANT (MIG) 31
8.1.1 Recipient Municipalities 328.1.2 PMUs 328.1.3 Provincial MIG Management Unit 338.1.4 National MIG Unit 338.1.5 Under spending at municipal level 338.1.6 Control measures for expenditures/transfers 348.1.7 Assist municipalities 348.1.8 Delaying of payments 358.1.9 Withholding of payments 358.1.10 Non-compliance 35
8.2 RE-ALLOCATION OF MIG FUNDS 35
9. MIG MANAGEMENT INFORMATION SYSTEM (MIS) 369.1 PRELIMINARY PHASE 36
9.1.1 Project Registration Form 369.2 PRE-IMPLEMENTATION PHASE (DESIGN & TENDER) 38
9.2.1 Register consultant 389.2.2 Request for payment from municipality (Design phase) 38
9.3 IMPLEMENTATION PHASE (CONSTRUCTION) 389.3.1 Register contractor 389.3.2 Request for Payment (Construction phase) 389.3.3 Physical Completion Report 389.3.4 Request for Payment (Retention) 38
10. GENERAL FILING AND BACKUP PROCEDURES 3910.1 BACKUPS 3910.2 PROJECT FILES 3910.3 MINUTES 3910.4 REPORTS 3910.5 FINANCIAL ADMINISTRATION SYSTEM 40
10.5.1 Submission of draw downs 4010.5.2 Proof of Expenditure (1084’s) 40
10.6 SERVICE LEVEL AGREEMENTS 40
CONTENTS
4
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
ABBREVIATIONS
The following abbreviations are used throughout this document.
BAS Basic Accounting System
CETA Construction for Education Authority
DME Department of Minerals and Energy
DoH Department of Housing
DORA Division of Revenue Act
DoT Department of Transport
DPLG Department of Provincial and Local Government
DPW Department of Public Works
DWAF Department of Water Affairs and Forestry
EMM Executive Manager MIG
EPWP Expanded Public Works Programme
GIS Geographical Information System
IDP Integrated Development Plan
IIF Infrastructure Investment Framework
IT Information Technology
KPIs Key Performance Indicators
LGCB Local Government Capacity Building Grant
LIC Labour Intensive Construction
MIIF Municipal Infrastructure Investment Framework
MIS Management Information System
MITT Municipal Infrastructure Task Team
NQF National Qualification Framework (SETA – Sector for Education Training Authority)
O&M Operation and Maintenance
PMITT Provincial Municipal Infrastructure Task Team
PMM Provincial MIG Manager
PPMU Provincial Programme Management Unit
PMU Project Management Unit
SMF Senior Manager Finance
SMIF Special Municipal Infrastructure Fund
SMM Senior Manager MIG
SMME Small, Medium and Micro Enterprises
5
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
1. Introduction
The purpose of this guideline document is to create conformity and to regulate the MunicipalInfrastructure Grant (MIG) programme management processes and procedures.
The National MIG Unit’s main responsibility is the administration of MIG funds and therefore theimplementation of the following management processes and procedures across all spheres ofgovernment:
• Communication, documentation and information flows generic to all sectors and departmentalpolicies
• Generic reporting mechanisms, formats and procedures• MIG national fund administration system• MIG Management Information System (MIS).
The planning process of the Municipal Infrastructure Investment Fund (MIIF) is not covered in thisdocument.
This document is a work in progress and will be updated as and when the environment or conditionschange.
2. Principles and objectives of theMunicipal Infrastructure Grant
2.1 Key principles
The Municipal Infrastructure Grant complements the equitable share grant to local government,however it is not provided unconditionally to municipalities. The key principles underpinning thedesign of the MIG are outlined below:
a) Focus on infrastructure required for a basic level of service: The MIG programme is aimedat providing only basic infrastructure.
b) Targeting the poor: The programme is aimed at providing services to the poor and funds willtherefore be targeted to reach them.
c) Maximising economic benefits: The programme will be managed to ensure that the localeconomic spin-offs through providing infrastructure are maximised. This includes employmentcreation and the development of enterprises.
d) Equity in the allocation and use of funds: The mechanism for distributing funds must providefor equitable access to such funds by the poor in order to make uniform progress in closing theinfrastructure gap.
6
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
e) Decentralisation of spending authority within national standards: Decisions relating tothe prioritisation of municipal infrastructure spending, such as the identification, selection andapproval of projects, are best undertaken at municipal level, with the following provisions:
• The operating finance and management arrangements must be in place.• A degree of national and provincial influence over capital spending, expressed through clear
norms, standards and spending conditions must be retained.• Unintended consequences should be limited: the grant must promote sound management
practices, not the reverse.
f) Efficient use of funds: Funding must be used to provide the greatest possible improvementin access to basic services at the lowest possible cost. This implies the following:
• There should be an appropriate selection of service levels.• Incentives and conditions must ensure that other funds are mixed with grant funds to minimise
leakage to non-eligible households and service levels.• The mechanism to disburse funds should be simple and easy to monitor, and the outcomes
of municipal spending should be easy to evaluate.
g) Reinforcing local, provincial and national development objectives: This implies the following:• The funding mechanism must be consistent with the planning processes of local, provincial
and national government.• Nodal municipalities associated with the Urban Renewal Strategy and the Integrated Sustainable
Rural Development Programme must receive proportionally greater allocations of funding.• Spatial integration must be promoted.• The emphasis must be placed on the selection of appropriate service levels.• The fund allocation formula should promote appropriate municipal performance relative to
policy objectives.
h) Predictability and transparency: Funds should be provided to individual municipalities on athree-year basis, consistent with medium term budgeting practice, with minimal in-year changesand with year to year changes based only on clearly defined conditions. It is also essential formunicipalities and other stakeholders to easily understand how the funds are distributed.
2.2 MIG programme objectives
National government provides infrastructure subsidies to ensure that all households have access toa basic level of infrastructure services. The benefits of this intervention are well known, particularlyin relation to the public good characteristics of many municipal services.
In the context of the principles outlined above, the key objectives of the Municipal Infrastructure Grantare to:
a) fully subsidise the capital costs of providing basic services to poor households: this implies thatpriority must be given to meeting the basic infrastructure needs of poor households, through theprovision of appropriate bulk, connector and internal infrastructure in key services;
b) distribute funding for municipal infrastructure in an equitable, transparent and efficient manner,which supports a co-ordinated approach to local development and maximises developmentaloutcomes;
c) assist in enhancing the developmental capacity of municipalities, through supporting multi-yearplanning and budgeting systems; and
d) provide a mechanism for the co-ordinated pursuit of national policy priorities with regard to basicmunicipal infrastructure programmes, while avoiding the duplication and inefficiency associatedwith sectorally fragmented grants.
7
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
3. Institutional arrangements3.1 At municipal sphere – the devolution of responsibility to the
lowest level
The MIG is a conditional grant to municipalities, and thus the management of the grant at municipallevel must occur within the planning, budgeting, financial management and operational arrangementsin this sphere. Effective management and utilisation of capital funding, falls within the responsibilityof the Municipal Manager.
Government, through the MIG programme, will therefore assist municipalities in the developmentof appropriate capital programme management capacity, typically achieved through the establishmentof Project Management Units (PMUs) within municipalities. PMUs will be accountable to the counciland management structure of the municipality in which they are established. However, they will besupported and monitored by the national MIG unit and by the Provincial Programme ManagementUnits.
Effective area-based, service sector and project planning is central to the success of a municipality’sinfrastructure investment programme. The MIG programme promotes the creation of an enablingenvironment through the devolution of responsibility to the lowest possible level and has twodimensions:
• Devolution of the project management function, which implies the establishment of a PMU withina municipality to ensure that there is ‘sufficient capacity’ to undertake the function.
• Devolution of responsibility for control of the funds, with associated accounting responsibility andthe requirement to contract with consultants and contractors, with the associated legal implications.
3.2 At provincial sphere
All national departments and their provincial counterparts retain their policy-making and regulatoryfunctions which cover the full range of municipal activity: governance, administration, planning,projects and operations. Furthermore, the departments and provinces retain their constitutional rightto intervene directly in the affairs of municipalities. (Reference: Constitution of RSA Act 108 of 1996)
Within the context of the MIG strategies, the provincial departments, through the Provincial ProgrammeManagement Units (PPMUs), will continue to hold responsibility for supporting and developingappropriate municipal planning capabilities. The MIG programme will integrate with these sectoralplanning initiatives through ensuring that:
• The MIG programme is properly integrated with municipal IDPs.• Planning for regional scale infrastructure is guided by provincial government, working in conjunction
with the municipalities and their PMUs.• The municipal PMUs are supported in their function of overseeing project feasibility studies within
the municipalities they serve, as part of the municipal planning process.
The following matrix details the specific roles, functions and responsibilities of each sphere ofgovernment.
3.3 Responsibility matrix
The role and responsibilities of the various roleplayers are as follows:
8
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
• M
inut
es o
f m
eetin
gs•
Site
vis
it re
port
s•
Labo
ur In
tens
ive
repo
rts
• C
ash
flow
rep
orts
MU
NIC
IPA
L SP
HER
E –
Incl
ud
ing
Pro
ject
Man
agem
ent
Un
its
(PM
Us)
Act
ivit
ies
Ou
tpu
tsIn
dic
ato
rs
Fina
ncia
l Man
agem
ent
• Th
e PM
U i
s re
spo
nsi
ble
fo
r th
e ad
min
istr
atio
n a
nd
fin
anci
al m
anag
emen
t o
f M
IGfu
nds,
wit
hin
the
mun
icip
al a
nd n
atio
nal
acco
unti
ng s
yste
ms
for
infr
astr
uctu
re p
roje
cts
of
the
mu
nic
ipal
ity
and
an
y o
ther
mu
nic
ipal
itie
s w
her
e th
e PM
U h
as b
een
del
egat
edth
is a
utho
rity.
• Th
e PM
U i
s re
spo
nsi
ble
fo
r th
e co
mp
lian
ce o
f al
l co
nd
itio
ns
con
tain
ed i
n t
he
Div
isio
nof
Rev
enue
Act
(DO
RA) f
ram
ewor
k re
latin
g to
all
fund
ing
mec
hani
sms.
• Th
e PM
U is
dire
ctly
resp
onsi
ble
for t
he re
conc
iliat
ion
and
timel
y su
bmis
sion
of a
ll D
ORA
repo
rtin
gan
d ad
hoc
repo
rtin
g as
and
whe
n re
quire
d.•
Fina
l com
pila
tion
of m
onth
ly, q
uart
erly,
bi-a
nnua
l and
ann
ual r
epor
ts t
o th
e M
IG M
anag
er•
Mon
itor
the
cons
olid
ated
cas
h flo
w p
erfo
rman
ce r
epor
ts o
n ea
ch p
roje
cts
and
on t
he r
egio
nal
prog
ram
me
colle
ctiv
ely
• Ve
rify
and
reco
ncile
qua
rter
ly t
rans
fers
fro
m N
atio
nal t
o th
e m
unic
ipal
ities
• A
udit
and
adm
inis
ter
the
mon
thly
cla
ims
and
expe
nditu
re
• D
ORA
rep
orts
• M
unic
ipal
fin
anci
al r
epor
ts
Proj
ect
Iden
tific
atio
nan
d Pr
iorit
isat
ion
•Th
e co
-ord
inat
ion
of t
he p
roje
ct i
dent
ific
atio
n an
d pr
iori
tisa
tion
pro
cess
for
mun
icip
alit
ies
serv
ed b
y th
e PM
U,
wh
ilst
ensu
rin
g p
rop
er i
nte
gra
tio
n o
f th
e re
spec
tive
IIF
’s a
nd
ID
P’s
wit
h th
e ap
prop
riat
e in
put
from
the
var
ious
oth
er g
over
nmen
t lin
e fu
ncti
on d
epar
tmen
tsto
ens
ure
sync
hron
ised
ser
vice
del
iver
y.•
Ensu
re t
hat
mun
icip
aliti
es h
ave
the
reso
urce
s to
ope
rate
and
mai
ntai
n th
e pr
ojec
t th
roug
hout
the
proj
ect
lifec
ycle
.•
Ensu
re t
hat
mun
icip
aliti
es b
udge
t fo
r th
e ca
pita
l rep
lace
men
t or
reh
abili
tatio
n co
sts
ther
eaft
er.
• Th
e fe
asib
ility
pro
cess
nec
essi
tate
s th
at d
ue c
onsi
dera
tion
be g
iven
to
the
feas
ibili
ty
of t
he p
roje
ct in
ter
ms
of:
º Pr
ovin
cial
and
reg
iona
l gro
wth
str
ateg
ies
º In
tegr
ated
reg
iona
l-lev
el in
fras
truc
ture
pla
nnin
g an
d te
chni
cal f
easi
bilit
y of
the
pro
ject
s.º
Infr
astr
uctu
re b
ackl
og s
tudi
es.
º La
bour
Inte
nsiv
e Pr
ojec
ts (E
PWP
Gui
delin
es f
or la
bour
inte
nsiv
e co
nstr
uctio
n).
