national cyclone risk mitigation project third party quality audit monthly progress report november...

Upload: apncrmptpqa

Post on 10-Feb-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    1/183

    Co n s u l t a n c y Se r v i ce s f o r T h i r d P a r t y

    Q u a l i t y A u d i t

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    2/183

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    CONTENTS

    1.0 Project Background 2

    2.0 Out Line Tasks to be carried out 3

    3.0 Findings of the Site Reports 4

    3.1 Summary of Audit opinion 6

    3.2 Corrective actions. 8

    3.3 Progress of works with reference to mile stones. 8

    4.0 Activities of Third Party Quality Audit Consultant 10

    Status of NCRMP Year-1 works in Table-1 11

    Spill over works statement for the Year-1 works in Table-2 12

    Details of spill over works for the year-1 works in Table-3 13

    Agreements communicated for NCRMP Year-2 works statement in Table-4 14

    Overall statement of Agreements communicated Year 2 works + Spill over Year 1 15

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    3/183

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    1. Project Background

    Andhra Pradesh (AP) state has one of the longest coastal belts in India. Out of 67,362 Km of road

    network in the state, the nine coastal districts cover 26,000 km of road length. Every year during the

    period of April-May and September-December, cyclonic situations set in to the Bay of Bengal. With

    the recent changes in climatic conditions, the catastrophic events are increasing resulting in very

    devastating cyclones like Laila, Jal etc where the loss is enormous. In the 97 years ranging from

    1892 to 1989, there were as many as 67 cyclones within the State.

    It is essential to provide safe residential accommodation to the vulnerable population during any

    eventuality or disaster due to natural calamities such as cyclones and associated tidal waves and

    storm surges. The project is formulated based on experiences of Government of Andhra Pradesh in

    mitigating such disasters during the past and also keeping in view the existing facilities available in

    the project area in Andhra Pradesh.

    The Government of India has applied for a credit of US$ 255 Million equivalent from the

    International Development Association (IDA) toward the cost of National Cyclone Risk Mitigation

    Project (NCRMP), and it intends to apply the proceeds to payments for goods, works, related

    services and consulting services under this Project

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    4/183

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    2. Outline of tasks to be carried outThe scopes of services for the Third Party Quality Audit (TPQA) assignment are

    A. The consultant will prepare an inception report within 30 days from signing of the contract that

    details the method agreed during negotiations to be employed in performing the services.

    B. Assist SPIU in resolving issues related to Non compliances.

    C. The field testing being conducted by the implementation staff will be observed and when doubtsarise in such observations another sample will be taken and will be tested independently to verify

    whether it is as per the standards or not.

    D. The consultant will review civil work components of the cyclone shelters and related roads &

    bridges of these buildings and compliances and non-compliances will be reported regularly to PIU

    and line department.

    E. Consultants will visit the sites for each stage of work and audit

    F. The consultant will visit the construction sites randomly without prior information to the

    implementing agency, along with the regular site visits. The consultant will be submitting weekly

    reports before the 3rd day of the following week. Monthly reports, quarterly reports, annual

    reports will be submitted as per the scheduled time plan. In case of noncompliance the

    consultant will be reporting the same to the concerned SPIU representative along with photo

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    5/183

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    K. The work plans of the implementation agency will be observed and suitable modifications will be

    suggested basing on the past experiences in the sites.

    L. The consultant will prescribe suitable formats for progress reporting and the same formats will

    be used to report regularly.

    M. The consultant will advise on the required site audit procedures for individual duties and

    responsibilities, including detailed inspection schedules and check lists.

    N. The Third Party Quality Audit will carry out additional tests, where a prime facie doubt arises

    related to quality of works and / or compliance of standards using mobile laboratory available

    with the consultant or nearby approved laboratories. The consultant shall advise few more labs

    for testing suitably, which after the approval of the SPIU / line departments, can be used for

    testing.

    O. Review the workers safety standards being followed in the construction site to avoid any type

    of losses / damages, as far as possible.P. The tests shall include all common tests as specified in Terms of Reference (ToR). Consultant

    will take the samples and get it tested in accredited/approved laboratories which will be first

    inspected and recommended for accrediting by Consultant under the project by SPIU. The

    identification and certification of the testing agency will be specific to the tests that can be

    carried out in a particular laboratory.

    Q The Cons ltant ill establish a mobile labo ato e cl si el fo Embankments

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    6/183

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    In Srikakulam District, number of MPCS buildings is to be constructed and hence experienced

    line departmental engineers are required to supervise the works. Only a Deputy Executive Engineer

    is holding the additional charge of the post of Executive Engineer. An experienced Executive

    Engineer is necessary for proper planning and supervision of the NCRMP works in Srikakulam

    District. The fact was brought to the notice of the Chief Engineer, PR, NCRMP during review

    meetings held in the office of SPIU. Sites for some MPCS buildings in East Godavari and GunturDistricts are not yet handed over to the contractor. These problems require to be resolved as quickly

    as possible.

    During inspections, TPQA engineers are verifying the test records, adequacy of machinery

    and work force, safety measures taken and site related problems if any. They are also carrying out

    all the field tests on the materials, on work done or being done. Some minor corrective measures

    which can be attended immediately are being got done in the presence of TPQA engineers, during

    their inspections. Samples are collected for laboratory testing for tests like California Bearing Ratio

    (CBR) tests on sub base and sub grade materials. Confirmatory Safe Bearing Capacity (SBC) for

    b ilding nd b idge te ting fo me h ni l nd hemi l p ope tie of teel nd te t on ement

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    7/183

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    The summary of site visits, NCRs issued during the month and Quality Control Tests done are

    tabulated hereunder.

    Sl. No. DistrictNo of Sitevisits by

    TPQA

    Number ofNCR Issued

    Quality control Testsdone

    Passed Failed

    1 Srikakulam 38 0 53 0

    2 Vizianagaram 10 2 10 0

    3 Visakhapatnam 13 0 1 0

    4 East Godavari 14 0 39 0

    5 West Godavari 34 0 79 6

    6 Krishna 77 0 166 0

    7 Guntur 32 1 12 0

    8 Prakasam 64 3 267 2

    9 N ll 29 0 208 0

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    8/183

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    Summary of TPQA observations requiring attention of SPIU in Quality Audit Reports.

    Sl.No

    Description of item Remarks

    1 Action Taken ReportsATRs for QCRs are not received from line departmental officers. Allthe others are delaying them. Prompt submission of ATRs will servethe purpose of issuing QCR.

    2

    Contractors work program andEnvironmental and SocialManagement Framework (ESMF)plan.

    Despite requesting several times, TPQA is not receiving or shownthe work program and ESMF for most of the works. TPQA suppliedthe model format for ESMF plan also. Necessary guidance will beextended by TPQA in preparation of the plan if necessary. TPQAconsultant has conducted training sessions at Kakinada,

    Amalapurm, Euru and Vijayawada about the SEMF. Now somecontractors are furnishing EMP.

    3 Quality control lab

    Contractor is not establishing QC lab for many road works. For

    small road works, necessary field testing equipment shall be madeavailable at site by the contractor so that the field officers can alsoconduct the QC tests. One QC lab for one package of road works ata central location shall be provided.

    4 Site inspection register

    At some places, site inspection registers are not maintained.Instructions of the inspecting officers are not being written in theregister. Some inspecting officers are issuing inspection reports.These reports are to be attached in the register.

    On man oads elect ical pole a e nea the ca iage a The a e

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    9/183

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    3.2 Corrective actions:

    Corrective actions for all the likely non-compliances are suggested as per standard specifications

    adopted in the contract documents in the Quality assurance Plan submitted. Accordingly for various

    non-compliances, corrective actions are suggested and getting implemented. Some of the corrective

    actions are discussed hereunder:

    1. Gradation non - compliance: In collection of aggregates for GSB Granular Sub Base), WMM (Wet

    Mix Macadam), WBM (Water Bound Macadam), OGPC (Open Grade Premix Carpet), Seal Coat, SDBC

    (Semi Dense Bituminous Concrete) and concrete aggregate collections. whenever gradation is not

    satisfied, corrective actions were suggested by TPQA to make the gradation compliant with the

    specified one. Generally, it was done by adding the missing or deficient sizes and re-breaking higher

    sized materials.

    2. Density - compliance: Whenever relative compaction is deficient in compacted layers of

    earthwork, shoulders, GSB layers, WBM layers or WMM layers, re-compaction is done by scarifying,watering to OMC (Optimum Moisture Content) and compaction to achieve the specified relative

    compaction

    3. Deficiency in thickness: NCRs were issued when thickness of GSB, WBM, WMM or sub-grade layer

    thickness is found to be less than the specified thickness. After the suggested corrective action is

    done, the NCR s are being closed after verification.

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    10/183

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    District wise Summary of Work Progress

    Sl.No

    DistrictUp to10%

    11 to40%

    41 to70%

    71%

    Completed

    WorksNot

    started

    Worksdeleted

    TotalNo ofworks

    1 Srikakulam 12 22 3 1 6 5 3 52

    2 Vizianagarm 1 1 2 1 0 7 0 12

    3 Visakhapatnam 0 0 2 5 3 1 0 11

    4 East Godavari 5 9 4 3 1 3 0 25

    5 West Godavari 0 10 14 6 1 2 0 33

    6 Krishna 15 12 11 12 0 0 0 50

    7 Guntur 2 1 1 0 2 3 0 9

    8 Prakasam 3 8 5 16 3 0 0 35

    9 N ll 1 10 9 20 0 0 0 40

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    11/183

    MONTHLY REPORT

    Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

    4.0 Activities of Third Party Quality Audit Consultant.

    All the activities of TPQA consultant, such as status of TPQA visits, Quality Audit reports, NCR status

    reports, status of Quality Control tests and other reports are summarized in the tables and furnished

    in this Monthly Progress Report as detailed below.

