nasim resume[1]

4
Mohammad Nasim Project Coordinator Phone: 9721199111, 9889988221 (5+ years exp.) E-Mail: [email protected] [email protected] Seeking challenging opportunities in Maintenance Operations, Project Execution; in the Telecom Sector. Professional Profile New site integration and commissioning of Nokia 2G Ultra site, metro site and Nokia 3G Supreme site and metro site. Quality Checking & Acceptance test for newly commissioned sites in co ordination with Vendor. Operation and maintenance of Nokia Ultra BTS and Nokia Flexi BTS (2G&3G). First level technical support for customer queries. Plan and run a subproject (like SW upgrade, SW change planning, Hardware Upgrade) Installation and Commissioning and Integration activities. Full Turn Key Installation of a BTS site including TI Works, Commissioning, Integration, Acceptance and Documentation. Organizational Experience Current Experience: NOV 2010 – Till Date Presently working as Project Coordinator (Idea3G UPEAST Project) with Nokia Siemens Networks Pvt. Ltd. Hand on experience of Configurational Changes on the following activities Installation and Commissioning of GSM 900/1800 MHz, WCDMA networks. Installation and Commissioning of NOKIA FLEXI BTS and NOKIA FLEXI WCDMA BTS and Nokia Flexi hopper (XC) Nokia Hybrid Flexi hopper. To maintain GSM 900/1800 MHz, WCDMA networks for minimizing the outage time. Configuration changes of existing sites for capacity enhancements, EDGE implementations and others. BTS installation and Expansions for various configurations, Cascade changes & migration of sites from collocated BSC to RBSC. To maintain PDH (7, 15, 23, 18,38GHz) and SDH (7, 15,23,8 GHz) network for minimizing the outage time. Implementation of SDH network in the existing PDH network & shifting of E1s from PDH to SDH hops. Coco in NSN RNC RNW object browser and manually in Flexi Rel-2 WBTS/Supreme Ultra WBTS. Second Carrier Addition in WBTS (F2 Upgrade). New Site Integration/Creation of Flexi WBTS of Rel-2/Supreme Ultra WBTS. Upgardation of Flexi WBTS of Rel-1 to Flexi WBTS of Rel-2. Rehoming of Sites from one RNC to Other. New Feature Activation. HSPA parameter changes. Commissioning and Integration of Nokia FLEXI BTS, Nokia FLEXI WCDMA BTS, Nokia Flexi hopper ( XC),Nokia Hybrid Flexi Hopper and SRA4 siemens HC. Operation and maintenance of Nokia Ultra BTS and Nokia Flexi BTS(2G&3G) Installation and integration of Nokia 2G flexi BTS and Nokia 3G Flexi BTS and Nokia Hybrid flexi Hopper. Troubleshooting of Nokia Flexi BTS. Fault rectification during Integration of Nokia Flexi BTS. TRANSMISSION and BTS Nokia Flexi Hopper, Nokia Metro Hopper, Nokia Hybrid Flexi Hopper, Nokia XC flexi Hopper and FXC RRI card. Nokia Ultra, Nokia Metro, Nokia Flexi BTS (2G), Nokia WCDMA Flexi (3G). Siemens SRAL and Siemens SRA4 HC.

Upload: piyush-srivastava

Post on 10-Mar-2015

149 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Nasim Resume[1]

Mohammad Nasim Project CoordinatorPhone: 9721199111, 9889988221 (5+ years exp.) E-Mail: [email protected] [email protected]

Seeking challenging opportunities in Maintenance Operations, Project Execution; in the Telecom Sector.