• ID
P•
Sect
or P
lans
• Pr
ovin
cial
/ Re
gion
al In
fras
truc
ture
inve
stm
ent
plan
s•
Back
log
stud
ies
• C
ontr
ibut
ion
to L
abou
r In
tens
ive
Proj
ects
(EPW
P)
Spec
ial M
unic
ipal
Infr
astr
uctu
reFu
nd•
The
co-o
rdin
atio
n of
SM
IF p
roje
ct a
pplic
atio
ns; i
n su
ppor
t of
inno
vatio
n in
the
pro
visi
on
of in
fras
truc
ture
• A
lso
in t
erm
s of
cos
t ef
fect
ive
regi
onal
-leve
l inf
rast
ruct
ure
solu
tions
invo
lvin
g a
num
ber
of m
unic
ipal
ities
.
• SM
IF B
usin
ess
Plan
s•
Regi
onal
Infr
astr
uctu
reIn
vest
men
t pl
an•
Tech
nica
l stu
dies
sup
port
ing
inno
vatio
n
Prog
ram
me
/ Pro
ject
Man
agem
ent
The
PMU
will
be
resp
onsi
ble
for
the
man
agem
ent
of t
he lo
cal i
nfra
stru
ctur
e pr
ogra
mm
e (m
unic
ipal
scal
e) a
s w
ell a
s ph
ysic
al p
roje
ct im
plem
enta
tion
activ
ities
whi
le e
nsur
ing
that
:•
All
proj
ects
mee
t ove
rall
plan
ning
obj
ectiv
es a
nd s
peci
fic k
ey p
erfo
rman
ce in
dica
tors
as
dete
rmin
edby
the
MIG
Pol
icy
Fram
ewor
k.•
The
co-o
rdin
atio
n of
reg
ular
pro
gres
s m
eetin
gs a
t lo
cal l
evel
and
rep
rese
ntat
ion
at t
he n
atio
nal
prog
ress
mee
tings
.•
Tthe
ass
ocia
ted
proj
ect m
anag
emen
t adm
inis
trat
ive
func
tions
from
pro
ject
regi
stra
tion,
eva
luat
ion
thro
ugh
to f
inal
pro
ject
com
plet
ion
repo
rts.
• Pr
ojec
t m
anag
e th
e la
bour
-inte
nsiv
e pr
ojec
ts in
line
with
in t
he E
PWP
fram
ewor
k an
d th
e re
late
dre
port
ing
requ
irem
ents
• C
ondu
ct s
ite-v
isits
/ m
eetin
gs t
o en
sure
com
plia
nce
to t
he P
roje
ct R
egis
trat
ion
form
and
the
Lett
er o
f A
ccep
tanc
e.•
Man
age
cash
flo
ws
and
com
mitt
ed p
roje
ct e
xpen
ditu
re
9
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
• M
inut
es o
f m
eetin
gs•
Site
vis
it re
port
s•
Labo
ur In
tens
ive
repo
rts
• C
ash
flow
rep
orts
MU
NIC
IPA
L SP
HER
E –
Incl
ud
ing
Pro
ject
Man
agem
ent
Un
its
(PM
Us)
Act
ivit
ies
Ou
tpu
tsIn
dic
ato
rs
Mon
itorin
g D
atab
ase
• Th
e PM
U w
ill b
e re
spon
sibl
e fo
r th
e IT
man
agem
ent
of t
he m
onit
orin
g da
taba
se a
nd t
hepr
epar
atio
n of
all
nece
ssar
y re
port
s to
mun
icip
al a
nd t
he r
elev
ant
prov
inci
al a
nd n
atio
nal
depa
rtm
ents
.•
Gen
erat
ion
of R
egis
trat
ion
form
s / B
usin
ess
plan
s / F
easi
bilit
y st
udie
s•
Dat
a ca
ptur
e, u
pdat
ing
and
repl
icat
ion
of a
ll da
ta a
nd K
PIs
• N
atio
nal M
IG In
form
atio
nSy
stem
(MIS
)
Adm
inis
trat
ion
/ Con
trac
tA
dmin
istr
atio
n•
The
co-o
rdin
atio
n of
SM
IF p
roje
ct a
pplic
atio
ns;
in s
uppo
rt o
f in
nova
tion
in t
he p
rovi
sion
of
infr
astr
uctu
re•
Als
o in
ter
ms
of c
ost
effe
ctiv
e re
gion
al-le
vel i
nfra
stru
ctur
e so
lutio
ns in
volv
ing
a nu
mbe
r of
mun
icip
aliti
es.
• A
udit
com
plia
nce
of l
egal
con
diti
ons,
req
uire
d fr
om t
he d
iffer
ent
sphe
res
and
sect
ors
ofG
over
nmen
t•
Mai
nten
ance
of
site
vis
it re
port
s, O
H&
S re
gist
er
• C
ontr
act D
ocum
enta
tion
for c
onsu
lting
engi
neer
s an
d co
ntra
ctor
s•
MO
As
etc
Ther
e m
ay b
e a
loca
l mot
ivat
ion
to e
stab
lish
prog
ram
me
scal
e in
itiat
ives
, whi
ch c
ould
incl
ude
dist
rict
scal
e la
bour
-ba
sed
cons
truc
tion
prog
ram
mes
, par
ticul
arly
for
roa
ds.
Such
initi
ativ
es t
ypic
ally
hav
e a
stro
ng c
apac
ity b
uild
ing
elem
ent.
• C
omm
unity
aw
aren
ess
cam
paig
ns.
• SM
ME
Lear
ners
hips
• W
orke
r tr
aini
ng d
urin
g em
ploy
men
t
•Em
ploy
men
t ex
ist
stra
tegi
es
• Tr
aini
ng P
rogr
amm
es
• M
unic
ipal
Par
tner
ship
s (S
MM
E)
• C
omm
unity
Bas
ed P
artn
ersh
ips
• C
omm
unity
Bas
ed P
artn
ersh
ips
Oth
er C
apita
l Wor
ks F
undi
ng•
Cap
ital w
orks
fun
ded
from
oth
er s
ourc
es w
ill b
e in
clud
ed w
ithin
the
com
pete
nce
of t
he P
MU
.•
Labo
ur In
tens
ive
Proj
ects
(EPW
P) –
Enc
oura
ge t
he u
se o
f th
e EP
WP
Gui
delin
es f
or la
bour
inte
nsiv
e co
nstr
uctio
n.
Proj
ect–
base
d C
apac
ity B
uild
ing
• Th
e PM
U w
ill b
e re
spon
sibl
e fo
r th
e br
oad
co-o
rdin
atio
n of
pro
ject
-bas
ed c
apac
ity b
uild
ing
and
deve
lopm
enta
l ini
tiativ
es.
• Th
is c
apac
ity b
uild
ing
com
pone
nt o
f M
IG is
onl
y co
ncer
ned
with
pro
ject
s an
d th
e ar
rang
emen
tsre
latin
g to
the
eff
ectiv
e de
liver
y of
mun
icip
al in
fras
truc
ture
and
will
be
targ
eted
in t
he f
ollo
win
gm
anne
r:
• C
apac
ity B
uild
ing
Plan
s
Proj
ect
Leve
lPr
ojec
tIm
plem
enta
tion
Cap
acity
bui
ldin
g is
ass
ocia
ted
with
impr
ovin
g th
e ab
ility
of c
omm
uniti
es t
o be
com
e in
volv
ed w
ith t
he p
roje
ctpl
anni
ng a
nd c
onst
ruct
ion
of p
roje
cts.
With
reg
ard
toth
e la
tter
the
foc
us is
on
labo
ur-b
ased
con
stru
ctio
n an
dsm
all c
ontr
acto
r de
velo
pmen
t
Ope
ratio
nal
Und
er t
his
cate
gory
the
pro
ject
incl
udes
an
unde
rtak
ing
to tr
ain
the
futu
re s
ervi
ces
prov
ider
(or o
pera
tor)
to o
pera
teth
e in
fras
truc
ture
. Typ
ical
ly th
is w
ould
invo
lve
com
mun
ity-
base
d or
gani
satio
ns b
ut it
may
also
be
aim
ed a
t mun
icip
alst
aff.
In s
ome
case
s th
e ob
ligat
ion
to s
uppo
rt s
ervi
ces
prov
ider
s m
ay e
xten
d fo
r up
to
thre
e ye
ars.
Suc
h co
sts
may
be
incl
uded
und
er p
roje
ct c
osts
.
Prog
ram
me
leve
l
Mun
icip
al S
cale
Prog
ram
me
Man
agem
ent
The
focu
s of
the
nat
iona
l eff
ort
unde
r th
e na
tiona
l MIG
offic
e w
ill b
e on
bui
ldin
g th
e ca
paci
ty o
f pr
ojec
tm
anag
emen
t un
its (P
MU
s) t
o en
sure
tha
t th
ey c
an f
ulfil
thei
r fu
nctio
ns.
Proj
ect
Impl
emen
tatio
n
Scal
e o
f In
itia
tive
Typ
e o
f A
ctiv
ity
Key
Fea
ture
s
10
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
MU
NIC
IPA
L SP
HER
E –
Incl
ud
ing
Pro
ject
Man
agem
ent
Un
its
(PM
Us)
Act
ivit
ies
Ou
tpu
tsIn
dic
ato
rs
Ope
ratio
n an
d Pl
anne
dM
aint
enan
ce•
Mun
icip
al In
fras
truc
ture
Inve
stm
ent
Plan
ning
tog
ethe
r w
ith In
tegr
ated
Dev
elop
men
t Pl
anni
ngis
nec
essa
ry f
or lo
ng-t
erm
fin
anci
al s
usta
inab
ility
of
mun
icip
al a
sset
s. In
sup
port
of
this
, it
iscr
itica
l tha
t m
unic
ipal
ities
hav
e pl
anne
d m
aint
enan
ce p
rogr
amm
es f
or t
heir
asse
ts o
n on
e ha
ndan
d th
e re
sour
ces
and
capa
city
on
the
othe
r.
• It
is t
he r
espo
nsib
ility
of
the
PMU
to
ensu
re t
hat
the
mun
icip
ality
has
the
res
ourc
es t
o fu
lfil t
heop
erat
ions
and
mai
nten
ance
obl
igat
ions
for
all
capi
tal p
roje
cts.
The
PM
U w
ill a
ssis
t w
here
ver
poss
ible
with
reg
ard
to t
he p
lann
ing
and
impl
emen
tatio
n of
the
O&
M p
rogr
amm
es,
dire
ctly
or in
dire
ctly.
• O
pera
tion
and
Plan
ned
Mai
nten
ance
Prog
ram
me
• U
pdat
ed a
sset
reg
iste
rs (
GIS
bas
ed)
GIS
• Th
e G
IS f
unct
ions
wou
ld b
e ba
sed
at t
he p
rovi
ncia
l off
ices
. Th
e G
IS f
unct
ion
can
be a
lso
beba
sed
at t
he P
MU
's
and
whe
re t
he G
IS is
bas
ed a
t Pr
ovin
ce,
mun
icip
aliti
es c
an m
ake
use
ofth
ose
prov
inci
al f
acili
ties.
• G
IS d
atab
ase
• A
sset
reg
iste
rs
Proj
ect
Mon
itorin
g an
d Ev
alua
tion
• So
cio-
econ
omic
impa
ct a
sses
smen
ts d
etai
ling
how
the
MIG
pro
gram
me
has
impa
cted
on
the
com
mun
itie
s an
d m
unic
ipal
itie
s in
ter
ms
of;
skill
s de
velo
pmen
t, c
omm
unit
y in
volv
emen
t,em
ploy
men
t cr
eatio
n, t
rain
ing,
mun
icip
al p
artn
ersh
ips,
loca
l eco
nom
ic d
evel
opm
ent
and
how
the
lives
of
the
com
mun
ities
hav
e im
prov
ed.
• Fa
cilit
atio
n of
bac
klog
stu
dies
and
env
ironm
enta
l im
pact
ass
essm
ents
of p
roje
cts
whe
n ne
cess
ary.
• Im
pact
Ass
essm
ent
Repo
rts
• Ba
cklo
g st
udie
s•
Mon
thly
Rep
orts
Com
mun
ity L
iais
on /
Dev
elop
men
t /
com
mun
icat
ions
• It
is c
ritic
al t
o th
e su
cces
s of
the
pro
gram
me
that
the
re is
the
app
ropr
iate
com
mun
icat
ion
and
liais
on w
ith t
he c
omm
unity
in r
espe
ct o
f pr
ojec
t pl
anni
ng a
nd im
plem
enta
tion
to e
nsur
e bu
y-in
and
long
ter
m s
usta
inab
ility
of
the
proj
ects
in t
erm
s of
the
com
mun
ity u
nder
stan
ding
the
nee
dto
pay
for
ser
vice
s as
wel
l as
the
deve
lopm
ent
of c
omm
unity
-bas
ed p
artn
ersh
ips
for
the
purp
oses
of O
&M
as
disc
usse
d ab
ove
unde
r th
e po
int
proj
ect-
base
d ca
paci
ty b
uild
ing.
• Fa
cilit
ate
com
mun
ity li
aiso
n lin
kage
s to
ens
ure
full
com
mun
ity p
artic
ipat
ion
at a
ll st
ages
of
apr
ojec
t’s li
fe c
ycle
.•
Dev
elop
and
impl
emen
t a
com
mun
icat
ion
stra
tegy
in li
ne w
ith p
rovi
ncia
l and
nat
iona
l obj
ectiv
es•
Pres
s re
leas
es•
Co-
ordi
nate
ope
ning
and
han
d ov
er c
erem
onie
s•
MIG
orie
ntat
ion
wor
ksho
ps e
tc•
Prep
are
and
deve
lop
MIG
cap
acity
bui
ldin
g bu
sine
ss p
lan
in a
lignm
ent
with
the
mun
icip
al L
ocal
Gov
ernm
ent
Cap
acity
Bui
ldin
g Pr
ogra
mm
e (L
GC
BG).
