narval ingeniería.dossier . summary. desalination plant for drinking water . el atabal (málaga)...

25
www.narvalingenieria.es

Upload: others

Post on 15-Aug-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

www.narvalingenieria.es

Page 2: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

Narv

al In

geni

ería

.Dos

sier

. Su

mm

ary

Desalination plant for drinking water El Atabal (Málaga)

Pipeline Negratín – Almanzora Pipeline Negratín – Almanzora

Sewage system and wastewater treatment plant of Vélez-Málaga, eastern costa del sol

Page 3: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

SUMM

ARY

Narval Ingeniería

Professionalism, independence, honesty, transparency.Our values have allowed us to remain in the sector for more than 28 years, increasing day by day our prestige and our client´s fidelity

Work on what we love: The creation of beautiful, socially useful works, with quality, and to the complete satisfaction of our customers.

About Us ............................................................................ 0405

Narval history ............................................................... 0607

Main lines of action .................................................. 0809

Work force & equipment ......................................... 1011

List of our clients .......................................................... 1213

Quality Control and Environmental

Management & R& D +i ............................................ 1415

Most important recent projects ........................ 1617

Roadway and railway Infrastructure ........... 1819

Hydraulic infrastructure ............................................ 20

Sanitary Engineering .................................................... 21

Territorial Organisation and town planning .................................................... 2223

Geotechnical stabilization ....................................... 24

Page 4: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

About us

Narv

al In

geni

ería

.Dos

sier

. Ab

out u

s

New bridge over the river Guadalquivir in Palma Del Rio (Córdoba)

Page 5: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

4.5

Narval Ingeniería was founded in 1983 by initiative of a small group of professionals who, before the foundation of the company, already had extensive experience in the field of civil engineering, hydraulic works, and urban planning.

We understand our business as a freely chosen vocation. For members of our company NARVAL means having an organization that allows us to work on what we love: the creation of beautiful works, socially useful, with quality, and to the complete satisfaction of our customers.

We are fully aware that the meeting of the virtues mentioned, is the guarantee of our future and the roots of our professional reputation. However, our company motto is the consideration that prestige, which means many years of work and dedication, can be squandered within a very short period of time. To avoid this is essential to maintain the highest levels of professionalism and efficiency in dealing with our customers.

We are fully aware that the combination of the virtues mentioned is the guarantee of our future and the foundation of our professional reputation. Maintaining the highest levels of professionalism and effectiveness in the relationships with our clients is the basic principle behind all our actions

We have created over the years an independent, strong company, with financial muscle and all our credit capacity intact. On the other hand, successive promotions of professionals have been incorporated into the social capital of the company, ensuring the continuity and a future based on professionalism and the expertise of our teams.

NARVAL is member of different professional associations, both national (TECNIBERIA) and autonomic (ASICA, of which NARVAL was a founding member) and maintains frequent collaborations with the University and various research centers.

In recent years, with the general economic crisis on the rise, we have diversified and increased our lines of work, undertaking various measures. On one hand, we have adapted our human capital to the market demand, without reducing one iota the quality of our services. We also highlight those initiatives that favor in the short-term the diversification and internationalization of our project. This is why we opted for our policy of R & D, already initiated during the years 2009 and 2010.

NARVAL means to carry out these objectives, based on the austerity that for many years (including those of better economic activity) has been part of the company philosophy, and the spirit of strenght, optimism and confidence in the future that we share with the entire team of NARVAL INGENIERIA.

Since its founding, the company implemented a set of values that shape our philosophical basis: professionalism, independence, honesty, transparency.

Our values have allowed us to remain in the sector for more than 28 years, increasing day by day our prestige and our client´s fidelity

NARVAL INGENIERÍA

BASIS FOR OUR IMMEDIATE FUTURE

Page 6: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

our history

Narv

al In

geni

ería

.Dos

sier

. Ou

r his

tory

N-340 road stretch: Castell de Ferro-Castillo de Baños.

N-340 road stretch: Castell de Ferro-Castillo de Baños. Almeria limit N-340 road stretch: Castell de Ferro-Castillo de Baños. Almeria border

TIMELINE

THE BEGINNING 1.983

WE INCREASE OUR FIELD OF ACTION

DEVELOPMENT OF NUMEROUS ACTIONS FOR STATE-OWNED

COMPANIES AND GOVERNMENT INSTITUTIONS

ACTIVITIES RELATED TO TERRITORIAL ORGANIZATION

INCREASEMENT OF OUR CLIENTS IN THE PRIVATE

SECTOR

PRESENTWE FACE THE

GENERAL CRISIS WITH OPTIMISM AND FIABILITY

Page 7: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

6.7

The early years were really difficult because of the small consulting market in Andalusia and Spain. Most of orders received were the result of parallel activities of expertise that members of Narval carried out in several important cities of Malaga.

