name event date name event date 1 cern f. zimmermann & w. scandale hhh, care meeting, paris,...
TRANSCRIPT
Name Event DateName Event Date11
HHH, CARE Meeting, Paris, April 17-18, 2007
CERNF. Zimmermann & W. Scandale
HHigh Energyigh EnergyHHigh Intensityigh IntensityHHadron Beamsadron Beams
http://care-hhh.web.cern.ch/care-hhh/
HHHHHHHHHHHH NetworkNetworkcoordinated by W. Scandale and F. Zimmermanncoordinated by W. Scandale and F. Zimmermann
Input from L. Bottura,
J.-P. Koutchouk, E. Laface,
L. Rossi, D. Tommasini,
K. Wittenburg,
Name Event DateName Event Date22
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHCARE-HHH networkCARE-HHH networkCoordinateCoordinate and and integrateintegrate the activities of the accelerator and particle the activities of the accelerator and particle
physics communities in a worldwide context, towards achieving superior physics communities in a worldwide context, towards achieving superior HHigh-Energy igh-Energy HHigh-Intensity igh-Intensity HHadron Beam facilities for Europeadron Beam facilities for Europe
road map for the upgrade of the European accelerator infrastructure (LHC and GSI accelerator complex)
coordinate activities and foster future collaborations dissemination and outreach
WP1: Advancements in WP1: Advancements in AAccelerator ccelerator MMagnet agnet TTechnologies echnologies (AMT)(AMT)
WP2: Novel Methods for WP2: Novel Methods for AAccelerator ccelerator BBeam eam IInstrumentation nstrumentation (ABI)(ABI)
WP3: WP3: AAccelerator ccelerator PPhysics and synchrotron hysics and synchrotron DDesign esign (APD)(APD)
Participating institutes: Participating institutes:
CEA, CERN, CSIC-CIEMAT, CCLRC, DESY, GSI, INFN, PSI, TEU, WUTCEA, CERN, CSIC-CIEMAT, CCLRC, DESY, GSI, INFN, PSI, TEU, WUT
Associated institutes: Associated institutes:
CRPP, ENEA, TUBE, ESRF, UPSA, FZK, TEMF, US-LARP (BNL,FNAL,LBNL,SLAC), CRPP, ENEA, TUBE, ESRF, UPSA, FZK, TEMF, US-LARP (BNL,FNAL,LBNL,SLAC), JINR, IHEP, KEKJINR, IHEP, KEK
Additional collaborations: Texas A&M U., U. Geneva, U. Bologna Additional collaborations: Texas A&M U., U. Geneva, U. Bologna
Name Event DateName Event Date33
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHactivities since CARE’06activities since CARE’06Events:• 3 HHH workshops held + HHH-US-LARP coordination meetings• 8 further workshops/symposia planned Dissemination and outreach: • presentations at 2 LHC-detector upgrade workshops, at 3 CERN &
INFN management meetings, 3 departmental/project seminars • 3 HHH workshop proceedings close to completion • 3 articles published in CERN Courier• HHH web sites maintained & developedExchanges and education: • several Russian, 2 US, and 1 EU accelerator physicist plus 3
representatives of European industry supported for HHH workshops• 1 EU scientist supported for 2-week visit to CERN • 5 doctoral students • recruited for summer 2007: 3 EU summer students
Name Event DateName Event Date44
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
workshops since CARE’06workshops since CARE’06
• 4th CARE-HHH-ABI4th CARE-HHH-ABI workshop on workshop on Simulation of BPM Simulation of BPM Front-End Electronics and Special Mechanical DesignsFront-End Electronics and Special Mechanical Designs , , Lüneburg, Germany, 30 November - 1 December 2006, Lüneburg, Germany, 30 November - 1 December 2006, Proceedings CARE-Conf-06-087-HHH Proceedings CARE-Conf-06-087-HHH
• Joint CARE-HHH-APDJoint CARE-HHH-APD, CARE-ELAN, and EUROTeV , CARE-ELAN, and EUROTeV mini-workshop on mini-workshop on E-Cloud Clearing (ECL2)E-Cloud Clearing (ECL2),, CERN, CERN, Geneva, 1-2 March 2007 Geneva, 1-2 March 2007
• CARE-HHH-APDCARE-HHH-APD mini-workshop on mini-workshop on Crystal Crystal Channeling for Large Colliders: Machine and Physics Channeling for Large Colliders: Machine and Physics Applications (CC-2007)Applications (CC-2007),, CERN, 22-23 March 2007 CERN, 22-23 March 2007
Name Event DateName Event Date55
