moving transit forward - the plan for st. louis mass transit

23
February 24, 2010

Upload: nextstlcom

Post on 30-May-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 1/23

February 24, 2010

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 2/23

“Moving Transit Forward”

A fiscally responsible, community-drivenvision for restoring, enhancing, andexpanding the Metro Transit system

Moving Transit Forward will:

Promote regional economic development

Strengthen Metro Transit as a vital regional asset

Provide quality transit access to more people Improve service to low-income, elderly, and

disabled residents

Include projects that are cost-effective

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 3/23

Final Alternatives

RefinedEnhancements,Technologies

Short-, Mid-, Long-Range Alternatives

Sequencing

Refined FinancialPlan

Series 3 CommunityEngagement

Preliminary AlternativesCore Values,

Evaluation CriteriaFinancial Analysis

PreliminaryAlternatives

Series 2 CommunityEngagement

Initial Research & Community Engagement

Baseline Survey,Focus Groups

Regional MobilityNeeds

Metro SystemPerformance

Series 1 CommunityEngagement

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 4/23

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 5/23

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 6/23

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 7/23

Community Engagement

Strategy positions transit as a central elementin St. Louis region

Initiates a regional conversation about transit

www.movingtransitforward.org Ongoing stakeholder meetings

Community workshops

○ Round 1: Preferred types of transit, improving thecustomer experience

○ Round 2: Preliminary alternatives, prioritization

○ Round 3: Draft plan, agreement that the plan meetsregion’s needs

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 8/23

Financial Analysis

Key 30-year financial model inputs

Capital and operating costs for investments

Restoration and continuation of MetroBus,

MetroLink, and Metro Call-A-Ride service

Projected performance of existing andpotential revenue sources

Helps to ensure fiscal realism

Guides sequencing of plan optionswithin the three phases

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 9/23

Financial Assumptions

Continuation of existing local funding with noreductions

Additional funding for capital and operating

Local State

Expansion projects are completed only if:

Federal participation

Local/State funds to operate are available

East-West Gateway selection process forcapital projects

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 10/23

Plan Components

Service Restoration

Reinstatement of MetroBus service

Restore Call-A-Ride service for elderly anddisabled

Restore peak frequency of MetroLink Add frequency to crowded MetroBus routes

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 11/23

Transit centers, bus stops

Smart Cards

Automated vehicle location

Web-based applications

○ metrostlouis.org○ NextStopSTL.org

○ Google Transit

○ TripFinder

Plan Components

Passenger Amenities and Technology

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 12/23

Light Rail

Bus Rapid Transit

Commuter Rail

Plan Components

System Expansion

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 13/23

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 14/23

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 15/23

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 16/23

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 17/23

Implementation Plan

Immediate Action Steps

Service restoration, enhancements

Financial discussions: MoDOT, FTA,elected officials

East-West Gateway: light rail, bus rapidtransit planning

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 18/23

Implementation Plan

Short Range (1 - 5 years)

Planning, engineering for next light railextension

2 Bus Rapid Transit routes Continue passenger amenities and

technology projects

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 19/23

Implementation Plan

Mid Range (5 - 10 years)

One light rail extension constructed,operating

Additional Bus Rapid Transit routes

Additional transit centers

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 20/23

Implementation Plan

Long Range (10 - 30 years)

Planning, engineering, construction,operation of second light rail alignment

Planning, engineering for third light railextension

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 21/23

Implementation Plan

To Be Determined

Commuter rail service Success depends on federal and state support of

high-speed intercity rail

Metro Transit service outside existingservice area Determined by funding from those counties

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 22/23

“Moving Transit Forward”

Metro Board of Commissionersapproved plan on February 12, 2010

East-West Gateway to lead capitalproject planning

8/14/2019 Moving Transit Forward - The Plan for St. Louis Mass Transit

http://slidepdf.com/reader/full/moving-transit-forward-the-plan-for-st-louis-mass-transit 23/23