• C
o-or
dina
te t
he p
roje
ct-b
ased
cap
acity
bui
ldin
g in
ter
ms
of:
• Jo
b cr
eatio
n, w
ith t
he f
ocus
on
intr
oduc
ing
labo
ur-b
ased
con
stru
ctio
n m
etho
dolo
gy a
nd t
hede
velo
pmen
t of
SM
MEs
whe
re t
echn
ical
ly f
easi
ble.
• Th
e de
velo
pmen
t co
mm
unity
-bas
ed p
artn
ersh
ips
for
the
oper
atio
n an
d m
aint
enan
ce o
f th
ein
fras
truc
ture
.•
Mon
itor
and
repo
rt o
n im
plem
ente
d ca
paci
ty b
uild
ing
initi
ativ
es.
• C
omm
unity
liai
son
chec
klis
ts•
Trai
ning
sch
edul
es
11
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
MU
NIC
IPA
L SP
HER
E –
Incl
ud
ing
Pro
ject
Man
agem
ent
Un
its
(PM
Us)
Act
ivit
ies
Ou
tpu
tsIn
dic
ato
rs
Plan
ning
/ D
evel
opm
enta
l Ini
tiativ
esEs
tab
lish
men
t o
f M
IG s
tru
ctu
res:
•Se
tup
/ est
ablis
h Pr
ovin
cial
MIG
Man
agem
ent
unit
•Su
ppor
t an
d fa
cilit
ate
the
esta
blis
hmen
t of
the
mun
icip
al P
roje
ct M
anag
emen
t U
nits
(PM
U)
Infr
astr
uct
ure
Inve
stm
ent
Plan
nin
g:
•En
sure
that
mun
icip
al ID
Ps c
ombi
ne to
form
a v
iabl
e de
velo
pmen
t fra
mew
ork
acro
ss th
e pr
ovin
ce,
an
d ar
e ve
rtic
ally
inte
grat
ed w
ith t
he P
rovi
ncia
l Gro
wth
and
Dev
elop
men
t St
rate
gy•
Supp
ort
the
dete
rmin
atio
n of
mun
icip
al b
ackl
ogs
and
the
prov
isio
n G
IS s
yste
ms
to s
uppo
rt t
hepl
anni
ng p
roce
ss•
Ensu
re t
hat
IDPs
giv
e pr
iorit
y to
the
bas
ic n
eeds
of
com
mun
ities
and
pro
mot
e th
e so
cial
and
ec
onom
ic d
evel
opm
ent
of c
omm
uniti
es•
Ensu
re t
hrou
gh t
he I
DP
proc
ess
- t
he p
rior
itiz
atio
n of
res
iden
tial
inf
rast
ruct
ure
for
wat
er,
sani
tatio
n, e
lect
ricity
, ref
use
rem
oval
, str
eets
, hou
sing
conn
ecto
r, an
d ot
her m
unic
ipal
infr
astr
uctu
relik
e ro
ads,
in li
ne w
ith a
ny M
IG o
r se
ctor
pol
icie
s es
tabl
ishe
d be
fore
the
sta
rt o
f th
e m
unic
ipal
finan
cial
yea
r•
Supp
ort
and
mon
itor
mun
icip
aliti
es t
o pr
epar
e an
d im
plem
ent
Wat
er S
ervi
ces
Dev
elop
men
tPl
ans
(WSD
P’s)
– in
coo
pera
tion
with
DW
AF
•En
sure
pro
per
co-o
rdin
atio
n be
twee
n al
l m
unic
ipal
inf
rast
ruct
ure
prog
ram
mes
wit
hin
the
resp
ectiv
e pr
ovin
ce•
Build
cap
acity
of
mun
icip
aliti
es t
o en
sure
the
dev
elop
men
t of
a t
hree
-yea
r ca
pita
l pla
n lin
ked
to it
s ID
P an
d bu
dget
- a
ppro
val b
y th
e m
unic
ipal
cou
ncil
requ
ired
no la
ter
than
30
June
200
4.
Ass
et M
anag
emen
t:•
Build
cap
acity
of
mun
icip
aliti
es t
o en
sure
the
dev
elop
men
t of
a s
usta
inab
le o
pera
tiona
l and
mai
nten
ance
pro
gram
me
for
the
thre
e ye
ars
and
beyo
nd –
the
cos
t of
whi
ch is
refle
cted
with
inth
e ap
prov
ed t
hree
-yea
r ca
pita
l pla
n bu
dget
.•
Build
cap
acity
of
mun
icip
aliti
es t
o en
sure
the
dev
elop
men
t of
a s
usta
inab
le o
pera
tiona
l and
mai
nten
ance
pro
gram
me
of e
xist
ing
infr
astr
uctu
re f
or w
ater
, sa
nita
tion,
ele
ctric
ity a
nd o
ther
infr
astr
uctu
re –
and
ass
ocia
ted
budg
et.
•G
IS s
yste
ms
supp
ort
for
the
deve
lopm
ent
of a
n ef
ficie
nt a
nd s
usta
inab
le a
sset
man
agem
ent
prog
ram
me.
Lo
cal E
con
om
ic D
evel
op
men
t /
Cap
acit
y B
uild
ing
:•
Supp
ort
the
esta
blis
hmen
t of
mun
icip
al s
ervi
ce p
artn
ersh
ips
thro
ugh
the
MIG
pro
gram
me
•Fa
cilit
ate
the
impl
emen
tatio
n of
labo
ur-in
tens
ive
met
hods
in a
ccor
danc
e w
ith th
e EP
WP
Gui
delin
esfo
r la
bour
inte
nsiv
e co
nstr
uctio
n an
d th
e SE
TA L
earn
ersh
ip P
rogr
amm
e.•
App
rova
l of
mun
icip
al c
apac
ity b
uild
ing
busi
ness
pla
ns, w
hich
mus
t in
clud
e co
mm
unity
bas
edpa
rtne
rshi
ps e
tc.
•M
inut
es o
f m
eetin
gs•
Eval
uatio
n re
port
s of
IDPs
•Th
ree
year
cap
ital p
lan
(Mun
icip
al)
•Pr
ovin
cial
Gro
wth
and
Dev
elop
men
tSt
rate
gy•
Part
ners
hip
agre
emen
ts
Faci
litat
ion
wit
h o
ther
Pro
vin
cial
Sect
or D
epar
tmen
ts.
Liai
son
with
Nat
iona
l Dep
artm
ents
:
•Es
tabl
ishm
ent
of P
rovi
ncia
l Mun
icip
al In
fras
truc
ture
Tas
k Te
am (P
MIT
T)•
All
sect
or d
epar
tmen
ts p
artic
ipat
e w
ithin
sco
pe o
f th
e Pr
ovin
cial
Mun
icip
al In
fras
truc
ture
Tas
kTe
am (P
MIT
T)•
Coo
rdin
atio
n be
twee
n al
l sec
tor
depa
rtm
ents
•Sc
hedu
led
Mee
tings
ºRe
gula
r pr
ogre
ss m
eetin
gs w
ith P
MU
s (c
haire
d by
PM
U m
anag
er)
ºRe
port
bac
k m
onth
ly m
eetin
gs w
ith t
he re
pres
enta
tive
of t
he N
atio
nal M
IG U
nit,
Pro
vinc
ial
Prog
ram
me
Man
agem
ent
Uni
t (P
PMU
), th
e PM
U m
anag
ers
and
Sect
or d
epar
tmen
ts•
Qua
rter
ly w
orks
hops
with
the
rep
rese
ntat
ive
of t
he N
atio
nal M
IG U
nit.
•M
inut
es o
f m
eetin
gs
1 2
12
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
MU
NIC
IPA
L SP
HER
E –
Incl
ud
ing
Pro
ject
Man
agem
ent
Un
its
(PM
Us)
Act
ivit
ies
Ou
tpu
tsIn
dic
ato
rs
Mon
itorin
g an
d Ev
alua
tion
Cen
tral
to
the
role
of
prov
ince
s is
the
bui
ldin
g of
inst
itutio
nal c
apac
ity o
f th
e m
unic
ipal
ities
to
ensu
reth
e ef
fect
ive
deliv
ery
of m
unic
ipal
infr
astr
uctu
re.
Fin
anci
al m
anag
emen
t:•
Prov
inci
al t
reas
urie
s m
ust
mon
itor
mun
icip
al c
apita
l bud
gets
, and
the
repo
rtin
g on
exp
endi
ture
,w
hile
eac
h pr
ovin
cial
sec
tor
depa
rtm
ent
will
be
expe
cted
to
fulfi
ll se
ctor
al m
onito
ring
role
.•
Mon
itorin
g th
e fin
anci
al s
tatu
s of
mun
icip
aliti
es t
hrou
gh P
roje
ct V
iabi
lity
•M
onito
r co
mpl
ianc
e w
ith D
ORA
fra
mew
ork
Perf
orm
ance
:•
Proj
ects
reg
iste
red
only
whe
n in
com
plia
nce
with
MIG
crit
eria
.•
Prog
ress
mee
tings
with
PM
Us
in t
erm
s of
cas
h flo
ws,
KPI
s, e
tc•
Mon
itor
prog
ram
me
perf
orm
ance
rep
orts
(DO
RA r
epor
ts, M
IG m
onth
ly r
epor
ts, M
IG q
uart
erly
repo
rts,
labo
ur in
tens
ive
repo
rts,
O&
M r
epor
ts)
whi
ch w
ould
incl
ude
som
e of
the
fol
low
ing
indi
cato
rs:
ºM
onth
ly c
ashf
low
per
form
ance
man
agem
ent
ºA
chie
vem
ent
of M
IG K
PIs.
ºA
chie
vem
ent
of L
IC K
PIs.
ºBi
-ann
ual r
epor
tsº
O&
M b
udge
tary
con
stra
ints
•M
onit
or p
erfo
rman
ce o
f m
unic
ipal
itie
s in
ter
ms
of;
expe
ndit
ure,
the
DO
RA c
ross
-cut
ting
cond
ition
s•
Prog
ress
on
rem
oval
of
back
logs
Ad
min
istr
atio
n /
Leg
al C
om
plia
nce
:•
Lega
l agr
eem
ent
com
plia
nce
by im
plem
entin
g co
ntro
l mec
hani
sms
and
guid
elin
esº
Proc
urem
ent
proc
edur
esº
MO
A c
ondi
tions
in a
lignm
ent
with
gra
nt c
ondi
tions
•U
pdat
e an
d m
aint
ain
nati
onal
dat
a in
form
atio
n sy
stem
at
prov
inci
al a
nd m
unic
ipal
lev
el.
Exte
nd
ed f
un
ctio
ns:
•En
sure
adh
eren
ce t
o th
e la
bour
-inte
nsiv
e co
nstr
uctio
n m
etho
ds in
ter
ms
of t
he E
xpan
ded
Publ
icW
orks
Pro
gram
me
(EPW
P) g
uide
lines
agr
eed
betw
een
Dep
artm
ent
of P
ublic
Wor
ks, N
atio
nal
Trea
sury
and
SA
LGA
, for
at
leas
t lo
w-v
olum
e ro
ads,
sid
ewal
ks, s
torm
-wat
er d
rain
age,
tre
nchi
nget
c.•
Ensu
re t
hat
Labo
ur In
tens
ive
Proj
ects
(EPW
P) c
an b
e di
stin
guis
hed
from
non
- La
bour
Inte
nsiv
ePr
ojec
ts (E
PWP)
.•
Mon
itor
capa
city
con
stra
ints
/ ga
ps•
Mo
nit
or
the
ou
tpu
ts o
f th
e m
un
icip
al o
per
atio
n a
nd
mai
nte
nan
ce p
rog
ram
mes
•M
onito
r th
e ad
here
nce
of O
ccup
atio
nal H
ealth
and
Saf
ety
plan
s•
Proj
ect
impl
emen
tatio
n pr
ogre
ss m
onito
ring
with
site
mee
tings
•Re
gist
er o
f si
te v
isit
repo
rts
•Pr
ojec
t vi
abili
ty a
udit
repo
rts
•M
inut
es o
f mee
tings
, Pro
gres
s re
port
s•
Perf
orm
ance
mon
thly
rep
orts
•Si
te v
isit
repo
rts
•EP
WP
repo
rt•
O&
M r
epor
ts•
OH
&S
plan
s / a
udits
•Si
te v
isit
repo
rts
3
13
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
MU
NIC
IPA
L SP
HER
E –
Incl
ud
ing
Pro
ject
Man
agem
ent
Un
its
(PM
Us)
Act
ivit
ies
Ou
tpu
tsIn
dic
ato
rs
Com
mun
icat
ion
•M
IG a
war
enes
s ca
mpa
igns
at
mun
icip
al le
vel,
orie
ntat
ion
wor
ksho
ps, t
echn
ical
wor
ksho
ps e
tc•
MIG
bro
chur
es, h
ando
uts
new
slet
ters
etc
•M
edia
Impl
emen
tatio
n aw
aren
ess
artic
les,
pre
ss r
elea
ses
etc
•M
aint
ain
a ph
otog
raph
ic d
ata
base
of
proj
ects
and
eve
nts
•In
put
for
MIG
web
site
•M
edia
mat
eria
l•
Web
site
4
Cap
acity
Bui
ldin
g / t
echn
ical
sup
port
•Pr
omot
ing
the
deve
lopm
ent
of lo
cal g
over
nmen
t ca
paci
ty t
o en
able
mun
icip
aliti
es t
o pe
rfor
mth
eir
MIG
fun
ctio
n.•
Faci
litat
e th
e bu
ildin
g of
inst
itutio
nal c
apac
ity in
ter
ms
of:
ºPr
ojec
t m
anag
emen
tº
Infr
astr
uctu
re in
vest
men
t pl
anni
ngº
Fina
ncia
l man
agem
ent
of c
apita
l bud
gets
ºPr
ocur
emen
t pr
oced
ures
(Com
plia
nce
with
CID
B re
gist
ratio
n co
nditi
ons)
ºLe
gal /
con
trac
tual
ºO
H&
S re
quire
men
tsº
Labo
ur-In
tens
ive
desi
gn a
nd m
etho
dolo
gyº
Ass
et M
anag
emen
tº
MIS
dat
a ba
se -
ope
ratio
n an
d m
aint
enan
ceº
MIG
adm
inis
trat
ion
and
repo
rtin
g sy
stem
sº
mpa
ct a
sses
smen
ts•
Prov
ide
GIS
sys
tem
s su
ppor
t to
the
pla
nnin
g pr
oces
s as
wel
l as
the
in t
he d
evel
opm
ent
of a
nef
ficie
nt a
nd s
usta
inab
le a
sset
man
agem
ent
prog
ram
me.