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHmajor presentationsmajor presentationsINFN CSN1 Meeting, Frascati, 28 November 2006INFN CSN1 Meeting, Frascati, 28 November 2006- “H8-RD22 Experiment to test Crystal Collimation for the LHC” - “H8-RD22 Experiment to test Crystal Collimation for the LHC” W. ScandaleW. ScandaleLHCb Upgrade Workshop, Edinburgh, 11 January, 2007LHCb Upgrade Workshop, Edinburgh, 11 January, 2007- “LHC Upgrade Plan and Ideas - Scenarios and Constraints from the - “LHC Upgrade Plan and Ideas - Scenarios and Constraints from the Machine Side,” invited talk,Machine Side,” invited talk, F. Zimmermann F. ZimmermannJoint AB & LHC Project Seminar, CERN, 18 January 2007Joint AB & LHC Project Seminar, CERN, 18 January 2007– “– “Baseline Scenario for the LHC Luminosity Upgrade, summary of the Baseline Scenario for the LHC Luminosity Upgrade, summary of the CARE-HHH LHC-LUMI-06 workshop”CARE-HHH LHC-LUMI-06 workshop” W. Scandale, F. Zimmermann W. Scandale, F. Zimmermann ATLAS & CMS Detector Electronics Upgrade Workshop, CERN, ATLAS & CMS Detector Electronics Upgrade Workshop, CERN, March 2007March 2007-““Two Scenarios for the LHC Luminosity Upgrade” Two Scenarios for the LHC Luminosity Upgrade” W. Scandale W. ScandaleLHC Project Seminar, CERN, 15 March 2007LHC Project Seminar, CERN, 15 March 2007- “H8-RD22 Experiment to Test Crystal Collimation for the LHC” - “H8-RD22 Experiment to Test Crystal Collimation for the LHC” W. W. ScandaleScandale
Name Event DateName Event Date66
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHdeliverables & milestones compared deliverables & milestones compared with original plan (CARE’06)with original plan (CARE’06)
2004: HHH & HHH-APD web site => OK2004: HHH & HHH-APD web site => OK2005: creation of first web-based beam dynamics code2005: creation of first web-based beam dynamics code
repository => OK repository => OK http://oraweb.cern.ch:9000/pls/hhh/code_website.startuphttp://oraweb.cern.ch:9000/pls/hhh/code_website.startup
2006: web based database for s.c. cables and magnets2006: web based database for s.c. cables and magnets=> OK, 40% complete => OK, 40% complete http://http://sdb.web.cern.ch/sdbsdb.web.cern.ch/sdb
milestones:milestones:web reference for IR optics => OKweb reference for IR optics => OKhttp://care-hhh.web.cern.ch/care-hhh/SuperLHC_IRoptics/IRoptics.html
booster synchrotron optics => delayed to 2007booster synchrotron optics => delayed to 2007structured list of intensity limits => nearing completionstructured list of intensity limits => nearing completionscaling laws for magnet and cryogenic cost => 2007scaling laws for magnet and cryogenic cost => 2007
1 summer student
2 summer students+ 1 doctoral student
Name Event DateName Event Date77
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
WP1: WP1:
Advancements in Advancements in
AAccelerator ccelerator MMagnet agnet TTechnologies echnologies
(AMT)(AMT)
Name Event DateName Event Date88
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHSuperconductors Database (SDB)Superconductors Database (SDB)
• database structure completedatabase structure complete
• web interfaces completeweb interfaces complete
• since January’07 collaboration with FNAL and since January’07 collaboration with FNAL and BNL on magnet & cable data sharingBNL on magnet & cable data sharing
• main work left to do: creation of automatic tools main work left to do: creation of automatic tools which import data from existing databases, e.g., which import data from existing databases, e.g., for LHC, Tevatron and RHIC, to SDB corefor LHC, Tevatron and RHIC, to SDB core
• this last task will be completed with the help of this last task will be completed with the help of two summer students in 2007two summer students in 2007
Courtesy E. Laface
http://sdb.web.cern.ch/sdb
Name Event DateName Event Date99
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH SDB exampleSDB example
Courtesy E. Laface
Name Event DateName Event Date1010
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH AMT activity OSOMAMT activity OSOM• design of 2 T pulsed superferric magnet, follow-up of ECOMAG
• cable and coil in the iron configured to minimize loss;
• conceptual design that dissipates less than 10 W/m in the superconducting coil, and a warm iron (i.e. negligible loss power);
• two variants: wide iron and compact version with correction coil, both suitable for a PS upgrade.
