national land records modernization programme …. s. k. kadupatil ias settlement commissioner and...
TRANSCRIPT
Shri. S. K. KaduPatil IAS Settlement Commissioner and Director of Land Records, Maharashtra State, Pune
National Land Records Modernization
Programme
(e-Dharti)
Maharashtra State
STATE STATISTICS
Geographical Area – 3.08 lacs sq.km.
Divisions – 6
Districts – 36
Talukas – 358
Villages - 44321
Tehsil Offices – 358
Dy.SLR Offices – 353
CTSO - 30
Circle Officers – 2106
Talathis – 12637
Department Overview
Settlement Commissio
ner & Director of
Land Records
Deputy Director Land
Records
Superintendent Land Records
Dy.SLR
Surveyor
State
Division
District
Taluka
3
Field Staff
Pr. Secretary Revenue
Divisional Commissioner
District Collector
Tahsildar
Talathi and Circle Officer
Land Records Department
Revenue Department
Online provision of more than 55 lacs computerized property cards (Urban RoR)
Over 2.5 crore RoR computerized (100% completed) and available through - www.mahabhulekh.maharashtra.gov.in
Over 10 lac RoR issued per month issued through various citizen service Centres like CSCs, setu kendras, etc.
Revamped Department Website www.bhumiabhilekh.maharashtra.gov.in
Maharashtra is the only State having urban property cards and have a Property Card Information System (PCIS)
Registration Department in Maharashtra has taken lot of initiatives like
iSARITA
eRegistration
eSBTR etc.
Department Overview
NLRMP (e-Dharti) – eMahabhumi Mapping
Computerization of Land Records
Data entry/re-entry/data conversion of all textual records including mutation
records and other land
Digitization of cadastral maps
eMutation and eChawadi*
eMaps
* Completely state initiated programme
NLRMP (e-Dharti) Components eMahabhumi Projects
Integration of textual and spatial data
Tehsil, sub-division/district Computer centers
State-level data centres
Inter-connectivity among revenue offices
Maharashtra SDC
eBhulekh
NLRMP – eMahabhumi Mapping
Resurvey
Computerization of Registration
Modern Record Room
Training and Capacity Building
Core GIS
Legal Changes
Programme Management Unit
eResurvey
eRegistration
eRecords
Land Records Training Institute
eBhulekh (partial)
Amendments to MLRC 1966 and Consolidation Holdings Act
eMahabhumi Society
NLRMP (e-Dharti) Components eMahabhumi Projects
As per directions of GoI, Mahabhumi Society in the form of PMU is formed and registered vide GR dt 20 March 2012.
Grants from GoI and GoM are managed through Mahabhumi Society account – Total Rs 37.30 Crore credited to PMU in March 2014
Core Committee formation completed and regular meetings held every quarter
Governing Body
Executive Body
The eMahabhumi funds are managed by Society as per Governing Committee decisions
Project Management Unit (PMU)
eMahabhumi Projects
eMojni eRegistration
eMutation eRecords
eResurvey
eChawadi
eMaps eBhulekh
Scanning of Records
(Modern Record
Room)
Digitization of
Cadastral Maps
Computerization of
registration process
Computerization of
Village officers
record Online Mutation
Computerization of
Process of current
measurement cases
Re-Survey using
latest
technologies
Core GIS
Implemented
In Process
Pilot Done. State Rollout readiness
NLRMP – Implementation Strategy
Systematic & Scientific approach to every component
Constitution of Domain Group of experts for each component
Consultation with Domain Group and Business Process Re-engineering (BPR)
Software development by NIC, Pune
All projects piloted in 1 taluka (Mulshi) before state-wide rollout
Appropriate Approvals by PIC, HPC
Creation of Mahabhumi Society (PMU)
Guidance from Principal Secretary (IT) GoM
Project Advisor Technical - MRSAC Nagpur, SoI, CDAC, PwC, SIO (NIC)
Management – MRSAC, PwC
IT infrastructure – M/s. CMS Ltd.
Connectivity
Wired (Taluka Offices) – BSNL and MTNL
Wireless (Data Card) – Vodafone, Idea, Airtel, Tata, Reliance, BSNL and MTNL
Technology - Microsoft, EnterpriseDB, Wipro
Scanning – Karvy, CMC, RICOH , VidyaOnline
Digitization – RAMTeCH Solutions Ltd.