•Fa
cilit
ate
the
deve
lopm
ent
of m
unic
ipal
Occ
upat
iona
l Hea
lth a
nd S
afet
y pl
ans
not
only
in t
erm
sof
pro
ject
impl
emen
tatio
n bu
t al
so w
ith r
espe
ct t
o op
erat
ion
and
mai
nten
ance
pro
cedu
res.
•Tr
aini
ng s
ched
ules
•G
IS d
atab
ase
•O
H&
S re
port
s
5
Inte
rven
tion
All
natio
nal d
epar
tmen
ts a
nd t
heir
prov
inci
al c
ount
erpa
rts
reta
in t
heir
polic
y m
akin
g an
d re
gula
tory
func
tions
whi
ch c
over
the
ful
l ran
ge o
f m
unic
ipal
act
ivity
: go
vern
ance
, ad
min
istr
atio
n, p
lann
ing,
proj
ects
and
ope
ratio
ns.
Furt
herm
ore,
the
dep
artm
ents
and
pro
vinc
es r
etai
n th
eir
cons
titut
iona
lrig
hts
to in
terv
ene
dire
ctly
in t
he a
ffai
rs o
f m
unic
ipal
ities
.
The
Mun
icip
al S
yste
ms
Act
als
o st
ates
the
fol
low
ing:
The
MEC
for
loca
l gov
ernm
ent
in a
pro
vinc
em
ust
esta
blis
h m
echa
nism
s, p
roce
sses
and
pro
cedu
res
in t
erm
s of
s 1
55 (6
) of
the
Con
stitu
tion
to:
•M
onito
r m
unic
ipal
ities
in t
he p
rovi
nce
in m
anag
ing
thei
r ow
n af
fairs
, exe
rcis
ing
thei
r po
wer
san
d pe
rfor
min
g th
eir
func
tions
•M
onito
r th
e de
velo
pmen
t of
loca
l gov
ernm
ent
capa
city
in t
he p
rovi
nce.
•A
sses
s th
e su
ppor
t ne
eded
by
mun
icip
aliti
es t
o st
reng
then
the
ir ca
paci
ty t
o m
anag
e th
eir
own
affa
irs, e
xerc
ise
thei
r po
wer
s an
d pe
rfor
m t
heir
func
tions
.
With
the
abo
ve in
min
d, in
terv
entio
n w
ould
be
requ
ired
in t
he f
ollo
win
g ci
rcum
stan
ces:
•N
on p
erfo
rman
ce o
f m
unic
ipal
ities
•N
on-c
ompl
ianc
e w
ith M
IG c
ondi
tions
and
cro
sscu
ttin
g co
nditi
ons
as d
etai
led
in s
ectio
n 8
ofM
IG p
olic
y fr
amew
ork
•N
on-c
ompl
ianc
e: p
roje
ct s
cope
, mism
anag
emen
t, m
isapp
ropr
iatio
n of
fund
s, im
prop
er p
rocu
rem
ent
proc
edur
es, w
ith r
epor
ting
requ
irem
ents
etc
Ref
eren
ce:
The
Con
stitu
tion
of t
he R
epub
lic o
f So
uth
Afr
ica.
Sec
tion
139,
sec
tion
154
(1),
sect
ion
155
(6) a
nd s
ectio
n 15
5 (7
).
Refe
renc
e w
as a
lso
mad
e to
the
Mun
icip
alSy
stem
s A
ct -
sect
ion
105
(1)(a
) and
sec
tion
105
(1) (
b)&
(c)
6
14
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
NA
TIO
NA
L SP
HER
E
Act
ivit
ies
Ou
tpu
tsIn
dic
ato
rs
Ove
rarc
hing
dp
lg o
utpu
ts•
Exer
cise
s fin
anci
al a
ccou
ntab
ility
for
the
MIG
pro
gram
me.
•A
dmin
istr
atio
n of
gra
nt t
rans
fers
.•
Sett
ing
up o
f th
e re
stru
ctur
ed M
ITT,
cha
iring
the
MIT
T an
d its
tec
hnic
al c
omm
ittee
(MIT
3) a
ndpr
ovid
ing
them
with
the
sec
reta
riat
func
tion.
•Se
ttin
g up
the
MIG
Uni
t•
Com
pile
an
annu
al r
epor
t to
par
liam
ent
on t
he M
IG p
rogr
amm
e.•
Mon
itor
perf
orm
ance
in r
espe
ct o
f ge
neric
con
ditio
ns.
•Re
spon
sibl
e fo
r m
onito
ring
the
cros
s-cu
ttin
g co
nditi
ons
DEP
AR
TMEN
T O
F PR
OV
INC
IAL
AN
D L
OC
AL
GO
VER
NM
ENT
Prim
ary
func
tions
Adm
inis
terin
g th
e us
e of
MIG
fun
ds (
ensu
ring
that
the
fun
ds a
re p
rope
rly a
lloca
ted
and
spen
t on
appr
opria
te p
roje
cts)
. Thi
s ac
tivity
rel
ates
onl
y to
the
way
pro
ject
s ar
e im
plem
ente
d an
d im
plie
s th
atna
tion
al a
nd p
rovi
ncia
l go
vern
men
t de
part
men
ts r
etai
n th
eir
norm
al r
espo
nsib
iliti
es f
or p
olic
y,re
gula
tion
and
capa
city
bui
ldin
g re
latin
g to
mun
icip
al g
over
nanc
e, a
dmin
istr
atio
n, p
lann
ing
and
oper
atio
ns a
ctiv
ities
. Fun
ctio
ns in
clud
e th
e fo
llow
ing:
•Im
plem
entin
g po
licy
rela
ting
to in
fras
truc
ture
del
iver
y;•
Sett
ing
up a
the
MIG
nat
iona
l fun
d ad
min
istr
atio
n sy
stem
, inc
ludi
ng m
onito
ring
arra
ngem
ents
;•
Ensu
ring
the
esta
blis
hmen
t of
pro
ject
man
agem
ent
units
in s
elec
ted
mun
icip
aliti
es•
Ope
ratin
g th
e na
tiona
l MIG
info
rmat
ion
syst
em;
•M
onito
ring
the
use
of M
IG f
unds
;•
Aud
iting
the
loca
l pro
gram
mes
to
ensu
re c
ompl
ianc
e;•
Ensu
ring
that
eva
luat
ion
of lo
cal p
rogr
amm
es t
akes
pla
ce; a
nd•
Prep
arin
g re
port
s to
MIT
T an
d to
pro
vinc
ial a
nd n
atio
nal g
over
nmen
t de
part
men
ts.
NA
TIO
NA
L M
IG U
NIT
Ove
rall
func
tions
All
natio
nal d
epar
tmen
ts a
nd t
heir
prov
inci
al c
ount
erpa
rts
reta
in t
heir
polic
y m
akin
g an
d re
gula
tory
func
tions
whi
ch c
over
the
ful
l ran
ge o
f m
unic
ipal
act
ivity
: go
vern
ance
, ad
min
istr
atio
n, p
lann
ing,
proj
ects
and
ope
ratio
ns.
Furt
herm
ore,
the
dep
artm
ents
and
pro
vinc
es r
etai
n th
eir
cons
titut
iona
lrig
hts
to in
terv
ene
dire
ctly
in t
he a
ffai
rs o
f m
unic
ipal
ities
. How
ever
, the
impo
rtan
ce o
f co
-ord
inat
ing
such
act
ivity
, with
the
obj
ectiv
e of
cre
atin
g a
com
mon
app
roac
h to
loca
l gov
ernm
ent,
is r
ecog
nise
d.Th
e M
unic
ipal
Infr
astr
uctu
re T
ask
Team
(M
ITT)
has
the
refo
re b
een
esta
blis
hed
and
assi
gned
the
seco
-ord
inat
ing
func
tions
.
The
MIT
T w
ill h
ave
the
follo
win
g ov
eral
l fun
ctio
ns:
•To
rev
iew
mun
icip
al in
fras
truc
ture
pol
icy
to e
nsur
e ef
ficie
ncy,
eff
ectiv
enes
s an
d co
nsis
tenc
y in
th
e de
liver
y of
infr
astr
uctu
re b
y m
unic
ipal
ities
;•
To m
onito
r pr
ogre
ss a
nd u
nblo
ck a
ny c
halle
nges
tha
t m
ay e
mer
ge in
the
del
iver
y of
ser
vice
s;
and
•To
mak
e de
cisi
ons
on t
he a
bove
.
MU
NIC
IPA
L IN
FRA
STR
UC
TUR
E TA
SK T
EAM
(M
ITT)
15
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
NA
TIO
NA
L SP
HER
E
Act
ivit
ies
Ou
tpu
tsIn
dic
ato
rs
Ove
rall
func
tions
The
MIT
T w
ill b
e su
ppor
ted
by t
he t
echn
ical
MIT
T, w
hich
is r
efer
red
to a
s M
IT3.
Thi
s w
ill b
e fo
rmed
from
the
sam
e de
part
men
ts a
s th
e M
ITT,
with
repr
esen
tativ
es a
t Chi
ef D
irect
or le
vel o
r the
ir m
anda
ted
alte
rnat
es. S
ALG
A a
nd t
he n
atio
nal M
IG p
rogr
amm
e m
anag
er w
ill a
lso
serv
e on
the
tea
m.
The
MIT
3 w
ill r
epor
t di
rect
ly t
o th
e M
ITT
and
will
hav
e th
e fo
llow
ing
resp
onsi
bilit
ies:
•En
sure
tha
t th
e M
ITT
agen
da f
ocus
es o
n th
e se
ctor
al p
riorit
ies;
•D
eter
min
e se
ctor
al p
riorit
ies,
whi
ch a
re li
nked
, to
Dep
artm
enta
l obj
ectiv
es;
•Fa
cilit
ate
impl
emen
tatio
n of
the
Mun
icip
al In
fras
truc
ture
Gra
nt (M
IG) p
olic
y;•
Prom
ote
finan
cial
, tec
hnic
al, s
ocia
l and
env
ironm
enta
l sus
tain
abili
ty o
f mun
icip
al s
ervi
ces
thro
ugh
infr
astr
uctu
re p
rogr
amm
es.
•M
onito
r an
d en
sure
impl
emen
tatio
n of
MIG
;•
Ass
ess
and
mon
itor
the
prog
ress
mad
e by
Dep
artm
ents
in im
plem
entin
g th
e de
cisi
ons
take
nat
the
MIT
T m
eetin
gs;
•En
sure
tha
t su
ffic
ient
info
rmat
ion
need
ed f
or a
dec
isio
n is
col
lect
ed;
•O
vers
ee t
he im
plem
enta
tion
of t
he p
ilot
proj
ects
;•
Faci
litat
e th
e es
tabl
ishm
ent
of t
he M
IG u
nit;
•C
oord
inat
e th
e im
plem
enta
tion
of t
he M
IG;
•D
raft
pol
icy
amen
dmen
ts a
nd o
ther
exp
ert
advi
se t
o th
e M
ITT;
•C
oord
inat
e th
e re
view
s of
the
MIIF
doc
umen
t;•
Ove
rsee
the
wor
k of
Wor
king
Com
mitt
ees
•C
omm
issi
on s
tudi
es o
n in
fras
truc
ture
.•
Coo
rdin
ate
impa
ct s
tudi
es o
n th
e M
IG.
•Re
view
and
cor
rect
blo
ckag
es in
pro
cess
.•
Ensu
re p
rope
r co
-ord
inat
ion
betw
een
sect
or d
epar
tmen
ts.
•Re
view
reg
ular
rep
orts
fro
m m
unic
ipal
ities
and
PM
U’s.
•Re
com
men
d po
licy
chan
ges
to t
he D
G/h
ighe
r co
mm
ittee
.•
Revi
ew S
ecto
r re
port
s.