The scope of activities of the company begun to increase gradually, while its technical capacity and work grew. The number and importance of its customers also increased, starting with the general directions of the Andalusian-related sector (Roads, Environment, Transport, Urban, etc.), followed by the State Administration (DG highways, General Directorate of Water, Directorate General of Railways, Urban, etc.). Later came both state-owned enterprises (ACUSUR, ACUAMED, GIF, ADIF, etc.) and regional-owned ones (GIASA, EGMASA, RAILWAY BOARD OF ANDALUSIA, etc.).

Our performances were polarized on most high-ways in eastern Andalusia (A-7, A-4, A-92, A-357), the ringroads of cities (Malaga, Granada, Marbella, Antequera, Ronda, Archidona, Baeza, etc.) construc-tion and / or upgrading of hundreds of kilometers of roads both from the Spanish Public Administration and the regional Andalusian, high-speed railways (LAV Córdoba-Málaga, Transversal Axis Rail, LAV-Murcia Almería), works to improve the hydraulic supply and sanitation (Málaga drinking water supply, drought emergency works from the system Viñuela, transfer Negratín Almanzora, hydraulic cycle of the municipali-ties of the Costa Tropical de Granada, Subsystem of river Tinto, siphon under the river Darro in Granada, etc..); protection works against floods in rivers and streams (Guadalhorce, Campanillas, etc.). drinking water reservoirs (Sevilla, Marbella, Benalmadena, etc..) water treatment plants and environmental works (water treatment plant of El Trapiche, Wastewater Treatment Plants of Loja, Alcalá la Real and Velez Malaga, etc..) desalination (Málaga), etc.

In the time that the road network in Andalusia was strongly affected by storm damage, NARVAL designed projects and supervised the most important works to stabilize slopes affected by landslides (Venta del Molinillo, Otivar, Alfacar , Rías Diezma, all of them in the province of Granada).

NARVAL also extended its activities in the field of spatial planning and sectorial plans such as general Intermodal Transportation in the Metropolitan Areas of Malaga and Granada, Health Infrastructure Plans in the provinces of Granada, Malaga and Almeria, the Master Plan Sanitation and Treatment master plan of Castilla la Mancha, the general urban plans of different municipalities of Malaga.

At the same time, NARVAL extended the scope of its business to clients in the private sphere. The result of these collaborations were the urban planning and the construction projects of promotions such as Alcaidesa (San Roque-La Linea), Plaza Mayor (Malaga), Santa Maria (Cadiz), Cerrado del Aguila (Mijas) or Circo de Calaceite (Torrox ). In this area the works of the new marina in La Linea de la Concepcion should be singled out.

Today, we are immersed in a group of actions that within a short period will lead to the diversification and internationalization of the company, and we are strengthening our policies on R & D+i, while continu-ing to develop various projects in each of our areas.

Narval Ingeniería was founded in 1.983 by initiative of a small group of professionals who, before the foundation of the company, already had extensive experience in the field of civil engineering, hydraulic works, and urban planning.

Some of our employees are share-holders, ensuring the continuity of our consulting firm and a future based on the professionalism and experience of our human resources.

OUR HISTORY

Page 8: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

main lines of activity

Narv

al In

geni

ería

.Dos

sier

. M

ain

lines

of a

ctiv

ity

Highway works A-334 from Baza to Huercal - Overastretch: From by Pass Road of Albox to El Cucador

Page 9: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

8.9

LINES OF ACTIVITY

The diversification of our lines of activity allows us to cover almost all the projects we are asked to develop

ROADWAY AND RAILWAY INFRASTRUCTURE

Studies and planningProjectsWork management

› Highways and interurban roads › Railway, trams and subway › Streets, squares and gardens › Traffic › Signposting and traffic lights › Public and private car parks › Country roads

HYDRAULIC INFRASTRUCTURE

Studies and planningProjectsWork management

› Dams and reservoirs › Channels and impeller conduits › Automations › Drains and rainwater drainage › Treatment of overbanks in rivers and protection against flooding

SEWAGE ENGINEERING

PlanningPlanning and managementPrior studiesProjectsWork management

› Potable water treatment plants › Treatment of waste water and waste water treatment plants › Desalination and brackish water treatment › Water supplies, tanks and distribution networks

ENVIRONMENTAL ENGINEERING

PlanningStudiesProjectsWork management

› Actions related with the maintenance and recovery of the environment

› Environmental prevention › Impact assessment studies › Reports › Ratings › Audits › Management of Urban Solid Waste › Elimination centres › Transfer stations › Recycling › Selective collection › Closing and sealing of uncontrolled tips