• other options also examined, such as transmission-line magnets using large current (typically 100 kA), and open gap magnets; these options were discarded because of practical issues (bending radius, magnet size);
• summary report within next few weeks [L. Bottura]
• also ongoing: comparison of s.c. and n.c. options for fast cycling “PS2”
Name Event DateName Event Date1111
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHAMT exchangesAMT exchanges
• F. Broggi (Milano) visited CERN for 2 weeks in F. Broggi (Milano) visited CERN for 2 weeks in April to work on heat deposition in low-April to work on heat deposition in low- region regionPrimary goal: change of energy deposition versus distance between triplet and IP. First study showed little dependence. Question byh US-LARP. Present activity: consolidate the conclusions and explore other parts of the parameter space; collaboration with C. Hoa/CERN on precise FLUKA description of IR1 and IR5, including exact magnetic fields (well advanced); set up a few PC's running the latest version of FLUKA (done); switch to latest FLUKA source (DPMJET), used at CERN; confirm the Valencia results with the latest descriptions, source and FLUKA version; prepare a study program of study showing parameter regions still to be explored; investigate these (aperture, insertion length, crossing angle) [J.-P. Koutchouk]
• E. Laface visited FNAL & BNL for 1 week to E. Laface visited FNAL & BNL for 1 week to coordinate work on s.c. databasecoordinate work on s.c. database
Name Event DateName Event Date1212
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHplanned AMT workshops planned AMT workshops
• CARE-HHH-AMTCARE-HHH-AMT workshop on workshop on Superconducting Superconducting Magnets and CablesMagnets and Cables, 3.5 days, at CERN , 3.5 days, at CERN reviews of cables and magnet design for high field superconducting magnetsreviews of cables and magnet design for high field superconducting magnets
• 27-28 September: 27-28 September: CARE-HHH-AMTCARE-HHH-AMT workshop on workshop on Heat Heat Generation and Heat Transfer in Superconducting Generation and Heat Transfer in Superconducting MagnetsMagnets ( (THERMOMAG’07THERMOMAG’07), Paris, 2 days ), Paris, 2 days minimizing minimizing and evacuating heat in the next generation of superconducting and evacuating heat in the next generation of superconducting magnets for high magnets for high intensity particle accelerators, such as the IR magnet for the intensity particle accelerators, such as the IR magnet for the LHC luminosity LHC luminosity upgrade and the fast cycling magnets for FAIR and for the LHC upgrade and the fast cycling magnets for FAIR and for the LHC injector chain injector chain upgrade; identify the state of the art on (1) cooling techniques upgrade; identify the state of the art on (1) cooling techniques (fluids and regimes), (fluids and regimes), (2) heat transfer mechanisms, (3) modeling of heat transfer (2) heat transfer mechanisms, (3) modeling of heat transfer from coils to cooling from coils to cooling system, (4) heat transfer experiments; identify a common set system, (4) heat transfer experiments; identify a common set of thermal design of thermal design criteriacriteria
