ational Aeronautics and Space Administration www.nasa.gov Installation Details Minimize/eliminate field welds (and grinding and cutting) All pipe work to be done to ASME B31.3, all documentation shall be supplied (including but not limited to material certs, welding qualification, hydro test?, and NDE) Piping ASTM A-285 Sch. 40 (.375” wall) ¼” NPT couplings (10 per elbow) Insulation: Armacell AP Armaflex Insulation paint: Devflex HP Semi-gloss color NASA blue Using demoed bypass pipe fabricate bypass per drawing (preferably at shop mimimize/eliminate field welds) All piping , ID shall be painted with: Devoe 235 Epoxy per manufacturers instructions All piping , OD shall be painted with: Rustoleum damp proof primer color red per manufacturers instructions Facilities Division performing support analysis and design (including basement column) 1

Upload: rafe-smith

Post on 03-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: National Aeronautics and Space Administration  Installation Details Minimize/eliminate field welds (and grinding and cutting) All pipe work

National Aeronautics and Space Administration

www.nasa.gov

Installation Details

• Minimize/eliminate field welds (and grinding and cutting)

• All pipe work to be done to ASME B31.3, all documentation shall be supplied (including but not limited to material certs, welding qualification, hydro test?, and NDE)

• Piping ASTM A-285 Sch. 40 (.375” wall)

• ¼” NPT couplings (10 per elbow)

• Insulation: Armacell AP Armaflex

• Insulation paint: Devflex HP Semi-gloss color NASA blue

• Using demoed bypass pipe fabricate bypass per drawing (preferably at shop mimimize/eliminate field welds)

• All piping, ID shall be painted with: Devoe 235 Epoxy per manufacturers instructions

• All piping, OD shall be painted with: Rustoleum damp proof primer color red per manufacturers instructions

• Facilities Division performing support analysis and design (including basement column)

1

Page 2: National Aeronautics and Space Administration  Installation Details Minimize/eliminate field welds (and grinding and cutting) All pipe work

National Aeronautics and Space Administration

www.nasa.gov

Relocate Pipe Support

2

relocate pipe support to original location

Page 3: National Aeronautics and Space Administration  Installation Details Minimize/eliminate field welds (and grinding and cutting) All pipe work

National Aeronautics and Space Administration

www.nasa.gov

Demolition

3

Page 4: National Aeronautics and Space Administration  Installation Details Minimize/eliminate field welds (and grinding and cutting) All pipe work

National Aeronautics and Space Administration

www.nasa.gov

Installation

4

install long radius elbows, bypass, and turn valve

Page 5: National Aeronautics and Space Administration  Installation Details Minimize/eliminate field welds (and grinding and cutting) All pipe work

National Aeronautics and Space Administration

www.nasa.gov

Installation

5

V-Cone flow meter

relocated pipe support at long spool mid-point

long spool

CRV or short spool TBD

Page 6: National Aeronautics and Space Administration  Installation Details Minimize/eliminate field welds (and grinding and cutting) All pipe work

National Aeronautics and Space Administration

www.nasa.gov

Updated Facility

6

V-Cone

Cheng Rotational Vane

Plenum

Long Radius Elbows

Valve to be turned so that as leading edge closes it points towards extrados of elbow