TOWN AND COUNTRY PLANNING

General range planningPartial range planningSpecial plansDetailed studiesUrbanisation projectUrbanisation works management

ARCHITECTURE

ProjectsWorks management

INDUSTRIAL ENGINEERING

Studies and planningProjectsWorks management

› Power supplies › Industrial buildings › Streets, squares and gardens › Public lighting › Petrol stations

EXPROPRIATION MANAGEMENT

Technical, legal and economic assistance to the expropriating organismWorks management

Page 10: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

Service area corresponding to the port installations of La Linea de la Concepcion in the Bahia de Algeciras port, for nautical, commercial and recreational use

work force& equipment

Narv

al In

geni

ería

.Dos

sier

. W

ork

forc

e &

equi

pmen

t

TThe consultancy company Narval Ingeniería, S.A. has a techni-cal office with a surface area of more than 600 m2 in:

Pasaje Noblejas nº 2, 1º29002 Málaga (España)[email protected]

This office is property of the company and it is permanently open, being its corporate address.

OUR OFFICES

Page 11: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

10.11

The growth of our company is particularly evident in the increase and care of our staff, our most valuable asset

We take care of our workers and we make them part of our phi-losophy and our particular way of understanding and pampering our projects.

WORK FORCE & EQUIPM

ENT

MANAGEMENT

ENGINEERING SERVICES

RAILWAY INFRASTRUCTURE

ROADWAY INFRASTRUCTURE

SANITARY ENGINEERING

HYDRAULIC INFRASTRUCTURE

ENVIRONMENTAL STUDIES

HYDRAULIC INFRASTRUCTURE

SANITARY ENGINEERING

INDUSTRIAL ENGINEERING

EXPROPRIATION MANAGEMENT

INTERNATIONAL

TERRITORIAL ORGANISATION& TOWN PLANNING

HEAD OF ECONOMIC- FINANCIAL DEPARTMENT

FINNANCIAL SERVICES

ACCOUNTS

PERSONNEL

PURCHASING

TENDERS

MARKETING

TRAINING

QUALITY CONTROL & ENVIRONMENTAL MANAGEMENT

R&D+I

GENERAL SERVICES

In Narval, we are aware that today it is essential the continuous update of knowledge and techniques of our industry, as well as the improvement of the equipment and instruments that we use to develop our projects.

Therefore, the management of the company and the participation of the staff in courses, conferences and seminars related to their particular field of activity

For this purpose, we have developed an annual training plan to expand and upgrade the skills and technical capacity of or employees.

We also have among our equipment all the instru-ments that we use to develop our work, either in our facilities or directly on the ground.

It is for this reason that we have last generation com-puter equipments, various topographic measurement instruments, as well as a fleet of cars to facilitate our travel to projects locations and works managements in which we participate.

Mobility and availability are key to the sector and we want to be wherever we are needed.

Page 12: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

list ofour clients

Narv

al In

geni

ería

.Dos

sier

. Li

st o

f our

clie

nts

Reconditioning of road C-341 (from Campillos to Jimena de la frontera) Section: Cuevas de Becerro to Ronda (Malaga)

Page 13: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

12.13

Each client requires different services and has different specific needs. In Narval we are fully aware of this and we adapt our services and resources to their specific needs.

We have a strong commitment to act according to the quality requirements demanded by the companies that hire us. We know that the level of responsability required is very high and that of our response depends not only our reputation but also that of those who have placed their trust in us.

A list of satisfied customers to brag about is our best guarantee

PUBLIC ADMINISTRATION

Government of Spain › Ministerio de Fomento (Ministry for Development) › Ministerio de Medio Ambiente (Ministry of Environment)

Regional Government › Andalucia. Regional Ministry of Public Works and Transports

› Regional Ministry of Environment › Regional Ministry of Tourism, Commerce and Sports › Castilla la Mancha. Regional Ministry of Public Works

Town Halls and Province Governments › Excma. Diputación Provincial de Málaga › Excma. Diputación Provincial de Granada › Excmo. Ayuntamiento de Málaga › Excmo. Ayuntamiento de Antequera › Excmo. Ayuntamiento de Ronda › Excmo. Ayuntamiento de Vélez-Málaga › Excmo. Ayuntamiento de Benalmadena › Excmo. Ayuntamiento de Archidona › Excmo. Ayuntamiento de Pizarra › Excmo. Ayuntamiento de Alora › Excmo. Ayuntamiento de Motril

Statal Public-owned company › A.D.I.F. Railway Infrastructure Management Bureau › ACUAMED. Mediterranean water agency › Autoridad Portuaria de Málaga

