nasa earned value management (evm) update · nasa earned value management (evm) update • planning...
TRANSCRIPT
![Page 1: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/1.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
evm.nasa.govevm.nasa.gov
National Aeronautics and Space AdministrationNational Aeronautics and Space Administration
NASA Earned Value Management (EVM) UpdateNASA Earned Value Management (EVM) UpdateEVM World
Jerald KerbyMay 2013
EVM World
Jerald KerbyMay 2013
https://ntrs.nasa.gov/search.jsp?R=20130014262 2020-06-03T11:33:19+00:00Z
![Page 2: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/2.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
22
Outline
• NASA Centers• EVM Requirements• EVM Assessment/Maturity Model• EVM Goals/Partners• EVM Capability• Surveillance • Lessons Learned• Available EVM Resources• Organization Focal Points• GAO Audit• Summary• Questions
![Page 3: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/3.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
3
NASA Centers
10 Centers1 FFRC
![Page 4: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/4.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
4
• OMB Circular A-11 requires for total project EVM (in-house and contracted effort) to comply with the ANSI/EIA-748 guidelines– Details are in the Capital Planning Guide Supplement
• The OMB Circular A-11 requirement has been flowed down to the current version of NPR 7120.5
Overarching EVM Requirements
![Page 5: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/5.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
5
Authority / Requirements• GPRA of 1993
• PMA 2002• OMB Circular A-11
• NPDs• NPR 7120
• MPDs / MDs• MPRs / Programs• MWIs / Projects
NASA Document Hierarchy
Defines “What”
EVMS Defines “How”
Handbooks / References• ANSI/EIA 748• PMI PMBOK
• NDIA PMSC EVMS Intent Guide• EVM Capability Documentation
• NASA Schedule Management HB • IBR HB/Toolkit
• WBS Handbook • EVM Handbook
Forms the foundation for EVM and facilitates training, mentoring, tool development, assessment, and integration
![Page 6: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/6.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
• Planning begins during Formulation.• EVM is applied in phases C and D to projects with an
estimated life cycle cost >$20 million and to Phase Emodifications, enhancements, or upgrades with an estimated cost > $20 million.
• EVM system complies with the guidelines in ANSI/EIA-748 and is described in the Project Plan.
• EVM system requirements are flowed down to applicable suppliers. (NFS 1834 is applied to contractors.)
• The project’s Performance Measurement Baseline (PMB) is established in Phase B in preparation for KDP C approval and is assessed during a review of the integrated baseline for the project.
• Project EVM reporting begins no later than 60 days after the start of Phase C. Contract EVM reporting begins no later than 90 days after contract award.
NPR 7120 EVM Requirements
![Page 7: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/7.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
EVM Requirements - Excerpts of Interest• 7120.5D: (Past)
– (2) The Project's EVM approach is in-place by KDP C and implemented in Phase C through KDP E.– (4) As a minimum, EVM principles, as defined by ANSI/EIA-748, Earned Value Management
Systems, apply from KDP C through KDP E, if the project's life-cycle cost is at or greater than $20M.
• 7120.5E (Present)– 2.2.7 Programs, at the discretion of the MDAA, projects in phases C and D with a life cycle cost
estimated to be greater than $20 million and Phase E project modifications, enhancements, or upgrades with an estimated development cost greater than $20 million shall perform earned value management (EVM) with an EVM system that complies with the guidelines in ANSI/EIA-748, Standard for Earned Value Management Systems. Use of the NASA’s EVM capability and processes, will ensure compliance with the ANSI standard. This capability allows tailoring to match the individual needs of the program or project, while still meeting the ANSI-748 guidelines.
– 2.2.8 EVM system requirements shall be applied to applicable suppliers in accordance with the NASA Federal Acquisition Regulation (FAR) Supplement 1834.201 and to in-house elements.
– 2.2.9 In accordance with the NASA Federal Acquisition Regulation (FAR) Supplement 1834.201, EVM system requirements shall be applied to applicable suppliers and to in-house work elements. For contracts that require EVM, a Contract Performance Report (CPR), Integrated Master Schedule (IMS), and Work Breakdown Structure (WBS) are required deliverables and the appropriate data requirements descriptions (DRDs) included in the contract and/or agreement.