Security audit – CyberQ Software Solutions Ltd., AKS IT Services
Website Development – Mahaonline
Language support – CDAC
Manuals – AIILSG (All India Institute of Local Self Government)
Implementation Vendors
Almost 20 vendors being interacted and handled by the department under eMahabhumi
eMutation (COMPUTERIZATION OF MUTATION PROCESS)
Mutation is the process of incorporating changes in the Record of Rights
eMutation has two scenarios: Automatic Initiation of Mutation on Registration as well on application to Talathi
100% online mutation process with major business process re-engineering
eMutation
Co
nce
pt
Typ
es
of
Mu
tati
on
Registered
Sale Deed
Gift Deed
Mortgage Deed
Release Deed
Exchange Deed
Etc. (7)
Non – Registered
Inheritance
Loan Encumbrances
Court Order
Land Distribution (Watap)
Reimbursement of Loan
LAQ and NA Order
Area Correction
Etc. (28)
Implementation in Process in all 358 talukas and 521 SRO offices
Provision of Laptop, Printer and Datacard to all 11,991 talathi and 2,011 Circle officers
Enabling staff with Digital Signatures (DSC) for over 14,774 staff till date
Provision of IT Infrastructure to all 358 Tahsils and LR offices
Provision of Network connectivity Wired – BSNL and MTNL
Wireless – Vodafone, Idea, Airtel, Tata and Reliance
VPN – Fortinet (provided by DIT)
eMutation cells setup across state in each taluka
Training to 1062 Master Trainers and over 15,275 staff
Integrated Help Desk created for all divisions
eMutation – Infrastructure and Connectivity Preparedness
Cu
rre
nt
Sta
tus
More than 4 crore RoR has been updated in the current data improvement exercise
Monitoring of Trial Run through MIS
eMutation - The Data Transition Process Flow
Data Conversion
Data Cleaning (Golu Removal)
Data Correction (DBA Tool)
Data Updation – Mutation and Crop
Trial Run CD with Prapatrak 1 from Tahsildar
Submission of Final CD with Paripatrak 2 from Collector
Final Orders from Settlement Commissioner for going Online and Stopping Manual Mutation Process
eMutation Network Architecture
eMutation (Statistics)
All 358 taluka Data CDs are being uploaded to State Data Centre for Final Online eMutation.
Current Status is as below:
Trial Run Status - Started in 358 talukas
Final Online Mutation – Online Mutation Started – 127Talukas
(Manual Mutation Completely Stopped)
Proposed completion date: All 358 talukas to go online on August 2015
Why eMutation
Mutation is the process of incorporating changes in the
Record of Rights as soon as registration of documents at SRO
office
eMutation has two scenarios: Automatic Initiation of Mutation
on Registration as well on application to Talathi
100% online mutation process with major business process
re-engineering
Giving automatic effect to RoR (Real Time)
eMutation – Mutation Process Flow
Reporting
Cognigance
Draft Mutation
Issue Notices (Serve)
Certify Mutation (Certification)
eMutation (Challenges Faced)
Resources with Talathi / Circle officer
I. Laptop: Purchased by them and reimbursed by Revenue sharing model (Rs.15/-=Rs.10/- for Talathi and Rs.5/- for Government )
II. Connectivity issue: Providing Secured connectivity with Data card : Funds were given by GOM for procurement of Data card. Monthly rental of Rs 750 is given to every talathi & Circle officer by GOM
III. Data Security measures: Usage of Digital signature by Talathi & Circle officers. All data is digitally signed.
eMutation (Logistical Problems)
General Software Issues :
1. Labels / Buttons should be self explanatory / Defined in Help file, should have tool tip.
2. Session Management / timeout / frequent logout should be handled properly. If a session ends in between, it should start from where it was broken.
3. Auto Save: If sufficient data entry is done Auto save feature should save the data before final Save.
4. Screen management: Economical in terms of human intervention and ease to understand. Maximum information to be captured so as to minimise Server round trip.
5. Automation in processes
6. Browser setting Automation, Date & Time format, Security Certificate installation on Server
eMutation (Logistical Problems)
General Software Issues :
7. Screen Layout / Design should be user friendly
8. Proper write-up for taking each type of Mutation with
Screen shots.
9. Checking of the software w.r.t. domain requirements as per
feedback from Online Tehsil. Release of New versions.
