n keyplan - epa.govt.nz€¦ · dti 1.65 dti 3.48 dti 2.15 dti 1.87 dti 1.31 dti 1.16 dti 1.83 dti...
TRANSCRIPT
SW
SW
SW
SW
SW
SW
KR
DR
KR
DR
KR
DR
KR
DR
KR
DR
KR
DR
KR
DR
KRDR
KRDR
KRDR
KRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDR
CU 634568
600 CONC
634.500
634.600
634.700
634.500
634.600
634.700
C:\u
se
rs\rh
usse
in
\a
pp
da
ta
\lo
ca
l\p
ro
je
ctw
ise
\kiw
ira
il_
pro
je
cts\d
ms0
48
89
\D
R-N
IM
T-S
T-L
Y-0
34
01
.d
wg
1
5-2
-2
1 1
0:2
1 A
M R
Hu
sse
in
KEYPLAN
NOTE:
ALL Services are indicative in location only.
All Services to be accurately located in the ground by owner provider
BEFORE any work is carried out in the indicated vicinity.
Copyright : "This drawing is and shall remain the property of KiwiRail Holdings Limited (KHL)
Rev No :DRAWING No. Original Std
APPROVED BY : -
DATE : -
Dig
ita
l D
ata
in
T
erm
s o
f .................................................... C
oo
rd
in
ate
syste
m.
N
PAPAKURA
PUKEKOHE
MISSION BUSH
BRANCH LINE
0 5 1015
2030
40 50 (m)
SCALE IN METRES
N
DATEINITIALSDATEDRAWNREVISION PARTICULARS
DESIGNED
DRAWN
LINE: Km:
SCALE:
CHECKED
APPROVED
REV
MS 27/11/20
RH 27/11/20
BB 27/11/20
DS 27/11/20
000.00-000.00
1:500 (A1)
A GATE 1 (CONCEPT DESIGN) 27/11/20
B GATE 2 (PRELIMINARY DESIGN) 12/02/21
LAYOUT PLAN 1:500 (A1)
NOTES:
1. REFER TO DRAWING 601002-DR-NIMT-CV-HS-00695 AND 00696 FORGENERAL NOTES AND LEGENDS.
PROPOSED PAERATA
STATION PLATFORMS
CH634.510-634.660 (6 CAR)
P2P ELECTRIFICATION
STRUCTURAL
PAERATA STATION PLATFORMS
DR-NIMT-ST-LY-03401
0
PROJECT FILE No:
THE CSR DUCT WILL BE LOCATED INSIDE THE
PLATFORM FACING (REFER TO TYPICAL DETAIL
WITHIN DESIGN REPORT RP-NIMT-ST-NA-00374)
AND THEN BURIED BEYOND THE PLATFORMS END
LEGEND: PROPOSEDNEW RAIL TRACK DESIGN
RAIL BOUNDARY
SIGNAL / BANNER (PROPOSED)
CSR DUCT (UNDERGROUND / CSR UTX 6 DUCTS) SECTION 2
CSR DUCT (ABOVEGROUND) SECTION 2
PIT SECTION 2
CTP MARKERS (PROPOSED)
SIGNAL UTX (2 DUCTS) SECTION 2
CSR DUCT (UNDERGROUND / CSR UTX 6 DUCTS) SECTION 1
PIT SECTION 1
SIGNAL UTX (2 DUCTS) SECTION 1
XMAS BLOCK OF LINE WORKS
REMAINDER WORKS
FUTURE PLATFORM EXTENSION
TO THE NORTH CH634.510 -
CH634.735 (9-CAR)
EXISTING CULVERT
TO BE REPLACED
DATEINITIALSDATEDRAWNREVISION PARTICULARS
DESIGNED
DRAWN
LINE: Km:
SCALE:
CHECKED
APPROVED
REV
MS 18/12/20
BD 18/12/20
BB 18/12/20
DS 18/12/20
1:25 (A1)
A GATE 2 (PRELIMINARY DESIGN) 19/02/21
I:\P
ro
je
cts\2
97
3 - P
ap
aku
ra
to
P
uke
ko
he
(P
2P
) p
ro
je
ct\5
0 D
ra
win
gs\5
3 P
re
lim
in
ary\P
UK
EK
OH
E S
TA
TIO
N\D
R-N
IM
T-S
T-D
D-0
34
07
.d
wg
1
0-2
-2
1 0
2:0
4 P
M B
ill.D
ai
KEYPLAN
NOTE:
ALL Services are indicative in location only.
All Services to be accurately located in the ground by owner provider
BEFORE any work is carried out in the indicated vicinity.