– 2.2.10 For projects requiring EVM, Mission Directorates shall conduct an pre-approval integrated baseline review as part of their preparations for KDP C to ensure that the project’s work is properly linked with its cost, schedule, and risk and that the systems are in place to conduct EVM.
![Page 8: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/8.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
Page 8
EVM Requirements
> $50M $20M to $50M $0 to $20M
NASA Projects
Flow‐Down to Contractors
32 GuidelinesNASA System
32 GuidelinesNASA System
Non‐EVMPerformance Mgmt
> $50M $20M or More Less than $20M
32 GuidelinesValidated
Full EVMTerms andConditions of DRDs
32 GuidelinesCompliance
Full EVMTerms andConditions of DRDs
Non‐EVMPerformance Mgmt
Performance MgmtTerms andConditions of DRD
All Supporting Contractors
![Page 9: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/9.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
EVM Assessment/Maturity Model
9
NPR 7120.5d
NPR 7120.5e
• Requirements and Process in place • Future Implementation will key
![Page 10: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/10.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
Consistency
Integrity
Repeatable/ Sustainable
Self-Reliant
Compliance
NASA EVM Goals/Partners
10
ProjectsEVM
Capability
Centers
EVM Implementation
![Page 11: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/11.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
What is the NASA EVM Capability?
11
• A common agency EVM capability/process that complies with the guidelines in ANSI/EIA-748 for in-house projects
• Documented with supporting handbooks, instructions, workarounds, etc.
• Tested through two pilot projects, Extra-vehicular Activities (EVA) and Ice, Clouds and Land Elevation Satellite (ICESat) II
• Approved by independent Peer Review Team with representation from each Mission Directorate and Center
• Reported to a senior level Agency Steering Committee represented by each Mission Directorate and Center
• Approved initial (phased) rollout by the Agency Project Management Council (APMC) – Space Launch System (SLS) - (MSFC)– ICESat II (GSFC)– Focus on EVM flow-down to contracts across the Agency
Overall Objective was to develop an Agency EVM capability that complies with the guidelines in ANSI/EIA-748 and test through two pilots, refine and finalize EVM process and documentation based on test results.
![Page 12: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/12.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
Products Developed by EVM Capability
EVM process flow diagrams (Storyboard) System Description (Detailed Process) Narratives (Summary Process) Project-Control Account Manager’s (P-CAM) Reference Guide
– Provides a quick reference for Technical Managers EVM Handbook
– Overall Agency and general EVM guidance Pilots results
– Lessons Learned/Issues/Workarounds/Recommendations EVM Acceptance/Surveillance Strategy
– Acceptance Strategy– Surveillance Overview
Software Acquisition Strategy– Hardware/Software access/acquisition
Training Modules by Process Area– Modularized training for each process area
12
Latest documents are on the www.nen.nasa.gov website under the EVM sub community folder
![Page 13: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/13.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
EVM Capability Toolbox
Process Flow(Storyboard)
Documented Procedures\Instructions
Training Materials
(Classroom)
Pilots Lessons Learned
Center EVM Focal Points
Surveillance Tools
EVM Capability
Components
Storyboard System Description APPEL (JIT) EVA Implementation Institutional wInsightNarratives Handbooks ICESat II Support Projects Cobra
Guides MPM
![Page 14: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/14.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
Maintaining Integrity through Surveillance
• Surveillance is a key function to ensure usefulness as a management tool and compliance with external mandates.
• Surveillance Frequency (programmatic/institutional)– Recurring assessment as part of the lifecycle
reviews and– NPR 7120.5 Center Surveys
• Mature EVM Capability for improved support of multi-center programs and projects
14
![Page 15: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/15.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
Top 5 Lessons Learned (linked to remaining risks)
15
1. Projects have to consider EVM Implementation from Day 1 of project1. Each time a charge code is created it effectively changes the
technical WBS for the life of the project2. Where will the work be controlled and performance taken?
EVM construct must be considered for control accounts and work packages.