10. Bug fixing / Release of patches as per feed back from Online
Tehsil
11. Running of eMutation software on Low Bandwidth.
eMutation (Logistical Problems)
Network & State Data Centre (SDC) Issues :
1. VPN over Broadband connectivity between Tehsil offices and SDC from BSNL/MTNL
2. VPN over Data card (SSL-VPN) connectivity between Village level offices (By talathi using Laptop – Data Cards)
3. Space requirement – Presently 24 TB is allocated for 1 year
4. Server allocation
10 Database Servers
14 Web servers (Application servers)
1 Monitoring server
eMutation (Logistical Problems)
Data related issues :
1. Data correction using 14 validation reports
2. Mismatch in Area of ROR and Holders
3. Mismatch in Area of ROR and Akarband
4. Incorrect way of writing Names of Holder
5. Incorrect Khata type selection
6. Names, Other rights information without mutation number
7. All mutation entries in manual records not reflected in computerised ROR
8. Updation of Crop information
eMutation (Logistical Problems)
Lack of Technical knowledge :
1. Understanding the software
2. LR- SRO Linkage
3. First time usage of Digital signatures, Data cards, Laptops
etc.
eMutation (What has been achieved and to be achieved)
a. On offline Mutation there is to much time required for certifying mutation and effect on RoR but, in online mutation as soon as the registration of document at SRO office there is initiation of online mutation process the overall time required for mutation certification is reduced.
b. No need to issue notices to the parties present during registration
c. Notice period if exceeds specify period (15 days) can be monitored online
d. Time required to update RoR (7/12) after Mutation certification reduced to zero days
e. Updation of 7/12 and other village forms is instant as soon as mutation is certified by circle officer
f. It helps the village accountants / Circle officer to generate the Mutation case file electronically
eMutation (The Road ahead)
a. Improvements
b. ADHAR linkage with RoR
All land holders will be linked with their ADHAR number in land record database.
In Land records, ADHAR number will be key to identify the person for any future transactions related to his land.
ADHAR number is currently getting verified at SRO offices, hence holders appearing in mutations through registered documents will be automatically pass through eKYC.
Verified ADHAR number will be sent to LR from SRO.
Remaining ADHAR numbers will be captured through Organic seeding.
eMutation (The Road ahead)
c. eChawadi (Forms 1-21 updation through eMutation)
d. How entire village gets maintained
e. Scanning of old records-meta data entry linking to existing
RoR
f. eMaps integration of Textual and Spatial data
g. eBhulekh- Concept of integration of all data generated under
various components of NLRMP
eChawadi (COMPUTERIZATION OF VILLAGE DAFTAR-
STATE INITIATED PROJECT)
Talathi – Village level revenue official & Chawadi – Office of Talathi Over 37 types of village Online Village Registers maintained through Software at State
Data Centre (SDC) and access through usage of laptop, datacard and Digital Signature by Talathi
Talathi (Village Accountant) handles Primary 21 register (7*12 being 2 of them)
Revenue Related – Register I to 5
Ownership Related - Registers 6 to 8
Revenue Collection Related – Registers 8 to 10
General Administration Related – Registers 11 to 15
Misc – Registers 17 -21
Other 16 types of Ancillary registers are also maintained online
eChawadi
Co
nce
pt
Extensive training sessions at Aurangabad Academy for over 679 Master Trainers Trained in Batches and over 8200 staff
Rollout in selected talukas –October 2015
Cu
rre
nt
Sta
tus
More than 35 villages tested the concept and ready for rollout post eMutation rollout
eRecords (Modernization of Record Rooms)
eRecords
Scanning Old Records for preservation, Document Management System (DMS) Software and Improving the physical infrastructure for record storage
Co
nce
pt
More than 40 lac documents scanned in pilot project Application developed by NIC with IPR with department Selection of vendors completed - division-wise Hands-on training conducted at Aurangabad LRTA for vendor teams and
Land Records Staff (176 DDE, DIO, Tahsildars, etc) Over 26 crore documents and 741 record rooms to be scanned POC on the verge of completion in all 35 districts Actual work started in 340 offices of 159 talukas in Phase I All record rooms to be provided with IT infrastructure for citizen service
delivery Scanned data to be hosted at State Data Center