Regional Public-owned company › G.I.A.S.A. Gestión de Infraestructuras de Andalucía › Ferrocarriles Andaluces.(Railways of the Government of Andalucía)

› E.P.S.A. - Empresa Pública de Suelo de Andalucía › E.P.P.A. Empresa Pública de Puertos de Andalucía

Local Public-owned companyw › E.M.T.S.A.M. Empresa Malagueña de Transportes › EMASA, Empresa Municipal de Aguas de Málaga › EMASAGRA. Empresa Municipal de Abastecimiento y Saneamiento de Granada

PRIVATE COMPANIES & CLIENTS

› Alcaidesa Inmobiliaria, S.A. › Armilar Procam, S.L. › Cerrado del Aguila, S.A. › Ejecución del Planeamiento, S.L. › Fadesa Inmobiliaria, S.A. › Grupo Civiero, S.A. › Taylor Woodrow España, S.A. › Winterthur Seguros G.S.A. › Construcciones Sando, S.A. › Contrat Ingeniería y Obras, S.A. › Corsam Corvian, S.A. › Degremont, S.A. › Elsan Pacsa, S.A. › Erosmer Ibérica, S.A. › Ferrovial Agroman, S.A. › Necso Entrecanales Cubiertas, S.A. › Martín Casillas, S.A. › O.H.L, S.A.

Our daily work and our ongoing effort would be meaningless without the full satisfaction of our customers, our priority

In Narval we are aware of the trust of our customers in our work

OUR CLIENTS

Page 14: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

quality & environmental & r+d+i

Narv

al In

geni

ería

.Dos

sier

. Qu

ality

& e

nviro

nmen

tal &

R &

D +

i

Narval Ingeniería has implemented a System of R & D +i (Re-search Development and Innovation) that is integrated with the quality system and the environmental management system the company has. This system has been developed in accordance with the requirements of the UNE 166002:2006.

Today NARVAL Ingenieria SA has integrated a Management Unit of R & D + I, composed of the heads of various departments of the company, which is essential for the proper development and maintenance of the system.

This system is already paying off, as to date and thanks to the technological monitoring and meetings held with the manage-ment, the unit has developed a research project under the In-novation and Development Agency of Andalusia (Agencia IDEA).

R & D +i

Page 15: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

14.15

In early 2001, in line with our corporate philosophy, we initiated a system of quality management based on ISO 9001, and an environmental manage-ment system based on ISO 14001, the latter operating from early 2004.

To provide our customers with the best guarantees, both systems are certified from its development by Bureau Veritas, a body accredited by ENAC (Spain) and UKAS (UK). We understand the responsibility that comes with our projects, and we believe in having ex-ternal accreditation bodies demonstrating the proper functioning of our workflow and our excellent results.

Moreover, both systems have their policies on quality and environmental management, according to the re-quirements of ISO 9.001/2008 and ISO 14.001/2004, which constitute the backbone of many of our actions.

Thanks to our quality control policy we have seen a continuous improvement in all activities undertaken by the company, something we feel very proud of, as it as a direct impact on customer satisfaction and results in the quality of our projects.

The backbone of our environmental policy is the envi-ronmental management system. Its base is the devel-opment of business activities in a sustainable way that respects the environment and society, through the use of recycled materials or low pollutants materials.

Narval Ingeniería has its own Department of Quality Control and Environmental Management, with its own staff, qualified as auditors of both quality control and environmental management with titles IRCA (International Register of Certified Auditors).

In Narval, we have the premise of making responsible constructions to preserve our future and that of those we love

QUALITY & ENVIRONMENTAL

We spend much of our resources to find ways to act with responsability to

our environment

QUALITY MANA-GEMENT

ENVIRON-MENTAL POLICY

OUR ENVIRONMENTAL POLICY AND OUR QUALITY CONTROL SYSTEM ARE THE PILLARS ON WHICH WE BASE THE REST OF OUR ACTIVITIES

Page 16: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

Sludge treatment system for the drinking water treatment plant of “El Atabal” (Málaga)

most importantrecentprojects

Narv

al In

geni

ería

.Dos

sier

. M

ost i

mpo

rtant

rece

nt p

roje

cts

Page 17: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

16.17

The premise, when undertaking any project will always be to apply our experience, enthusiasm and good work to the development of works, regardless

the particular area they belong to, provide welfare and easing lives of many people.

The magnitude and quality of the projects undertaken throughtout our history is our best bussiness card and reflects the confidence of our clients

The diversity of activities we undertake allows us to offer broad coverage

PROJECTS

NARVAL ACTIVITY IS STRUCTURED, BASICALLY, AROUND THE NEXT LINES OF BUSINESS: ROADWAY AND RAILWAY INFRAESTRUCTURE, HYDRAULIC INFRAESTRUCTURE, SANITARY ENGINEERING, TERRITORIAL ORGANISATION AND TOWN PLANNING.