TEC
HN
ICA
L M
ITT
(MIT
3)
Polic
y re
view
s•
Refle
ct a
nd r
evie
w m
unic
ipal
infr
astr
uctu
re p
olic
y as
and
whe
n re
quire
d;•
Revi
ew e
mer
ging
dev
elop
men
ts e
man
atin
g fr
om o
ther
pro
gram
mes
and
pro
cess
whi
ch h
ave
dire
ct b
earin
g on
mun
icip
al in
fras
truc
ture
del
iver
y e.
g. t
he re
stru
ctur
ing
of e
lect
ricity
dis
trib
utio
nin
dust
ry;
•Re
view
sec
tor
serv
ice
deliv
ery
targ
ets;
•Pr
omot
e fin
anci
al, t
echn
ical
, soc
ial a
nd e
nviro
nmen
tal s
usta
inab
ility
;•
Mak
e po
licy
prop
osal
s to
Cab
inet
;•
Mon
itor
sect
or s
ervi
ce d
eliv
ery
impa
ct;
•A
gree
on
regu
latio
ns, w
here
req
uire
d;•
Prop
ose
scal
ing
dow
n or
bro
aden
ing
the
scop
e of
ser
vice
del
iver
y le
vels
, whe
re r
equi
red;
and
•En
sure
the
ful
film
ent
of c
omm
itmen
ts e
man
atin
g fr
om t
he d
ecis
ions
of
the
Cab
inet
Mak
gotla
,C
lust
ers
and
Loca
l Gov
ernm
ent
Min
Mec
.
16
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
NA
TIO
NA
L SP
HER
E
Act
ivit
ies
Ou
tpu
tsIn
dic
ato
rs
Nat
iona
l Tre
asur
y (N
T)•
Adm
inis
ters
legi
slat
ion
that
has
impl
icat
ions
for
the
MIG
pro
gram
me,
not
ably
DO
RA.
•In
corp
orat
ion
of M
IG c
ondi
tions
and
tra
nsfe
rs in
to D
ORA
.•
Ensu
re t
hat
mun
icip
aliti
es o
bser
ve a
nd o
pera
te w
ithin
the
mac
roec
onom
ic f
ram
ewor
k dr
iven
by n
atio
nal
•go
vern
men
t.
Dep
artm
ent
of W
ater
Aff
airs
and
Fore
stry
(DW
AF)
•Po
licym
akin
g, in
clud
ing
the
sett
ing
of n
orm
s an
d st
anda
rds
for
wat
er s
ervi
ces
infr
astr
uctu
re.
•Pl
anni
ng o
vers
ight
(reg
iona
l and
wat
er s
ervi
ce d
evel
opm
ent
plan
s).
•M
onito
ring
of w
ater
sec
tor
rela
ted
cond
ition
s an
d pr
ogre
ss in
mee
ting
targ
ets.
•In
itiat
ing
inte
rven
tion
rela
ted
to w
ater
ser
vice
s ac
tiviti
es.
Dep
artm
ent o
f Pub
lic W
orks
(DPW
)•
Coo
rdin
ate
the
Expa
nded
Pub
lic W
orks
Pro
gram
me
•Se
t cr
iteria
rel
ated
to
pove
rty
alle
viat
ion
and
empl
oym
ent
gene
ratio
n.•
Adv
ise
mun
icip
aliti
es o
n in
tens
ive
labo
ur-b
ased
pro
cess
es, s
yste
ms,
tec
hniq
ues
and
appr
oach
es.
•Li
aise
with
mun
icip
aliti
es o
n pr
ocur
emen
t re
form
s.•
Mon
itor
perf
orm
ance
in r
elat
ion
to e
mpl
oym
ent
gene
ratio
n, la
bour
bas
ed t
echn
olog
y an
dSM
ME
invo
lvem
ent.
Dep
artm
ent o
f Min
eral
s an
d En
ergy
(DM
E)•
DM
E's
resp
onsi
bilit
ies
will
rel
ate
initi
ally
to
polic
y de
velo
pmen
t. O
nce
the
Inte
grat
ed N
atio
nal
Elec
trifi
catio
n Pr
ogra
mm
e (IN
EP),
has
been
inco
rpor
ated
into
the
MIG
pro
gram
me
it w
ill u
nder
take
sim
ilar
resp
onsi
bilit
ies
to t
hose
iden
tifie
d fo
r D
WA
F.
Dep
artm
ent
of T
rans
port
(DoT
)•
Polic
y re
latin
g to
mun
icip
al r
oads
and
mun
icip
al t
rans
port
.•
Mon
itorin
g of
the
per
form
ance
of
mun
icip
aliti
es in
the
pro
visi
on o
f ro
ads
and
com
plia
nce
with
cond
ition
s ap
plic
able
to
this
sec
tor.
•En
surin
g th
at f
unds
allo
cate
d to
tra
nspo
rt in
fras
truc
ture
are
pro
perly
spe
nt.
Dep
artm
ent
of H
ousi
ng (D
oH)
•C
oord
inat
ion
of p
olic
y an
d pl
anni
ng o
f ho
usin
g de
velo
pmen
t an
d th
e pr
ovis
ion
of in
fras
truc
ture
thro
ugh
the
MIG
pro
gram
me.
•Sy
nchr
onis
atio
n be
twee
n th
e M
IG p
rogr
amm
e an
d th
e H
ousi
ng F
und.
Dep
artm
ent
of L
abou
r (D
oL)
Trai
ning
of
wor
kers
on
Labo
ur In
tens
ive
Proj
ects
(EPW
P).
Dep
artm
ent o
f Spo
rt a
nd R
ecre
atio
nSo
uth
Afr
ica
(DSR
SA)
•Po
licy
rela
ting
to s
port
s an
d re
crea
tion.
•En
surin
g th
at M
IG f
unds
are
pro
perly
app
lied
to b
uild
ing
asso
ciat
ed in
fras
truc
ture
.•
Mon
itor
cond
ition
s ap
plic
able
to
this
sec
tor.
17
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
4.Conditions applied to the MIG
The MIG is a conditional grant. The formula is intended to allocate funding in accordance withgovernment’s policy priorities. The utilisation of this funding in accordance with these policy prioritiesand objectives is a function of the conditions imposed on its use by beneficiary municipalities.
4.1 Principles relating to the setting of conditions
Conditions will be applied to ensure that municipalities appropriately address the objectives andparameters of this policy statement. The conditions seek to avoid placing an undue burden ofcompliance on municipalities. Therefore, the number of conditions must not be excessive and it mustbe possible to easily measure performance in relation to the conditions.
The following conditions will be applicable to the MIG Programme:• Division of Revenue Act• Cross-cutting conditions• Sector specific conditions
4.1.1 Division of Revenue Act (DORA)
Refer to the Division of Revenue Act for the current financial.
Refer to the relevant Conditional Grant Frameworks in the DORA:• Municipal Infrastructure Grant (MIG).
4.1.2 Cross-cutting conditions
The following conditions (Section 8.2 of the MIG policy framework document, Concise version – finaldated 5 February 2004) are set as the founding conditions for the MIG programme, which may bevaried from time to time by the Municipal Infrastructure Task Team (MITT). The PMU must ensurecompliance with these conditions:
a) Conformity with IDPs: No MIG funds may be spent outside the framework of a municipality’spre-existing IDP and its approved budget. The IDPs should be based on the provision ofa basic package of services to the poor, appropriate services levels, financial sustainabilityand the existence of adequate organisational capacity.
b) Limitation on operational spending: The MIG grant can only be used for capital investmentand cannot be used to finance operating expenditure other than the prescribed percentagepermitted for the operation of a PMU in applicable municipalities.
c) Restrictions on eligibility: Spending of MIG funds is restricted to those categories ofinfrastructure, beneficiaries and levels of service identified in Section 5 of the MIG Policy.To ensure that eligibility requirements are met a cap on capital spending per householdwill be set and specific requirements may be set for the amount of spending on particulartypes of infrastructure.
18
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
d) Adequate attention to rehabilitation: The municipality must invest an appropriate
proportion of the funds on rehabilitating existing infrastructure.
e) Pledging of funds to secure loan finance: No ‘pledging’ (the assigning of capital grant
funds to be used to pay off a loan to a particular lending organisation) may be undertaken
with MIG funds.
f) Achievement of specified basic service coverage targets: the attainment of pre-agreed
basic service coverage targets in specific sectors (water and sanitation, for example) to be
achieved by a particular municipality over a three-year period, based on their current
position.
g) Poverty alleviation: It is important for the economic spin-offs of infrastructure delivery to
be maximised. This relates primarily to temporary and permanent job creation arising for
municipal infrastructure investments. This condition will be associated with national
government’s 'Expanded Public Works Programme' (EPWP). The gender provisions of this
programme must be adhered to.
h) Reporting: The recipient municipality has prepared and submitted all monthly reports on
grant utilisation in a prescribed format by a specified time.
i) MIG funds to be allocated in municipal budget: All MIG funds to be spent in any year must
be allocated to specific projects, which must be identified in municipal budgets.
j) Registration of MIG projects (otherwise referred to as project feasibility study): All projects
to be funded with MIG funds, wholly or partially, must have a project registration form
which conforms with requirements of the MIG programme and whichmust be registered
on the national MIG database before the award of contracts for construction commences.
4.1.3 Sector specific conditions
Each sector department (DWAF, DME, DoT and DSRSA) may establish further conditions specific to
their sectors. Such conditions will be included at the discretion of the MITT.
4.1.3(a) Department of Public Works
To adhere to the labour-intensive construction methods in terms of the Expanded Public Works
Programme (EPWP) guidelines agreed between Department of Public Works, National Treasury and
SALGA, for at least low-volume roads, sidewalks, storm-water drainage, trenching etc.
4.1.3(b) Department of Water Affairs and Forestry
(a) The funding is only to be used for the Basic Water Services component of the projects.
Basic water services in this case means basic water supply facilities and/or basic
sanitation facilities as defined in the Strategic Framework for Water Services, approved
by Cabinet September 2003.
19
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
(b) Projects to be funded must be within the Water Services Development Plan (WSDP) as theSector Component of the IDP.
(c) Projects to be funded must be proven to be viable, feasible, acceptable and sustainablebased on a proper feasibility study.
(d) To ensure sustainable operation and maintenance of the proposed infrastructure theoperating, finance and management arrangements must be in place and committed. (Ifacceptable to the other sectors, this could be a crosscutting condition).
(e) Projects must be implemented in line with the policies as set by the Strategic Frameworkfor Water Services and the legal requirements of the Water Services Act (Act 108 of 1997)as well as the National Water Act (Act 36 of 1998).
4.1.3(c) Department of Transport
The development of road infrastructure to poor households that would create access to trade, localeconomic development and essential services and to promote road safety.
20
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
5.Communication flow andinteraction procedures
Overall control of the MIG programme can only be exercised effectively if processes and proceduresand proper lines of communication are followed. Essentially, the MIG programme is implemented inthe framework of public service delivery to communities, especially to those who do not have accessto basic services. The White Paper of Transformed Public Services 1997 – or the White Paper of BathoPele seeks an approach which puts pressure on systems, procedures, attitudes and behaviour withinthe Public Service and reorients them in the customer’s favour, an approach which puts the peoplefirst. Communication is a strategic element of service delivery.
5.1 Interaction
5.1.1 Interaction between the National MIG Unit, Provincial ProjectManagement Unit, PMUs and municipalities
• All communication from the National MIG Unit will be via the Provincial Project ManagementUnits as indicated on the institutional management flowchart.
CABINET
MITT Representative Sector Departments
DPLG DWAF DPW DSRSA DoT DoH DNT LG Elec. ESKOM
MIT3 National MIG UnitNational MIG Unit
reporting to Directors within CD
Sector Conditions
Policy and Regulations
PMITT
Regional and ProvincialGrowth Strategies
Eastern Cape
Gauteng
KwaZulu-Natal
Northern Cape
Limpopo
Western Cape
Free State
North West
Mpumalanga
Provincial ProjectManagement Unit
MIG Policy & GuidelinesRegional Growth Strategies
MIG Guidelines & Policy
Local Government
LM
PMU
PMU established atLM with appropriate
capacity
DM LM LM LM
PMU
21
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
• The National MIG Unit can only communicate directly with the municipalities on financial matters(disbursement of funds, etc), with a copy of the summary of the discussion submitted to theProvincial Programme Management Unit.
5.1.2 Interaction between PMU, municipality and project consultant/s
The PMU and project consultant/s will communicate to each other via the municipality where a PMUis not located within a municipality.
5.2 Meetings
In order for the National MIG Unit to conduct its primary and overall functions (refer to Item 4.3 –responsibilities matrix) and to monitor the compliance of crosscutting and sector specific conditionsas well as progress, the following meetings are envisaged:
5.2.1 Provincial progress meetings
This meeting will be between the National MIG and Provincial Programme Management Unit as wellas the PMUs.
Chairperson : To alternate between the four Senior Managers (dplg)Co-ordinator : dplg delegated officialIntervals : MonthlyDates : Meeting schedule to be provided by National MIG UnitVenue : Provincial Programme Management Unit’s officesAttendance : National MIG Unit, Provincial Programme
Management Units and relevant PMUs.Purpose : To monitor:
• overall progress (financial, project implementation)• compliance of MIG conditions• achievement of specified KPIs• the establishment of PMUs• Labour intensive projects• Nodal municipalities• Special Municipal Infrastructure Fund (SMIF)• Infrastructure categories and funding elements• Three-year development plans (submission & compliance)To discuss:• project registrations, MIS and IT related matters• administrative matters• auditing requirements• policy issues• financial matters• communication• reporting formats / requirements• problems experienced and possible solutions / suggestions
Agenda : To be compiled and distributed before the meeting
22
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
The National MIG Unit will be responsible to compile, finalise and distribute the minutes of the monthlymeetings within 7 working days after the date of the meeting to all relevant parties. The progressmeeting’s agenda must be distributed to all the relevant parties at least 7 working days before themeeting.