Name Event DateName Event Date1313
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
WP2: WP2:
Novel Methods for Novel Methods for
Accelerator Beam Instrumentation Accelerator Beam Instrumentation
(ABI)(ABI)
Name Event DateName Event Date1414
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH44thth ABI workshop ABI workshop
• 27 participants: 6 CERN, 7 DESY, 5 GSI, 1 CEA, 27 participants: 6 CERN, 7 DESY, 5 GSI, 1 CEA, 2 RAL, 2 Globes Electronics, 3 Kyocera, 1 FNAL2 RAL, 2 Globes Electronics, 3 Kyocera, 1 FNAL
• topics: BPM sensors, BPM electronics, cold BPMstopics: BPM sensors, BPM electronics, cold BPMs
• proceedings almost ready, will be published as proceedings almost ready, will be published as CARE-Conf-06-087-HHH CARE-Conf-06-087-HHH
Name Event DateName Event Date1515
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
planned ABI workshop planned ABI workshop
• End of 2007: End of 2007: HHH-ABI HHH-ABI annual workshop on annual workshop on Tools Tools for Diagnostic Systems at High-Intensity (Pre-) for Diagnostic Systems at High-Intensity (Pre-) Accelerators; Emittance Preservation and Accelerators; Emittance Preservation and Measurements in the Accelerator ChainMeasurements in the Accelerator Chain, GSI, , GSI, GermanyGermany
Name Event DateName Event Date1616
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
WP3: WP3:
Accelerator Physics Accelerator Physics
and synchrotron Design and synchrotron Design
(APD)(APD)
Name Event DateName Event Date1717
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHCERN Courier 2, 2007CERN Courier 2, 2007
Name Event DateName Event Date1818
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHLHC upgrade parametersLHC upgrade parametersparameterparameter 25 ns, smaller * 50 ns, long
transverse emittancetransverse emittance 3.75 3.75
protons per bunchprotons per bunch 1.7 4.9
bunch spacingbunch spacing 25 50
beam currentbeam current 0.86 1.22
longitudinal profilelongitudinal profile Gauss Flat
rms bunch lengthrms bunch length 7.55 14.4
beta* at IP1&5beta* at IP1&5 0.08 0.25
full crossing anglefull crossing angle 100 381
Piwinski parameterPiwinski parameter 0.60 2.5
peak luminositypeak luminosity 15.5 8.9
events per crossingevents per crossing 296 340
initial lumi lifetimeinitial lumi lifetime 2.1 5.3
effective luminosity effective luminosity (T(Tturnaroundturnaround=5 h)=5 h)
3.6 3.5
4.6 6.7
e-c heat SEY=1.4(1.3)e-c heat SEY=1.4(1.3) 1.04 (0.59) 0.36 (0.1)
SR heat load 4.6-20 KSR heat load 4.6-20 K 0.25 0.36
image current heat image current heat 0.33 0.78
gas-s. 100 h (10 h) gas-s. 100 h (10 h) bb 0.06 (0.56) 0.09 (0.9)
D0 + crab wire comp.
two LHC upgrade scenariosdeveloped atLUMI’06:25 ns and50 ns spacing
Name Event DateName Event Date1919
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHupgrade bunch structures
25 ns
50 ns
nominal
25 ns
ultimate& 25-ns upgrade
50-ns upgrade,no collisions @S-LHCb!
50 ns
50-ns upgradewith 25-ns collisionsin LHCb
25 ns
new alternative!
new baseline!