WE SHOULD ALSO ADD SOME SPECIFIC ACTIONS OF VARIOUS KINDS, RESULT OF GRADUAL DIVERSIFICATION WE HAVE EXPERIENCED

Sewage works in Estepona Adaptation of cross-town link MA-401. stretch: roundabout of Maria Zambrano to Hitemasa

Page 18: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

Narv

al In

geni

ería

.Do

ssie

r . R

oadw

ay a

nd ra

ilway

Infra

stru

ctur

e

Our projects

Roadway and railway InfrastructureWe apply our knowledge and expertise to develop projects to build roads, railways, bridges, links. always with the purpose of improving the accessibility in road communications, overcoming natural barriers and always with the utmost respect for the environment in all our solutions

01 Reconditioning of the A-7. P.K. 169.260 to 175.160. Stretch: San Pedro de Alcantara cross-town link province of Malaga. Beneficiary Ministerio de Fomento. Investment 59,6 mill.€. Execution period 2006 - 201202 Highway A-7.052 from Cartama to Churriana. Beneficiary Giasa (Regional Public Agency of Junta de Andalucía). Investment 37,3 mill.€. Execution period 2007 - 200803 New west bypass of Malaga section: C-3310/A-7. Beneficiary Ministerio de Fomento. Investment 103 mill.€. Execution period 2005 - 2006

› Construction Project of the widening of the A-356 road. Stretch: Trapiche neighbourhood to Velez Malaga

› High-speed platform Mediterranean corridor-Section: barranco de Gafarillos - los Arejos

› Third lane in each direction on the highway of the fifth centenary A-49. Strech: Huevar to Chucena

› Sevilla -Alcala de Guadaira tram. Stretch: uni-versity of Pablo de Olavide - technological park, in Sevilla (Spain)

› Reconditioning of the A-7. P.K. 169.260 to 175.160. Stretch: San Pedro de Alcantara cross-town link.Province of Malaga

› Highway works A-333 from Baza to Huercal - Overa. Stretch: from by pass road of Albox to El Cucador

› Adaptation of cross-town link MA-401. Stretch: roundabout of Maria Zambrano to Hitemasa

› Remodeling the junction in Sanlucar de Bar-rameda (Cadiz)

› Major rail junction Andalusia setion: Club de Campo - Alcores tunnel link

› Improvement road project A-435.Strecth: Pozoblanco – Torrecampo

› Bridge on the river “IRO” in Chiclana de la Frontera (Cadiz)

› Highway A-7.052 from Cartama to Churriana. › New bridge over the river Guadalquivir on A-453 road (Palma del Rio)

› Northeast bypass of Palma del Rio › Extension to third lane in the east of Malaga ring P.K. 243+500 to 246+600

› High-speed railway connection of the major rail junction of Andalusia with Seville

› Modal transport exchanger (central station) in La Marina Square (Málaga)

› New west bypass of Malaga section: C-3310/A-7

› New road connection between Ronda and San Pedro de Alcantara, in Malaga

› Remodelling of the bridge over river Guadal-horce on the old road N-340, (Malaga)

01

02 03

Page 19: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

18.19

PROJECTS: ROADW

AY AND RAILWAY

INFRASTRUCTURE

04 Adaptation of cross-town link MA-401. Stretch: Roundabout of Maria Zambrano to Hitemasa. Beneficiary Malaga Town Hall. Investment 20,2 mill.€. Execution period 2006 - 201005 High-speed platform Mediterranean corridor section: Barranco de Gafarillos - Los Arejos. Beneficiary A.D.I.F. Investment 52,8 mill.€. Execution period 2009 - 201206 Adapting of drainage and treatment of the surface of the A-9. Section: P.K.229 to 242. Beneficiary Giasa. Investment 18,55 mill.€ Execution period 2001-200307 Remodeling the junction in Sanlucar de Barrameda (Cadiz). Beneficiary Giasa (Andalusia Public Administration) Investment 21,9 mill.€. Execution period 2008 - 20107

› Sierra Nevada motorway A-44 .Stretch: Armilla Ringroad (South)

› High speed railway between Cordoba and Malaga .Stretch 9: Antequera - Estacion de Bobadilla

› Sur de Ronda ringroad › Adapting of drainage and treatment of the surface of the A-92. Section: P.K.229 to 242

› Western access to Malaga port. Stretch: Princ-esa street – costa del sol motorway. 1st phase (Princesa street – Thermal plant point). Malaga province

› 2nd stage of access to Malaga port › Antequera norht ringroad › Reconditioning of road C-341 (from Campillos to Jimena de la Frontera) Section: Cuevas de Becerro to Ronda (Malaga)