The National MIG Unit will be responsible to compile, finalise and distribute the minutes of the quarterlyworkshop within 22 working days after the date of the workshop to all relevant parties. The quarterlyworkshop’s agenda must be distributed to all relevant parties at least 14 working days before theworkshop.
5.2.3 Ad-hoc meetings
Ad-hoc meetings will be conducted by the National MIG Unit, in conjunction with the ProvincialProgramme Management Unit members, to obtain grass-root level information on specific projectsand / or to intervene / resolve problem areas at Provinces, Municipalities and/or projects.
Chairperson : dplg delegateCo-ordinator : dplg delegateIntervals : QuarterlyDates : Meeting schedule to be provided by National MIG UnitVenue : To be determined (alternating between nine provinces)Attendance : National MIG Unit (Senior Managers) and the nine (9) Provincial
Programme Management Units. Representatives of SectorDepartments could be invited.
Purpose : • Report on progress during previous 3 months• Report on “best practices” / labour intensive projects• Strategic planning between all roleplayers• Provincial feedback on issues / matters that could hamper the
implementation of the programme• Discuss new innovation projects• Information, transformation and way forward• Presentations by private / public sector specialist on key issues• Team building exercise
Agenda : To be compiled and distributed before the meeting by ????
5.2.2 National quarterly workshops
Considerations in arranging meetings:
• Identify the stakeholders that should attend the meetings and send them personalised invitationsto the meetings. Invitations should detail the purpose of the meeting and state a reply date to ensure thatthe organisers of the meeting know the availability of the invited persons.
• Meeting agendas or programmes should be distributed well in advance of the meeting, requesting inputsand comments.
• Presentations should be well prepared.• Indicate a willingness to cooperate with each other at meetings.• Do not openly disagree with team members. Rather acknowledge the contribution, explain the current
situation, view or difficulties, and elevate the discussion to a higher, collaborative, problem-solving discussion.• Meetings are more readily able to achieve their objectives when all attendees receive short, to-the-point
written information for discussion about a week in advance of the meeting.
23
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
MIG Project Life Cycle
MUNICIPAL INFRASTRUCTURE GRANT (MIG) LIFE CYCLE
MIG projects follow a similar project life cycle with the same requirements during the different stages.Each step is graphically depicted in the project cycle on page??? and described below:
1. PRELIMINARY PHASE
1.1 Project identification
The basis for taking any decisions on infrastructure provision should stem form the IntegratedDevelopment Plans (IDP’s) compiled by municipalities. The IDP should also incorporate a propercommunity participation process and thereby ensure that the true needs of the communitiesare being addressed by the identified projects. The community identifies the need for a serviceand the ward committee reports that to the municipality. The IDP will also form the basis ofalignment between the MIG Programme and other Sector Departments programmes. Themunicipalities must also compile a three-year capital plan (based on the format provided by theDepartment of Treasury), which must be linked to the IDP and municipal budget (operationaland maintenance costs must be included in the budget).
The municipality’s three-year capital plan should include project lists detailing the relative priorityof the different projects as well as the planned implementation periods, details of the level ofservices that will be provided and estimates of the operating expenditure and revenue of allinfrastructure.
The three-year capital plan must be submitted to National Treasury and dplg and must bereviewed on an annual basis by National Government. The Division of Revenue Act requiresthat a municipal Council must approve “a three-year capital plan linked to its IDP and budgetno later than 30 June of each year”.
It is important that municipalities constantly monitor the progress of the implementation oftheir projects, as well as timeously identify and plan for the projects that must be implementedduring the next financial year.
PRELIMINARY PHASE
Project identification (30 days)
Project prioritisation and selection (90 days)
Obtain Council resolution (90 days)
Project registration (at dplg) (30 days)
PRE-IMPLEMENTATION PHASE
Design (60 days)
Tender document and procurement (60 days)
IMPLEMENTATION PHASE
Appoint successful Contractor (Milestone)
MONTHS
1 2 3 4 5 6 7 8 9 10 11 12
24
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
The average duration for the completion of the preliminary and pre-implementation phases,as indicated in the schedule below, is approximately 12 months. (It could take much longerdepending on the frequencies of Council meetings)
Municipalities must also adhere to the labour intensive construction methods in terms of theEPWP guidelines agreed between the Department of Public Works, National Treasury and SALGA.Municipalities should also support / promote the establishment of Municipal Service Partnershipsthrough the MIG programme.
The three-year capital plans must be submitted to the municipality / District Municipality’sInfrastructure Planning Forum for the prioritisation and selection process.
1.2 Project prioritisation and selection
In terms of the Division of Revenue Act (DORA) [Act 5 of 2004], in certain cases funds areallocated per District Municipal Area and the projects identified in the three year capital plans(IDP’s) of the different Local Municipalities (LM) within the boundaries of a District Municipality(DM) will be the projects to be prioritised. Although there are no prescriptions for the methodin which this should take place, it is recommended that the prioritisation be done at anInfrastructure Planning Forum.
All municipalities in the District Municipal area must be represented on this forum along withrepresentatives from the District Municipality and the Provincial MIG Management Unit (PMMU).
The representatives on the forum must have the delegated authority to take decisions on behalfof the municipality that they represent. This will result in proper streamlining of the projectprioritisation process.
The Infrastructure Planning Forum will have the task of prioritising the proposed projects receivedfrom the different municipalities. The following conditions and criteria must be taken intoaccount in the prioritisation process:
• Approved three year capital plans• Division of Revenue Act (DORA)• MIG cross-cutting conditions• MIG Sector specific conditions• MIG funding windows / criteria• Cost effective regional level infrastructure solutions involving a number of municipalities.
The result of the deliberations of the Infrastructure Planning Forum should be a prioritised listof projects that comply with all the criteria and conditions as mentioned above.
As soon as the prioritised list of projects has been forwarded to the relevant municipalities,resources must be allocated to:• Conduct feasibility studies to determine the sustainability of the proposed projects• Compile the Technical Reports (Water and Sanitation projects only)• Complete the Project Registration Forms on the Management Information System (MIS).Consultants could be appointed on the project by using a roster system.
Once the municipality has captured the Project Registration Form on the MIS, a hard copy ofthe Project Registration Form as well as the necessary Technical Report must be submitted tothe Municipal Project Management Unit (PMU). The PMU will evaluate the Project RegistrationForm and Technical Reports. The PMU will sign off the Project Registration Form on the MIS.A hard copy of the Project Registration Form must be printed and filed. The PMU must immediatelysubmit the Technical Report to DWAF for their evaluation and approval.
25
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
1.3 Project registration
The Provincial MIG Management Unit (PMMU) will extract the Project Registration Form fromthe MIS, evaluate and verify for compliance with the MIG conditions, three-year capital planas well as targets set for key performance indicators (KPIs). If the information on the ProjectRegistration Form in compliance with the MIG criteria, the PMMU will sign off the form on theMIS.
The National MIG Management Unit (NMMU) will extract the Project Registration Form fromthe MIS and evaluate the project. Any discrepancies, errors and/or queries must immediatelybe forwarded to the PMUs for rectification / clarification. As soon as the Technical Report hasbeen approved by DWAF and submitted to the NMMU the project file with all the relevantinformation and evaluation sheet will be submitted to the Senior Manager MIG (SMM) andSenior Manager Finance (SMF).
The SMM and SMF will evaluate the information and if in compliance with the MIG fundingcriteria, they will sign the Project Registration Form off on the MIS. The NMMU will then forwarda signed Project Registration Letter to the Municipality (PMU).
The Project Registration Form will form the baseline against which the implementation of theproject will be measured / monitored (e.g. financial matters, KPI achievements and scope ofwork).
2. PRE-IMPLEMENTATION PHASE
2.1 Design
In most instances, a Municipality will not have the capacity to undertake the detailed designfor a project.
It is therefore advisable that a consulting engineer be appointed to perform this task.
A municipality should consider the following when appointing a consulting engineer / consultingengineering company:
• It is preferable that only individuals / companies that are registered with SAACE or SABTACObe considered. Members of these organisations are bound by a certain code of conduct,which will provide some assurance of quality / professionalism to the municipality.
• The appointment should be in terms of the standard contracts, which can be obtained,from the Department of Public Works or SAACE.
The Municipality must appoint a consulting engineer from their roster system to ensure thatan equitable spread of work is achieved between the different companies. The consultingengineer’s information must be captured on the MIS (Register Consultant Form).
The consulting engineer must identify different design alternatives that can be used for theproject and will advise the municipality on labour-based processes, systems, techniques andapproaches after consultation with all the relevant Sector Departments. The municipality mustendorse the design alternative selected as the operation and maintenance costs have to becarried by the municipality for the duration of the project’s lifetime.
After the municipality has evaluated the design alternative selected, it will be endorsed if itcomplies with the MIG criteria. The consulting engineer will thereafter proceed to complete allthe necessary surveys as well as the preliminary design report. The municipality will evaluateand verify the preliminary design report and should any amendments be required, the municipalitywill refer the design report back to the consulting engineer. Once the municipality is satisfiedwith the preliminary design report, it must be endorsed as approved.
26
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
The consulting engineer may now proceed to complete the detail design for the project basedupon the approved preliminary design report.
2.2 Tender document and procurement
The schedule of quantities and tender document is based upon the final design for the project.The consulting engineer must ensure that the prescribed preferential procurement proceduresthat will be used for the evaluation of tenders be clearly stipulated in the tender document.
The tender may now be advertised in regional newspapers. The normal tender period isapproximately one (1) month and a site inspection will normally be held so that prospectivecontractors can familiarise themselves with the site and project conditions / requirements. Afterthe closing of tenders the consulting engineer will evaluate the tenders received and compilea tender report with their recommendations. The tender report will be submitted to themunicipality for their evaluation and endorsement.
3. IMPLEMENTATION PHASE
3.1 Construction
After the tender report has been approved, the municipality can appoint the successful bidder.This contractor’s information must be captured on the MIS (Registered Contractor Form). Thecontractor can then commence with construction of the project in terms of the contractdocument and construction drawings issued. The consulting engineer will represent themunicipality during this period and supervise the work carried out by the contractor. However,the contractor will be responsible for the quality and correctness of the work preformed in allcases.
During the construction period of a project, it is important that key performance indicatorsincluded in the Project Registration Form are carefully monitored.
For this purpose, it is important that the following MIS forms be completed / updated by theconsulting engineer on a monthly basis:
• Request for payment (design and construction phases)• Physical completion report
These MIS forms must be submitted to the PMU for reporting purposes.
Once the contractor has successfully completed the contract according to the prescribed contractconditions, technical specifications and standards the consulting engineer will issue a physicalcompletion certificate. This information must be captured on the MIS (physical completion reportform).
4. Operation and maintenance
During the Defects Liability period (approximately 12 months after the completion of the contract)the contractor will be responsible to rectify / repair / reconstruct any defects that may occur on thecontract. At the end of the Defects Liability period, the consulting engineer will release all the balanceof the contractor’s retention money. This information must be captured on the MIS (request forpayment (retention)).
The last stage of the MIG project life cycle, the operation and maintenance of the infrastructureconstructed is also the most costly one. Municipalities must carefully consider these costs and ensurethat adequate funds are budgeted for personnel, materials and equipment in order to operate andmaintain the infrastructure created and to provide a sustainable service.
27
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
Preliminary project phase
Municipal Infrastructure Grant (MIG) Project Life Cycle
Project Identification
ProjectPrioritisationand Selection
Inputs andassistance by
Sector Departments
Project List Generated
Project lists submittedto Municipality
(Infrastructure PlanningForum)
Project evaluated againstavailable funds, MIG conditionsand Three-year capital plans
by Municipal Council
Final list of projects compiledand Consulting Engineers
allocated by Municipality usingroster system
Municipality (PMU)activates Project
Registration on website
ProjectRegistration
Form
Notes
Policy-making, including
the setting of norms and
standards for basic service
infrastructure.
Ensuring that IDP give
priority to basic needs in
communities and promote
the social and economic
development of
communities.
Planning oversight
(regional and service
development plans)
and service delivery
targets.
Identify needsthrough community
participation
Explore alternativefunding options
Municipalitycompiles Three-year
capital plan
Municipal IntegrateDevelopment Plan
Municipality (PMU) evaluatesProject Registration Form and
Technical Report
Changes requested Changes requested
Project Registration Formcompleted on line and a hard copysubmitted to Municipality (PMU)
Technical report completedand hard copy submitted to
Municipality (PMU)
Project registration
28
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
Preliminary project phase
Municipal Infrastructure Grant (MIG) Project Life Cycle
Notes
Municipality (PMU) signsProject RegistrationForm off on MIS and
submit Technical Reportto DWAF
Technical Report for “Wet”projects submitted toDWAF for approval
Senior Manager MIG (SMM)and Senior Manager Finance
(SMF) sign the ProjectRegistration Form off on MISand signed registration lettersend to Municipality (PMU)
Technical Reportreferred back to
Municipality(PMU)
DWAF evalutestechnical reports
PMMU evaluatesproject
PMMU evaluatesproject
Municipality (PMU) evaluatesProject Registration Form and
Technical Report
Cha
nges
req
uest
ed
on previous page
Municipality (PMU) evaluatesProject Registration Form and
Technical Report
on previous page
• KPI / DORA reporting begins• Access to MIG funds through fund administration system
Set criteria related to
proverty aleviation and
employment.
