Transcript
Page 1: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

US Army Corps of Engineers

BUILDING STRONG®

MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

Patrick G. Tucker

MVD Civil Disaster Planner

Sarah Jones

MVR Emergency Management

May 8, 2014

Page 2: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®

Concept of Operations

2

• MSC’s and District’s responsibilities aligned by state.

• Support FEMA/DHS through traditional ESF # 3 mission assignments as well as nontraditional missions.

• Worst Case Scenario assumes Memphis and St. Louis will be impacted districts (their PRT’s will not be available)

• Support to USACE Civil Works Projects Will Be Within Current Civil-Works Boundaries

Page 3: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®3

Support to USACE Civil Works Projects Will

Be Within Current Civil-Works Boundaries

MVP, MVR, MVK, & MVN will still be

responsible for their CW AORMVM and MVS will be in reconstitutionImpacted MVM & MVM areas will be divided

into 4 sectors by MS River and E-W line

along MVM flood fight areas.CW Task force assigned to each sector

MVD CW Concept of Operations

Page 4: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®4

NEW MADRID EARTHQUAKECIVIL WORKS TASK FORCES

(NWTF)(MVP)

(NETF)(MVR)

(SWTF)(MVN) (SETF)

(MVK)

Page 5: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®

GIS/PLANNING

Page 6: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®

STATE EOC, JFO, FSA/ISB

Page 7: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®

MVR Task Force

Page 8: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®

Team Structure Capabilities Employment Gaps

Team Structure

Page 9: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®

MVR CWTF – NE Purpose CWTF-F Management Cell

► Direct damage assessments► Upward reporting► Resource support

CWTF Assessment Team► Mobile team – DTOS► Perform CW damage assessments

CWTF Support Team► Co-located with CWTF-F► Technical expertise to assessment and flood teams

CWTF Flood Fight Support► Mobile team► Coordinate/perform flood fight operations

Page 10: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®

Page 11: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®

Page 12: MVD NEW MADRID EARTHQUAKE RESPONSE PLAN

BUILDING STRONG®


Top Related