PROJECT QUALITY MONITORIN
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
2/18
When construction starts, the contractor must perform the followingrequirements:
1. Set up a quality management system in which every individual, theconstruction department must follow
2. Perform materials testing, building components, constructionequipment, technological tools prior to construction and installation inaccordance with construction standards and design requirements3. Set up and test implementation of construction methods, constructionprogress
4. Create and keep updating a works diary
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
3/18
Works diary is the original document of construction works inorder to exchange information between
contractors clients, contractors and architects
Diary consists of two distinct parts:
the first part is recorded by contractors the rest is for clients and supervisors
What is works diary?
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
4/18
What is inside the diary?
Contents of works diary
list of technical staff of the contractors involved in constructionworks (the titles and duties of each person),
situation of the construction every day,
situation of the construction for each type of work,
details of the entire implementation process,
brief description of the construction methods,
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
5/18
(continued)
the actual situation of materials,
components used,
the deviation from the construction drawings, specifying thecauses and correction methods
review of the quality management department on site aboutconstruction quality
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
6/18
6. Before requesting client acceptance, the construction unitmust check the construction works, construction components,construction process, the construction items and work with theparticipants as follows:
Leader The person in charge of construction directly Head of construction workers Representatives of the contractors Representative of the quality management team tohelp supervisors Technical representative of the contractor
5. Inspection of health and safety issues, environmentalcondition inside and outside of construction site
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
7/18
7. Complete fixing drawings after examination of theconstruction site condition
8. Report on progress, quality, quantity, health andsafety issues and environmental condition for clients
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
8/18
ARCHITECT/ENGINEER
Input Process Output
Output Input Process Output
Input Process
OWNER
OWNER CONSTRUCTOR
Requirements
of owner
Design
Phase
Plans
andSpecifications ConstructionPhase ConstructedFacility
Operation
andMaintenancePhase
CONSTRUCTION PROCESSCONSTRUCTION PROCESS
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
9/18
OJECT QUALITY IMPROVING T
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
10/18
TOTAL QUALITY CONTROL FLOW CHART
QualityStandard
QualityManagement
Construction Management
Planning &Design
Construction
Operation & MaintenancePh
ases
Evaluation
Evaluation
Evaluation
Feedback
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
11/18
Who is customer?
What Level of Quality do they need?
Are they purchasing to Some QualitySpecification?
Any Safety Considerations?
Future Litigation?
Ethical Issues?
QUALITY PLANNING
Who is customerWhat do they need
QUALITY CONTROL
Evaluate, compare, actEstablish infrastructure
QUALITYIMPROVEMENT
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
12/18
QUALITY CONTROL
Inspection Destructive Non-destructive Sampling
Process Control
Monitoring Process (relates to inspection) Feedback Control Statistical Process Control (knowing when the process is out of control)
Correction
Knowing what to correct when process is out of control
QUALITY PLANNING
Who is customerWhat do they need
QUALITY CONTROL
Evaluate, compare, actEstablish infrastructure
QUALITYIMPROVEMENT
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
13/18
Problem
Solving
Steps
PlanDoStudy
Act
Link theseTwo in
Quality Circle
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
14/18
Tools for Quality Control
Check Sheets
Pareto Charts
Why-Why Diagrams
Cause & Effect Diagrams
Flowcharts
Histograms
Scatter Diagram
Control Charts
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
15/18
CAUSE AND EFFECT DIAGRAMS (Fishbone Diagram)Used in brainstorming session to help identify the causes of qualitylosses. This diagram is particularly useful after the flow chart and thePareto diagrams have been developed.
Step 1: Decide on the quality characteristic {e.g. Reduction of wobbleduring machine rotation}Step 2: Set up the fish bone backboneStep 3: Identify main factors causing effect {e.g. Workers, Materials,Inspection, Tools}Step 4: Add Cause to each branch
CAUSE QUALITYEffect
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
16/18
-
8/6/2019 Nang Cao Chat Luongxaydung_English6_dai2.
17/18
Benefits of Cause and Effect Diagram Making diagram is educational in itself Outline relationship Note what samples need to be taken
Guide for discussion Causes are actively sought and results written on diagram Appropriate data collected - no time wasted Shows level of technology
-