    Status of NCRMP Year-1 works are given in Table-1

    Spillover works statement for the Year-1 works are given in Table-2

    Details of Spillover works for the year-1 works are given in Table-3

    Agreements communicated for NCRMP Year-2 works statement given in Table-4

    Overall statement of Agreements communicated Year-2 works + Spillover Year-1 works

    statement is given in Table-5

    Final QCRs to be submitted for the Year-1 works statement is given in Table-6

    Status of works communicated agreements and spill over works abstract is given in Table-7

    W k i t t f ll 9 di t i t l d A A

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    12/183

    RHB

    RCS

    MPCS

    B

    ridges

    Roa

    ds(R&B)

    Total

    RHB

    RCS

    MPCS

    B

    ridges

    Roa

    ds(R&B)

    Total

    RHB

    RCS

    MPCS

    B

    ridges

    Roa

    ds(R&B)

    Total

    1 Srikakulam 6 8 2 4 1 21 6 8 0 3 1 18 12 0 0 2 1 0 3 0

    2 Vizianagaram - - - 2 1 3 0 0 0 2 1 3 3 0 0 0 0 0 0 0

    3 Visakhapatnam 8 6 7 - - 21 8 6 6 0 0 20 14 0 0 0 0 0 0 1

    4 East Godavari 2 8 3 - - 13 2 7 2 0 0 11 8 0 0 1 0 0 1 1

    5 West Godavari 10 - - - - 10 10 0 0 0 0 10 10 0 0 0 0 0 0 0

    6 Krishna 5 3 - - - 8 5 3 0 0 0 8 8 0 0 0 0 0 0 0

    7 Guntur 3 12 - 2 - 17 3 12 0 1 0 16 11 0 0 0 1 0 1 0

    8 Prakasham 14 7 2 1 - 24 14 7 2 1 0 24 24 0 0 0 0 0 0 0

    9 Nellore 16 10 - - - 26 16 8 0 0 0 24 24 0 2 0 0 0 2 0

    Total 64 54 14 9 2 143 64 51 10 7 2 134 114 0 2 3 2 0 7 2

    Total No. of works entrusted in Year-1 = 143 nos No. of works deleted = 2 nos

    No. of works completed by 14.04.2013 = 129 nos Spillover works in to Year 2 = 143 2 129 = 12 nos

    No.ofworksdeleted

    No.

    ofFinalReports

    Submitted

    Status of NCRMP Year-1 works as on 14.04.2013 TABLE - 1

    S.no

    District

    No. of works(Under Concluded

    Agreements)No. of works Completed No. of works under Progress

    Page 11 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    13/183

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    14/183

    Sl.

    NoDistrict

    Categ

    ory

    Packages allotted under

    Phase - 1s.no Names of works under each package

    Agreement

    No. / Date

    Work

    StatusRemarks

    1 1Road from R&B road Mobagam to

    Duubakavanipeta via Gajapathinagaram

    /2010-11, Dt.

    30.04.2011completed completed

    2 2Road from Talasamudram to Dola

    Regulator

    /2010-11, Dt.

    30.04.2011completed completed

    3 NCRMP/B-W/AP/RHB/PRED/01/Polaki/005

    3 Road from R&B road Edulavalasa - Killamto Jonnam via Talasamudram

    /2011-12, Dt.30.04.2011

    completed completed

    4R&B

    bridge

    NCRMP/B-W/AP/Br/R&B/

    01/Uppugedda/0024

    Construction of High level bridge across

    Uppugedda at KM 7/6 of Srikakulam

    muncipal limits to Pukkalapeta via

    Killipalem

    47/2010-

    2011,Dt17.12.2

    010

    completed

    5 5Construction of Cyclone shelter at

    Kollipadu

    G.o rt No 451

    dt 06.04.2010completed

    6 6 Construction of Cyclone Shelter at RunkuG.o rt No 451

    dt 06.04.2010completed

    7 Visakhapatnam

    MPCS NCRMP/B-W/AP/MPCS/PRED/03/Rambilli/004

    1 Construction of CS at Venkayyapalem /2011-12, Dt.03.10.2011

    Completed Finishing works nearing completion

    8East

    GodavariMPCS

    NCRMP/B-W/AP/MPCS/PRED/

    04/ Uppalaguptam/0021

    Construction of CS at Pedaraghavulapeta

    of Uppalaguptam Mandal

    78/2011-12

    Dt:17.10.2011Completed

    9 BridgesNCRMP/B-W/AP/Br/R&B/

    07/Bapatla/0114

    Reconstruction of HLB @Km2/4 of Bapatla -

    Pandurangapuram Road across perali drain

    78/2010-11

    1.12.2010Completed

    Working estimate Submitted : 423 Lakhs, as

    against of 398 lakhs as per aggrement

    (Approved estimate not given)

    10 RCSNCRMP/B-W/AP/RCS/PRED/

    07/PV Palem/0016

    Road from R&B Road Alluru to

    Yadavapalem

    2011-2012

    1.11.2011completed work completed, FQCR Submitted

    11 3Road from @ 56/8 to C.K road to

    Periyavettu kuppam CS14.09.2012

    work in

    progressWBM Gr-III completed.

    12 2Providing BT road to Pedapannamgadu in

    Tada Mandal14.09.2012

    Work

    completed

    Black topping completed. Only road furniture

    is to be fixed

    NCRMP/B-W/AP/RCS/PRED/

    09/Tada/009RCS

    SPSR

    Nellore

    STATUS OF SPILL OVER (NCRMP YEAR-1) WORKS AS ON 30.11.2013 TABLE - 3

    Srikaulam

    RHB

    NCRMP/B-W/AP/RHB/PRED/

    01/Polaki/006

    MPCSNCRMP/B-W/AP/MPCS/PRED/

    01/Santhabommalli/005

    Guntur

    Page 13 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    15/183

    Packages Works Packages Works Packages Works Packages Works Packages Works Packages Works Packages Works

    1 Srikakulam 12 25 4 11 4 10 20 46 0 0 0 0 20 46

    2 Vizianagaram 3 4 1 5 3 3 7 12 0 0 0 0 7 12

    3 Visakhapatnam 1 1 3 4 3 5 7 10 0 0 0 0 7 10

    4 East Godavari 3 5 6 9 5 8 14 22 2 2 0 0 16 24

    5 West Godavari 0 0 4 9 8 24 12 33 0 0 0 0 12 33

    6 Krishna 0 0 8 26 8 23 16 49 1 1 0 0 17 50

    7 Guntur 2 2 2 3 1 1 5 6 1 1 0 0 6 7

    8 Prakasam 0 0 3 11 8 23 11 34 1 1 0 0 12 35

    9 Nellore 0 0 11 19 9 19 20 38 0 0 0 0 20 38

    21 37 42 97 49 116 112 250 5 5 0 0 117 255

    Details of Agreements Communicated by SPIU to TPQA Consultant to the end of November 2013 TABLE - 4

    R&B I & CADTOTAL

    MPCS RCS RHB

    PR

    TOTAL Bridges Saline EmbankmentDistrictSl.

    No.

    Total

    Page 14 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    16/183

    TABLE - 5

    Packages Works Packages Works Packages Works Packages Works Packages Works Packages Works Packages Works

    1 Srikakulam 13 27 4 11 5 13 22 51 1 1 0 0 23 52

    2 Vizianagaram 3 4 1 5 3 3 7 12 0 0 0 0 7 12

    3 Visakhapatnam 2 2 3 4 3 5 8 11 0 0 0 0 8 11

    4 East Godavari 4 6 6 9 5 8 15 23 2 2 0 0 17 25

    5 West Godavari 0 0 4 9 8 24 12 33 0 0 0 0 12 33

    6 Krishna 0 0 8 26 8 23 16 49 1 1 0 0 17 50

    7 Guntur 2 2 3 4 1 1 6 7 2 2 0 0 8 9

    8 Prakasam 0 0 3 11 8 23 11 34 1 1 0 0 12 35

    9 Nellore 0 0 12 21 9 19 21 40 0 0 0 0 21 40

    24 41 44 100 50 119 118 260 7 7 0 0 125 267Total

    RCS RHB

    Details of Agreements Communicated by SPIU to TPQA Consultant to the end of November 2013 + Spill over works of Year-1

    Sl.

    No.District

    PR I & CAD

    TOTALMPCS

    Saline

    Embankment

    R&B

    TOTAL Bridges

    Page 15 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    17/183

    Sl.

    No

    Dist

    rict

    Categ

    ory

    Packages allotted under

    Phase - 1S.No Names of works under each package Work Status Remarks

    1 1 Road from DPN R&B road to Uddandapalem Work completed Approval of working estimate awaited

    2 2 Road from K. Umilada Junction to Koduru (Link Road) Work completed Approval of working estimate awaited

    3 3Road from Borubhadra, Malagam to Kollipadu via

    Seepuram, Gantapeta Work completed Approval of working estimate awaited

    4 1 Construction of CS at Gajapathinagaram Work completedCopy of Approved working estimate &

    ATRs not recived

    5 2 Construction of CS at Ratnayampeta Work completedCopy of Approved working estimate &

    ATRs not recived

    6 3 Construction of CS at Patimeeda Work completedCopy of Approved working estimate &

    ATRs not recived

    7 4 Construction of CS at Mullaparra Work completedCopy of Approved working estimate &

    ATRs not recived

    8 5 Construction of CS at Bangarampeta Work completed

    Copy of Approved working estimate &

    ATRs not recived

    9East

    Godavari

    RCSNCRMP/B-W/AP/RCS/

    PRED/04/Uppalaguptam/0031

    Road from R&B Road to Chinaraghavulapeta Cyclone

    ShelterWork completed

    Approval of working estimate waited &

    ATRs not received

    10 1Road from Ganapavaram R&B Road to

    PedamarpuvaripalemWork completed Approval Working Estimate received

    11 2 Road from R&B Road to Chinapuluguvaripalem Work completed Approval Working Estimate received

    No. of works for which Final QCRs submitted = 118 nos ; No. of works for which Final QCRs to be submitted = 11 nos

    Note: Quality Audit was done for all the items of the above completed works. Pre-final QCRs were also submitted. Approval of working estimates

    incorporating the deviations are awaited. Immediately after the receipt of approved working estimates from the departmental officers and ATRs in few cases,

    final QCRs will be submitted.