Copyright : "This drawing is and shall remain the property of KiwiRail Holdings Limited (KHL)
Rev No :DRAWING No. Original Std
APPROVED BY : -
DATE : -
Dig
ita
l D
ata
in
T
erm
s o
f .................................................... C
oo
rd
in
ate
syste
m.
N
PAPAKURA
PUKEKOHE
MISSION BUSH
BRANCH LINE
P2P ELECTRIFICATION
STRUCTURE
PAERATA STATION CROSS SECTIONS
DR-NIMT-ST-DD-03407
0
PROJECT FILE No:
TYPICAL SECTION - PAERATA STATION AT CH 634.600
SCALE 1:25 (A1)
400015204500
2300
3700
16040
1520 4500
2300
3700
2400
1350
2400
500
OLE MAST
600 x 600 x 60
TACTILE PAVER
(BY OTHERS)
LEVELLING SCREED
AND ASPHALT SURFACE
(BY OTHERS)
2% FALL
1200Ø PILE
PRECAST COPING
ELEMENT
PRECAST WALL
ELEMENT
TEMPORARY WORKS
CLEARANCE GAUGE
VOID
FORMATION DRAINAGE
IN-SITU FOOTING
1300 x 1000 PIER
FOUNDATION CAP
(BY OTHERS)
4200 x 1000 LIFTSHAFT
FOUNDATION PAD (BY
OTHERS)
TEMPORARY WORKS
CLEARANCE GAUGE
75
0
75
0
EXISTING
GROUND PROFILE
PROPOSED
GROUND PROFILE
EXISTING
GROUND PROFILE
PROPOSED
GROUND PROFILE
300 MINIMUM STRUCTURAL
FIIL ZONE
BURIED
CSR DUCTS
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
KRDRKRDR
COH 639500
22KV
CU 639595
500 CONC
CU 639600
500 CONC
FG 639770
639.500
639.600
639.700
639.800
639.500
639.600
639.700
639.800
C:\u
se
rs\rh
usse
in
\a
pp
da
ta
\lo
ca
l\p
ro
je
ctw
ise
\kiw
ira
il_
pro
je
cts\d
ms0
48
89
\D
R-N
IM
T-S
T-L
Y-0
34
02
.d
wg
1
5-2
-2
1 1
0:2
6 A
M R
Hu
sse
in
KEYPLAN
NOTE:
ALL Services are indicative in location only.
All Services to be accurately located in the ground by owner provider
BEFORE any work is carried out in the indicated vicinity.
Copyright : "This drawing is and shall remain the property of KiwiRail Holdings Limited (KHL)
DRAWING No. Original Std
APPROVED BY : -
DATE : -
Dig
ita
l D
ata
in
T
erm
s o
f .................................................... C
oo
rd
in
ate
syste
m.
N
PAPAKURA
PUKEKOHE
MISSION BUSH
BRANCH LINE
N
0 5 1015
2030
40 50 (m)
SCALE IN METRES
DATEINITIALSDATEDRAWNREVISION PARTICULARS
DESIGNED
DRAWN
LINE: Km:
SCALE:
CHECKED
APPROVED
REV
MS 27/11/20
RH 27/11/20
BB 27/11/20
DS 27/11/20
000.00-000.00
1:500 (A1)
A GATE 1 (CONCEPT DESIGN) 27/11/20
B GATE 2 (PRELINARY DESIGN) 12/02/21
LAYOUT PLAN1:500 (A1)NOTES:
1. REFER TO DRAWING 601002-DR-NIMT-CV-HS-00695 AND 00696 FORGENERAL NOTES AND LEGENDS.
PROPOSED DRURY WEST
STATION PLATFORMS
CH639.600 - CH639.750 (6-CAR)
P2P ELECTRIFICATION
STRUCTURAL
DRURY WEST STATION
PLATFORMS
DR-NIMT-ST-LY-03402
PROJECT FILE No:
LEGEND: PROPOSEDNEW RAIL TRACK DESIGN
RAIL BOUNDARY
SIGNAL / BANNER (PROPOSED)
CSR DUCT (UNDERGROUND / CSR UTX 6 DUCTS) SECTION 2
CSR DUCT (ABOVEGROUND) SECTION 2
PIT SECTION 2
CTP MARKERS (PROPOSED)
SIGNAL UTX (2 DUCTS) SECTION 2
CSR DUCT (UNDERGROUND / CSR UTX 6 DUCTS) SECTION 1
PIT SECTION 1
SIGNAL UTX (2 DUCTS) SECTION 1
XMAS BLOCK OF LINE WORKS
REMAINDER WORKS
THE CSR DUCT WILL BE LOCATED INSIDE THE
PLATFORM FACING (REFER TO TYPICAL DETAIL
WITHIN DESIGN REPORT RP-NIMT-ST-NA-00374)
AND THEN BURIED BEYOND THE PLATFORMS END
FUTURE PLATFORM EXTENSION TO THE
SOUTH CH639.525 - CH639.750 (9-CAR)
DATEINITIALSDATEDRAWNREVISION PARTICULARS
DESIGNED
DRAWN
LINE: Km:
SCALE:
CHECKED
APPROVED
REV
MS 18/12/20
BD 18/12/20
BB 18/12/20
DS 18/12/20
1:25 (A1)
A GATE 2 (PRELIMINARY DESIGN) 19/02/21
I:\P
ro
je
cts\2
97
3 - P
ap
aku
ra
to
P
uke
ko
he
(P
2P
) p
ro
je
ct\5
0 D
ra
win
gs\5
3 P
re
lim
in
ary\P
UK
EK
OH
E S
TA
TIO
N\D
R-N
IM
T-S
T-D
D-0
34
12
.d
wg
1
0-2
-2
1 0
2:0
5 P
M B
ill.D
ai
KEYPLAN
NOTE:
ALL Services are indicative in location only.
All Services to be accurately located in the ground by owner provider
BEFORE any work is carried out in the indicated vicinity.
Copyright : "This drawing is and shall remain the property of KiwiRail Holdings Limited (KHL)
Rev No :DRAWING No. Original Std
APPROVED BY : -
DATE : -
Dig
ita
l D
ata
in
T
erm
s o
f .................................................... C
oo
rd
in
ate
syste
m.
N
PAPAKURA
PUKEKOHE
MISSION BUSH
BRANCH LINE
P2P ELECTRIFICATION
STRUCTURE
DRURY WEST STATION
CROSS SECTIONS
DR-NIMT-ST-DD-03412
0
PROJECT FILE No:
TYPICAL SECTION - DRURY WEST STATION AT CH 639.700
SCALE 1:25 (A1)
400015204500
2300
3700
16040
1520 4500
2300
3700
2400
1350
2400
500
OLE MAST
600 x 600 x 60
TACTILE PAVER
(BY OTHERS)
LEVELLING SCREED AND
ASPHALT SURFACE
(BY OTHERS)
2% FALL
1200Ø PILE
PRECAST COPING
ELEMENT
PRECAST WALL
ELEMENT
TEMPORARY WORKS
CLEARANCE GAUGE
VOID
FORMATION DRAINAGE
IN-SITU FOOTING
1300 x 1000 PIER
FOUNDATION CAP
(BY OTHERS)
4200 x 1000 LIFTSHAFT
FOUNDATION PAD (BY
OTHERS)
TEMPORARY WORKS
CLEARANCE GAUGE
2% FALL
75
0
75
0
PROPOSED
GROUND PROFILE
EXISTING
GROUND PROFILE
PROPOSED
GROUND PROFILE
EXISTING
GROUND PROFILE
EDGE OF PLATFORM
SURFACING
(BY OTHERS)
300 MINIMUM STRUCTURAL
FIIL ZONE
BURIED
CSR DUCTS
D
T
I
1
.
6
5
D
T
I
3
.
4
8
D
T
I
2
.
1
5
D
T
I
1
.
8
7
D
T
I
1
.
3
1
D
T
I
1
.
1
6
D
T
I
1
.
8
3
D
T
I
1
.
2
2
D
T
I
2
.