Cu
rre
nt
Sta
tus
eRecords – timelines
Scanning Phase No of Talukas Proposed Completion date
Phase I 159 Sept 2015
Phase II 123 Dec 2015
Phase III 74 March 2016
Total 356
* The scanning work in two talukas completed in pilot project
DMS Software
Document Management System (DMS) Software is Developed in Consultation with National Informatics Centre. The software comprises complete end-to-end modules starting from the scanning of document till the citizen service delivery
Following are the stages of the end-to-end Scanning Process Document Preparation for Scanning Document acceptance from Record Room Scanning of Records at Taluka offices Image QC of scanned Documents Metadata Entry at the District Metadata Data Centre (DMC)
Double Blind Metadata Entry Vendor Quality Check (Manual QC and Auto-QC) Department QC
Document Search and Retrieval Accounting Module of DMS for Citizen Service Delivery Citizen Service Delivery of the Scanned Documents
Modules of DMS Software
Scanning
Image QC
Metadata Entry
Metadata QC
Search & Retrieval
Accounting
Challan Generation
Printing
DOCUMENTS TO BE SCANNED
Tehsildar Office Dy.SLR Office CTSO
Old 7/12 Tippan Enquiry Register
Old mutation register Gunakar book Property Card
Current khate register Akarphod Property Register
K.d.e. Patrak K.J.P. Field Book
Inam patrak Akarband Vaslevar Book
Birth-death register Consolidation Scheme register/
shudhipatrak
City Survey Gaon Dharika
Consolidation jabab file Town Planning Scheme
Shet pustak
Vasalewar book
Consolidation gaon p.c.
Kshetra book/field book
Tabe pawati
9(1)9(2) maps of consolidation
SCANNED OUTPUT TO CITIZENS
ACTIVITIES AT RECORD ROOM
Document Preparation
Inward Outward
Register
Users Registration for
Vendor & Department
Image Quality Check by Vendor
Jacket Creation & Book details entry.
Work Assignment for
Image Entry
Image Quality Check by Department
Export Data for Meta Data Entry @ District
Level
Activities @ Record Room Tehsil Office
Image Processing and Entry of Book & Page number
Rejections
ACTIVITIES AT RECORD ROOM
Metadata Entry Quality Check by Department
Double Blind Data Entry
Metadata Entry Quality Check by Vendor
Users Registration for
Vendor & Department
Work Assignment for
Operator 1 & Operator 2
Import Data received from Tehsil Office for
Meta Data Entry
Operator 1 does Data entry of Book 1
Operator 2 does Data entry of Book 1
Teh
sil l
eve
l re
cord
ro
om
Activities @ District Meta Data Entry
Center
Rejections
COMPACTORS IN RECORD ROOMS
COMPACTORS IN RECORD ROOMS
eMaps (DIGITIZATION OF CADASTRAL MAPS)
MAPS IN MAHARASHTRA
Kate Phalni Phalni
Division of Survey
number
(tippan format)
Division of
Survey
Number
Individual
land
parcel sketch
Tippan
Mosaice
d
tippans
Village
Map
MAPS IN MAHARASHTRA
Pot Phalni Sub Division
Sub division in
phalni
Sub division in
phalni
Joint Meas. Sheet Layout
Land Acquisition
Maps
Agri. To Non-
Agri.
1. Tippan
2. Kate Phalani / Phodi Tippan
3. Phalani maps / Pot Hissa maps / Gut Plot Maps
4. Fair Sketch
5. Gut book maps
6. Triangulation Sheets
7. Cloth mounted maps of Survey No.
8. Savistar Bhumapan Mojni Maps
9. Others (Resurvey maps)
10. City Survey maps
11. Court Watap maps
12. Land acquisition maps
13 Non Agricultural maps
MAP STRUCTURE – A COMPARISON
FMB (Tippan)
Village Map
GO
I G
uid
elin
es
Ma
ha
rash
tra
Tippan
Kate Phalni
Phalni
Gat Book
LA Q Sheet
Village Map
MAP MAINTAINED ANALYSIS
States Mah’stra Kar’tka Gujarat AP MP Chh’garh
1. Cadastral Maps Maintained
i. Tippan Yes Yes Yes Yes No No
ii. Hissa Mapani Book/Phodi Tippan
Yes Yes Yes Yes No No
iii. Land Acquisition Maps Yes Yes Yes Yes No No
iv. Sub-divi.Plan Yes Yes Yes Yes No No
v. NA measurement Plan Yes Yes Yes No No No
vi. Village Map Yes Yes Yes Yes Yes Yes
vii. Triangulation Sheets Yes Yes Yes No No No
eMaps
Various map sheets maintained in Maharashtra like Phalni / Sub-Division maps, Gat Book, LAQ and NA measurement sheets, etc. are to be digitized
Co
nce
pt
More than 20,000 map sheet used in department’s day to day working has been digitized in pilot project
Provision of IT infrastructure to provide maps to citizens at Mulshi State total of 92,75,222 sheets & 4,80,91,174 polygons to be digitized
Cu
rre
nt
Sta
tus
Following approvals have been asked from GoI Government of India has granted approval for the digitization of cadastral
maps which includes only tippan and village map. However, In Maharashtra, there exist over 13 other types of cadastral maps which are required to be digitized along with tippan and village maps.