› MA-201 road access to Cuevas Bajas › Costa del Sol motorway, Marbella, N-340 Cadiz to Barcelona Through Malaga, from KM 181.0 to KM 190.0

› Reconditioning of Huescar to Puebla Don Fafrique Stretch of A-330 road

› New road Malaga ringroad (west) Stretch: junction with C-3310 – Malaga motorway – Las Pedrizas

› N-340 road Stretch: Castell del Ferro – Castillo de Baños

› Elimination of level crossing and bridge over the river Guadalhorce on the MA 441 road. Section: Álora

› Costa del Sol motorway, Marbella, N-340 Cadiz to Barcelona through Malaga, from KM 189.95 to KM 202.00

› Rehabilitation and improvement of the MA-403 and MA-404 roads. Stretch: From Casarabonela to Zalea (A-357)

› Rehabilitation and improvement of the A-343 road. Stretch: Zalea to Alora and west access to Alora

06

04

05

07

Page 20: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

Narv

al In

geni

ería

.Do

ssie

r . P

roye

ctos

de

inge

nier

ía h

idrá

ulic

a //

Inge

nier

ía s

anita

ria

Our projects

Hydraulic infrastructureWe develop all types of projects related to the treatment and management of water, such as pipelines for drinking water, focusing on getting the best use and distribution of water resources, tanks, etc.. and contributing to social welfare

01 Drinking water tank in Antequera , ringroad water supply to Antequera,and new supply line from main Antequera water tank. Beneficiary Giasa (Regional Public Agency of Junta de Andalucía). Investment 10,7 mill.€. Execution period 2002 - 200602 Pipeline Negratin –Almanzora. Beneficiary Acusur (State- Company). Investment 60 mill.€. Execution period 2000 - 200503 Channeling works of the Prado Jurado, Carambuco and Merino rivers. Beneficiary EGMASA (Regional Public Agency of Juntade Andalucia). Investment 6,7 mill.€. Execution period 2009 - 201104 Supply to the Metropolitan area of Granada. Darro Siphon. Beneficiary Giasa (Regional Public Agency of Junta de Andalucía). Investment 2,1 mill.€ Execution period 2003 - 2004

› Supply pipes to Campo de Gibraltar › Actions for the prevention of floods in the rivers Fuengirola and Pajares (Malaga)

› Channeling works of the Prado Jurado, Caram-buco and Merino rivers

› Defensive wall against floods in the river Almachar passing throught the urban core (Malaga)

› Construction Project of the drinking water pipeline from Aljaima to Estación de Cártama (Málaga)

› Water pipe conexion from “Tranco de Beas” Reservoir lake to drinking water treatment plant of “Las Copas” to strenghten the drinking water supply to “La Loma de Ubeda.”

› Main supply conduits of the western Costa del Sol. east branch. Section: Verde river- Guadalpin stream potable water treatment plant

› Channeling of river Campanillas in Malaga › New reservoir tank in Chiclana de la Frontera, Cadiz

› Supply tubes from the Rules dam to Molvizar potable water treatment plant

› Channeling of the Romero stream in the munici-pality of Velez-Malaga

› Drinking water tank in Antequera , ringroad water supply to Antequera,and new supply line from main Antequera water tank

› Collector from the Cerro Blanco dam (Grande river) to the El Atabal drinking water treatment plant (Malaga)

› Supply to Antequera Golf › 12.000m³ tank of drinking water in Alcaidesa › Pipeline Negratin –Almanzora › Supply to the Metropolitan area of Granada. Darro Siphon

› Regulation tank in Benalmadena water supply to the western Costa de Sol

› Emergency works on supply line from water Viñuela – Malaga. Stretch: Jaboneros – Suarez

› Emergency works on supply line from water Viñuela – Malaga. Stretch: Viñuela – Malaga

01

02

03

04

Page 21: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

20.21

Our projects

Sanitary engineeringIn this line of activity we are dedicated to cleaning up the areas where human activity takes place. To do this we use the interaction of our experience and expertise in hydraulics, chemistry, physics, mechanics, etc.., and environmental engineering. We contribute to reduce water-borne diseases as many of our projects facilitate the treatment, filtering and disinfection of water for human consumption.