    NCRMP/B-W/AP/MPCS/PRED

    /03/Payakaraopeta/003

    NCRMP/B-W/AP/MPCS/PRED

    /03/Nakkapalli/002

    List of Works which are completed and final QCRs to be submitted by TPQA (awaiting approval of W.E/R.E) TABLE - 6

    NCRMP/B-W/AP/RHB/PRED/

    01/Santhabommali/003

    MPCS

    Visakhapatnam

    Srikakulam

    RHB

    RCSNCRMP/B-W/AP/RCS/PRED/

    07/Karlapalem/002Guntur

    Page 16 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    18/183

    PR

    R&B-Bridges

    I&CADD

    Started

    Notstarte

    d

    Progress

    Complete

    d

    Deleted

    CivilEngine

    ers

    visits

    Env&Social

    visits

    ElectricalEngg

    visits

    TotalVisits

    Issued

    Closed

    Pending

    CivilAudit

    Reports

    Social&Env

    Auditreports

    ElectricalAudit

    reports

    1 Srikakulam 51 1 0 49 44 5 38 6 3 360 23 13 396 634 15 12 3 41 23 9

    2 Vizianagaram 12 0 0 6 5 7 5 0 0 71 9 1 81 143 3 1 2 9 9 1

    3 Visakhapatnam 11 0 0 11 10 1 7 3 0 181 9 14 204 607 10 2 8 31 9 14

    4 East Godavari 23 2 0 25 22 3 21 1 0 166 20 10 196 575 1 1 0 24 20 9

    5 West Godavari 33 0 0 33 31 2 30 1 0 279 41 0 320 471 20 20 0 35 42 0

    6 Krishna 49 1 0 50 50 0 50 0 0 334 24 0 358 458 12 6 6 58 23 0

    7 Guntur 7 2 0 9 6 3 4 2 0 205 3 0 208 86 2 2 0 9 3 0

    8 Prakasam 34 1 0 35 35 0 32 3 0 410 35 0 445 1340 22 15 7 72 35 0

    9 Nellore 40 0 0 39 40 0 40 0 0 358 39 0 397 1537 17 14 3 59 39 0

    260 7 0 257 243 21 227 16 3 2364 203 38 2605 5851 102 73 29 338 203 33Total

    ABSTRACT STATUS OF NCRMP WORKS PROGRESS AS ON 30.11.2013 TABLE - 7

    Cummulative Visits of TPQA

    Cummulative Audit

    Reports submitted

    by TPQA

    Sl.

    No.District

    Work Entrusted Status of Works

    TotalNo.

    ofQCtests

    cond

    ucted

    NCRs By TPQA

    Reviewo

    fContract

    Document

    Page 17 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    19/183

    Annexure - A

    Status of Works

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    20/183

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 39

    11 to 40% 73

    41 to 70% 51

    71% 64

    Completed 16

    Works Not Started 21

    Deleted 3

    Total No of Works 267

    Consolidated Abstract Status of NCRMP Works as on 30.11.2013

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    21/183

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 3

    11 to 40% 8

    41 to 70% 5

    71% 16

    Completed 3

    Works Not Started 0

    Total No of works 35

    Abstract Status of NCRMP Works in Prakasam District as on 30.11.2013

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    22/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    1

    Y2-228

    Road from R&B road to

    Motupalli CS870 57.22 GSB Completed 7.87 14%

    2

    Y2-229 Road from Km1/2+186 ofChinaganjam Railway gate-

    Bapaianagar ZP Road to

    Ramachandranagar H/o

    Kothapalem

    836 44.54 GSB Completed 7.00 16%

    3

    Y2-230

    Motupalli R&B Road to

    Nirikshanagiri (via)

    Rudramambapuram CS in

    Motupalli G.P.

    2276 102.57 GSB Completed 20.78 20%

    4

    Y2-231

    Road from R&B road to

    Mattigunta CS363 13.21 GSB Completed 2.61 20%

    5

    Y2-232 Vedullapalli Vodarevu R&B

    road to CS at

    Vijayalakshmipuram

    482 15.78

    Earth Work Completed,

    WBM Grade-II in

    Progress

    2.00 13%

    6

    Y2-233 Pakala PR Road to

    Chellammagaripattapupale

    m CS

    1200 55.59

    GSB Completed, WBM

    Grade-II Completed, CD

    Completed & CC

    Completed

    33.19 60%

    7

    Y2-234 Pakala PR road to

    Potthaiahgaripalem CS,

    Kranthinagar Revu.

    2150 102.15

    GSB Completed, CC

    Completed, WBM Grade-

    II in Progress

    71.89 70%

    8

    Y2-235

    Woollapalem R&B road to

    Devalampallipalem CS1200 47.81 Earth Work in Progress 5.00 10%

    9

    Y2-236

    Road from Tangutur to

    Ananthavaram640 41.70

    GSB Completed, CC

    Pavement Completed41.54 100% Completed

    10

    Y2-238

    Road from Z.P. road to

    Srirampattapupalem2040 111.73

    GSB Completed, CC

    Completed, Shoulders

    Completed

    111.73 100%

    11

    Y2-239

    Road from ZP road to

    Pallipalem of Chakicharala800 56.54

    GSB Completed, CC

    Completed, WBM Grade-

    II, WBM Grade-III &

    OGPC + SC Completed,

    Shoulders Completed.

    56.50 100%

    Status of NCRMP works in Prakasam District as on 30.11.2013

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory Agreement

    Amount

    (Lakhs)/

    Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the Work

    1

    NCRMP/B-W/

    AP/RCS/

    PRED/08/

    Chinaganjam &

    Chirala/006

    RCS 233.00 /

    25.03.1325.05.14

    24.08.13

    Earth work,

    GSB, WBM

    (32%)

    Length

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    24.01.14

    CC, WBM,

    Shoulders

    (54%)

    24.05.14

    CC,

    Shoulders,

    BT & Road

    Furniture

    (100%)

    15.0

    5.1

    3

    For the

    Package,

    progress of

    works is slow

    and not as

    per Milestone

    40.26 13%

    For the

    package,

    progress of

    works is slow

    and not as

    per Milestone

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA

    observationStage of work

    Value of

    work

    done in

    % of

    work

    done

    for the

    work

    13.12.13

    WBM Gr-II,

    CC & CD

    Works

    (54%)

    13.05.14

    WBM Gr-

    III, BT,

    Shoulders,

    Earth work

    & Road

    Furniture

    (100%)

    02.0

    4.1

    3

    151.62 23%2

    NCRMP/B-W/

    AP/RCS/

    PRED/08/

    S.Konda &

    Tangutur/010

    RCS 247.00 /

    14.03.1314.05.14

    13.08.13

    Earth work

    & GSB

    (32%)

    10.12.13

    GSB, WBM

    Gr-II, CC-

    1km (42%)

    10.03.14

    CC-

    1.390km,

    BT,

    Shoulders,

    Earth Work

    & Road

    Furniture

    (100%)

    15.0

    3.1

    3

    168.23 95% Completed3

    NCRMP/B-W/

    AP/RCS/

    PRED/08/

    Ulavapadu

    /009

    RCS 169.00 /

    11.03.1310.03.14

    10.08.13

    Earth

    Work, CD

    Works

    (29%)

    Page 21 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    23/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory Agreement

    Amount

    (Lakhs)/

    Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the WorkLength

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA

    observationStage of work

    Value of

    work

    done in

    % of

    work

    done

    for the

    work

    12

    Y2-387

    R&B Road to

    Pulavaripalem600 36.71

    GSB Completed, CC

    Completed, Shoulders in

    Progress

    35.00 95%

    13

    Y2-388

    Road from Chinnaganjam

    Rly gate to Bapaiahnagar5577 187.50 175.50 93.6%

    14

    Y2-389

    Road from R & B road to

    Kothaplem1925 83.06 77.98 94%

    15

    Y2-390

    Motupalli R & B Road to

    Krishna Nagar360 23.37

    GSB Completed, CC

    Pavement Completed21.81 93%

    16

    Y2-391

    Road from R & B Road to

    Yanadi Sangam850 48.19 GSB Completed 9.05 19%

    17

    Y2-392 Jeedichetlapalem R&B

    road to

    Kunkuduchetlapalem

    2170 126.27 Work Stopped 4.16 3%

    18

    Y

    2-397

    KEM R&B road to

    Chinapattapupalem900 43.13 40.63 94%

    19

    Y2-398 Salt Road from Madnur ZP

    road to

    Pedapattapupalem

    973 53.69 50.92 94.8%

    20

    Y2-399

    Madnur ZP road to

    Swarnandhrapattapupalem800 43.11 40.88 95%

    21

    Y2-400

    Madnur ZP road to

    Bapujiyanadi colony285 16.57

    GSB Completed, CC

    Completed, Shoulders in

    Progress

    15.71 95%

    22

    Y2-401 Salt Road from Madnur ZP

    road to Namburi yanadi

    colony

    975 47.89 45.25 94%

    23

    Y2

    -402 Salt Road from Madnur ZP

    road to Thotagunta

    yanadi colony

    1100 51.75 48.77 94%

    7

    NCRMP/B-W/

    AP/RHB/

    PRED/08/

    Tangutur/021

    RHB 143.00 /

    14.04.1310.04.14

    10.09.13

    Earth work,

    GSB (20%)