Ensure that Municipalities
operate within the macro
economic framework
driven by National
Government.
Coordinate and
synchronise interactions
between MIG Programme
and other programmes (i.e.
Housing Fund).
Pre-Implementation
• Monthly reporting begins
Project registered
29
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
Pre-Implementation
Municipal Infrastructure Grant (MIG) Project Life Cycle
Notes
Project Consultantappointed
by Municipality
Advise Municipalities
on intensive labour
based processes,
systems, techniques
and approaches.
Liaise with Municipalities
on procurement reforms.
Provide assistance
and advice with
regard to technical
matters and designs /
methods in order to
provide sustainable
infrastructure / services.
Design
Design alternativesidentifies
(Labour intensiveconstruction)
Design alternativesevaluated
and endorsed byMunicipality
Preliminary designcompleted and
submitted toMunicipality for
evaluation
Municipalityevaluates design
report
Municipalitycomplies with
MIG project conditions
Preliminary design reportreferred back to consultant
and emendedDesign report
endorsedby Municipality
Design Reportapproved byMunicipality
Detailed DesignCompleted
Schedule of quantitiesand tender document
compiled
Tender advertisement, siteinspection, evaluation of
tenders, tender report
• Register Consultant Form• Request for Payment (Design Phase) Form
30
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
Pre-Implementation
Municipal Infrastructure Grant (MIG) Project Life Cycle
Notes
Tender report endorsedby Municipality
Tender Report submittedto Municipality for
evaluation
Tender reportapproved byMunicipality
Implementation
Contractor appointed byMunicipality, construction
drawings issued by Engineer
Project Constructed
Project Completed
Implementation
Defects liability period
Physical Completioncertificate issued
Ongoing operation andmaintenance by Municipality
Operation and maintenance
Construction
• Register Contractor Form• Request for payment (Construction Phase) Form• Physical Completion Report Form• Request for Payment (Retention) Form
• Site visit• Ending of MIG funding
Monitoring progress to meet sectordepartments targets.
Initiate interventions related toservice provision activities.
Monitor employment generation,labour based technology and SMMEinvolvement.
Monitor compliance of sector specificconditions.
Ensure that MIG funds are properlyapplied.
Assist with the capacity building ofthe PMUs.
Monitor operations and maintenaceactivities conducted by theMunicipality.
Initiate interventions related tooperations and maintenanceactivities.
Tender report referred back
Tender report referredback to consultant and
amended Municipalityevaluates tender
report
31
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
6. Generic reporting mechanisms,formats and procedures
Municipalities are required to report monthly on progress, draw downs and DORA as well as quarterlyon their key performance indicators. Reports must be submitted as listed in the table below in orderto achieve the required milestone dates.
Municipalitiesto PMU
PMU to PMMUPMMU toNMMU
NMMU to EMMEMM to
dplg: CFO /Financial Dept.
dplg: CFO toTreasury
dplg to SectorDepartments
Monthly progress report 3rd 6th 10th 20th
KPI report 3rd 6th 10th 20th 25th
DORA 3rd 6th 10th 16th 18th 20th
Draw downs 3rd 6th 10th 12th 15th
Milestone dates per month
Note: The KPI Report must be submitted on a quarterly basis therefore the dates above is relevantto the month in which the report is due.
6.1 Division of Revenue Act (DORA) – monthly reporting
The duties of the transferring national officer and receiving officers (Municipal Managers of recipientmunicipalities) are clearly stipulated in the yearly DORA.
The monthly DORA report would reflect on the following items:
• Amount of funds transferred / received by a municipality.• Amount of funds delayed or withheld from any municipality and the reasons for such a delay
or withholding.• Actual expenditure incurred by the municipality in respect of its allocation.• Extent of compliance by a municipality with the conditions of an allocation and the Division of
Revenue Act.• Explanation for any material (supplier) problems experienced or variations effected by a
municipality and a summary of the steps taken to deal with such problems or the effect of suchvariations.
• Other issues as the National Treasury may determine.
The procedures and timeframes for the submission of the monthly DORA reports for the variousspheres of government are as follows:
6.1.1 Recipient municipalities
The PMU of the recipient municipality shall develop, verify, reconcile, check and submit the hard copyof the monthly DORA report and the updated electronic format (Excel spreadsheet) and a signed hardcopy of the DORA report to the relevant Municipal Manager no later than the 3rd of each month.
6.1.2 PMUs
The PMU will verify and reconcile the monthly DORA reports received from the Municipal Managers.Any discrepancies, errors and/or queries must immediately be forwarded to the Municipal Manager/sfor rectification/clarification. A consolidated municipal DORA report will be compiled by the PMU andsubmitted to the PMU manager for approval.
32
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
Any discrepancies, errors and/or queries must immediately be forwarded to the Municipal Managersfor rectification/clarification.
The PMU manager shall submit the updated electronic format (Excel spreadsheet) and a signed hardcopy of the DORA report to the PPMU no later than the 6th of each month.
6.1.3 Provincial Programme Management Unit (PPMU)
PPMU will verify and reconcile the monthly DORA reports received from the various municipalities inthe province. Any discrepancies, errors and/or queries must immediately be forwarded to the PMUmanager/s for rectification/clarification.
A consolidated provincial DORA report will be compiled by the PPMU and submitted to the ProvincialProgramme Management Unit and submitted to the PPM for approval.
The PPMU shall submit the updated electronic format (Excel spreadsheet) and a signed hard copy ofthe DORA report to the National MIG Unit no later than the 10th of each month.
The PPMU must also ensure that an updated electronic format (Excel spreadsheet) and a signed hardcopy of the DORA report for the provincial project management capacity for MIG be submitted tothe National MIG Unit no later than the 10th of each month.
Note: The Provincial Programme Managers should process reports from the municipalities as andwhen they are received.
6.1.4 National MIG Unit
The National MIG Unit will verify and reconcile the monthly DORA reports received from the nine (9)PPMUs. The monthly DORA reports would be evaluated and verified utilising the following documentation/ information:
• Provincial DORA and monthly progress reports (current and previous month).• dplg’s BAS system report.
- Any discrepancies, errors and/or queries must immediately be forwarded to the Provincial MIGManagers for rectification/clarification.
- A consolidated national DORA report will be compiled by the National MIG Unit and submittedto the Senior Manager Finance (SMF) for approval.
- The SMF shall submit an updated electronic format (Excel spreadsheet) and a signed hard copyof the following DORA reports to the Executive Manager MIG (EMM) no later than the 17th ofeach month:
• Municipal Infrastructure Grant (MIG)
The EMM shall submit the electronic format (Excel spreadsheet) and a signed copy of the consolidatednational DORA reports to the dplg – Chief Financial Officer no later than the 18th of each month.
6.1.5 dplg – Chief Financial Officer
The dplg – Chief Financial Officer shall submit the updated electronic format (Excel spreadsheet) anda signed hard copy of the following DORA reports to National Treasury no later than the 20th of eachmonth:• Municipal Infrastructure Grant (MIG)
33
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
6.2 Monthly Progress Report
The National MIG Unit must compile and submit a comprehensive Monthly Progress Report to theExecutive Manager MIG (EMM) no later than the 20th of each month.
The Monthly Progress Report will reflect on the following issues:
Section 1 : Executive Summary • Introduction• Financial status• Project implementation status• Programme evaluation- Nodal Municipalities- Labour intensive projects- Special Municipal Infrastructure Fund (SMIF)• Problem areas and remedial action plans by the National and
Provincial MIG Management Units.
Section 2 : Detailed reports • Schedule of work• Status of Programme (National perspective)- Project status- Financial status• National cashflow• Provincial cashflows
Section 3 : Site visit reports
Section 4 : Contact details
The procedures and timeframes for the submission of the Monthly Progress Report for the variousspheres of government are as follows:
6.2.1 Recipient municipalities
The Municipal Manager must obtain the completed relevant MIS project forms from the projectconsultants and submit a signed hard copy of the documentation to the PMU no later than the 3rd
of each month.
6.2.2 PPMUs
The PMU must obtain all the updated MIS project forms from the municipalities and capture theinformation on the MIS.
The PMU manager must evaluate and verify the completeness/correctness of data / information(financial and KPIs) captured on the MIS. Any discrepancies, errors and / or queries must immediatelybe forwarded to the Municipal Manager for rectification / clarification.
A consolidated PMU monthly report must be printed from the MIS and a copy, signed by the relevantMunicipal Manager / authority, will be submitted to the PPMU no later than the 6th of each month.
34
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
6.2.3 Provincial Programme Management Unit (PPMU)
The PPMU will generate a consolidated provincial monthly report from the MIS. The PPMU mustevaluate and verify this report with the following:
• Monthly report received from the PMUs.• Previous consolidated provincial monthly report.• Previous DORA report received from the PMUs.• Previous consolidated DORA report.
Any discrepancies, errors and / or queries must immediately be forwarded to the PPMU’s for rectification/ clarification.
Once the Provincial MIG Manager has consolidated the provincial monthly report, the National MIGUnit must be notified by no later than the 10th of each month.
6.2.4 National MIG Unit
The National MIG Unit must generate the consolidated national monthly report from the MIS oncethe Provincial MIG Manager has submitted the consolidated provincial monthly report.
The National MIG Unit must evaluate and verify this report with the following:
• Previous consolidated national monthly report.• Previous consolidated national DORA report.• The departmental BAS system.
Any discrepancies, errors and / or queries must immediately be forwarded to the Provincial MIG Unitfor rectification / clarification.
The National MIG Unit must finalise and submit the report to the EMM for processing no later thanthe 20th of each month. Once the report has been signed by the EMM the departmental website willbe updated with the relevant report.
6.3 Quarterly KPI Report
The National MIG Unit must compile and submit a KPI report to the EMM on a quarterly basis. Thisreport will be a consolidated report of the previous quarters' monthly financial Progress Reports andKPI Report.
The EMM will submit the Quarterly KPI Report to the MITT. Once the MITT has approved the report,copies will be produced for distribution to the various PMITTs and relevant sector departments androleplayers.
35
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
The Quarterly KPI Report will reflect on the following:
Section 1 : Assessment of MIG KPIs • Summary• Funds allocated to infrastructure categories and funding
elements• Implementation in nodal areas• Total financial contributions• Employment opportunities- Women- Youth- Disabled• Number of persons employed• Person days of employment• Training provided per module of training• SMME involvement• Labour intensive projects (EPWP).
Section 2 : Detailed reports • National Report• Provincial Report (nine)
Section 3 : Contact details • Format and contents still to be finalised.
The procedures and timeframes for the submission of the Quarterly KPI Report will be exactly as forthe monthly progress report except for the fact that it will be compiled on a quarterly basis.
6.4 Annual Report
The National MIG Unit will compile, on an annual basis, a report on the achievements of the programmein general over the past financial year. This report will be a consolidated report of:
• The Monthly progress reports.• The Quarterly KPI reports.• The two social and economic impact reports.
36
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
7. MIG national fundadministration system
The funds for MIG will be appropriated to dplg’s budget and the department remains overall responsiblefor the disbursement of funds to provinces and municipalities.
The multi-year formula based allocation will be calculated to provide funds to all municipalities.
The allocation, which each municipality will receive, is based on the following parameters:• Backlogs in specific services.• Poverty.• Identification of a node.
Once the allocations had been gazetted, the EMM will forward a “Letter of Allocation” to the nineprovinces and recipient municipalities.
The letters of allocation should at least include information on the following:• Overview of the MIG programme.• MIG allocation to municipalities.• Requirements of PMUs business plan.• Special Municipal Infrastructure Fund (SMIF).• Indicative allocations for the remainder of the MTEF period.• Conditions.
The dplg would only transfer funds once the recipient municipality has submitted its signed “Certificateof Acceptance and Compliance” in respect of the MIG.
The recipient municipalities must comply with the following conditions stipulated in the DORAframework:• Prioritise residential infrastructure projects in line with any MIG or sector department’s policies
before the start of the municipal financial year.• The Municipal Council must approve their three-year capital plan linked to its IDP and budget no
later than 30 June 2004. The budget must reflect the operation and maintenance costs forthe three years and beyond.
• District Municipalities must provide detail information by 30 June 2004 on expected transfers tothe local municipalities, as well as any information on projects undertaken directly by the DistrictMunicipalities.
• All committed projects must be prioritised.• Adhere to the labour-intensive construction methods in terms of the Expanded Public Works
Programme (EPWP) guidelines agreed between the Department of Public Works, National Treasuryand SALGA, for at least low-volume roads, sidewalks, stormwater drainage, trenching etc.
• Provide quarterly reports on budget and project implementation.
The funds of the MIG conditional grant would be disbursed as follows:
7.1 Municipal Infrastructure Grant (MIG)
Funds would be disbursed by dplg to recipient municipalities according to a payment schedule. MIGfunds could only be utilised on projects once the projects are registered and signed-off on the MISby a senior MIG manager in conjunction with the SMF.