Professional Profile New site integration and commissioning of Nokia 2G Ultra site, metro site and Nokia 3G Supreme

site and metro site. Quality Checking & Acceptance test for newly commissioned sites in co ordination with Vendor. Operation and maintenance of Nokia Ultra BTS and Nokia Flexi BTS (2G&3G). First level technical support for customer queries. Plan and run a subproject (like SW upgrade, SW change planning, Hardware Upgrade) Installation

and Commissioning and Integration activities. Full Turn Key Installation of a BTS site including TI Works, Commissioning,

Integration, Acceptance and Documentation.Organizational Experience

Current Experience:NOV 2010 – Till Date Presently working as Project Coordinator (Idea3G UPEAST Project) with Nokia Siemens Networks Pvt. Ltd.Hand on experience of Configurational Changes on the following activities

Installation and Commissioning of GSM 900/1800 MHz, WCDMA networks. Installation and Commissioning of NOKIA FLEXI BTS and NOKIA FLEXI WCDMA BTS and Nokia Flexi

hopper (XC) Nokia Hybrid Flexi hopper. To maintain GSM 900/1800 MHz, WCDMA networks for minimizing the outage time. Configuration changes of existing sites for capacity enhancements, EDGE implementations and

others. BTS installation and Expansions for various configurations, Cascade changes & migration of sites

from collocated BSC to RBSC. To maintain PDH (7, 15, 23, 18,38GHz) and SDH (7, 15,23,8 GHz) network for minimizing the outage

time. Implementation of SDH network in the existing PDH network & shifting of E1s from PDH to SDH hops. Coco in NSN RNC RNW object browser and manually in Flexi Rel-2 WBTS/Supreme Ultra WBTS. Second Carrier Addition in WBTS (F2 Upgrade). New Site Integration/Creation of Flexi WBTS of Rel-2/Supreme Ultra WBTS. Upgardation of Flexi WBTS of Rel-1 to Flexi WBTS of Rel-2. Rehoming of Sites from one RNC to Other. New Feature Activation. HSPA parameter changes. Commissioning and Integration of Nokia FLEXI BTS, Nokia FLEXI WCDMA BTS, Nokia Flexi hopper

( XC),Nokia Hybrid Flexi Hopper and SRA4 siemens HC. Operation and maintenance of Nokia Ultra BTS and Nokia Flexi BTS(2G&3G) Installation and integration of Nokia 2G flexi BTS and Nokia 3G Flexi BTS and Nokia Hybrid flexi

Hopper. Troubleshooting of Nokia Flexi BTS. Fault rectification during Integration of Nokia Flexi BTS.

TRANSMISSION and BTS Nokia Flexi Hopper, Nokia Metro Hopper, Nokia Hybrid Flexi Hopper, Nokia XC flexi Hopper and FXC

RRI card. Nokia Ultra, Nokia Metro, Nokia Flexi BTS (2G), Nokia WCDMA Flexi (3G). Siemens SRAL and Siemens SRA4 HC.

1. Previous Experience:

MAY 2009 – NOV 2010 Nokia Siemens Networks Pvt.Ltd. Project Engineer (TI)

Nokia Siemens Networks Pvt.Ltd. is a telecom based company engaged in installation Commissioning, Maintenance and supervision of various type of telecom switches with major players like NOKIA for Tata GSM Project (UPEAST).

TRANSMISSION Installation & commissioning of NOKIA transmission equipment FIPA/FIFA. Installation & commissioning of ALCATEL MUX.

Page 2: Nasim Resume[1]

Troubleshooting & Cross connection at ALCATEL 1642EMC, 1642EM, 1660 & 1662 MUX. Worked on transmission equipment at CERAGON R1/R2 PDH(1+0) & PDH(1+1), SDH. Software upgradation and NMS activity of CERAGON R1 PDH/R2 SDH. Channel routing and E1 routing at CERAGON R1PDH/R2 SDH. Installation & commissioning of NEC PDH/SDH (1+0, 1+1). Worked on CERAGON R2 SDH (1+0) ring activity with Protection. Worked on BSC software REFLECTION for monitoring of Base stations.

NOKIA BTS Installation, Testing, Commissioning & Integration of NOKIA FLEXI SITE EDGE BTS. Installation, Testing, Commissioning & Integration of NOKIA IBS and RRH SITE BTS. Software upgradation and call testing at BTS End.