    10.01.14

    WBM, CD

    Works &

    CC (55%)

    10.04.14

    Shoulders,

    BT & Road

    Furniture

    (100%)

    24

    Y2-403

    Road from Tangutur to

    Tallapalem (via)

    Velagapudi (Km 4/5 to

    7/465)

    2965 143.00

    05.0

    4.1

    3 GSB Completed, CC

    Completed & WBM Grade-

    II Completed

    90.38 63% 90.38 63%

    Progress of

    work is as per

    Milestone

    For the

    package

    Progress of

    works are

    slow and not

    as per

    Milestone

    5

    NCRMP/B-W/

    AP/RHB/

    PRED/08/

    Chinaganjam

    /013

    RHB 197.00 /

    19.03.1318.03.14

    18.08.13

    Earth work

    & GSB

    (26%)

    10.11.13

    WBM, CD &

    CC works

    (54%)

    11.05.14

    BT & Road

    Furniture

    (100%) 24.0

    3.1

    3

    288.48 94%

    For the

    package

    Progress of

    works are as

    per Milestone

    GSB Completed, CC

    Completed, WBM Grade-

    II, WBM Grade-III

    Completed, OGPC + SCCompleted, Shoulders in

    Progress

    4

    NCRMP/B-W/

    AP/RHB/

    PRED/08/

    Chinaganjam

    /012

    RHB 307.00 /

    11.03.1311.05.14

    10.06.13,

    Earth Work

    & GSB

    (32%)

    RHB 256.00 /

    11.03.1310.09.14

    10.11.13

    Earth work,

    GSB (47%)

    18.12.13

    WBM, CD

    Works &

    CC (44%)

    18.03.14

    BT & Road

    Furniture

    (100%) 15.0

    5.1

    3

    35.02 12%

    For the

    package

    Progress of

    works are as

    per Milestone

    GSB Completed, CC

    Completed, WBM Grade-

    II, WBM Grade-III

    Completed, OGPC + SC

    Completed, Shoulders in

    Progress

    10.04.14

    WBM Gr-II,

    WBM Gr-III

    & CD

    Works

    (65%)

    10.09.14

    CC,

    Shoulders,

    BT & Road

    Furniture

    (100%)

    20.0

    3.1

    3

    GSB Completed, CCCompleted, WBM Grade-

    II, WBM Grade-III

    Completed, OGPC + SC

    Completed,Shoulders in

    Progress

    242.16 80%6

    NCRMP/B-W/

    AP/RHB/

    PRED/08/

    Kothapatnam/0

    20

    Page 22 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    24/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory Agreement

    Amount

    (Lakhs)/

    Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the WorkLength

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA

    observationStage of work

    Value of

    work

    done in

    % of

    work

    done

    for the

    work

    8

    NCRMP/B-W/

    AP/RHB/

    PRED/08/

    Tangutur/022

    RHB 131.00 /

    14.03.1313.03.14

    13.08.13

    Earth work,

    GSB (20%)

    13.12.13

    WBM Gr-II,

    CD Works

    & CC

    (55%)

    13.03.14

    Shoulders,

    BT & Road

    Furniture

    (100%)

    25

    Y2-404 Road from Tangutur-

    Ravivaripalem road @1/2

    KM to Pasukuduru.

    2900 131.00

    14.0

    4.1

    3 GSB Completed, CD

    Works Completed & CC

    Completed, WBM Grade-

    II Completed

    70.97 54% 70.97 54%

    Progress of

    work is as per

    Milestone

    26

    Y2-405

    Road from Kanuparthy toKukkalavaripalem

    800 39.55 GSB Completed 8.69 22%

    27

    Y2-406

    Road from Kanuparthy to

    Yanadi Sangam1500 71.83 GSB Completed 28.99 40%

    28

    Y2-407

    Road from Kanuparthy to

    MS Pattapupalem2300 118.31 GSB Completed 54.89 46%

    29

    Y2-409 Road from KEM R&B Road

    to Vajjireddypalem -

    Pattapupalem

    1185 58.50

    GSB Completed, CC

    Completed, WBM Grade-

    II, WBM Grade-

    IIICompleted, OGPC +

    SC Cpmpleted, Shoulder

    is in Progress

    49.45 85%

    30

    Y2-410

    KEM R & B road to

    Pinnivaripalem1650 62.08

    GSB Completed, CCCompleted, WBM Grade-

    II, WBM Grade-III

    Completed, OGPC + SC

    Completed, Shoulders in

    58.32 94%

    31

    Y2-411 Salt Road from Madnur ZP

    road to

    Chinnapattapupalem

    800 33.89

    GSB Completed, CC

    Completed, WBM Grade-

    II, WBM Grade-

    IIICompleted, OGPC +

    SC Cpmpleted, Shoulder

    is in Progress

    31.84 94%

    32

    Y2-412

    KEM R & B road to E.

    Pallipalem650 29.20

    GSB Completed, CC

    Completed, Shoulders in

    Progress

    29.00 99%

    33

    Y2-413 Road from KEM R & B

    road to

    Chenchupapayapalem

    1550 56.72

    GSB Completed, CC

    Completed, WBM Grade-II, WBM Grade-III &

    OGPC + SC Completed,

    Shoulders in Progress

    53.17 94%

    11

    NCRMP/B-W/

    AP/RHB/

    PRED/08/

    Ulavapadu

    /016

    RHB 359 /

    11.03.1310.06.14

    10.09.13

    Earth work,

    GSB (12%)

    10.02.14

    WBM Gr-II,

    WBM Gr-III

    & CD

    Works

    (64%)

    10.06.14

    CC-

    Shoulders,

    BT & Road

    Furniture

    (100%)

    34

    Y2-414 Road From M.C road to

    West ST colony of

    Veerapalli

    5380 359.00

    20.0

    3.1

    3

    GSB Completed, CC

    Completed, WBM Grade-

    II, WBM Grade-III &

    OGPC + SC Completed.

    Shoulders in Progress

    349.88 97% 349.88 97%

    For the

    package

    progress of

    work is as per

    Milestone

    10

    NCRMP/B-W/

    AP/RHB/

    PRED/08/

    Kothapatnam

    /019

    RHB 240.00 /

    15.03.1314.06.14

    14.09.13

    Earth work,

    GSB (29%)

    9

    NCRMP/B-W/

    AP/RHB/

    PRED/08/ NG

    Padu/011

    RHB 229.00 /

    20.03.1319.06.14

    19.09.13

    Earth work,

    GSB (25%)

    19.01.14

    WBM Gr-II,

    WBM Gr-III

    & CD

    Works

    (49%)

    19.06.14

    CC,

    Shoulders,

    BT & Road

    Furniture

    (100%)

    14.02.14

    WBM Gr-II,

    WBM Gr-II,

    CC-50% &

    CD Works

    (35%)

    14.06.14

    CC-50%,

    Shoulders,

    BT & Road

    Furniture

    (100%)

    20.0

    3.1

    3

    221.78 74%

    For the

    package

    Progress of

    works are as

    per Milestone

    09.0

    4.1

    3

    92.57 19%

    For the

    package

    Progress of

    works are as

    per Milestone

    Page 23 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    25/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory Agreement

    Amount

    (Lakhs)/

    Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the WorkLength

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA

    observationStage of work

    Value of

    work

    done in

    % of

    work

    done

    for the

    work

    12

    NCRMP/B-W/

    AP/Br/

    R&B/08/

    Ongole/023Bridge

    372.00 /

    12.04.1311.09.14

    11.08.13

    Completion

    of

    Foundation

    s upto Sill

    Level

    (35%)

    11.12.13

    Completion

    upto below

    Deck Salb

    (47%)

    11.04.14

    Completion

    of entire

    work

    including

    approaches

    (100%)

    35

    Y2-455

    Reconstruction of High

    level bridge at Km. 11/10

    of Ongole - Kothapatnam

    road

    4 vents

    of 16m

    span

    372.00

    20.0

    4.1

    3

    Sinking of Well Curbs in

    progress37.00 10% 37.00 10%

    For the

    package

    progress of

    work is as per

    Milestone

    Page 24 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    26/183

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 1

    11 to 40% 10

    41 to 70% 9

    71% 20

    Completed 0

    Works Not Started 0

    Total No of works 40

    Abstract Status of NCRMP Works in SPSR Nellore District as on 30.11.2013

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    27/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    1

    Y2-240 Road from @ 56/8 to

    C.K road to Periyavettu

    kuppam CS

    1910 71.83

    Earth work, GSB and

    WBM Gr-II & WBM Gr-III

    are completed.

    67 93%

    2Y2-241 Providing BT road to

    Pedapannamgadu inTada Mandal

    1015 32.47

    Earth work, GSB WBM Gr-

    II & III and BTcompleted.

    32 99%

    2

    NCRMP/B-W/

    AP/RCS/

    PRED/09/

    Alluru/012

    RCS 24.39

    18.03.201317.09.13

    17.06.13

    Earthwork, CD

    Works, and

    GSB (9%)

    17.08.13 CC

    Pavement &

    Shoulders

    (90%)

    17.09.13

    Road

    furniture.

    (100%)

    3

    Y2-242

    Approach road to

    Labbipalem420 24.39 01.05.13

    GSB and CC pavement

    are completed21 86% 21 86%

    3

    NCRMP/B-W/

    AP/RCS/

    PRED/09/

    Bogole/013

    RCS 58.99

    20.03.201319.12.13

    19.07.13

    Earthwork,

    and GSB

    (35%)

    19.10.13

    WMM, CD

    Works and

    Shoulders

    (73%)

    19.12.13

    BT and

    Road

    furniture.

    (100%)

    4

    Y2-243

    Road from R & B road

    to Pathakadapalem1400 58.99 01.05.13

    Earth work for widening

    is done. GSB Progress23 39% 21 36%

    5

    Y2-244 Road from

    Ramudupalem on R&B

    road to Pallipalem

    3600 209.93

    Earth work, GSB and CC

    pavement are completed.

