Submitted by the National Institute of Standards and Technology

April 5, 2018

Draft Review

National Institute of Standards and Technology Campus Master Plan

Gaithersburg, Maryland

_______________

Page 2: National Institute of Standards and Technology Campus

Location

2

Page 3: National Institute of Standards and Technology Campus

“To promote U.S. innovation and industrial competitiveness by advancing measurement science, standards, and technology in ways that enhance economic security and improve our quality of life.”

Mission

3

Page 4: National Institute of Standards and Technology Campus

Surrounding Context

NIST

N

4

Page 5: National Institute of Standards and Technology Campus

Surrounding Context

NIST

N

5

Page 6: National Institute of Standards and Technology Campus

Surrounding Context

NIST

Nresidential

parkland

6

Page 7: National Institute of Standards and Technology Campus

• Rolling terrain, dotted with trees and wooded areas• 62 buildings and structures, totaling over 3.6 million gross square feet of space• 4,000 personnel (both employees and associates)• Approximately half of the permanent buildings are currently over 50 years old• Campus features modern architectural design of the late 1950s and the 1960s

NIST

Campus Setting

7

Page 8: National Institute of Standards and Technology Campus

8

Existing Campus

N

Page 9: National Institute of Standards and Technology Campus

9

Laboratories / Administration

Support

Specialty Laboratories

Existing Campus

Page 10: National Institute of Standards and Technology Campus

10

Existing Campus

N

Page 11: National Institute of Standards and Technology Campus

11

Existing Campus

Page 12: National Institute of Standards and Technology Campus

12

NIST Historic District/Core

Page 13: National Institute of Standards and Technology Campus

13

Existing Campus

Page 14: National Institute of Standards and Technology Campus

14

D

E

Existing Campus

Page 15: National Institute of Standards and Technology Campus

15

D

E

C

F

A

B

Existing Campus

Page 16: National Institute of Standards and Technology Campus

16

D

E

C

F

A

B

Existing Campus

Page 17: National Institute of Standards and Technology Campus

17

D

E

C

F

A

B

Existing Campus

Page 18: National Institute of Standards and Technology Campus

18

Existing Parking

NCPC Goal 1:2.0

Overall Campus 1:1.5

Existing Campus

Page 19: National Institute of Standards and Technology Campus

19

Draft Campus Master Plan

Page 20: National Institute of Standards and Technology Campus

20

Assumptions

• Future programming requires 1.4 million gross square feet of new space

• 1,100 employee increase

Draft Campus Master Plan

Page 21: National Institute of Standards and Technology Campus

21

Draft Campus Master Plan

Outcomes

• Energy conservation

• Growth in a flexible manner

• Consolidated delivery/shipping and receiving/ and conference visitor processing

• Better campus security

• More environmentally sustainable, active campus.

Page 22: National Institute of Standards and Technology Campus

22

Goals

• Increase total forest land area to 15% (Maryland-National Capital Park and Planning)

• Increase total tree canopy area to 40% by 2025 (Maryland Department of the Environment)

• Treat 20% of all future impervious surface area runoff (Maryland Department of the Environment)

• Reduce nutrient / sediment stormwater runoff loads equivalent to treatment of 20% of pre-1985 impervious surface area by 2025 (Chesapeake Bay Preservation Act)

• Attain the following NIST building performance goals:

- Daylight 75% of all regularly-occupied interior building space- Supply 30% of campus hot water demand with solar technology- Supply 30% of campus electrical needs with renewable sources by FY25- Reduce energy intensity by 25% by FY 25