Unit for cost realization to be changed to polygons instead of FMBs Modification in the unit rate for digitization project Su
bm
issio
ns
Request for Digitization of Additional Map sheets
# NLRMP Guidelines Maharashtra requirement
1 FMB/ Tippan
2 Village maps
Other Cadastral maps to be digitized in Maharashtra
1 - Tippan
2 Kate Phalani / Phodi Tippan
3 - Phalani maps / Pot Hissa maps / Gut Plot Maps
4 - Fair Sketch
5 - Gut book maps
6 - Triangulation Sheets
7 Cloth mounted maps of Survey No.
8 Savistar Bhumapan Mojni Maps
9 Others (Resurvey maps)
10 City Survey maps
11 Court Watap maps
12 Land acquisition maps
13 Non Agricultural maps
e - Mojni (COMPUTERIZATION OF LAND MEASUREMENT
CASES- STATE INITIATED PROJECT)
e-Mojni
Computerization of entire process to handle citizen applications for various types of measurement cases received in LR offices
Manually maintained Mojni registers has been completely stopped Running Successfully in all 383 Offices of land records department Till today, 6.15 Lakh applications have been processed through eMojni (approx
15,000 per month) More than 1164 officials and data entry operators have been trained Application security audited before hosting at SDC
Public Data Entry SMS gateway GRAS Integration
Co
nce
pt
Cu
rre
nt
Sta
tus
Fu
ture
Pla
ns
Completed 3 years and more than 6 lac applications handled
e-mojni- (The Road ahead)
eMojni (Process Flow)
Application by citizen
Visit to site for Mojani
Actual Mojani
Issue of K Prat to citizen
1
2
3
eMojni (In Statistics)
eResurvey (Resurvey)
Pilot – Mulshi
2013-14
State Rollout
Proposed
eResurvey - Need of Resurvey (Guidelines given by MoRD, DoLR, GoI)
Frame work of survey in field has completely broken down.
The boundaries shown in the records do not tally with the actual conditions on the
ground .
This may happen due to obliteration of field and sub division of boundaries and /or
due to misplacement of a large percentage of the local ground control point marks.
As a result of which it is difficult to identify the fields with reference to the records.
Resurvey is also necessary in the case of sudden development of the area due to
causes such as -
Sub-divisions
Transfer of dry lands into wetlands
Large scale transfer of holdings
eResurvey – Pilot Project
Pilo
t P
roje
ct
12 Villages of Mulshi Taluka of Pune District.
Methods of Survey:
• Pure Ground Method : E. T. S. & D. G. P. S.
• Hybrid Approach : HRSI & ETS / DGPS
Number of GCPs established : 176
Detail measurement completed :
• By Pure Ground Method - 6 villages
• By Hybrid Approach - 6 villages
Present Status :
LPM distributed in 12 villages.
Complaints / suggestions received from the land holders
Determination of Method to be adopted for Resurvey of State.
Georeferenced Satellite Image Mauje Mukhaiwadi, Tal. Mulshi, Dist. Pune
54
Village Map of Survey Numbers : Scanned Copy ( Year 1930)
55
Village Map of Survey Numbers : Digitized Copy
टिपा स. न.ं ची हद्द
56
Superimposition of Survey Numbers Village Map on Satellite Image
टिपा स. न.ंची हद्द
57
Original Tippan (1930) : Scanned copy - Survey No. 211
58
Original Tippan : Digitized Copy
टिपा स. न.ंची हद्द
वसला रेषा
59
Superimposition of Digitized Tippan on Satellite Image
टिपा स. न.ंची हद्द
60
Phalni Map : Digitized copy (1952)
61
Superimposition of Digitized Phalni on Satellite Image
टिपा स. न.ंची हद्द फाळणी हद्द
62
Pot phalni : Digitized Copy (1965)
स. नं.ची हद्द
फाळणी हद्द
63
Superimposition of Digitized Pot Phalni on Satellite mage
64
Phalni - Consolidation : Digitized Copy (1979)
टिपा स. न.ंची हद्द फाळणी हद्द
65
Superimposition of Digitized Phalni on Satellite Image
टिपा स. न.ंची हद्द फाळणी हद्द
66
DETAILS OF CONSOLIDATION SCHEME SURVEY NO. 211 (YEAR 1979)
SR. No. Survey No. Hissa No. Gat No.