    WMM is Progress

    150 71%

    6

    Y2-245

    Road from Korutur to

    Pattapupalem2250 159.58

    Earth work,CD works &.

    GSB Completed. WMM is

    in progress

    115 72%

    5

    NCRMP/B-W/

    AP/RCS/

    PRED/09/

    Kavali/020

    RCS 166.89

    28.02.201327.02.14

    27.07.13

    5Months: Earth

    Work, GSB

    (24%)

    27.11.13

    9 Months:

    WMM, CD

    works

    (72%)

    27.02.14

    12 Months:

    BT & Road

    Furniture

    of all works

    (100%)

    7

    Y2-246 Road from 230/6 Km of

    M.C Raod to

    Pedapattapupalem

    6200 166. 89 01.03. 13

    Earth work for widening,

    vented road dam GSB

    completed.WMM is in

    progress

    110 66% 110 66%

    Pogress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    8

    Y2-247

    Road from R&B road to

    Utukuru Pallipalem3800 143.3

    Earth work , GSB &

    WMM are completed.79 55%

    9

    Y

    2-248 Road Ponnapudi R&B

    Road to

    Ramachendrapuram.

    2230 123.8Earth work, GSB, WMM

    are completed.83 67%

    10

    Y2-249

    Ponnapudi R&B road to

    Busagadipalem2000 98

    Earth work GSB & CC

    road are completed.57 58%

    11

    Y2-250 Road from Ponnapudi

    R&B Road to

    Lakshimipuram

    1.115 54Earth work GSB & CC

    road are completed.35 65%

    12

    Y2-251

    Road from R&B Road to

    Ramalingapuram2193 72

    Earth work GSB are

    completed CC road is

    progress.

    14 19%

    268 54%

    Progress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    6

    NCRMP/B-W/AP/RCS/

    PRED/09/

    Vidavaluru

    /021

    RCS 497.800

    20.03.201319.06.14

    19.09.13

    6Months: Earth

    Work, GSB

    (21%)

    19.02.14

    11 Months:WMM, CC

    Pavement of

    all works,

    CD works

    (78%)

    19.06.14

    15 Months:BT & Road

    Furniture

    of all

    works.

    (100%)

    01.04.13

    99 95%

    Progress o

    work is not

    within the

    mile stones

    as per value

    of work done.

    Extension of

    Progress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    4

    NCRMP/B-W/

    AP/RCS/

    PRED/09/ I.Pet/018

    RCS 369.51

    20.03.2013 19.06.14

    19.09.13

    Earthwork, CD

    Works, CCPavement and

    GSB (54%)

    19.02.14

    WMM, and

    Shoulders(74%)

    19.06.14

    BT and

    Roadfurniture

    (100%)

    21.03.13 265 72%

    Progress of

    work is with

    in the mile

    stones as pervalue of work

    done.

    1

    NCRMP/B-W/

    AP/RCS/

    PRED/09/

    Tada/009

    RCS 104.300

    14.09.201213.09.13

    13.2.13

    Earthwork,

    Pipe culverts,

    GSB & CC

    pavement(49%)

    13.06.13

    WBM Gr-II,

    Gr-III and

    Shoulders

    (86%)

    13.09.13

    BT and

    Road

    furniture.

    (100%)

    15.09.12

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA

    observationStage of work

    Value

    of

    work

    done

    in

    % of

    work

    done

    for the

    work

    Length

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory Agreement

    Amount

    (Lakhs)/

    Date

    DFC

    Milestone/ Financial Targets (%)

    Sl.No

    of

    work

    Projectcode

    Name of the Work

    Page 26 of 182

    Status of NCRMP works in SRSP Nellore District as on 31.11.2013

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    28/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA

    observationStage of work

    Value

    of

    work

    done

    in

    % of

    work

    done

    for the

    work

    Length

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory Agreement

    Amount

    (Lakhs)/

    Date

    DFC

    Milestone/ Financial Targets (%)

    Sl.No

    of

    work

    Projectcode

    Name of the Work

    7

    NCRMP/B-W/

    AP/RCS/

    PRED/09/

    Chillakur/ 014

    RCS 293.28

    21.03.201320.03.14

    20.09.13

    Earthwork,

    and GSB.

    (39%)

    20.12.13

    WMM, CD

    Works, CC

    Pavement &

    Shoulders

    (84%)

    19.03.14

    BT and

    Road

    furniture.

    (100%)

    13

    Y2-252 Road from R&B Road

    Lingavaram to

    Narravaripalem

    6808 293. 28 22.03. 13

    Earth work for widening

    is completed.GSB

    Completed.WMM is in

    Progress

    134.5 46% 134.5 46%

    8

    NCRMP/B-W/

    AP/RCS/

    PRED/09/

    Chillakur/015

    RCS 112.77

    21.03.201320.03.14

    20.08.13

    Earthwork,

    and GSB.

    (38%)

    20.12.13

    WMM, CD

    Works, CC

    Pavement &

    Shoulders

    (82%)

    20.03.14

    BT and

    Road

    furniture

    (100%)

    14

    Y2-253 Road from R&B road

    (via) Narravaripalrm to

    Srinivasa Satram

    2260 112. 77 01.04. 13

    Earth work for widening

    is completed.GSB

    Completed.WMM is in

    Progress

    88 78% 88 78%

    9

    NCRMP/B-W/

    AP/RCS/

    PRED/09/

    Kota/016

    RCS 157.200

    20.03.201319.03.14

    19.08.13

    Earthwork,

    and GSB.

    (21%)

    18.12.13

    WMM,CD

    Works, CC

    Pavement &

    Shoulders

    (56%)

    19.03.14

    BT and

    Road

    furniture

    (100%)

    15

    Y2-254 Road from R&B Road to

    Doruvukatta road (via)

    Allmpadu, Deyyaladibba

    4320 157.2 21.03.13

    Earth work for widening,

    GSB, CC pavement ,CD

    works , WMM and BT

    completed.

    151 96% 151 96%

    16

    Y2-255 Road from Kotha Kudur

    Katepalli road to

    Patha Pattapupalem

    600 25.67Jungle clearance is in

    progress2 8%

    17

    Y2-256

    Road from C.S. Puram

    to Edurupalem2200 74.31

    From km 0.0 to km 1.2

    Earth work, GSB, WMM ,

    BT completed

    34 46%

    18

    Y2-257

    Mahlakshmi puram to

    Sagara Sangamam (via)

    Muthyalathopu

    Pattapupalem

    2600 65.66

    Earth work for widening,

    WMM and BT Completed.

    CD works completed.

    63 96%

    19

    Y2-258 Road from R&B road

    Nelaturu to

    Ananthavaram CS

    100 7.24 GSB is completed 2 28%

    11

    NCRMP/B-W/

    AP/RCS/

    PRED/09/

    Tada/024

    RCS 97.55

    22.03.201321.03.14

    21.07.13

    Earthwork,

    and GSB.

    (35%)

    21.10.13

    WMM, CD

    Works, CC

    Pavement &

    Shoulders

    (79%)

    21.12.13

    BT and

    Road

    furniture

    (100%)

    20

    Y2-259 Road from @ Km 65/4

    of CK Road to Tada

    Kuppam CS

    1900 97.55 23.03.13

    Earth work for

    widening,CD, GSB and

    WMM and BT

    completed.

    96 98% 96 98%

    progress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    12

    NCRMP/B-W/

    AP/RCS/

    PRED/09/

    Chittamur/010

    RCS 172.82

    12.08.201311.11.14

    11.02.14

    Earthwork,

    and GSB.

    (27%)

    11.07.2014,

    wmm, 75%

    of cd

    work,cc

    pavement,

    schoulder

    77%

    11.11.2014

    BT 25% of

    CD Work

    and Road

    furniture

    100%

    21

    Road from Nidigurthi

    R&B road to

    Mukkidipalem via

    gollapalem and to CS of

    Chittamur mandal in

    Nellore dist

    3075 172. 82 12.08. 13

    Earth wok, Sub grade

    and CD works

    completed.GSB is

    progress

    55 32% 55 32%

    progress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    Progress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    10

    NCRMP/B-W/

    AP/RCS/

    PRED/09/

    T.P.Gudur &

    Muthukur /019

    RCS 172.98

    15.03.201314.06.14

    14.09.13

    6Months: Earth

    Work, GSB

    (17%)

    14.02.14

    11 Months:

    WMM, CD

    works, CC

    Pavement

    (76%)

    14.06.14

    15 Months:

    BT and

    Road

    Furniture

    (100%)

    01.07.13 101 58%

    progress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    Page 27 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    29/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA

    observationStage of work

    Value

    of

    work

    done

    in

    % of

    work

    done

    for the

    work

    Length

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory Agreement

    Amount

    (Lakhs)/

    Date

    DFC

    Milestone/ Financial Targets (%)

    Sl.No

    of

    work

    Projectcode

    Name of the Work

    13

    NCRMP/B-W/

    AP/RHB/

    PRED/09/

    Allur/018

    RHB 120.86

    18.03.201317.03.14

    17.08.13

    Earthwork,

    and

    GSB.(16%)

    17.12.13

    WMM, CD

    Works, CC

    Pavement &

    Shoulders

    (77%)

    17.03.14

    BT and

    Road

    furniture.

    (100%)

    22

    Y2-419 Road from R.I Road to

    C.R. Palem (via)

    Sambhunipalem

    4000 120.86 01.06.13 CD works is progress. 30 25% 30 25%

    Progress of

    work is

    slightly

    behind the

    mile stones

    as per value

    of work done.

    23

    Y2-420 Salt Road from Iskapalli

    to Salt fields at Kotha

    Kurrupattapupalem

    3000 134

    Earth work, GSB & WMM

    are completed. CD works

    completed.