PROJECTS: ROADW

AY AND RAILWAY

INFRASTRUCTURE

01 Sludge treatment system for the drinking water treatment plant of “El Atabal” (Malaga). Beneficiary ACUAMED (Statal Public Agency Dependant on Ministry of Environment). Investment 6 mill.€. Execution period 2007-201002 Sewage works in Loja (Granada). Beneficiary Board of Hydraulic Works, Ministry of Transport and Public Works, Contracting body: Junta de Andalu-cía (Andalusian Regional Government. Investment 1,7 mill.€. Execution period 1994-199603 Expansion of the drinking water treatment plant of “Rio Verde” in Marbella. Beneficiary EGMASA (Regional Public Agency of Junta Andalucia) Investment 30,5 mill.€. Execution period 2010

› Desalination plant of the Costa del Sol › General Infraestructure for irrigation with regenerated waste water form the waste water treatment,plant of Arroyo de la Miel

› Expansion of the drinking water treatment plant of “Rio Verde” in Marbella

› Reuse of wastewater in the treatment plant of Pinedo (Valencia)

› Works for the sewage collection system and the waste water pumping station and the enlargement of the waste water treatment plant of Mengibar (Jaén)

› Sanitation and purification of waste water in Los Yesos and Melicena and ocean outfall for the pumping sta-tion of El Varadero

› -Sludge treatment system for the drinking water treat-ment plant of “El Atabal” (Malaga)

› Tertuary systems for the waste water treatment plants of Marbella, Manilva, Cala de Mijas and Estepona

› Desalination plant for drinking water El Atabal (Malaga) › Works dependent on supply, sewage and depurifica-tion management for the council of the Costa Tropical in Granada

› Alcaidesa waste water treatment plant

› Sewage management system for the western Costa del Sol. Reconditioning and improvements to pumping stations and collectors. Manilva sector

› Sanitation of the eastern Costa del Sol-Axarquia: › Suply and sewage general systems of the north sector of the city of Ronda

› Collectors, pumping stations, and ocean outfalls of Velez Malaga (Malaga)

› Sewage system, eastern Costa del Sol Wastewater treatment plant of Velez-Malaga

› Sewage works in Loja (Granada) › Construction Project of the sewage collection systems and the waste water treatment plants of Árchez and Salares (Málaga)

› Preliminary designs and specifications for the sewage collection systems and the wastewater treatment plants of Benamejí, Rute, Fernan Nuñez, Palenciana, Moriles and Las Navas del Selpillar

› Specifications and construction Projects of the sewage collection systems and the waste water treatment plants of Arjona and Porcuna

› Waste water treatment plant of Alcalá La Real (Jaén)

01

02 03

Page 22: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

Narv

al In

geni

ería

.Do

ssie

r . T

errit

oria

l org

anis

atio

n an

d to

wn

plan

ning

Our projects

Territorial organisation and town planningWe undertake this activity always taking into account the socioeconomic development of areas and priorizing above all a better quality of life, the responsible management of natural resources and the rational use of land

01 Urbanisation of the sector number 1 of the urban action programme SUNP-BM-3 of the P.G.O.U.of Malaga. Beneficiary Bahía de Málaga Desarrol-los Integrales S.A. Investment 5,35 mill.€. Execution period 2006-200802 Preliminary study of the road organisation of the west ring road of Malaga and the Guadalhorce higway. Beneficiary Malaga town hall. Investment 161 mill.€. Execution period 2004 - 200503 New Park Avenue, on the undeground railway corridor in Malaga. Beneficiary Malaga town hall. Investment 51,20 mill.€. Execution period 200904 Metropolitan transportation plan of the area of Granada: sustainable mobility plan. Beneficiary Junta de Andalucía (Andalusian Public Administration) Execution period 2005-2008

› General urban plan of the city of Yunquera › General urban plan of the city of Fuerte del Rey (Jaen)

› Special plan for infraestructures for general town plan of the city of Malaga

› New Park Avenue, on the undeground railway corridor in Malaga

› Service area corresponding to the port installa-tions of La Linea de la Concepcion in the Bahia de Algeciras port, for nautical, commercial and

recreational use (Alcaidesa Puerto Deportivo) › Urbanisation of PAU R-2. Cabra (Cordoba) › Urbanisation of the sector number 1 of the urban action programme SUNP-BM-3 of the P.G.O.U.of Malaga

› Urbanisation of sector nº3 in urban action programme SUNP-BM-3 of Malaga general urban plan

› Metropolitan transportation plan of the area of Granada: sustainable mobility plan

03 04

0201

Page 23: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

22.23

05

PROJECTS: ROADW

AY AND RAILWAY

INFRASTRUCTURE

05 Urbanisation of sector SUP.PT-2 El Cañaveral (Malaga). Beneficiary Compensation board of Sector SUP.PT-2 “El Cañaveral Investment 15,7 mill.€. Execution period 200706 Special plan for infraestuctures for general town plan of the city of Malaga. Beneficiary Malaga town hall . Execution period 2008 - 201107 Update of the intermodal transportation plan of the metropolitan area of Malaga. Beneficiary Transport Consortium Malaga. Execution period 200508 Modal transport interchanger (Central Station) in the plaza de la Marina (Malaga)