Draft Campus Master Plan

Page 23: National Institute of Standards and Technology Campus

23

Draft Campus Master Plan

Page 24: National Institute of Standards and Technology Campus

24

Core DevelopmentGate F

Gate A

Pedestrian Promenade

Draft Campus Master Plan

Page 25: National Institute of Standards and Technology Campus

25

Core Development

Draft Campus Master Plan

Page 26: National Institute of Standards and Technology Campus

26

Draft Campus Master Plan

Alternative A Alternative B Alternative C

Alternative D Alternative E Alternative F

new research space

new administrative

space

renovation

concourse

Page 27: National Institute of Standards and Technology Campus

27

Draft Campus Master Plan

Alternative A Alternative B Alternative C

Alternative D Alternative E Alternative F

new research space

new administrative

space

renovation

concourse

Capturing the Courtyards

Page 28: National Institute of Standards and Technology Campus

28

Draft Campus Master Plan

Alternative A Alternative B Alternative C

Alternative D Alternative E Alternative F

new research space

new administrative

space

renovation

concourse

Extending Connections

Page 29: National Institute of Standards and Technology Campus

29

Draft Campus Master Plan

Alternative A Alternative B Alternative C

Alternative D Alternative E Alternative F

new research space

new administrative

space

renovation

concourse

Creating a New Precinct

Page 30: National Institute of Standards and Technology Campus

30

Draft Campus Master Plan

Alternative A Alternative B Alternative C

Alternative D Alternative E Alternative F

new research space

new administrative

space

renovation

concourse

Capturing the Center

Page 31: National Institute of Standards and Technology Campus

31

Draft Campus Master Plan

Alternative A Alternative B Alternative C

Alternative D Alternative E Alternative F

new research space

new administrative

space

renovation

concourse

Functional Organization

Page 32: National Institute of Standards and Technology Campus

32

Draft Campus Master Plan

Alternative A Alternative B Alternative C

Alternative D Alternative E

new research space

new administrative

space

renovation

concourse

New Research Emphasis

Alternative F

Page 33: National Institute of Standards and Technology Campus

33

Draft Campus Master Plan

Alternative A Alternative B Alternative C

Alternative D Alternative E

new research space

new administrative

space

renovation

concourse

Alternative F

New Research Emphasis

Page 34: National Institute of Standards and Technology Campus

34

Draft Campus Master Plan

Alternative A Alternative B Alternative C

Alternative D Alternative E

new research space

new administrative

space

renovation

concourse

Alternative F

New Research Emphasis

Page 35: National Institute of Standards and Technology Campus

35

Draft Campus Master Plan

Alternative A Alternative B Alternative C

Alternative D Alternative E

new research space

new administrative

space

renovation

concourse

Alternative F

New Research Emphasis

Page 36: National Institute of Standards and Technology Campus

36

Core Development

Draft Campus Master Plan

Page 37: National Institute of Standards and Technology Campus

37

Draft Campus Master Plan

Alternative F

• All new construction for research uses

• Reinforces pedestrian concourse spine

• Respects traditional historic core boundary

• Redevelops largest area of surface parking

Page 38: National Institute of Standards and Technology Campus

38

Gate A

Draft Campus Master Plan

Page 39: National Institute of Standards and Technology Campus

39

Draft Campus Master Plan

Option 2

Option 1

Option 3

Page 40: National Institute of Standards and Technology Campus

40

Draft Campus Master Plan

Gate F

Page 41: National Institute of Standards and Technology Campus

41

Draft Campus Master Plan

Option 3

Option 2

Option 1

Option 4

Page 42: National Institute of Standards and Technology Campus

42

Draft Campus Master Plan

Option 3

Option 2

Option 1

Option 4

Page 43: National Institute of Standards and Technology Campus

43

Draft Campus Master Plan

Option 3

Option 2

Option 1

Option 4

Page 44: National Institute of Standards and Technology Campus

44

Draft Campus Master Plan

Commercial Vehicle Inspection Area

Option 4

Shipping & Receiving Building

Visitor Screening

Security Gate

Page 45: National Institute of Standards and Technology Campus

45

Draft Campus Master Plan

Commercial Vehicle Inspection Area

Option 4