    105 78%

    24

    Y2-421

    Road from R&B road to

    Zuvvagu Lakshmipuram1800 84

    Earth work for widening

    done. GSB in progress12 14%

    25

    Y2-422

    Road from R&B Road to

    Zuvvagu2100 31.24

    Earth work, GSB, WMM,

    CD works and CC Road

    are completed.

    23 74%

    26

    Y2-423 Annagaripalem R&B

    road to Pedanattu

    Pattapupalem

    2100 57.28

    Earth work for widening

    done. GSB, WMM

    Progress

    40 70%

    27Y2-424

    Pedapattapupalem toNandempuram

    2844 77.17 Earth work, GSB andWMM is completed

    57 74%

    28

    Y2-425

    Ponnapudi-Utukur road

    to Pattapupalem2700 137

    Earth work for widening

    and GSB completed.42 31%

    29

    Y2-426

    Road from R&B road to

    Venkatareddypalem1100 58.63 Sub Grade in progress 15 26%

    30

    Y2-427

    Ponnapudi R&B road to

    Anjanayapuram950 52

    Earth work for widening

    and GSB is in progress.21 40%

    31

    Y2-428

    Ponnapudi Utukur

    road to Srigowripuram1100 68.44

    Earth work for widening

    and GSB is in progress.15 22%

    32

    Y2

    -429

    Ponnapudi Utukur

    R&B road To Kothuru

    1080 59.43

    Earth work ,GSB

    completed & WMM is

    completd

    35 59%

    33

    Y2-430 Road from Ponnapudi

    Utukur R&B road to

    Prasanthi giri colony

    1200 65.79

    Earth work for widening,

    GSB,CC road WMM & BT

    are completed.

    65 99%

    34

    Y2-431

    Ponnapudi R&B road to

    Venkatanarayanapuram1352 67.87

    Earth work for widening,

    GSB,CC road WMM & BT

    are completed.

    67 99%

    35

    Y2-432

    Road from Ponnapudi

    R&B road to Ponnapudi500 33.22

    Earth work, GSB & CC

    pavement are completed31.7 95%

    Progress ofwork is with

    in the mile

    stones as per

    value of work

    done.

    56 23%

    17

    NCRMP/B-W/

    AP/RHB/

    PRED/09/

    Vidavaluru

    /026

    RHB 294.86

    21.03.201319.06.14

    20.09.13

    6Months: Earth

    Work, GSB

    (23%)

    20.02.14

    11 Months:

    WMM, CC

    Pavement of

    all works,

    CD works,

    (88%)

    19.06.14

    15 Months:BT and

    Road

    Furniture

    of all

    works.

    (100%)

    21.03.13 213.7 72%

    140 56%

    Progress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    15

    NCRMP/B-W/

    AP/RHB/

    PRED/09/

    Kavali/024

    RHB 134.45

    04.03.201303.03.14

    3.08.13

    5Months: Earth

    Work, GSB

    (32%)

    3.12.13

    9 Months:

    WMM, CD

    works,

    shoulders(69%)

    03.03.14

    12 Months:

    BT & Road

    Furniture

    complete

    of work.

    (100%)

    01.06.13 97 72%

    Progress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    16

    NCRMP/B-W/

    AP/RHB/

    PRED/09/

    Vidavaluru

    /025

    RHB 247.63

    20.03.201319.03.14

    20.08.13

    5Months: Earth

    Work, GSB

    (27%)

    20.12.13

    9 Months:

    WMM, CC

    Pavement of

    all works,

    CD works,

    (84%)

    19.03.14

    12 Months:

    BT & Road

    Furniture

    of all

    works.

    (100%)

    21.03.13

    14

    NCRMP/B-W/

    AP/RHB/

    PRED/09/

    Allur/019

    RHB 249.24

    18.03.201317.03.14

    17.08.13

    Earthwork,

    and GSB

    (24%).

    17.12.13

    WMM, CD

    Works, CC

    Pavement

    and

    Shoulders

    (49%)

    17.03.14

    BT and

    Road

    furniture.

    (100%)

    19.03.13

    Page 28 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    30/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA

    observationStage of work

    Value

    of

    work

    done

    in

    % of

    work

    done

    for the

    work

    Length

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory Agreement

    Amount

    (Lakhs)/

    Date

    DFC

    Milestone/ Financial Targets (%)

    Sl.No

    of

    work

    Projectcode

    Name of the Work

    36

    Y2-433

    Mypadu R&B Road to

    Kollimittapalem2328 129.94

    Earth work for widening,

    GSB and WMM

    completed

    109.53 84%

    37

    Y2-434 Nellore Mypadu R&B

    Road to West

    Pattapupalem

    900 56.28Earth work , GSB & CC

    road is completed53 94%

    19

    NCRMP/B-W/

    AP/RHB/

    PRED/09/

    V.Chalam/021

    RHB 69.400

    08.02.201307.11.13

    7.07.13

    5Months: Earth

    Work, GSB

    (22%)

    7.11.13

    9 Months:

    WMM, CD

    works,

    (82%)

    7.02.14

    12 Months:

    BT & Road

    Furniture

    (100%).

    38

    Y2-435

    Road from

    Thirumalammapalem

    R&B Road to Gajulapalli

    Koneru

    2400 69.4 09.02.13

    From km 0/0 to km 2.00,

    Earth work, GSB, CD

    works, WMM & BT are

    completed. From Km 2.0

    to 2.4 work could not be

    completed due to court

    case.

    65 94% 65 94%

    20

    NCRMP/B-W/

    AP/RHB/

    PRED/09/

    Kota/022

    RHB 252.640

    19.03.201318.06.14

    18.09.13

    6Months: Earth

    Work, GSB

    (23%)

    18.02.13

    5 Months:

    WMM, CD

    works,

    (82%)

    18.06.14

    4 Months:

    BT & Road

    Furniture

    remaining

    all items.

    (100%)

    39

    Y2-436

    Road from R&B road

    Kothapatnam to

    Yamadinnepalem (via)

    Srinivasasatram

    5968 252. 64 20.03. 13

    Earth work for widening

    and GSB ,cc road are

    completed. WMM work is

    in progress.

    190 75% 190 75%

    21

    NCRMP/B-W/AP/RHB/

    PRED/09/

    Kota/023

    RHB 53.87

    508.02.201307.11.13

    7.06.134Months: Earth

    Work, GSB

    (24%)

    7.9.133 Months:

    WMM, CD

    works,

    (81%)

    7.01.142 Months:

    BT & Road

    Furniture

    (100%)

    40

    Y2-437 Road from at km 22/5

    of Yamadinne palem

    road to Gunnampadia

    1320 53.87 09.02.13

    Earth work forwidening, GSB, CD

    works, WMM and BT

    Completed. CC pavement

    completed.

    53 98% 53 98%

    Progress of

    work is aheadof the mile

    stones as per

    value of work

    done.

    Progress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    18

    NCRMP/B-W/

    AP/RHB/

    PRED/09/

    I.Peta/027

    RHB 186.24

    21.03.201320.03.14

    20.08.13

    5Months: Earth

    Work, GSB

    (20%)

    20.12.13

    9 Months:

    WMM, CD

    works,

    (89%)

    20.03.14

    12 Months:

    BT & Road

    Furniture

    remaining

    all items.

    (100%)

    21.03.13 162.53 87%

    Progress of

    work is with

    in the mile

    stones as per

    value of work

    done.

    Page 29 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    31/183

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 0

    11 to 40% 0

    41 to 70% 2

    71% 5

    Completed 3

    Works Not Started 1

    Total No of works 11

    Abstract Status of NCRMP Works in Visakhapatnam District as on

    30.11.2013

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    32/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    1

    NCRMP/B-W/

    AP/MPCS/

    PRED/03/

    Rambillii/004MPCS 75.06

    03.10.2011

    02.07.12

    EOAT

    approved

    up to

    25.07.13

    02.01.12

    Ground

    Floor

    Plinth

    Leve

    02.04.12

    Casting of

    all slabs

    02.07.12

    Completio

    n of all

    items of

    work

    1

    Y2-048 Construction of

    cyclone shelter at

    Venkayyapalem

    75.06

    Re start

    after getting

    approval of

    foundation

    re design on

    29.06.12

    All slabs, brick work,

    plastering, wood

    joinery, flooring,

    plumbing, painting

    completed.

    75.06 100% 75.06 100%

    Completed. Working

    estimate

    preparation/approva

    l is awaiting.

    2

    NCRMP/B-W/

    AP/MPCS/

    PRED/03/ S

    Rayavaram

    /009

    MPCS 129.92

    20.04.201319.04.13

    19.09.13

    Ground

    Floor

    Plinth

    Level

    19.01.14

    Casting of

    all floors

    19.04.13

    Completio

    n of all

    items of

    work

    2

    Y2-057 Construction of CS at

    Bangarampalem I & II

    H/o Vakadu. (Type D)

    129 .92 20.04.13

    Earthwork excavation

    started and stop due to

    site dispute. Alternate

    site is identified and

    approval is pending.

    0.00 0% 0 0%

    The village

    proposed to be

    aquired for navel

    base purpose.

    Hence the field

    officers are

    informed to higher

    otherties for

    cancellation of the

    work

    3Y2-1

    65

    Road from R&B road

    to

    Chinanagamayyapalem

    CS

    1525 47.29 11.03.13

    WBM Gr-II from KM

    0.000 to 0.800

    completed.

    3 nos. CD works

    completed.

    WBM Gr-III from KM

    0.000 to 0.800

    completed. OGPC +Seal

    coat from Km 0.00 to

    0.800 completed.

    26 55%

    45% value of work

    is not able to do

    due to site dispute

    with forest dept.@

    4

    Y2-166

    Road from R&B road

    to Annavaram CS1100 31.15 11.03.13

    WBM Gr-II from km

    0.00 to 1.057 and CC

    Road work from km

    1.057 to 1.107

    completed. WBM Gr-III

    and OGPC + Seal coat

    from Km 0.00 to 1.057

    completed.

