Structure of module • Theory: What can we learn from IAEA / ICRP
• Strategy to develop a site-specific monitoring plan
• Life cycle of a site-specific monitoring plan • Parameters to be measured during different states of a site specific monitoring plan
• Some general principles for the development of a site specific monitoring plan
• Case study WISMUT, incl. measurement approaches and QA/QC
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
3
Theory: P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
ICRP 43 (1984): Principles of Monitoring for the Radiation Protection of the Population
IAEA (2005): Environmental and Source Monitoring for Purposes of Rad. Protection, IAEA Saftey Standard Series No. RS-G-1.8
Source Monitoring
Environmental Monitoring
Individual Monitoring
Personal-related environmental Monitoring / baseline monitoring Measurement: along environmental media at sites of the critical group
Source-related environmental monitoring (“fence” measurements)
Operation monitoring; remediation monitoring; Check of sealing functions
Dosimetry, working place measurements
4
Strategy to develop a site-specific monito-ring plan
Agree on goal of the monitoring task to be solved see also life cycle of a monitoring system
Top-down approach historical research (documents) screening measurements (gamma dose rate, sampling in a coarse meshed grid, aerial gamma screening) identify the scope of contamination, the area of concern, the objects of relevance of your site
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
5
Strategy to develop a site-specific monito-ring plan
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
Top-down approach (cont.) Identify critical objects (objects with relevant environmental impact) Identify the critical exposure pathways • Exposure pathway analysis
• Identification of the dominating ways of dispersion of contaminants (geological studies, hydrological modelling)
Identify the critical group of exposure Identify the best-suitable hard and software for measurement
6
Strategy to develop a site-specific monito-ring plan
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
Top-down approach (cont.) Identify site-specific conditions that might have an impact on your monitoring system • accessibility to the sites (local infrastructure) • potential partners (external labs, QA/QC partner)
Take the natural background into account • Base line studies available ?, Bgrd measurements
Recognise the relevant regulatory conditions for implementation of a monitoring system • Laws, recommendations, requirements regarding
reporting/record keeping, QA/QC requirements
7
Establish your program
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
Goal Description of the site Field: Measurement points, parameters to be measured Lab: Field sampling / Parameters to be measured Intervals QA/QC program Responsible person Reporting, record keeping
8
Life Cycle of a Monitoring System for Existing Exposure Situations
Existing Situations Exposure situation
Site investigation; Pre-remediation Monitoring
Goal
Stage
Remediation Monitoring
Post-remediation Monitoring
• monitoring after termination of physical remediation work
• long-term monitoring
time
Number of measurement
time
• Site characterisation • data base to decide on justification of remediation • data base for modelling, identification of optimised remedial measures
• proof of remediation success (technical barriers, covers) • demonstration of long-term stability of the remedial measures) • political aspects (stakeholder expectations, concerns of the local public; epidemiological studies, etc.))
• assessment of the environm. impact of measures (environment, local public) • surveillance of workers (dosimetry etc)
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
9
Same pictures / examples / remarks / hints / etc.
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
10 P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
Getting started:
11
Parameters to be measured (1) Air
Ambient dose äquivalent rate H*(10) Dust / dust fallout Noise Radioactivity (ll alphas, nuclide-specific concentrations, radon, radon progenies [attached/unattached], AMAD)
Water monitoring (surface, groundwater, seepage, releases) Water levels Field parameters (T, pH, Eh, redox potential, turbitity) Radiological parameter (key nuclides, complete nuclide vector: Chemo-toxic parameters, salinity, metals (As, Ni, Cu, Mn, Fe)
Soil Specific activities, concentration of non-radioactive substances
Biota Specific activities, concentration of non-radioactive substances
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
12
Parameters to be measured (2) P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
Operational Monitoring (water treatment plants) Releases (volumes, radioactivity [load, concentrations], other hazardous substances [load, concentrations]) Parameters governing technological processes Parameters characterizing residues
Individual dosimetry, hygienic working conditions Radiological parameters • Personal doese equivalent, penetrating Hp(10) • Radon/radon progeny concentration, equilibrium factor, AMAD, attached/unattached Rn progenies • Long-lived alpha emitters (dust-born) Air quality • Dust • Aerosols (gases) Noise
Geotechnical parameters Seismic parameters, levels, settlements,
13
Some general aspects and examples of measurements a) The monitoring is site specific as well as object specific, not static
and it is subject to regular amendments/optimizations
b) Distinction has to be made between the basic monitoring (baseline measurements and person-related environmental monitoring)
and object- and/or process-related monitoring of the environmental impact of remedial measures (source monitoring, source-related environmental monitoring)
c) Distinction has to be made between controlled releases of radioactivity into the environment and the diffuse radioactivity migration into the air and into aquatic systems
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
14
Monitoring of controlled discharges: water pathway
Controlled discharge into receiving streams or underground
Typically, such waters are collected and monitored for volume and quality.