0
7
1
5
0
P
V
C
S
S
S
S
S
S
65 A
C
(R
isin
g)
S
S
S
S
S
S
150 P
VC
1
5
0
A
C
8
5
P
V
C
(
R
i
s
i
n
g
)
S
S
S
S
SS
1
5
0
P
V
C
8
0
A
C
150 A
C
80 A
C
(R
ising)
SS
SS
SS
S
S
S
S
S
S
S
S
S
S
1
5
0
A
C
1
5
0
P
V
C
85 AC
(Rising)
SS
SS
SS
SS
SS
SS
SS
SS
S
S
S
S
S
S
1
5
0
P
V
C
1
5
0
P
V
C
1
5
0
A
C
1
5
0
A
C
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SS
SS
SS
SS
SS
SS
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SS
SS
SS
SS
SS
SS
SS
5
0
P
V
C
1
5
0
P
V
C
W
W
W
W
W
W
W
W
1
0
0
P
V
C
100 PV
C
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
100 P
VC
W
W
W
W
W
W
W
1
0
0
P
V
C
W
W
W
W
W
W
1
0
0
P
V
C
W
W
50 P
VC
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
W
W
W
W
1
0
0
P
V
C
W
W
W
W
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
630 C
LS
W
W
1200 CLS
W
W
W
W
W
W
WW
W
W
W
W
1
2
0
0
C
L
S
W
W
3
0
0
P
V
C
-
U
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
1200 CLS (Abandoned)
W
W
W
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
P
P
P
P
P
P
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
SW
SW
SW
SW
SW
SW
SW
S
W
S
W
S
W
SW
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
SW
SW
SW
SW
SW
SW
SW
SW
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
S
W
SW
SW
SW
SW
SW
SW
SW
KRDRKRDR
KRDR
KRDR
KRDR
KRDRKRDR
KRDRKRDR
KRDR KRDR KRDRKRDR
KRDR
KRDR
KRDR
KRDR
KRDR
KR
DR
KR
DR
KR
DR
KR
DR
KR
DR
KR
DR
KR
DR
KR
DR
KR
D
R
KR
D
R
K
R
D
R
K
R
D
R
K
R
D
R
K
R
D
R
K
R
D
R
K
R
D
R
K
R
D
R
K
R
D
R
K
R
D
R
K
R
D
R
K
R
D
R
K
R
D
R
K
R
D
R
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
P
P
P
P
P
S
S
S
S
S
S
SS
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SS
S
S
S
S
SS
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
s
V
G
V
G
V
G
V
G
V
G
V
G
V
G
V
G
V
G
V
G
V
G
V
G
V
G
V
G
V
G
V
G
VG
VG
VG
VG
VG
VG
VG
VG
VG
VGVGVG
V
G
V
G
V
G
V
G
V
G
V
G
V
G
V
G
VGVG
VG
VG
VG
VG
VG
V
G
VG
VG
VG
V
G
VG
V
G
V
G
V
G
V
G
V
G
VG
VG
C
H
CH
CH
CH
CH
CH
CH
C
H
C
H
CH
C
H
CH
C
H
C
H
C
H
C
H
C
H
C
H
CH
C
H
CH
CH
CH
CH
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
CH
CH
CH
C
H
C
H
C
H
C
H
C
H
CH
CH
CH
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
CH
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
CH
CH
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
CH
CH
CH
CH
CH
CHCH
CH
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
CH
CH
CH
CH
CHCH
CHCH
C
H
C
H
C
H
C
H
CH
CH
C
H
C
H
C
H
C
H
CH
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
CH
CH
CH
CH
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
C
H
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
C
U
6
4
2
3
4
7
2
2
0
0
C
O
N
C
W 642010
1200 CLS
VG 642030
160 PE
SW 642066
2100 CONC
KRC 642150
C
O
H
6
4
2
3
5
1
2
2
K
V
C
U
6
4
2
3
5
0
3
0
0
C
O
N
C
C
U
6
4
2
2
2
7
4
5
0
C
O
N
C
S
W
6
4
2
2
4
0
CU 642050
2200 CONC
S
S
6
4
2
2
1
0
8
0
A
C
642.000
642.100
642.200
6
4
2
.3
0
0
WAIHOEHOE ROAD
642.000
642.100
642.200
6
4
2
.3
0
0
WAIHOEHOE ROADC
:\u
se
rs\rh
usse
in
\a
pp
da
ta
\lo
ca
l\p
ro
je
ctw
ise
\kiw
ira
il_
pro
je
cts\d
ms0
48
89
\D
R-N
IM
T-S
T-L
Y-0
34
03
.d
wg
1
5-2
-2
1 1
1:4
7 A
M R
Hu
sse
in
KEYPLAN
NOTE:
ALL Services are indicative in location only.
All Services to be accurately located in the ground by owner provider
BEFORE any work is carried out in the indicated vicinity.
Copyright : "This drawing is and shall remain the property of KiwiRail Holdings Limited (KHL)
Rev No :DRAWING No. Original Std
APPROVED BY : -
DATE : -
Dig
ita
l D
ata
in
T
erm
s o
f .................................................... C
oo
rd
in
ate
syste
m.