Shipping & Receiving Building

Visitor Screening

Security Gate

Page 46: National Institute of Standards and Technology Campus

46

Draft Campus Master Plan

Commercial Vehicle Inspection Area

Option 4

Shipping & Receiving Building

Visitor Screening

Security Gate

Page 47: National Institute of Standards and Technology Campus

47

Draft Campus Master Plan

Commercial Vehicle Inspection Area

Option 4

Shipping & Receiving Building

Visitor Screening

Security Gate

Page 48: National Institute of Standards and Technology Campus

48

Draft Campus Master Plan

Commercial Vehicle Inspection Area

Option 4

Shipping & Receiving Building

Visitor Screening

Security Gate

Page 49: National Institute of Standards and Technology Campus

49

Draft Campus Master Plan

Commercial Vehicle Inspection Area

Option 4

Shipping & Receiving Building

Visitor Screening

Security Gate

Page 50: National Institute of Standards and Technology Campus

50

Draft Campus Master Plan

Gate F

Page 51: National Institute of Standards and Technology Campus

51

Pedestrian Promenade

Draft Campus Master Plan

Page 52: National Institute of Standards and Technology Campus

52

Pedestrian Promenade

Draft Campus Master Plan

Building 101

future CCT stop

Page 53: National Institute of Standards and Technology Campus

53

Draft Campus Master Plan

Landscape Plan

Page 54: National Institute of Standards and Technology Campus

54

Draft Campus Master Plan

Landscape Plan

new meadow areas

new forested areas

Page 55: National Institute of Standards and Technology Campus

55

Draft Campus Master Plan

StormwaterManagement Plan

Page 56: National Institute of Standards and Technology Campus

56

Draft Campus Master Plan

Connectivity Plan

Page 57: National Institute of Standards and Technology Campus

57

Draft Campus Master Plan

Sustainability Plan

Page 58: National Institute of Standards and Technology Campus

58

Draft Campus Master Plan

Gate F

Gate A

Core Development

Phase 1: Immediate Priorities

Page 59: National Institute of Standards and Technology Campus

59

Draft Campus Master Plan

Phase 2: Next Step Projects

Building 101

Page 60: National Institute of Standards and Technology Campus

60

Draft Campus Master Plan

Phase 3: Program Expansion

new garage

new labs

Page 61: National Institute of Standards and Technology Campus

61

Draft Campus Master Plan

Independent Projects

Page 62: National Institute of Standards and Technology Campus

62

Draft Campus Master Plan

Page 63: National Institute of Standards and Technology Campus

63

Future Access / Travel

Future Parking

NCPC Goal 1:2.0

Overall 1:1.9

Federal Employees 1:2.0

Non-Federal Employees 1:1.7

Page 64: National Institute of Standards and Technology Campus

64

Future Access / Travel

Page 65: National Institute of Standards and Technology Campus

65

Future Access / Travel

Page 66: National Institute of Standards and Technology Campus

66

NIST

Future Access / Travel

King Farm

Shady Grove

Lakelands

Downtown Crowne

Washington Grove

Kentlands

Rio

Page 67: National Institute of Standards and Technology Campus

67

Future Access / Travel

NIST

King Farm

Shady Grove

Washington Grove

Lakelands

Downtown CrowneKentlands

Rio

Page 68: National Institute of Standards and Technology Campus

68

Future Access / Travel

NIST

Kentlands

King Farm

Washington Grove

Lakelands

Shady Grove

Rio

future development

Page 69: National Institute of Standards and Technology Campus

69

Future Access / Travel

Potential Travel Demand Management Elements

• Identify TDM Coordinator for the campus and develop multi-year plan• Provide interior campus shuttle• Improve on-site bicycle amenities, with secured bicycle parking/storage facilities and convenient

shower/changing facilities• Identify (and fund if necessary) locations for Capital Bikeshare locations• Establish employee parking permit system with designated spaces• Provide reserved, convenient carpool/vanpool parking• Install a transportation information screen in the lobby of Building 101 and/or other employee-

frequented locations to show real-time information regarding buses that serve the campus directly, interior campus shuttle, shuttles to MARC/Metrorail, and other multimodal transportation options that serve the campus

Page 70: National Institute of Standards and Technology Campus

70

Executive Director’s Recommendation

The Commission:

Approves the following comments on the draft campus plan for the National Institute of Standards and Technology (NIST) Gaithersburg campus.