2. Support Contractor costs will continue to be a constraint unless proper cost reporting requirements are flowed down to contracts• Support Contracts are often owned by other organizations
outside of the projects with no EVM requirements.3. Work Authorization agreements that document an agreement of
scope, schedule and budget by both sponsor and performing orgs. are fundamental to the implementation of EVM
4. PP&C skills must be strengthened to support EVM and project management
5. Senior Level Management support is needed across the agency with the change management process
![Page 16: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/16.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
Mission Directorate& Center
EVM Focal Point
POLICY , HANDBOOKS, GUIDANCE• NPR 7120.5• EVM Handbook • Scheduling Handbook • IBR Toolkit • WBS Handbook• Project Control Account Manager (CAM) Guide (draft)• Standardized WBS (7120.5)• EVM Capability Products
• Process/Storyboard• System Description• DRDs
MISSION
PROGRAM / PROJECT
REQUEST
PRODUCTS & SERVICES
• Center EVM Implementation Plans and Support
• Support for Agency and Centers EVM Policy & Procedures• Training• RFP Development• SEB EVM Evaluation• IBR Support• Data Analysis/Tools• Surveillance• In-house EVM SupportRESOURCES, SYSTEMS, TOOLS
• Automated Tools• wInsight/Cobra
• Access to Training Materials and • online EVM/Scheduling/CAM/IBR training available through SATERN
• Websites • evm.nasa.gov• Internal material/Knowledge Now• nen.nasa.gov
• EVM Working Group Meetings and Peer Support
NASA EVM Resources
![Page 17: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/17.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
Organizational EVM Focal Points
ORGANIZATION NAME EMAIL ADDRESS TELHeadquarters - Focal PointsIPCE Charles Hunt [email protected] 202.358.0803Procurement Carl Weber [email protected] 202.358.1784OCIO John Bosco [email protected] 202.358.1352OCFO Louis Barbier [email protected] 202.358.1421Mission Directorates - Focal PointsSMD Voleak Roeum [email protected] 202.358.0941HEOMD Cris Guidi [email protected] 202.358.1777Centers - Focal PointsAmes Alan Wong [email protected] 650.604.4952Dryden Patty Daws [email protected] 661.276.2964Glenn Bob Sefcik [email protected] 216.433.8445
GoddardStephen Shinn [email protected] 301.286.5894Julie Baker [email protected] 301.286.8096
Jet Propulsion Lab Cal Chambers [email protected] 818.354.0092Johnson Glenn Lutz [email protected] 281.483.9257Kennedy - Deputy Chair Kristen Kehrer [email protected] 321.867.3691Langley Dr. Barry Lazos [email protected] 757.864.5731Marshall - Chair Jerald Kerby [email protected] 256.544.3243
StennisDeborah Norton [email protected] 228.688.1168Robert Ross [email protected] 228.688.2320
![Page 18: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/18.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
NASA EVM Website (Homepage)evm.nasa.gov
![Page 19: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/19.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
NASA Engineering Network https://nen.nasa.gov
![Page 20: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/20.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
NEN - NASA Community of Practice
![Page 21: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/21.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
NEN - NASA EVM Community of Practice
![Page 22: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/22.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
Focus Areas in response to GAO EVM Recommendations
• Corrective action plans to focus on the following areas
• Rollout of EVM Capability (NASA EVM Process)
• Conduct Skills Assessment• Develop Change Management Plan• Strengthen EVM Surveillance
• NASA will periodically report to GAO on the progress that the Agency has made to the recommendations corrective action plan
22
![Page 23: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/23.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
Key Components of EVM Process
Requirement (7120)Roll Out SupportSurveillance
Program
ProcessesDocumentation
ToolsCustomerSupport
Curriculum Training Materials
TargetAudiences
23Everything is in place for implementation
![Page 24: NASA Earned Value Management (EVM) Update · NASA Earned Value Management (EVM) Update • Planning begins during Formulation. • EVM is applied in phases C and D to projects with](https://reader033.vdocuments.site/reader033/viewer/2022042310/5ed78aa6ec73a923ab52d984/html5/thumbnails/24.jpg)
NA
SA E
arne
d Va
lue
Man
agem
ent (
EVM
) Upd
ate
Questions?
24