My SCE is Working, I Know It and I Can ProveSCE Barrier Ownership
ASEAN HSSE 2019
19.09.2019
What to Do – Focus on Barrier Management
▪ Barriers need to work when we need them to work▪ It is everyone’s responsibility
MY SCE IS WORKING AND I
KNOW IT
• I know the Barriers
• I know my Role
• I keep them healthy
• I can prove it
Challenges in Barrier Management
Clear line of sight to Major Accident HazardsClear roles & responsibilitiesRegular engagements and
collaboration
• Active use of e.g. Hazards & Effects Register, Bowties
• HSE Case mindset embedded into “business as usual” e.g. into Learning From Incident, Management of Change, Permit to Work
• Understand how HSE Case benefits the business
• Convince and align stakeholders
• Consistent approach and messages
• What else can go wrong? What’s new? What has changed?
• Monitor barrier effectiveness through Process Safety Performance Indicators
• Assurance on Process Safety Performance
Chronic Unease -
Mindfulness
Leadership Commitment & Direction
Tools & Capability
Sustainable Process
Barrier
Ownership
Barrier Effectiveness: It is everyone’s responsibility
Barrier Owner
• SCE meet the design /
functional intent
• Monitor SCE compliance
• Analyze SCE performance
Executor
• Perform the assurance
task
• Report outcome
• Highlight deficiencies
Technical Authority
• Set the requirement of
SCE and acceptance
criteria as per PTS /
code and standard
What are SCEs?
Simply put: SCEs are barriers put in place to prevent and/or limit the effect of a hazard with Major Risks
SCEs are Barriers
SCEs are to create FOCUS
- the failure of which could cause or contribute substantially to Major Accident Hazard (MAH)
- a purpose of which is to prevent, or limit the effect of a major accident”
Safety Critical Elements (SCEs) are Parts of an installation and such of its structure, plant equipment and systems (including computer program) or any part thereof:
Execute/ Review and Implement Assurance
Identify Major Accident and SCE Develop Performance Standard
SCE Performance Monitoring
“ Swiss Cheese Model can be transferredto PSPI Triangle, to reflect that as layersof protection fail, event will progressfrom the bottom of the pyramid to thetop. ”
SCE Verification Activities
Management of SCE Deviation
PSPI TRIANGLE
SCE Management on a Page
12
3
4
5
6
Are SCEs (Barriers) by Themselves Good Enough?
Why?
Because SCEs need to perform as required when
needed – they must be maintained to prevent the holes
from aligning.
SCE without an associated Assurance/Maintenance Activity is not a Barrier.
Good Design/Operation Integrity
• Less holes
• Minimizes time of temp holes exist
• Limits holes size
Poor Design/Operation Integrity
• Increases holes
• Increases the time of temp holes exist
• Increases holes size
The ‘holes’ in the cheese represent the weaknesses in the barriers, leaving them ineffective in the role as a risk control system.
Barrier Effectiveness
Design It Right, Construct It Right, Operate It Right, Maintain It Right
Site Specific Performance Standard
SCE Group and goal
What need to be done to ensure the
SCE is meeting the functional
requirement (technical and quality
audits)
What results are we recording to
indicate that SCE is functioning
2
Execute/Review and Implement Assurance
All deviation must have Risk Assessment , RCFA and etc and endorse by respective TA
3
• Centralized web based system accessible globally• Real-time information on status of SCE for each site • Integrated deviation management process
FSM retrieves SCE Maintenance PMMS Transaction Data; Deviation of LAFD need to be done using FSM 4
Verification Process Flow
• Scheduling• Team
formation• Site liaison
• Inspection• Test
Witnessing• Interviews• Evidence
Recording• VWI form
• Condition assessment
• Risk Ranking• Standards
reference
A) Verification team:• Feedback from site
verification• Recommendation• HSE Health Status
B) Asset owner:• Reports Risk Status
on HSE Online• Gap Closure Report
on HSE Online• Gap closure
agreement
Visit Planning
Desktop Review
Site Visit &
Recording
Severity Assessment
Reporting
Verification Process Flow 5
SCE Performance Monitoring
Swiss Cheese Model can be transferred to PSPI (Process Safety Performance Indicator) Triangle, to
reflect that as layers of protection fail, event will progress from the bottom of the pyramid to the top
SCE PM/ CM Overdue under Tier 4- Active monitoring focused on a