Name Event DateName Event Date2020
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
25 ns spacing
50 ns spacing
luminosity evolution
averageluminosity
initial luminosity peakmay not be useful for physics
Name Event DateName Event Date2121
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
25 ns spacing
50 ns spacing
event pile up
Name Event DateName Event Date2222
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH25 ns, low 25 ns, low *,*,
with levelingwith leveling
50 ns, long 50 ns, long
bunches, with levelingbunches, with levelingevents/crossingevents/crossing 300300 300300
run timerun time N/AN/A 2.5 h2.5 h
av. luminosityav. luminosity N/AN/A 2.6x102.6x103434ss-1-1cmcm-2-2
events/crossingevents/crossing 150150 150150
run timerun time 2.5 h2.5 h 14.8 h14.8 h
av. luminosityav. luminosity 2.6x102.6x103434ss-1-1cmcm-2-2 2.9x102.9x103434ss-1-1cmcm-2-2
events/crossingevents/crossing 7575 7575
run timerun time 9.9 h9.9 h 26.4 h26.4 h
av. luminosityav. luminosity 2.6x102.6x103434ss-1-1cmcm-2-2 1.7x101.7x103434ss-1-1cmcm-2-2
assuming 5 h turn-around time
Name Event DateName Event Date2323
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
25 ns spacing
50 ns spacing
luminosity evolution with leveling
averageluminosity
150 events / crossing
Name Event DateName Event Date2424
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHdynamic squeeze for 50-ns option
N150
Name Event DateName Event Date2525
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHdynamic bunch length change for 50-ns option
we might also reduce the charge/bunchand go for shorter bunches
Name Event DateName Event Date2626
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHIR upgrade opticsIR upgrade optics““compact low-gradient” NbTi, compact low-gradient” NbTi, *=25 cm*=25 cm
<75 T/m (Riccardo De Maria, Oliver Bruning)<75 T/m (Riccardo De Maria, Oliver Bruning)
““modular low gradient” NbTi, modular low gradient” NbTi, *=25 cm*=25 cm <90 T/m (Riccardo De Maria, Oliver Bruning)<90 T/m (Riccardo De Maria, Oliver Bruning)
““low low maxmax low-gradient” NbTi, low-gradient” NbTi, *=25 cm *=25 cm
<125 T/m (Riccardo De Maria, Oliver Bruning)<125 T/m (Riccardo De Maria, Oliver Bruning)
standard Nbstandard Nb33Sn upgrade, Sn upgrade, *=25 cm *=25 cm ~~200 T/m,200 T/m, 2 versions with different magnet parameters2 versions with different magnet parameters(Tanaji Sen et al, Emmanuel Laface, Walter Scandale)(Tanaji Sen et al, Emmanuel Laface, Walter Scandale)
+ crab-waist sextupole insertions+ crab-waist sextupole insertions?? (LNF/FP7) (LNF/FP7)
early separation with early separation with *=8 cm, Nb*=8 cm, Nb33SnSn includes D0; either triplet closer to IP or Q0; includes D0; either triplet closer to IP or Q0; being prepared for PAC’07 (Jean-Pierre Koutchouk et al)being prepared for PAC’07 (Jean-Pierre Koutchouk et al)
compatiblewith50-nsupgradepath
Name Event DateName Event Date2727
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHcrab waist scheme crab waist scheme
cyI
xpH
2
4
1 2
minimizes at s=-x/c
focal plane
realization:add sextupoles at right phase distance from IP
initiated and ledby LNF in the frame of FP7;first beam testsat DAFNE later in 2007
Hamiltonian
Name Event DateName Event Date2828
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHphased LHC upgradephased LHC upgrade
• recent CERN management decision: early IR recent CERN management decision: early IR upgrade (“phase-1”): based on NbTi magnets, upgrade (“phase-1”): based on NbTi magnets, implemented ~2012implemented ~2012
• ““low-gradient” large-aperture NbTi optics low-gradient” large-aperture NbTi optics solutions developed by HHH are three good solutions developed by HHH are three good candidatescandidates
• IR optics selection by Lyn Evans in 2007; input IR optics selection by Lyn Evans in 2007; input from HHH studies from HHH studies
• more ambitious Nbmore ambitious Nb33Sn upgrade and higher Sn upgrade and higher luminosity planned in a 2luminosity planned in a 2ndnd phase phase
Name Event DateName Event Date2929
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHECL2 workshopECL2 workshop• 35 participants: 16 CERN (4 AB/ABP, 1 AB/OP, 7 AB/RF, 2 35 participants: 16 CERN (4 AB/ABP, 1 AB/OP, 7 AB/RF, 2
AT-VAC, 2 TS), 3 German enamel industry (Eisenwerke AT-VAC, 2 TS), 3 German enamel industry (Eisenwerke Dueker, Wendel Email), 4 US (BNL, Cornell, LBNL & Dueker, Wendel Email), 4 US (BNL, Cornell, LBNL & SLAC), 1 KEK, others from European institutes (Astec, LNF, SLAC), 1 KEK, others from European institutes (Astec, LNF, DESY, ANKA, U. Rostock, CELLS, U. Sannio, ESRF) DESY, ANKA, U. Rostock, CELLS, U. Sannio, ESRF)
• topics: CERN NEG coatingtopics: CERN NEG coating facility, motivation, technological facility, motivation, technological solutions, solutions, simulations, beam simulations, beam
measurements, impedance, measurements, impedance, - for PS2, SPS upgrade, - for PS2, SPS upgrade,
LHC upgrade, CLIC & ILC LHC upgrade, CLIC & ILC
Name Event DateName Event Date3030
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
slotted vacuum chamber (W. Bruns)slotted vacuum chamber (W. Bruns) New!New!