1 211 1 15
2 211 2/1Part,2Part,3Part,4Part,5Par
6Part,7 Part 16
3 211 2/1Part,2Part,3Part,4Part,5Part
6Part,7 Part 17
4 211 2/1Part,2Part,3Part,4Part + 3+4+5 18
5 211 6 19
Total 1 23 5 67
PREPARATION OF GAT MAP
टिपा गिाची हद्द
68
PREPARATION OF VILLAGE MAP
टिपा गिाची हद्द
69
VILLAGE MAP AFTER RESURVEY
70
LAND PARCEL MAP GAT NO. 18
71
LAND PARCEL MAP
72
RESURVEY
RECORD OF RIGHT NOT REFLECTING GROUND REALIT Y
Form No 7
Form No 12
Village Form No 7 After Resurvey
Form No 7
Map
Village Form No 7 After Resurvey
Form No 7
Map
RESURVEY OF MAHARASHTRA STATE
Total expenditure required for resurvey of the state : ₹1356.95 Cr.
50% share of GoI : ₹203.63 Cr.
(As per the rate of Rs. 15.5000 per sq km sanctioned by GoI.)
The expenses to be incurred by the state Govt.
(measurement, establishment, digitization) : ₹1153.32Cr.
Creation of post for validation and verification, 2048 temporary & 1209
on contract basis, total 3257 posts. : ₹290.24 Cr.
The expenditure to be recovered by way of sanad fee : ₹ 1605 Cr.
(@ ₹ 300 per Acre)
The grants required in the year 2015-2016 from GOI : ₹ 45.03 Cr.
RESURVEY RATE ANALYSIS – (EXPERIENCE FROM PILOT PROJECT)
NLRMP Guidelines Maharashtra Pilot Project
Sr.
No. Component of Resurvey NLRMP Guidelines Resurvey Pilot Project Actual Rate
1 GCP 2000
GCP 7034
GPS Reading 6000
Digitization of Old Survey Records 7227
Data entry 600
2
Acquisition of HRSI geo-referencing,
ground truthing and Ortho-image
generation
6000 Satellite Image procurement per sq.km. 4632
Satellite Image processing per sq.km. 4200
3 Feature Extraction 2000
Feature Extraction 2000
Superimposing old maps and generation of polygon 1800
Giving chalta no to polygon 600
4 Field Validation - 2500 Field visit for validation & incorporation of New Pothissa 2500
5 Printing of Maps 1500 Printing of Land Parcel Map 1600
6 Integration of textual details with maps 500 LPM Generation with Integration of textual details 300
7 Generation and Serving of Notices 500 Distribution of LPM 800
8 Sundry expenditure 500
Receiving application /grievances 600
Field visit for redressal of complaints 2400
Corrections of maps & Hard copy generation) 600
Printing of Village map 200
Printing of RoR for promulgation 2000
Printing of Registers 2000
Hardware charges 1000
TOTAL (Rate / Sq.km.) 15500 48193
Resurvey - The work done so far
The amendment proposed in following acts. Maharashtra Land Revenue Code 1966 Bombay prevention of fragmentation and consolidation of holdings act 1947 Proposal submitted on 26/12/2014 to 6/1/2015
Proposal for amendments in Maharashtra land Revenue (Restriction on use of Land) rules 1968 will be submitted after the amendment in the acts.
New rules for resurvey are being prepared A draft of Manual of resurvey is being prepared GCPN
To be established through state PWD Grid Prepared by MRSAC, Pune The readings of GCPN by private agencies The validation of DGPS readings by SOI
Digitization of Cadastral maps RFP for the Digitization is prepared Proposal to be submitted to State Govt.