06 07 08

› Urbanisation of sector UE-5 in Santa Fe (Granada)

› Urbanisation of sector UA-1 “La Dehesa” in Ronda (Malaga)

› Urbanisation of sector “Miralrio” in Chiclana de la Frontera (Cadiz)

› Urbanisation of sector SUP.PT-2 El Cañaveral (Malaga)

› Interior Urbanisation and Technical Assistance to works management urbanisation in PLOT RI-2 “La Alcaidesa”. San Roque (Cadiz)

› Modal transport interchanger (Central Station) in the plaza de la Marina (Malaga)

› Outdoor commercial centre, Cantareros street (Antequera)

› Urbanisation of sector UNP-2 and sector UNP-3 PGOU Torrox (Malaga)

› Urbanisation sector 23 in Mijas, Cerrado del Aguila

› Study of alternatives of the road access to the seaport of Malaga

› Area 13-SR, “Diego Salinas Barracks” in San Roque (Cadiz)

› Urbanisation of the sector URP-VB.2, in Mar-bella. Stages 3 and 5

› Feasibility study of a network of private car parkings associated with the public transport network of the metropolitan area of Malaga

› Update of the intermodal transportation plan of the metropolitan area of Malaga

› Preliminary study of the road organisation of the west ring road of Malaga and the Guadalhorce higway

› Urbanisation of sector 14D.02.02 in La Linea de la Concepcion, (Cadiz)

› Organisation and town planning of industrial Estate in Buenavista area (Malaga)

Page 24: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

02

04 Antes de la reparación Después de la reparación

Our projects

Geotechnical stabilizationIn this branch of engineering we address the interaction between the different constructions and the ground. We investigate the characteristics of soils and rocks to determine their properties and to design solutions such as foundations, stabilization, screens, etc.

01 Emergency works on the A-92.Stabilization of the slope on the left cut in Diezm. Beneficiary Giasa (Public Agency of Junta de Andalucía). Investment 9,5 mill.€. Execution period 2001-200202 Works to stabilize the left bank of the reservoir lake of La Viñuela, in the municipality of La Viñuela (Malaga). Beneficiary Agencia Andaluza del Agua (Andalusian administration for environment). Investment 10,2 mill.€. Execution period 2009-201103 Restoration of the link in Alfacar. corection of the landslide of rias, PK 272+400 in the A-92 highway (Granada). Beneficiary Giasa (Public Agency of Junta de Andalucía). Investment 3,46 mill.€. Execution period 2001-200204 Emergency protection works of the slope on the A-387 road, P.K. 11+500 and correction of landslides in the A-366 P.K. 43+300 and P.K. 44+100. Beneficiary Agencia de Obra Pública de la Junta de Andalucia ( Andalusian Administration for development). Investment 0,98 mill.€. Execution period 2010

› Slope stabilization at parcel G-28 of urbanisa-tion “La Zagaleta” in Benahavis (Malaga)

› Slips corrections in the access road to Ardales › Works to stabilize the left bank of the reservoir lake of La Viñuela, in the municipality of La Viñuela (Malaga)

› Works to stabilize the slope in the PLOT C-25 of the urbanisation La Zagaleta in the municipality of Benahavis

› Wall to repair the slip at station 0+450 on the VI road of urbanisation Los Arqueros, in Benahavis (Malaga)

› Emergency protection works of the slope on the A-387 road, P.K. 11+500 and correction of landslides in the A-366 P.K. 43+300 and P.K. 44+100

› Emergency works on the A-92. stabilization of the slope on the left cut in Diezma

› Restoration of the link in Alfacar. corection of the landslide of rias, PK 272+400 in the A-92 highway (Granada)

› Works of consolidation and correction of land-slides in the highway A-92 (El Molinillo)

› Stabilization of the slope in the municipal soccer

01

03

Narv

al In

geni

ería

.Do

ssie

r . G

eote

cnic

al s

tabi

lizat

ion

Page 25: Narval Ingeniería.Dossier . Summary. Desalination plant for drinking water . El Atabal (Málaga) Pipeline Negratín – Almanzora. Pipeline Negratín – Almanzora Sewage system and

24.25

Pasaje Noblejas nº 2, 1º 29002 Málaga (España) t. (+34) 952 34 39 01 f. (+34) 952 35 08 16 [email protected] www.narvalingenieria.es

Narval Ingeniería

Professionalism, independence, honesty, transparency. Our values have allowed us to remain in the sector for more than 28 years, increasing day by day our prestige and our client´s fidelity.

We work on what we love: the creation of beautiful, socially useful works, with quality, and to the complete satisfaction of our customers.