N
PAPAKURA
PUKEKOHE
MISSION BUSH
BRANCH LINE
N
0 5 1015
2030
40 50 (m)
SCALE IN METRES
DATEINITIALSDATEDRAWNREVISION PARTICULARS
DESIGNED
DRAWN
LINE: Km:
SCALE:
CHECKED
APPROVED
REV
MS 27/11/20
RH 27/11/20
BB 27/11/20
DS 27/11/20
000.00-000.00
1:500 (A1)
A GATE 1 (CONCEPT DESIGN) 27/11/20
B GATE 2 (PRELIMINARY DESIGN) 12/02/21
LAYOUT PLAN1:500 (A1)
NOTES:
1. REFER TO DRAWING 601002-DR-NIMT-CV-HS-00695 AND 00696 FORGENERAL NOTES AND LEGENDS.
PROPOSED DRURY
CENTRAL STATION
PLATFORMS
CH642.082-642.232 (6-CAR)
P2P ELECTRIFICATION
STRUCTURAL
DRURY CENTRAL STATION
PLATFORMS
DR-NIMT-ST-LY-03403
0
PROJECT FILE No:
THE CSR DUCT WILL BE LOCATED INSIDE THE
PLATFORM FACING (REFER TO TYPICAL DETAIL
WITHIN DESIGN REPORT RP-NIMT-ST-NA-00374)
AND THEN BURIED BEYOND THE PLATFORMS END
LEGEND: PROPOSEDNEW RAIL TRACK DESIGN
RAIL BOUNDARY
SIGNAL / BANNER (PROPOSED)
CSR DUCT (UNDERGROUND / CSR UTX 6 DUCTS) SECTION 2
CSR DUCT (ABOVEGROUND) SECTION 2
PIT SECTION 2
CTP MARKERS (PROPOSED)
SIGNAL UTX (2 DUCTS) SECTION 2
CSR DUCT (UNDERGROUND / CSR UTX 6 DUCTS) SECTION 1
PIT SECTION 1
SIGNAL UTX (2 DUCTS) SECTION 1
XMAS BLOCK OF LINE WORKS
REMAINDER WORKS
FUTURE PLATFORM
EXTENSION TO THE SOUTH
CH642.007 - CH642.232 (9-CAR)
DATEINITIALSDATEDRAWNREVISION PARTICULARS
DESIGNED
DRAWN
LINE: Km:
SCALE:
CHECKED
APPROVED
REV
MS 18/12/20
BD 18/12/20
BB 18/12/20
DS 18/12/20
1:25 (A1)
A GATE 2 (PRELIMINARY DESIGN) 19/02/21
I:\P
ro
je
cts\2
97
3 - P
ap
aku
ra
to
P
uke
ko
he
(P
2P
) p
ro
je
ct\5
0 D
ra
win
gs\5
3 P
re
lim
in
ary\P
UK
EK
OH
E S
TA
TIO
N\D
R-N
IM
T-S
T-D
D-0
34
17
.d
wg
1
0-2
-2
1 0
2:0
6 P
M B
ill.D
ai
KEYPLAN
NOTE:
ALL Services are indicative in location only.
All Services to be accurately located in the ground by owner provider
BEFORE any work is carried out in the indicated vicinity.
Copyright : "This drawing is and shall remain the property of KiwiRail Holdings Limited (KHL)
Rev No :DRAWING No. Original Std
APPROVED BY : -
DATE : -
Dig
ita
l D
ata
in
T
erm
s o
f .................................................... C
oo
rd
in
ate
syste
m.
N
PAPAKURA
PUKEKOHE
MISSION BUSH
BRANCH LINE
P2P ELECTRIFICATION
STRUCTURE
DRURY STATION CROSS SECTIONS
DR-NIMT-ST-DD-03417
0
PROJECT FILE No:
TYPICAL SECTION - DRURY STATION AT CH 642.150
SCALE 1:25 (A1)
400015204500
2300
3700
16040
1520 4500
2300
3700
2400
2400
500
OLE MAST
2% FALL
1200Ø PILE
PRECAST COPING
ELEMENT
PRECAST WALL
ELEMENT
TEMPORARY WORKS
CLEARANCE GAUGE
VOID
FORMATION DRAINAGE
4200 x 1000 LIFTSHAFT
FOUNDATION PAD
(BY OTHERS)
TEMPORARY WORKS
CLEARANCE GAUGE
2% FALL
500
4200 x 1000 LIFTSHAFT
FOUNDATION PAD
(BY OTHERS)
600 x 600 x 60
TACTILE PAVER
(BY OTHERS)
LEVELLING SCREED AND
ASPHALT SURFACE
(BY OTHERS)
75
0
75
0
PROPOSED
GROUND PROFILE
EXISTING
GROUND
PROFILE
PROPOSED
GROUND PROFILE
EXISTING
GROUND PROFILE
EDGE OF PLATFORM
SURFACING
(BY OTHERS)
IN-SITU FOOTING
300 MINIMUM STRUCTURAL
FIIL ZONE
BURIED
CSR DUCTS