    30 96%

    4

    NCRMP/B-W/

    AP/RCS/

    PRED/03/ S

    Rayavaraam

    /006

    RCS 56.46

    07.03.201306.12.13

    06.07.13

    Earth

    work, CC

    road

    (29.28%)

    06.10.13

    CC Road

    (67.18%)

    06.12.13

    Shoulders

    , Roadfurniture

    & CC road

    (100%)

    5

    Y2-16

    7

    Road from R&B roadto Revupolavaram CS

    1065 56.46 07.03.13

    Earth work for

    widening, CC Road

    work, shoulder works

    are completed from KM

    0.000 to KM 0.8538 and

    from KM 0.8845 KM

    1.072

    56 99% 56 99%

    3

    NCRMP/B-W/

    AP/RCS/

    PRED/03/

    Bheemili/005

    RCS 78.44

    11.03.2013

    10.07.13

    Earthwork

    , Pipe

    culverts of

    all

    works(10

    %)

    10.12.13

    Status of NCRMP works in Visakhapatnam District as on 30.11.2013

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory

    Agreement

    Amount

    (Lakhs)/Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the Work

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA observation

    Value of

    work

    done in

    % of

    work

    done for

    the work

    Stage of work

    10.10.13WBM

    Gr-II,

    Gr-III and

    CC

    pavement

    of all

    work

    (54.76%)

    10.12.13BT,

    Shoulders

    and Road

    furniture

    complete

    of all

    works

    (100%)

    55 70%

    Length

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commence

    ment of

    work

    Page 31 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    33/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory

    Agreement

    Amount

    (Lakhs)/Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the Work

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA observation

    Value of

    work

    done in

    % of

    work

    done for

    the work

    Stage of workLength

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commence

    ment of

    work

    5

    NCRMP/B-W/

    AP/RCS/

    PRED/03/

    Rambilli/007

    RCS 38.78

    11.03.201310.09.13

    10.06.13

    Earthwork

    , GSB (

    15%)

    10.08.13

    CC Road

    ( 89.45)

    10.09.13

    Wearing

    coat,

    shoulders

    and Road

    furniture

    complete

    ( 100%)

    6

    Y2-168

    Road from R&B road

    to Kothapatnam CS650 38.78 11.03.13

    Earth work, sub

    grade,GSB, shoulders

    and CC Road work

    completed from KM

    0.000 to KM 0.610.

    39 101% 38.7 100% Completed

    7

    Y2-280

    Road from R&B road

    to Rajavaram425 14.38 07.03.13

    One pipe culvert, WBM

    Gr-II, Gr-III and OGPC

    seal coat Work is

    completed from KM 0.0

    to 0.425

    14 94%

    6.4% value of One

    pipe culvert work is

    not executed as the

    field officers

    proposed that it is

    not required.

    8

    Y2-281 Road from Rajala R&B

    Road to

    Rajaraidupalem

    1764 65.34 07.03.13

    Sub grade with selected

    earth (Gravel): from km

    0.640 to 0.750, from km

    1.190 to 1.764, earth

    work & WBM Gr-II

    completed from km

    0.000 to 0.012 & from

    km 0.030 to 1.764, GSB

    : 1488 Meters from km0.030 to 0.094, from km

    0.340 to 1.764, CD

    works (4 nos) and

    retaining wall

    completed. WBM Gr-III

    Rolling is progress..

    32 49%

    9

    Y2-282 Road from R&B road

    to Gajareddipalem via

    Venkaypalem

    2614 109.87 07.03.13

    4 Nos pipe culverts,

    from Km 0/106 to 1/600

    and from km 2/0 to

    2/620 GSB, WBM Gr-II

    & III, OGPC + Seal

    coat, from km 1.600 to

    2.000 and from KM

    2.620 to 2.720 GSB

    work completed.

    92 84%

    138 73%

    06.10.13

    Earthwork

    ,Pipeculver

    ts,GSB

    ( 35.8%)

    06.04.14

    WBM Gr-

    II,Gr-III

    andshoulders

    & CC

    Pavement

    ( 72.6%)

    06.06.14

    BT and

    Roadfurniture

    ( 100%)

    6

    NCRMP/B-W/

    AP/RHB/

    PRED/03/Payakaraopeta

    /005

    RHB

    189.5907.03.2013 06.06.14

    Page 32 of 182

    Mil t / Fi i l T t T l

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    34/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory

    Agreement

    Amount

    (Lakhs)/Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the Work

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons

    for non-

    started

    works

    TPQA observation

    Value of

    work

    done in

    % of

    work

    done for

    the work

    Stage of workLength

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commence

    ment of

    work

    7

    NCRMP/B-W/

    AP/RHB/

    PRED/03/Payakaraopeta

    /008

    RH

    B 62.04

    07.03.2013 06.12.13

    06.07.13

    Earth,GSB

    ,Retainingwall (

    22%)

    06.10.13

    CC Road(86%)

    06.12.13

    CC drain,

    CD works,

    Shoulders

    and Roadfurniture

    complete

    (100%)

    10Y2-

    283 Road from Z.P Road

    Palmanpeta toKorlayyapeta

    1110 62.04 07.03.13

    One single row and one

    two row pipe culvert

    works completed.

    Retaining wall work

    completed for 62.55

    Meters (62.55m in km

    0/600). Earth work, GSBand CC pavement

    from Km 0/0323 to Km

    0/4021, from Km 0/689

    to 0/9294 and Cross

    Road from Km 0/328 to

    0/498 Completed

    60 96% 60 96%

    CC drain, body walls

    and parapet walls

    for one CD work isnot done.

    8

    NCRMP/B-W/

    AP/RHB/

    PRED/03/

    Atchutapuram

    /009

    RHB 26.09

    07.03.201306.09.13

    06.06.13

    Earth

    work,CC

    Road

    (26.22%)

    06.08.13

    CC Road

    (70.81%)

    06.09.13

    Shoulders

    and Road

    furniture

    11

    Y2-284

    Road from R&B Road

    to Vadapalem450 26.09 07.03.13

    Shoulders and CC Road

    completed from KM

    0.000 to KM 0.4244

    26 100% 26 100% Completed

    Page 33 of 182

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    35/183

    RATE OF PROGRESS OF WORKS No of works

    up to 10% 12

    11 to 40% 22

    41 to 70% 3

    71% 1

    Completed 6

    Works Not Started 5

    Works Deleted 3

    Total No of works 52

    Abstract Status of NCRMP Works in Srikakulam Districtas as on 30.11.2013

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    36/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    1

    Y2-001

    Construction of CS at

    Kollipadu112.03 Completed 112 100%

    2

    Y2-002

    Construction of CS at

    Runku112.03 Completed 112 100%

    3

    Y2-005

    Construction of MPCS

    in Amalapadu

    Resanctioned, Not

    started0 0%

    4

    Y2-006

    Construction of MPCS

    in Angavanipeta86.4 Not started 0 0%

    Line Dept officers

    are taken position

    of required land

    from

    Gramkantam. The

    villagers wanted

    to construct the

    CS at Amalapadu.

    5

    Y2-007

    Construction of MPCS

    in Ch.BatasalavanipetaDELETED

    6

    Y2-008 Construction of MPCS

    in ChintavanipetaDELETED

    7

    Y2-009

    Construction of MPCS

    in U.Narisingapally86.4 Not started 0 0%

    8

    Y2-010 Construction of MPCS

    in Bypalli

    (Type C)

    117.38

    PCC for Footings,

    footings, pedestals

    and columns up to

    bottom of plinth

    beam are

    completed, Back

    filling in foundation

    is in progress.

    25 21%

    9

    Y2-011 Construction of MPCS

    in Chinavanka

    (Type C)

    119.1

    PCC, Footings,

    Columns below

    plinth levelcompleted.

    Backfilling in

    foundation is in

    progress.

    19 16%

    10

    Y2-012 Construction of MPCS

    in Chinakotturu

    (Type A)

    89.21

    PCC, Footings

    completed. Columns

    is in progress.

    13 15%

    11

    Y2-013 Construction of CS in

    Chinajuttuvanipalem

    (Type A)

    DELETED

    3

    NCRMP/B-W/

    AP/MPCS/PRED/01/

    V.Kotturu/004MPC

    S

    422.279.03.13 8.09.14

    Progress of work is

    behind the mile

    stones. Contractorhas to speed up the

    work to achive the

    progress.

    8.11.13

    Ground

    Floor

    PlinthLevel of

    all works

    (24.34%)

    8.04.14

    Casting of

    all slabs

    of allworks

    (59.64%

    Value)

    8.09.14

    Completet

    ion of allworks

    (100%

    Value)

    57 17%

    100%

    2

    NCRMP/B-W/

    AP/MPCS/

    PRED/01/

    V.Kotturu/003MPCS 475.07

    09.03.1308.09.14

    08.11.13

    Ground

    Floor

    Plinth

    Level of

    all works

    (28.72%)

    08.04.14

    Casting of

    all slabs

    of all

    works

    (65.27%

    Value)

    08.09.14

    Completet

    ion of all

    works

    (100%

    Value)

    0 0%

    1

    NCRMP/B-W/

    AP/MPCS/

    PRED/01/

    Santhabommali

    /005

    MPCS 224.07

    17.10.11

    EOAT

    approved

    up to

    04.09.13

    16.03.12

    Ground

    Floor

    Plinth

    Level of

    all works

    Length

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    16.08.12

    Casting of

    first floor

    roof slabs

    of all

    works

    16.01.13

    Completet

    ion of all

    works

    (100%

    Value)

    Nov-11

    Status of NCRMP works in Srikakulam District as on 30.11.2013

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory

    Agreement

    Amount

    (Lakhs)/Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the Work

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons for

    non-started

    works

    TPQA observationStage of work

    Value of

    work

    done in

    % of

    work

    done for

    the work

    224.00

    Page 35 of 182

    e Milestone/ Financial Targets Total

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    37/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Length

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory

    Agreement

    Amount

    (Lakhs)/Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the Work

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons for

    non-started

    works

    TPQA observationStage of work

    Value of

    work

    done in

    % of

    work

    done for

    the work

    4

    NCRMP/B-W/

    AP/MPCS/

    PRED/01/

    Ranastalam

    /008

    MPCS 88.75

    15.03.1314.03.14

    14.09.13

    Ground

    Floor

    Plinth

    Level of

    all works

    (21%)

    14.2.14

    Casting of

    all slabs

    of all

    works

    (67%

    Value)

    14.06.14

    Completet

    ion of all

    works

    (100%

    Value)

    12

    Y2-018 Construction of MPCS

    in Kommaravanipeta

    (Type A)

    88.75 15.03.13

    Earth work

    excavation, PCC,

    footings completed.

