map – 21 “transit” moving ahead for progress in the 21 st century 2015 ftip/fstip workshop

7
Brian Travis California Department of Transportation Division of Mass Transportation January 14, 2013

Upload: brooke

Post on 23-Jan-2016

36 views

Category:

Documents


0 download

DESCRIPTION

MAP – 21 “Transit” Moving Ahead for Progress in the 21 st Century 2015 FTIP/FSTIP Workshop. Brian Travis California Department of Transportation Division of Mass Transportation January 14, 2013. Key Staff. Jane Perez - Division Chief. MAP 21Oversight. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: MAP – 21 “Transit” Moving Ahead for Progress in the 21 st  Century 2015 FTIP/FSTIP Workshop

Brian TravisCalifornia Department of Transportation

Division of Mass TransportationJanuary 14, 2013

Page 2: MAP – 21 “Transit” Moving Ahead for Progress in the 21 st  Century 2015 FTIP/FSTIP Workshop

Jane Perez - Division Chief. MAP 21Oversight.

Mark Codey – Federal Programs Office Chief. MAP 21 Implementation.

Jila Priebe – State Transit Programs Office Chief. MAP 21 Safety, Asset Management and Performance Measures.

Brian Travis – RTAP and Legislative Management. MAP 21 Point Contact, Oversight and Coordination.

Page 3: MAP – 21 “Transit” Moving Ahead for Progress in the 21 st  Century 2015 FTIP/FSTIP Workshop

MAP 21 Working Group – CTA, CalAct, Caltrans, Local Agencies

Dialogues – SCOPT & AASHTO (National) and Statewide – Program level (5310)

Conference Participation – Spring and Fall CTA/CalAct, FHWA/FTA Workshop

Meeting Presentations - RCTF, RTPA, CFPG, FHWA/FTA Region IX

Designations – 5307, 5310, 5337 and 5339

ANPRM, NPRM, Circulars, Guidance – Continuing

Page 4: MAP – 21 “Transit” Moving Ahead for Progress in the 21 st  Century 2015 FTIP/FSTIP Workshop

What are the Impacts?

To the Division of Mass Transportation?

To the Grantee

Page 5: MAP – 21 “Transit” Moving Ahead for Progress in the 21 st  Century 2015 FTIP/FSTIP Workshop

Consolidated Programs

Enhanced Mobility of Seniors and Individuals with Disabilities (5310) - Now Incorporates New Freedom Eligibilities

Rural Area Formula Grants (5311) - Now Incorporates JARC Eligibilities

Page 6: MAP – 21 “Transit” Moving Ahead for Progress in the 21 st  Century 2015 FTIP/FSTIP Workshop

New Programs/Activities

Urban Area Program – Section 5307

Bus and Bus Facilities – Section 5339

Page 7: MAP – 21 “Transit” Moving Ahead for Progress in the 21 st  Century 2015 FTIP/FSTIP Workshop

Thank You!