2. Previous Experience:

OCT 2007 – MAY 2009 Ericssson India Pvt.Ltd. BSS Engineer

Ericsson India Pvt.Ltd. is telecom-based company engaged in installation, maintenance and supervision with ERICSSON for various types of BTS and BSC SITES for project AIRTEL (UPEAST).

Significant Achievements: Instrumental in managing and testing of cell site of AIRTEL in UP (EAST) for Ericsson. Major involvement in maintenance of transmission equipment of Ericsson system in Azamgarh zone. Actively involved in

ERICSSON RBS/TRANSMISSION Worked on all types of indoor ERICSSON RBS 2206,2204,2204v2, 2964 etc. Worked on also outdoor ERICSSON RBS 2202,2204,2111,2954 etc. Worked on transmission equipment at Minilink-E and Traffice node. Installation, Testing & Configuration of HI-Cap, Traffic-Node, Axx-Craft (9100/9200). Traboubelshooting & Cross-connection at Traffic node and Axx-Craft. Worked on SDH ring of Traffic-Node and Hi-Cap with Protection. Worked on Winfiol software for BSC to monitor RBS. Assisted in installation, commissioning & Integration of MOBILE BTS. Termination of alarms at Distribution Frame. Quality inspection of cell site & performing AT of site. Major involvement in cabinet expansion, TRX and sector addition.

3. Previous Experience:

MAY 2006- OCT 2007 Nokia Siemens Networks Pvt.Ltd. Project Engineer

Significant Achievements Major involvement in swap of Siemens BTS with Nokia BTS in cluster Allahabad zone. Instrumental in managing and testing of cell site of VODAFONE in U.P. for NOKIA.

NOKIA BTS/TRANSMISSION Installation, Testing, Commissioning & Integration of NOKIA ULTRA SITE EDGE BTS. Installation, Testing, Commissioning & Integration of NOKIA METRO SITE BTS. Installation & commissioning of NOKIA transmission equipment RRI, E1&T1 card and FIU also. Cross-connection and E1 routing at FIU as well as other transmission equipment. Demonstrative excellence in converting two Metro site BTS in 3-sectored single site. Assisted in installation, commissioning & Integration of MOBILE BTS. Measurements check of VSWR and Earthing.

4. Previous Experience:

OCT 2005- MAY 2006 Relcom Engineering Pvt.Ltd. BTS Engineer (Project)

Page 3: Nasim Resume[1]

Relcom Engineering Pvt.Ltd. is a telecom based company engaged in installation Commissioning, Maintenance and supervision of various type of telecom switches with major players like NOKIA, SIEMENS, BSNL, ERICSSON, RELIANCE, MOTOROLA in over India.

Responsibilities: Understand the Tools, T&M, Resources, Documentation, billing etc and briefing to the

Project team members. Compiling works instructions and conveying to the team. Day-to-Day co-ordination with team members and the customer representative. Assisting for Resource indents and T&M indents depending upon the project Allocation. Provide status update, compile reports / documents as required by CM / PM. Sub cons’ Work verification in terms of Quality & tools.

Academics

Intermediate school examination from U.P. Board with 51% in 2000.High school examination from U.P.Board with 66% in1998.

Achievement

Attended training Ericsson (RBSC) Certification from Ericsson held at Lucknow.Attended training Nokia site EDGE Bts Certification from Nokia held online.

Technical Qualification

B.Tech. in Electronics and Communication Engineering from Aligarh College of Engineering &

Technology, Aligarh Affiliated to U.P.Technical University, Lucknow.

Industrial Training

Organization: I.T.I. Pvt. Ltd., RaeBareli.Project: Studied latest Technology employed in Exchange: -C-Dot,

Cordect, SMPS. Area of Interest

Communication Systems Switching System

Personal Details

Father’s Name : Habib AliDate of birth : 27th of Mar 1983Sex : MaleMarital Status: MarriedNationality : IndianPassport No. : G3403023

Date: Place: Mohammad Nasim

C T C – 3.6 Lacks per Ann.Expected – NegotiableCurrent Location – Varanasi Cluster