Creation of staff Proposal submitted to State Govt. on 5/1/15
To develop s s/w for resurvey will be carried out through MRSAC and NIC Pune
eBhulekh (INTEGRATION OF TEXTUAL AND SPATIAL DATA)
eBhulekh
eResurvey
eMaps
eRecords
Single Window Citizen Service Delivery (eBhulekh)
eMojni eMutation
All Data from below eMahabhumi projects to converge in a single window application eRecords
eMaps
eResurvey
eMutation
eMojni
All land related Information in chronological order for a particular land parcel April’15
Rollout
Land records pertaining to rural lands are available at
Tehsil record room while that of Urban (where city survey
has taken place) are available at Deputy SLR offices.
Records are available in Textual as well as Spatial forms
(Maps).
Current records are available with Talathi / Dy.SLR office
/ CTSO offices.
eBhulekh : Single Point Portal for Comprehensive Land
Records Information Services
Presently to obtain a Land Record document, Citizen has to
physically visit the office, Apply for the document, Department
officials searches for the document, and issue the document if
found.
The citizen’s are not aware from which office what Land
related document he can get.
From the huge number of documents (in paper form in fragile
condition) the record keeper may have to spend days to
search a document.
The round trip of Citizens increases for getting multiple type of
documents from different offices.
eBhulekh : Single Point Portal for Comprehensive Land
Records Information Services
Under eMahabhumi, Land records are now getting
into digital form.
All 7/12 & Property Card data are in digital form
Registration data is in digital form
Village Maps are digitized
Measurement cases (eMojni) are now computerized
Scanning of old land records – Roll out
Digitization of Maps – Pilot completed
Pilot project of Resurvey – Pilot completed, to be rolled out in Six Districts
All data generated under eMahabhumi will be kept at State Data Center
(SDC)
Every Document is associated with its Meta Data (key information to
identify the document)
Documents from various components of eMahabhumi are linked with
help of Meta Data
Search report giving details of documents available in digital format can
be generated.
Document can be Printed / Downloaded from Single point – round trips of
Citizen’s to offices ..minimized
Under eMahabhumi, Land records are now getting
into digital form.
Search based on
Name or Survey
Number
eMahabhumi Databank
Documents needed for Search
Report
•eMojni •eMutation •eChawadi •eRecords •eMaps •eResurvey •Registration
•Web based
•Functionally tested for Pilot project
•Talks in Real Time Mode with all eMahabhoomi components
• Linkages with other department possible
Document Search By Name, By Survey Number / Gat Number
1st Result from eMutation: List of ROR i.e. 7/12 & Khata Register along with the Holders Name belonging to that Gat Number is Listed
Village Form 7 from eMutation : Real time 7/12 is fetched from online system
Village Form 12 from eMutation : Fetched – Real time 7/12 is fetched from online system
eMutation & eRecords Link for Mutation Numbers on 7/12 : Mutation number on 7/12 are live i.e. the entire Mutation Entry Can be seen by a mouse Click on that Mutation Number (say 176)
Mutation Register from eRecords (Scanning Project) PDF file in eRecords is searched using Meta Data as Village Code, Gat Number, Ferfar Number and is displayed
Old Mutation entries on old 7/12 : Mutation number appearing on old 7/12 are shown in Drop Down, select the desired number to view mutation entry
Scanned Mutation register
Current Khata Register (8A) : Link to eChawadi Khata Register gets extracted from Online eChawadi / eMutation data
Similarly one can view old Khata Registers (8A)
Search LR Documents from eMaps, eMojni, eResurvey On button click, one can find Old Maps , FMB – Tippan, Gat Book, Find out Measurement cases - eMojni
LR Documents matching with selected Gat number
Consolidation Scheme
Shet Pustak
FMB - Tippan
Details of Mojni Application
Mojni Application
History of Village Maps : Original Village Map
History of Village Maps : After Consolidation Scheme (Current)
History of Village Maps : Satellite Image over lapped with Current position – Resurvey Project
Search by Gat number : Enter the desired Gat Number
Result from eRecords : All old 7/12, Khata register (8A) are listed
Old 7/12 with facility to view old Mutations
Cont : 7/12 if on multiple page / filers is STITCHED by software to show all pages one by one
GAT Book - Nakasha
Linkage to eMojni : Realtime information
Status of Mojni Application
Status of Mojni Application
Land Parcel Map
THANK YOU