Supports the Alternative F development concept, which concentrates new development in the campus center (historic core) to facilitate research; preserves the campus’s open space character; and adds more programmable outdoor spaces to facilitate professional collaboration.

Finds that Alternative F most successfully provides for NIST’s research mission, while preserving the historic campus core and integrating new sustainable development measures.

Historic Preservation

Notes that the Maryland Historic Trust (State Historic Preservation Office) has determined the campus is eligible for inclusion in the National Registerof Historic Places “for its association with events that made important contributions to the broad patterns of history under the Science and Technologyand Postwar Research Campus Design themes, and as a recognizable entity that embodies the characteristic of Post War Research Campus design.”

Finds that Alternative F best preserves the campus core’s existing grid pattern of development, formal landscape, large-scale monumental buildings, and general/specialized laboratories, identified as hallmarks of postwar research campus design.

Commends NIST’s careful consideration of the campus’s unique historic character throughout the planning and design process.

Sustainability

Supports the National Institute of Standards & Technology’s effort to meet federal and State sustainability goals at its Gaithersburg campus through integrated, campus-wide strategies related to stormwater management, landscaping, and energy-efficiency.

Finds that all of the proposed alternatives, including Alternative F, convert significant amounts of manicured property to new forests and meadows; identify a campus-wide system of rain gardens, bioswales, and planter boxes; and identify future solar panel installations and net-zero energy buildings.

Page 71: National Institute of Standards and Technology Campus

71

Executive Director’s RecommendationThe Commission:

Access/Transportation

Supports NIST’s plans to develop a new pedestrian promenade between the adjacent Corridor Cities Transitway station and campus core, new interior campus trail network, additional sidewalks/crosswalks, bikeshare stations, and new external bicycle trails to encourage pedestrian, bicycle, and transit travel.

Supports the planned development of Gate F to accommodate future commercial vehicle inspections, shipping/receiving, and conference visitor screening based on site compatibility.

Requests that NIST continue refining the project’s design to minimize impacts to the campus setting and off-site neighborhoods through landscaping, reconfiguring access roads, and light control measures.

Notes that NIST will improve its overall parking ratio from 1:1.5 to 1:1.9 with the implementation of the campus plan. The proposed ratio for federal employees, who comprise approximately 70 percent of the total population on campus, is 1:2. The proposed ratio for non-federal employees (contractors, guest researchers), who comprise 30 percent of the total population, is 1:1.7.

Requests that NIST prioritize development of a detailed Travel Demand Management plan with future mode share goals, program implementation steps/schedules, and regular commuter travel monitoring program for both federal and non-federal employees. The TDM plan should contain programs, strategies, goals, and implementation information specifically directed at encouraging more sustainable travel behavior by non-federal employees.

Requests that NIST submit a transportation progress report to NCPC for review prior to submitting the new parking garage and Building 411 lot expansion projects with the following information:

• Status of programs included in the future NIST Travel Demand Management plan, which demonstrate progress towards attaining future non-single occupant vehicle mode share goals; and

• Travel trend information based on commuter surveys given between 2016 and most recent survey prior to submission of the new garage and Building 411 lot expansion projects.

Page 72: National Institute of Standards and Technology Campus

72

Draft Campus Master Plan

Page 73: National Institute of Standards and Technology Campus

73

Building 301

Gate CQuince Orchard Road

streetview looking at Gate C

Appendix