    13 15% 13 15%

    Site is handed

    over to the

    contractor. But

    the contractor

    started the earth

    work excavation

    in the month of

    August.

    Progress of work is

    behind the mile

    stones. Contractor

    has to speed up the

    work to achive the

    progress.

    13

    Y2-010 Construction of MPCS

    in CH.Kovvada

    (Type C)

    Not started 0 0%

    14

    Y2-011 Construction of MPCS

    in Donipeta

    (Type A)

    Earth work

    excavation

    completed, PCC for

    footings is in

    progress.

    1.85 2%

    15

    Y2-012 Construction of MPCS

    in Pothayyapeta

    (Type B)

    Earth work

    excavation is in

    progress.

    0.6 1%

    6

    NCRMP/B-W/

    AP/MPCS/PRED/01/

    Kavati/011MPC

    S

    80.8320.03.13 19.03.14

    19.08.13

    Ground

    FloorPlinth

    Level

    (28.51%)

    19.12.13

    Casting of

    all slabs.(60.23%

    Value)

    19.03.14

    Completet

    ion of allworks

    (100%

    Value)

    16Y2-0

    23 Construction of MPCS

    in Ch.Karrivanipalem(Type B)

    80.83 15.08.13 Earth work is inprogress 1 1% 1 1%

    Site is handed

    over to the

    contractor. But

    the contractorstarted the earth

    work excavation

    in the month of

    August.

    Progress of work is

    behind the mile

    stones. Contractorhas to speed up the

    work to achive the

    progress.

    7

    NCRMP/B-W/

    AP/MPCS/

    PRED/01/

    Sompeta/012MPCS 88.78

    15.03.1314.03.14

    19.08.13

    Ground

    Floor

    Plinth

    Level

    (33%)

    19.12.13

    Casting of

    all slabs.

    (67%

    Value)

    19.03.14

    Completet

    ion of all

    works

    (100%

    Value)

    17

    Y2-024 Construction of MPCS

    in Ramayyapatnam

    (Type B)

    88.78 15.03.13

    PCC completed,

    Reinforcement for

    footings is in

    progress.

    5.5 6% 5.5 6%

    Progress of work is

    behind the mile

    stones. Contractor

    has to speed up the

    work to achive the

    progress.

    18

    Y2

    -025

    Construction of MPCS

    in Metturur (Type D)

    119.775 15.03.13

    PCC for Footings,

    footings, pedestals

    and columns up to

    bottom of plinth

    beam arecompleted, Back

    filling in foundation

    is in progress.

    23 19%

    19

    Y2-026 Construction of MPCS

    in Nuvvalarevu (Type

    D)

    119.775 Not started 0 0%

    Site is handed

    over to the

    contractor. The

    contractor has to

    start the work.

    8

    NCRMP/B-W/

    AP/MPCS/

    PRED/01/

    V.Kotturu / 013MPCS 239.55

    15.03.1314.06.14

    14.09.13

    GroundFloor

    Plinth

    Level of

    all works

    (22.97%)

    14.02.14

    Casting ofall slabs

    of all

    works

    (52.58%

    Value)

    14.06.14

    Completet

    ion of all

    works

    (100%

    Value)

    23 10%

    Progress of behind

    themile stones.

    Contractor has to

    speed up the work

    to achive the

    progress.

    2.45 1%5

    NCRMP/B-W/

    AP/MPCS/

    PRED/01/

    Ranasthalam/0

    09

    MPCS 300.24

    26.10.1325.01.15

    25.04.14

    Ground

    Floor

    Plinth

    Level of

    all works

    25.09.13

    Casting of

    all slabs

    of all

    works

    (% Value)

    25.01.15

    Completet

    ion of all

    works

    (% Value)

    Page 36 of 182

    e Milestone/ Financial Targets Total

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    38/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Length

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory

    Agreement

    Amount

    (Lakhs)/Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the Work

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons for

    non-started

    works

    TPQA observationStage of work

    Value of

    work

    done in

    % of

    work

    done for

    the work

    9

    NCRMP/B-W/

    AP/MPCS/

    PRED/01/

    Santhabommall

    i /014

    MPCS 116.89

    20.03.1319.03.14

    19.08.13

    Ground

    Floor

    Plinth

    Level

    (21%)

    19.12.13

    Casting of

    all slabs.

    (% Value)

    19.03.14

    Completet

    ion of all

    works

    (100%

    Value)

    20

    Y2-027 Construction of MPCS

    in R.Sunnapally

    (Type C)

    116.89 20.03.13Earth work is in

    progress2 2% 2 2%

    The contractor

    started the earth

    work excavation in

    the month of July.

    Awaiting for SBC

    result.

    21

    Y2-028 Construction of MPCS

    in Calingapatnam

    (Type D)

    125.78 15.03.13

    Stilt floor slab and

    Columns below 1st

    floor slab are

    completed,

    shuttering for ramp

    & stair case is in

    progress.

    52 41%

    22

    Y2-029 Construction of MPCS

    in Bandaruvanipeta

    (Type D)

    125.78 15.03.13

    plinth beam and

    columns up to

    bottom of stilt floor

    slab are completed.

    Stilt floor slab

    centering work is in

    progress

    40.5 32%

    11

    NCRMP/B-W/

    AP/MPCS/

    PRED/01/

    Polaki/018MPCS 92.48

    15.03.1314.03.14

    14.08.13

    Ground

    Floor

    Plinth

    Level

    (15%)

    14.12.13

    Casting of

    all slabs

    of all

    works

    (68%

    Value)

    14.03.14

    Completet

    ion of all

    works

    (100%

    Value)

    23

    Y2-030 Construction of MPCS

    in Akkuvaram (Type

    C)

    92.48 15.03.13

    PCC completed,

    Reinforcement for

    footings is

    completed and

    footing concrete is

    in progress.

    11 12% 11 12%

    Progress of work is

    behind the mile

    stones. Contractor

    has to speed up the

    work to achive the

    progress.

    24

    Y2-031 Construction of MPCS

    in Jaganadhapuram

    (Type B)

    89.43 15.03.13

    PCC, Footings &

    columns below

    plinth beam

    completed and back

    filling is in progress.

    17 19%

    25

    Y2-032 Construction of MPCS

    in Kottamukkam (Type

    A)

    88.72 15.03.13

    PCC, Reinforcement,

    footings, columnsupto stilt floor

    completed, RR

    Masonary work is in

    progress

    16 18%

    37%

    Progress of work

    behind the mile

    stones. Contractor

    has to speed up the

    work to achive the

    progress.

    12

    NCRMP/B-W/

    AP/MPCS/

    PRED/01/

    Ranastalam

    /016

    MPCS 178.26

    15.03.1314.06.14

    Progress of work is

    behind the mile

    stones. Contractor

    has to speed up the

    work to achive theprogress.

    14.09.13

    Ground

    Floor

    Plinth

    Level of

    all works

    (26.01%)

    14.2.14

    Casting of

    all slabs

    of all

    works

    (58.56%

    Value)

    14.06.14

    Completet

    ion of all

    works

    (100%Value)

    33.00 19%

    Site is handed

    over to the

    contractor. But

    the contractor

    started the earth

    work excavationin the month of

    June

    10

    NCRMP/B-W/

    AP/MPCS/

    PRED/01/

    Gara/015MPCS 251.57

    15.03.1314.06.14

    14.09.13

    Ground

    Floor

    Plinth

    Level of

    all works

    (28.43%)

    14.2.14

    Casting of

    all slabs

    of all

    works

    (59.88%

    Value)

    14.06.14

    Completet

    ion of all

    works

    (100%

    Value)

    92.5

    Page 37 of 182

    e Milestone/ Financial Targets e Total

  • 7/22/2019 National Cyclone Risk Mitigation Project Third Party quality Audit Monthly Progress Report November 2013

    39/183

    First Second Third

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

    Length

    (Mts)

    AGG

    Value

    of work

    (Lakhs)

    Date of

    commen

    cement

    of work

    Sl.

    No.

    of

    Pkg

    Package Nos.

    catagory

    Agreement

    Amount

    (Lakhs)/Date

    DFC

    Milestone/ Financial Targets

    (%)Sl.No

    of

    work

    Projectcode

    Name of the Work

    Total

    Value of

    Work

    done for

    package

    (Lakhs)

    % of

    work

    done for

    the

    Package

    Reasons for

    non-started

    works

    TPQA observationStage of work

    Value of

    work

    done in

    % of

    work

    done for

    the work

    26

    Y2-036 Construction of MPCS

    in Patadibbalapalem

    (Type A)

    89.91

    Footings, columns

    below plinth beam

    completed. Filling in

    foundation has to

    be taken up

    19 21%

    27Y2-

    037 Construction of MPCS

    in Bontalakoduru(Type B) 86.87

    Earth