MVD NEW MADRID EARTHQUAKE RESPONSE PLAN. Patrick G. Tucker MVD Civil Disaster Planner Sarah Jones MVR Emergency Management May 8, 2014. Concept of Operations. MSC’s and District’s responsibilities aligned by state. - PowerPoint PPT PresentationTRANSCRIPT
US Army Corps of Engineers
BUILDING STRONG®
MVD NEW MADRID EARTHQUAKE RESPONSE PLAN
Patrick G. Tucker
MVD Civil Disaster Planner
Sarah Jones
MVR Emergency Management
May 8, 2014
BUILDING STRONG®
Concept of Operations
2
• MSC’s and District’s responsibilities aligned by state.
• Support FEMA/DHS through traditional ESF # 3 mission assignments as well as nontraditional missions.
• Worst Case Scenario assumes Memphis and St. Louis will be impacted districts (their PRT’s will not be available)
• Support to USACE Civil Works Projects Will Be Within Current Civil-Works Boundaries
BUILDING STRONG®3
Support to USACE Civil Works Projects Will
Be Within Current Civil-Works Boundaries
MVP, MVR, MVK, & MVN will still be
responsible for their CW AORMVM and MVS will be in reconstitutionImpacted MVM & MVM areas will be divided
into 4 sectors by MS River and E-W line
along MVM flood fight areas.CW Task force assigned to each sector
MVD CW Concept of Operations
BUILDING STRONG®4
NEW MADRID EARTHQUAKECIVIL WORKS TASK FORCES
(NWTF)(MVP)
(NETF)(MVR)
(SWTF)(MVN) (SETF)
(MVK)
BUILDING STRONG®
GIS/PLANNING
BUILDING STRONG®
STATE EOC, JFO, FSA/ISB
BUILDING STRONG®
MVR Task Force
BUILDING STRONG®
Team Structure Capabilities Employment Gaps
Team Structure
BUILDING STRONG®
MVR CWTF – NE Purpose CWTF-F Management Cell
► Direct damage assessments► Upward reporting► Resource support
CWTF Assessment Team► Mobile team – DTOS► Perform CW damage assessments
CWTF Support Team► Co-located with CWTF-F► Technical expertise to assessment and flood teams
CWTF Flood Fight Support► Mobile team► Coordinate/perform flood fight operations