mosquito road bridge replacement project

10
Mosquito Road Bridge Replacement Project PROJECT UPDATE COUNTY OF EL DORADO DEPARTMENT OF TRANSPORTATION Board of Supervisors August 10, 2021 21-1180 C 1 of 10

Upload: others

Post on 27-Jan-2022

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mosquito Road Bridge Replacement Project

Mosquito Road Bridge

Replacement Project

PROJECT UPDATE

COUNTY OF EL DORADO

DEPARTMENT OF

TRANSPORTATION

Board of Supervisors

August 10, 2021

21-1180 C 1 of 10

Page 2: Mosquito Road Bridge Replacement Project

AGENDA

Project “Look Ahead”

Current & Upcoming

Items

“What to Expect”

21-1180 C 2 of 10

Page 3: Mosquito Road Bridge Replacement Project

July – Dec ‘20 Jan – Jun ‘21 July – Dec ‘21 Jan – Jun ‘22

Project “Look Ahead”

Approximate Schedule

*Pending Final Authorizations21-1180 C 3 of 10

Page 4: Mosquito Road Bridge Replacement Project

Preparation for Construction

Final Construction Bid Package

Final Permit & Mitigation Clearances & Funding Authorizations

Construction Team

Public Outreach

Emergency Service Coordination

Board Authorization

Current & Upcoming Items

21-1180 C 4 of 10

Page 5: Mosquito Road Bridge Replacement Project

Preparation for Construction

Construction Considerations

Utilize County Staff & Resources

Specialized (Segmental Bridge)

Construction Management (CM)

Support Request For Proposal (RFP):

a. Structure Specialist & Inspector

b. Augment County Staff (As Needed)

Current & Upcoming Items

21-1180 C 5 of 10

Page 6: Mosquito Road Bridge Replacement Project

Preparation for Construction

Construction Team Selection

CM Support RFP

3 Quality Proposals Received

Unanimous Top Score

Jacobs Engineering

i. Extensive Segmental

Experience (Design &

Construction)

ii. Strong Supporting Team

iii. County Experience

(Blended Staff)

iv. Contract Highlights:

o “As Needed” overlap,

Other Direct Costs

(ODCs)

Current & Upcoming Items

21-1180 C 6 of 10

Page 7: Mosquito Road Bridge Replacement Project

Preparation for Construction

Construction Contracts

Upcoming Consultant Contracts (Fall 2021):

CM Support – Jacobs (If Approved)

Design Support – Quincy

Advertise for Construction (Winter 2021)

Current & Upcoming Items

21-1180 C 7 of 10

Page 8: Mosquito Road Bridge Replacement Project

Construction

Costs: Capital $62 Million, CM = $8.5 Million

Planned to Begin Spring 2022

Construction Estimated 2 – 3 years

Heavy Equipment & Trucks

Intermittent Lane Closures

Road closures up to 10 weeks per year

Similar closure periods to existing annual bridge maintenance

Public Outreach on website, news media, & roadway message

boards

“What to Expect”

21-1180 C 8 of 10

Page 9: Mosquito Road Bridge Replacement Project

Max. 1.3 mile segment reduced to 0.3 mile

Approx. 6 mile segment

Approx. 2.3 mile segment

Approx. 9.6 mile RCR segment

Approx. 4.4 mile SR 193/49 & US 50 segment

Community Access Routes

“What to Expect”

21-1180 C 9 of 10

Page 10: Mosquito Road Bridge Replacement Project

Conclusion

Concluding Remarks

21-1180 C 10 of 10