enamel electrodes (F. Caspers) enamel electrodes (F. Caspers) New!New!
electrete inserts (F. Caspers)electrete inserts (F. Caspers) New!New!
NEG coating (P. Chiggiato)NEG coating (P. Chiggiato)
ECL2: solutions against ECL2: solutions against electron cloudelectron cloud
slotted chamber
enamel-based electrode
Name Event DateName Event Date3131
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHCC-2007CC-2007topics: topics:
• critical review of experimental resultscritical review of experimental results
• crystal production technologiescrystal production technologies
• application of bent crystals to LHC collimation system application of bent crystals to LHC collimation system
• assessment of new crystals through experiments at SPS assessment of new crystals through experiments at SPS and Tevatron and Tevatron
• use of crystals for diffractive physicsuse of crystals for diffractive physics
co-sponsored by INTASco-sponsored by INTAS
45 participants: INFN Genova, U. Ferrara, INFN Legnaro, 45 participants: INFN Genova, U. Ferrara, INFN Legnaro, PNPI Gatchina, IHEP Protvino, FNAL, JINR Dubna, PNPI Gatchina, IHEP Protvino, FNAL, JINR Dubna, INFN Frascati, INFN Roma, U. Manchester, U. Texas, INFN Frascati, INFN Roma, U. Manchester, U. Texas,
Name Event DateName Event Date3232
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
PRL article on 2006 SPS PRL article on 2006 SPS experiments published experiments published
last week!last week!
including CARE including CARE acknowledgement acknowledgement
SPS crystal SPS crystal
collimation testcollimation test
Name Event DateName Event Date3333
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH2007 crystal experiments2007 crystal experiments7 weeks of SPS runs allocated to collaboration
Goals: (1) test multi-strip crystals (2) check the effect on ions
(3) verify their fragmentation and e.-m. dissociation inside the crystal,
(4) test the effectiveness of crystal collimation for ILC
Support: CARE-HHH , INTAS-CERN, INFN-NTA,Russian Foundation for Basic Research, CERN AB and AT Departments
Name Event DateName Event Date3434
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHAPD exchangesAPD exchanges• R. De Maria (grad student) visited FNAL for 1 R. De Maria (grad student) visited FNAL for 1
month month in February-March to work onin February-March to work on heat heat deposition in low-deposition in low- region for NbTi “low- region for NbTi “low-gradient” IR optics solutionsgradient” IR optics solutions Collaboration with N. Mokhov, US-LARP
• W. Scandale visited FNAL for 1 week W. Scandale visited FNAL for 1 week in February in February to participate into participate in Tevatron crystal experiment Tevatron crystal experiment
• Two graduate students (U. Dorda, G. Sterbini) Two graduate students (U. Dorda, G. Sterbini) will will participate inparticipate in RHIC beam-beam compensation RHIC beam-beam compensation experiments for two weeks experiments for two weeks this June, in the frame this June, in the frame of HHH/US-LARP collaborationof HHH/US-LARP collaboration
Name Event DateName Event Date3535
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHplanned APD workshopsplanned APD workshops• CARE-HHH-APD CERN-GSICARE-HHH-APD CERN-GSI bi-lateral working meeting on bi-lateral working meeting on