37
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
7.1.1 Recipient municipalities
The recipient municipalities must compile and submit the following to the PPMU:
• Cover letter from Municipal Manager.• Certificate of expenditure and revenue signed by the Municipal Manager.• Copies of the proof of payments (1084’s).• Copies of progress payment certificates of contractors.• Copies of professional fee claims of consultants.
These documents must be submitted to the PMU no later than the 3rd of the month.
It is important to note that the request for draw down of funds would occur as per the schedule andactual expenditure and proof of payment (1084’s) must be reported on a monthly basis.
7.1.2 PMUs
The PPMU will receive and verify the information signed by the Municipal Managers. Any discrepancies,errors and/or queries must immediately be forwarded to the Municipal Manager forrectification/clarification. The information must reach the PPMU not later than the 5th of each month.
The PMU manager will receive and verify the information and submit the consolidated draw down,signed by the Municipal Manager, with supporting documentation and submit to the PPMU no laterthan the 6th of each month. The PMU manager must also sign the certificates of expenditure andincome.
Note: If the municipality does not have a PMU, the municipality itself should perform the functionsof a PMU, verify and submit all documentation directly to the PPMU.
38
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
7.1.3 Provincial MIG Management Unit (PPMU)
The PPMU will verify and reconcile the draw downs received from the various recipient PMUs in theprovince. Any discrepancies, errors and/or queries must immediately be forwarded to the PMU projectmanager/s for rectification/clarification.
A consolidated draw down will be compiled by the PPMU Unit and submitted to the PMM forprocessing. The following documents will be submitted to the National MIG Unit not later than the10th of the month:
• A cover letter from the PPMU with a summary of draw downs received from municipalities.• Certificates of expenditure and revenue must also be signed by the PMM.• Copies of proof of payments (1084’s).• An updated proof of payment control sheet.
7.1.4 National MIG Unit
The National MIG Unit will receive the consolidated draw down with supporting documentation fromthe PPMU not later than the 10th of the month.The National MIG Unit will then verify and reconcile the information against:• National monthly progress report.• National monthly DORA report.• dplg’s BAS system.• Updated draw down control sheet on MIS.
The National MIG Unit will capture the new information on the MIS hereafter they will compile thefollowing documents for each draw down received and submit it to the SMF, before the 12th of themonth, for approval:
• Transfer payment for MIG memorandum.• Sundry payment advice.• The certificate of expenditure and revenue, as compiled and signed by the municipal manager,
will be attached.
The National MIG Unit will update their proof of payment control sheet and file the copies of theproof of payments received.
The SMF must submit the draw downs to the EMM for approval. After approval these documentationmust be submitted, no later than the 15th of the month, to the dplg - Financial AdministrationDepartment for payment/transfer of funds.
On receipt of proof of transfer of funds from the dplg - Financial Administration Department, theNational MIG Unit will fax the proof of transfer/s to the PPMU as well as recipient municipalities. Thedraw down control sheet on the MIS will also immediately be updated with latest proof of transfersreceived.
7.1.5 Under-spending at municipal level
The National MIG Unit will identify, on an ongoing basis, based on monthly reports, anyvariances/regular/drastic under-expenditure. The following actions will be taken:
• Confirm the variances with the PPMU.• Write to the municipality within 8 working days after the 10th of the month about the variances
explaining the implications thereof and the problems experienced with under-expenditure.• Copy the letter to the PPMU.
39
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
• Reflect the variances in the monthly Division of Revenue Report.• Write a letter to National Treasury regarding the variances, by the 20th of the month, reflecting
the actions taken (such as delaying or withholding of transfers) to address the under-expenditure.
7.1.6 Control measures for expenditures/transfers
The PPMU transfers funds to municipalities on a monthly drawd own basis.
The Provincial MIG Manager will submit requests for draw downs to the National MIG Unit on the10th of the month where after the National MIG Unit will:
• Assess the expenditure of the municipalities against the transfers.• Inform the municipalities within 8 working days after the 10th of the month about the variances,
explaining the implications thereof and problems experienced with under expenditure.• If a municipality did not spend 50% of the amount previously transferred the amount still available
on their books will be subtracted from their request for draw down.• Should a municipality consistently not spend its funds and this situation persists, transfer/payment
will be withheld until proof of expenditure and an amended payment schedule are received.
7.1.7 Assist municipalities
The National MIG Management Unit will identify municipalities with challenges / problem areas.Meetings will be arranged with all parties / stakeholders involved (PPMU, municipality, consultant,contractor), to discuss action plans in order to resolve problem areas. Feedback / follow-up will be necessary to determine if issues have been addressed successfully.
40
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
7.1.8 Delaying of payments
The National MIG Unit will recommend delaying of payments to the National Treasury shouldprovinces/municipalities not comply with the Division of Revenue Act.
7.1.9 Withholding of payments
The National Treasury will withhold transfers if the National MIG Unit could provide proof of non-compliance with the Division of Revenue Act.
7.1.10 Non-compliance
Any serious or persistent non-compliance with the Division of Revenue Act constitutes financialmisconduct and dplg would therefore seek national intervention to attend to these incidents. Thisincludes under-expenditure and non-compliances such as late or no submission of reports or information.(Also refer to the Local Government: Municipal Finance Management Act and sections 38, 39, 40and 86 (1) of the Public Finance Management Act).
7.2 Re-allocation of MIG funds
Refer to the relevant Division of Revenue Act.
41
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
8. MIG Management InformationSystem (MIS)
The MIG Management Information system (MIS) is a comprehensive management tool that providesintegrated management reports on aspects such as progress and exceptions, actual outputs againsttargeted output, finances and cash flow. The system enables the users the management of manydifferent business processes in a consolidated way. The number of different information/data capturingforms on the MIS follows the logical progression of MIG projects through its life cycle.
MIS interfaces directly with the day-to-day operational aspects of each process. It maintains a cohesivedatabase, integrating information from all the business processes required for comprehensiveorganisation management.
MIS provides municipalities with a tool for controlling their own programmes while at the same timeproviding consolidated reporting of financial, progress and performance indicators on a provincialand national scale.
The important benefit with this approach is that only information relevant to the specific phase willbe recorded. Static information from one reporting period to another will also be pre-printed on theforms and the unnecessary capturing of known information will be prevented in this way.
The proposed MIS forms, to be completed by the PMUs/municipalities at certain stages of the projectlife cycle, will be used throughout the project life cycle, are as follows:
8.1 Preliminary phase
The relevant forms are specified in the sections below.
8.1.1 Project Registration Form
The sector departments must participate in the IDP process. The project registration form must becompleted once the municipality and PMU have prioritised the projects to be implemented.This form will be submitted to the National MIG Unit for registration of the project.
The costs involved with the completion of the project registration form, conducting of feasibilitystudies, value engineering and compilation of technical reports, will be for the account of the recipientmunicipalities.
Once the project registration form has been signed-off on the MIS system by the SMM and SMF therecipient municipality will be reimbursed for these costs incurred on projects as well as the projectcost.
The table below details the method to be followed to ensure the proper evaluation, control and filingof a Project Registration form.
42
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
Evaluation of a project registration form
1. Print replication log from MIS on a daily basis in order to see whether there is any
new project registration forms, additional funding requests or changes.
2. Contact PMU requesting whether project registration form must be evaluated or not.
Await confirmation from PMU before proceeding with evaluation.
3. Print out project registration form from MIS.
4. Create project file.
5. Check status of project on MIS
Check if project is signed-off and authorised at PMU level on MIS
Check if project name and number on file correlate with information on MIS
Check if all necessary fields on project registration form is completed
Check if project description and motivation correlate and if project qualifies for
funding in terms of MIG requirements
Check following fields in particular:
• Breakdown of funds
• Labour Intensive project (EPWP) Yes / No
• Average project wage rate
• Beneficiaries
• Funding (MIG, public and/or private sector)
• Employment generation
o Women
o Youth
o Disabled
• Number of persons employed
• Person days of employment generation
• Planned training activities per module of training
• Operation and maintenance budget
• Outputs and other targets
• Budget control
• Declaration on standard conditions
6. See if the following documentation has been provided by the PMU:
• Council Resolution
• DWAF Technical Report (only for Water, Sanitation and Waste Disposal
projects).
7. If above has not been provided, contact PMU requesting this information. Proceed
with project registration once all of the documentation has been provided.
8. Place project registration form in project file.
9. Submit project file to Secretary for information control and tracking.
10. Secretary submits files to SMM for sign-off purposes on MIS.
43
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
During evaluation, if found that there is non-compliance to MIG criteria or outstanding information,a letter will be written to the PMU explaining the situation.
This form will be the baseline against which the implementation of the project will be measured (e.g.financial matters, achievement of KPIs and scope of work).
8.2 Pre-implementation phase (design and tender)
8.2.1 Register consultant
This form is to be completed once the municipality has appointed project consultants.
Note: Consultants appointed on Labour Intensive Projects (EPWP) must take note of the specificrequirements according to the SETA NQF qualifications framework for labour-intensive construction,learning guides, learning programmes and assessment instruments.
8.2.2 Request for payment from municipality (design phase)
This form is to be completed at the end of every month during which the project is being designed.
8.3 Implementation phase (construction)
8.3.1 Register contractor
This form is to be completed once the municipality has appointed the successful tenderer, based onthe consultant’s tender evaluation and recommendation.
Note: Contractors appointed on Labour Intensive Projects (EPWP) must take note of the specificrequirements according to the CETA NQF qualifications framework for labour-intensive construction,learning guides, learning programmes and assessment instruments.
8.3.2 Request for payment (construction phase)
This form is to be completed at the end of every month during which the project is under construction(contractor’s progress certificates and/or consultant professional fee claims).
8.3.3 Physical completion report
This form is to be completed after the physical completion certificate has been issued (site handover).
8.3.4 Request for payment (retention)
This form is to be completed when the retention funds of the project become due (expiring of thedefect liability period).
The successful implementation of system depends on quality informationand ownership of the system by its users.
44
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
9. General filing and backupprocedures
9.1 Backups
This paragraph covers the method to be followed to store backups of computer information.a) A backup shall be made at least once every month of all computers in the office and those in the
personal possession of each staff member, which contain MIG related information.b) Backups shall also be made to the network drive of the dplg at:
Users on 'Pta\Users' (H:)/MIG/Consultants.
9.2 Project Files
The National MIG Unit must ensure that all documentation relevant to the MIG programme be filedin such a manner so as to enable any member of the Unit, to quickly and accurately access any requireddocumentation at any time.
The National MIG Unit must keep record of all the projects registered on the MIS and signed-off bythe SMM in conjunction with the SMF.
For each project a file must be opened on which the following documentation must be filed andupdated on a regular basis:• Project registration form together with supporting documentation.• Correspondence from sector departments such as DWAF, DPW, DME, DoT, DoH, DSRSA etc.• DWAF’s response with the regard to the Technical Report submitted.• Certificate of Compliance (DORA).• General correspondence between the relevant roleplayers.• Operation and maintenance plan furnished by the municipality.• A copy of the signed (by the Municipal Manager) certificate of fulfilment of conditions together
with all relevant / supporting documentation (e.g. Council resolution, agreement betweencommunity and municipality on the service package and payment for services, etc).
• Employment records.• Training records.
9.3 Minutes
The following documentation must be filed per province:• Signed copy of the minutes.• Agenda.• Attendance register.• All relevant documentation received at the meeting.
9.4 Reports
The following reports must be filed:• Monthly progress.• Quarterly KPI.• ISRDP & URP.• Monthly DORA.• Ad-hoc reports.
45
NATIONAL MIG MANAGEMENT UNIT PROGRAMME MANAGEMENT PROCESSES AND PROCEDURES
9.5 Financial Administration System
9.5.1 Submission of draw downs
The following documentation must be filed in the Provincial Financial file per month:• Transfer of payment MIG Memorandum.• Sundry payment advice.• Certificate of Expenditure and Revenue (received from PMU).• Proof of transfer of funds.• Draw downs control sheet on the MIS.
9.5.2 Proof of Expenditure (1084’s)
The following documentation must be filed in the provincial 1084’s file per month:• Proof of payment control sheet (received from PMU).• Proof of expenditure.
9.6 Service Level Agreements
The Service Level Agreements between the District Municipalities and Local Municipalities must befiled per province in the Service Level Agreements file.
Municipalities should send letters of acceptance of the MIG conditions on receiving MIG funds.
CONTACT DETAILS: PROVINCIAL DEPARTMENTS
National Department of Provincial Tel: (012) 334 4942
and Local Government Fax: (012) 334 4872
Eastern Cape Department of Housing Tel: (040) 609 5565
and Local Government Fax: (040) 636 4285
Free State Department of Local Tel: (051) 405 5717
Government and Housing Fax: (051) 405 5008
Gauteng Department of Development Tel: (011) 355 5412
Planning and Local Government Fax: (011) 355 5403
KwaZulu-Natal Department of Traditional and Tel: (033) 355 6172
Local Goverment Fax: (033) 355 6547
Limpopo Department of Local Goverment Tel: (015) 295 6851
and Housing Fax: (015) 295 4700
Mpumalanga Deparment of Local Government Tel: (013) 766 6605
Fax: (013) 766 8449
Nothern Cape Department of Housing and Tel: (053) 830 9462
Local Government Fax: (053) 830 9562
North West Depatment of Developmental Tel: (018) 387 3747
Local Goverment and Housing Fax: (018) 387 3745
Western Cape Department of Local Goverment Tel: (021) 483 4191
Fax: (021) 483 3244