Page 1: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Place your chosen

image here. The four

corners must just

cover the arrow tips.

For covers, the three

pictures should be the

same size and in a

straight line.

National Grid: NTS Operation

Carrie Clifford

Page 2: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

2

Key roles of the System Operator

Safe, reliable and efficient operation of the National

Transmission System (NTS)

Residual Energy Balancing of the Gas Market

Response & Management of events and emergencies

Page 3: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

3

St. Fergus

Teesside

Easington

Theddlethorpe

Bacton

Barrow

Burton Point

Isle of Grain

Milford Haven

Gas Transmission in Great Britain

~8,200km pipeline

Operating pressure 70 - 94bar

7 Beach Reception Terminals

3 LNG Importation Terminals

3 Interconnectors

10 storage sites

23 compressor stations

200+ Exit Points

Highest Demand Day : 465 mcm

Lowest Demand Day : 117 mcm

Annual Throughput : 85 bcm

Page 4: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Place your chosen

image here. The four

corners must just

cover the arrow tips.

For covers, the three

pictures should be the

same size and in a

straight line.

Supply & Demand

Page 5: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Terminal Supply

5

Isle Of Grain

St. Fergus

Teesside

Theddlethorpe

Easington (inc. Rough )

Bacton

Burton Point

Barrow

Milford Haven

SRS & MRS

Winter 2014/15

Increase from previous winter

Decrease from previous winter

Terminal Supply Comparison

Page 6: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

6

Supply Breakdown

UKCS

Norway

LNG

Interconnectors

Storage Withdrawal

Winter 2014/15

Page 7: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

7

LNG

Page 8: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Instantaneous Supply v Demand

8

Page 9: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

9

30 Day Rolling Average LP Swing

Linepack Swing Winter 2002/03 Winter 2007/08 Winter 2012/13 Winter 2013/14 Winter 2014/15

Maximum 18.9 18.7 29.9 28.7 38.6

Average 4.7 8.6 13.9 15.3 14.7

Page 10: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Place your chosen

image here. The four

corners must just

cover the arrow tips.

For covers, the three

pictures should be the

same size and in a

straight line.

Operations

Page 11: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

11

Planning for a Gas Day

Year Ahead Day Ahead Day

NTS Maintenance Planning

NTS Supply & Demand Forecasting

NTS Capability & Risk (inc SO incentive opportunity & risk)

Shipper Re-Nominations

Customer Physical

Supply & demand profiles

NTS Capacity Sales

Unplanned events

Y2 Y3+ Month Ahead Week Ahead

Operating Plans

NTS Offline Network Simulation Scenarios

Page 12: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

12

Daily Operations

Accommodate Supply/Demand Profiles

Pressure Obligations

Enable System Access requirements

Efficient Compressor Operation

Maintain/ Manage NTS Linepack

Page 13: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

13 13

System Operator Actions

Network Management

Operational

tools (internal)

Operational tools

(external) Commercial tools

Network

Integrity

Reconfigure

Network

Redistribute

Linepack

Utilise

Compressors

Move / cancel

Maintenance

Agree revised

Pressures

Flow Swaps

Enforce Contractual

Offtake Rules

Scaleback

‘Interruptible’

Capacity

Gas Quality Terminal

Flow Advice

Residual balancing

actions

Locational Energy

Actions

Short term NTS Flex

Restrictions

Margins Notice

Constraint

Management Actions

Operating Margins

Pressure Terminal

Flow Advice

(Entry)

Shutdown sites

Critical

Transportation

Constraint

Information Provision (MIPI / Website / Gemini)

Page 14: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

14 14

System Operator Actions

Network Management

Operational

tools (internal)

Operational tools

(external) Commercial tools

Network

Integrity

Reconfigure

Network

Redistribute

Linepack

Utilise

Compressors

Move / cancel

Maintenance

Agree revised

Pressures

Flow Swaps

Enforce Contractual

Offtake Rules

Scaleback

‘Interruptible’

Capacity

Gas Quality Terminal

Flow Advice

Residual balancing

actions

Locational Energy

Actions

Short term NTS Flex

Restrictions

Margins Notice

Constraint

Management Actions

Operating Margins

Pressure Terminal

Flow Advice

(Entry)

Shutdown sites

Critical

Transportation

Constraint

Information Provision (MIPI / Website / Gemini)

Page 15: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

15 15

System Operator Actions

Network Management

Operational

tools (internal)

Operational tools

(external) Commercial tools

Network

Integrity

Reconfigure

Network

Redistribute

Linepack

Utilise

Compressors

Move / cancel

Maintenance

Agree revised

Pressures

Flow Swaps

Enforce Contractual

Offtake Rules

Scaleback

‘Interruptible’

Capacity

Gas Quality Terminal

Flow Advice

Residual balancing

actions

Locational Energy

Actions

Short term NTS Flex

Restrictions

Margins Notice

Constraint

Management Actions

Operating Margins

Pressure Terminal

Flow Advice

(Entry)

Shutdown sites

Critical

Transportation

Constraint

Information Provision (MIPI / Website / Gemini)

Page 16: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

16 16

System Operator Actions

Network Management

Operational

tools (internal)