Collective Effects–Coordination of Theory and ExperimentsCollective Effects–Coordination of Theory and Experiments, , CERN, Geneva, Switzerland CERN, Geneva, Switzerland
• 1-5 October: CARE-HHH-APD event 1-5 October: CARE-HHH-APD event BEAM’07BEAM’07 , CERN , CERN
- mini-workshop on - mini-workshop on LHC Injectors UpgradeLHC Injectors Upgrade & FAIR& FAIRPS2, SPS enhancements, GSI upgradesPS2, SPS enhancements, GSI upgrades
- mini-workshop on - mini-workshop on LHC Beam Parameters UpgradeLHC Beam Parameters Upgradebeam parameters and upgrade scenarios; e.g. bunch spacing, operation beam parameters and upgrade scenarios; e.g. bunch spacing, operation with large Piwinski angle, luminosity performancewith large Piwinski angle, luminosity performance
- - Francesco Ruggiero Memorial SymposiumFrancesco Ruggiero Memorial Symposium (Oct. 3) (Oct. 3)
• 7-9 November: CARE-HHH-APD workshop on7-9 November: CARE-HHH-APD workshop on LHC IR UpgradeLHC IR Upgrade ((LUMI'07LUMI'07)), INFN Frascati, Italy, INFN Frascati, Italy
new low-beta quadrupoles, detector-integrated dipoles and new low-beta quadrupoles, detector-integrated dipoles and quadrupoles, quadrupoles, crab cavities, wire compensation, experience with new crab cavities, wire compensation, experience with new DAFNE IRDAFNE IR
Name Event DateName Event Date3636
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH
Francesco Ruggiero Memorial SymposiumFrancesco Ruggiero Memorial Symposium
Tentative speakers: S. Berg, C. Biscari, O. Bruning, Tentative speakers: S. Berg, C. Biscari, O. Bruning, W. Chou, M. Furman, K. Hirata, A. Mostacci, W. Chou, M. Furman, K. Hirata, A. Mostacci,
L. Palumbo, C. Petit-Jean-Genaz, S. Petracca, E. Picasso, L. Palumbo, C. Petit-Jean-Genaz, S. Petracca, E. Picasso, W. Scandale, J. Thomashausen, F. Zimmermann ,… W. Scandale, J. Thomashausen, F. Zimmermann ,…
3 October 2007
during
HHH-APD
BEAM’07
Name Event DateName Event Date3737
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHGantt chart for next 18 months
AMT and ABI
Name Event DateName Event Date3838
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHHGantt chart for next 18 months
APD
Name Event DateName Event Date3939
F. Zimmermann & W. Scandale
HHH, CARE Meeting, Paris. April 17-18, 2007CERN
HHHHHHHHHHHH ConclusionsConclusions
• numerous numerous high-impact workshopshigh-impact workshops
• focused focused activities in many frontier areasactivities in many frontier areas- crystal collimation, slim magnets, e-cloud suppression, low-angle - crystal collimation, slim magnets, e-cloud suppression, low-angle crab cavities, beam-beam compensation, novel optics design schemes, crab cavities, beam-beam compensation, novel optics design schemes, fast cycling s.c. magnets, new beam diagnosticsfast cycling s.c. magnets, new beam diagnostics
• results benefit results benefit global accelerator communityglobal accelerator community- - code repository, s.c. database, intensity limitscode repository, s.c. database, intensity limits
• enhanced enhanced dissemination & training effortdissemination & training effort- mutual visits between partner labs, publications, seminars, web - mutual visits between partner labs, publications, seminars, web pages, summer students and graduate students pages, summer students and graduate students
• HHH is “HHH is “high-returnhigh-return investment investment for Europe” for Europe”