Operational tools

(external) Commercial tools

Network

Integrity

Reconfigure

Network

Redistribute

Linepack

Utilise

Compressors

Move / cancel

Maintenance

Agree revised

Pressures

Flow Swaps

Enforce Contractual

Offtake Rules

Scaleback

‘Interruptible’

Capacity

Gas Quality Terminal

Flow Advice

Residual balancing

actions

Locational Energy

Actions

Short term NTS Flex

Restrictions

Margins Notice

Constraint

Management Actions

Operating Margins

Pressure Terminal

Flow Advice

(Entry)

Shutdown sites

Critical

Transportation

Constraint

Information Provision (MIPI / Website / Gemini)

Page 17: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Balancing Responsibilities

Shippers Role

Obliged to provide commercial input and output nominations

(forecasts)

No obligation to physically balance portfolio

Incentivised to balance portfolio

Gas Supply Gas demand

NTS Connected Sites

Obliged to provide physical

entry profiles (DFN’s)

NTS Connected Sites

Obliged to provide physical

exit profiles (OPN’s)

National Grid’s Role – Residual Balancer

Ensure overall NTS balance is within safe physical operating

parameters

Neutral to direct costs of system balancing

Cost or revenue of retaining a physical balance of the NTS is

smeared back out to the Shipping community through

‘Neutrality’

Page 18: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Residual Balancing

System

Light

System

Heavy

Linepack is the volume of gas held in the NTS (sum of all the gas in the pipes)

Projected

Closing

Linepack

OPN

Demands

DFN

Inputs

Opening

Linepack +

Page 19: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Gas Day Chart

19

Page 20: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Instantaneous Supply v Demand

20

Page 21: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Gas Day Chart

21

Page 22: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

22 22

System Operator Actions

Network Management

Operational

tools (internal)

Operational tools

(external) Commercial tools

Network

Integrity

Reconfigure

Network

Redistribute

Linepack

Utilise

Compressors

Move / cancel

Maintenance

Agree revised

Pressures

Flow Swaps

Enforce Contractual

Offtake Rules

Scaleback

‘Interruptible’

Capacity

Gas Quality Terminal

Flow Advice

Residual balancing

actions

Locational Energy

Actions

Short term NTS Flex

Restrictions

Margins Notice

Constraint

Management Actions

Operating Margins

Pressure Terminal

Flow Advice

(Entry)

Shutdown sites

Critical

Transportation

Constraint

Information Provision (MIPI / Website / Gemini)

Page 23: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

23

Margins Notice (MN)

A MN will remain in place until the end of the gas day to which it is applicable, unless

superseded by a Gas Deficit Warning.

The Margins Notice report is published daily providing a rolling five day view of supply

& demand data and information relating to storage Safety Monitors

http://www2.nationalgrid.com/uk/industry-information/gas-transmission-system-

operations/balancing/daily-margins-notice-report/

A D-1 Notification issued by NTS via ANS to all NTS users.

Purpose:

1. To provide a high level, day ahead notice of a potential supply/demand imbalance for

the coming Gas Day and;

2. To encourage NTS users to take heed of the rolling Daily Margins Report and

reassess their position relative to prevailing forecasts.

Daily

Methodology

Page 24: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

A warning issued by NTS via ANS to all NTS users

Purpose:

To stimulate a market response to address the EOD forecast significant NTS physical EOD

imbalance.

24

National Gas Deficit Warning (GDW)

Methodology

The GNCC have full discretion on the

issue of a GDW, there are no predefined

triggers.

The GDW can be issued in advance

of or during the Gas Day.

Potential Triggers

Actual/Forecast

Demand

Other

relevant

information

A GDW withdrawal notice will be

issued when appropriate to retract the

active GDW.

Page 25: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

25 25

System Operator Actions

Network Management

Operational

tools (internal)

Operational tools

(external) Commercial tools

Network

Integrity

Reconfigure

Network

Redistribute

Linepack

Utilise

Compressors

Move / cancel

Maintenance

Agree revised

Pressures

Flow Swaps

Enforce Contractual

Offtake Rules

Scaleback

‘Interruptible’

Capacity

Gas Quality Terminal

Flow Advice

Residual balancing

actions

Locational Energy

Actions

Short term NTS Flex

Restrictions

Margins Notice

Constraint

Management Actions

Pressure Terminal

Flow Advice

(Entry)

Operating Margins

Shutdown sites

Critical

Transportation

Constraint

Information Provision (MIPI / Website / Gemini)

Page 26: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

Place your chosen

image here. The four

corners must just

cover the arrow tips.

For covers, the three

pictures should be the

same size and in a

straight line.

Winter Preparations

Page 27: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

27

Winter Preparations

October onwards…

Winter Consultation & Outlook

Offtake Capacity Statement process

(DN Assured Pressures)

Asset Assurance

Summer September

Daily monitoring of

Storage safety monitors

Winter Simulation scenarios

Margins Notice Reset

Page 28: National Grid: NTS Operation...2 Key roles of the System Operator Safe, reliable and efficient operation of the National Transmission System (NTS) Residual Energy Balancing of the

28

Questions

Thanks you for attending today's webinar

Please submit any questions to the email address below

[email protected]