Discharge is from specific hydraulic structures (drainage structures) or from water treatment plants.
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
15
Monitoring of controlled discharge: air pathway
Controlled discharges of air-born radioactivity via a ventilation shaft
Typically, the air is collected and monitored for volume and quality.
Discharge is from specific structures (ventilation shafts and holes at mine sites, ventilation structures in water treatment facilities)
Ventilation shaft #382 at the Schlema site
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
16
Monitoring of diffuse emissions - water pathway
Diffuse leakage of seepage and percolating waters into ground and surface waters
Quantity and to some extent the quality of such waters can only be evaluated by modelling. Their sources are infiltration waters percolating through mine dumps, tailings ponds, and mine workings.
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
17
Monitoring of diffuse emissions - air pathway Radon exhalation, Dispersion of dust-born radioactivity
Here: Comparison of radon exhalation rates, summer vs. Winter
summer, with Toutside > 10 OC winter, with Toutside < 10 OC
<= 0,1 Bq/(m²s) 0,11...0,2 Bq/(m²s) 0,21...0,5 Bq/(m²s) 0,51...1,0 Bq/(m²s) > 1,0 Bq/(m²s)
Legende:
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
18
Monitoring: The WISMUT Case Study
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remedaition Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
19
Monitoring: The WISMUT Case Study P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
for a limited time rehabilitation project,
Monitoring of the
Basic monitoring Continuous surveillance
Rehabilitation monitoring Project-related measurements
Monitoring of geomechanical
stability
Monitoring of non-radioactive
components
Monitoring of radioactive components
Long-term monitoring after completion of rehabilitation
Guideline relating to emission and immission monitoring
in mining
WISMUT operates one of the largest environmental monitoring systems in Europe. 30000 samples per year (95 % water samples)are causing 300.000 database entries.
20
WISMUT Monitoring: Water Pathway P. Schmidt, Monitoring and Measurement Approaches
ca. 350 monitoring points
ca. 200 monitoring points
IMMISSIONS EMISSIONS
SEEPAGE WATER
FROM HEAPS and
TAILING PONDS
MINE DRAINAGE WATER
catched
GROUND WATER
SURFACE WATER
RECEIVING STREAMS WATER TREATMENT
PLANT
ca. 50 emission points
diffuse
ca. 200 monitoring points
ca. 1800 monitoring points
ca. 130 monitoring points
The monitoring network is divided into an emission and immission section to control the discharges and allow dose and risk estimates
21
WISMUT Monitoring: Water Pathway P. Schmidt, Monitoring and Measurement Approaches
Over 1800 monitoring points for observation of • ground-, surface, seepage and processing waters • at 7 former uranium mining and milling sites.
Measured parameters • radionuclides (e.g.Ra-226, U-238) • non-radiological p. (As, metals, salinity, ..) • hydro-meteorological parameters
Annual work volume • 30.000 samplings • 300.000 parameter
analysis
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
22
WISMUT Monitoring: Air Pathway (2012) P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
Basic Monitoring Air/ground pathway (295 meas. points) - Rn-222 (234 points) - dust and long-lived alphas (25 points) - Ra-226 in precipitated dust (33 points)
Plus emission points
- 2 shafts, - 3 controlled air emissions from water treatment facilities) x air, 12 x water)
Remediation monitoring many thousand measurements/a - Rn concentration, Cpot, Rn exhalation - Ambient dose rates, - dust long-lived alpha emitters
23
LIMS / AL.VIS-W P. Schmidt, Monitoring and Measurement Approaches
The ALWIS system has been developed by WISMUT. It is a simple, easy to use, powerful tool to unify geographical and environmental data management.
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
LIMS: Laboratory Information Management System
AL.VIS-W: Technical Data Base System at WISMUT
24
Legende Radonmeßstellen
Radon Monitoring at the Schlema site
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
25
Groundwater monitoring at the Schlema-Alberoda site
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
26
Surface water monitoring at the Schlema-Alberoda site
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
27
Sample Taking: P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
(picture from the last sample taking ?)
.... in this way?
28
Sample Taking: P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
.... or in this way?
Most of the errors are due to improper samp-ling and sample prepa-ration
29
QA/QC: P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
Baseline QA/QC
I Wismut QA/QC handbook, ISO 9000 conform
I Special Department at Wismut I General Instructions, internal guidelines for measure- ments, accreditation of the laboratories, metrological basis (own calibration facilities), computer added QA/QC, special data bases, ... internal certification Process-related QA/QC I Assurance and control of process-specific parameters I Internal certification of successful performance of a certain process
30
QA/QC: P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
Calibration – the WISMUT secondary standard calibration fields
31 P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
View into the
Radon- Laboratory with 8 m³ chamber and 400 l containers
BFS - DKD - Calibration - Laboratory
8 m³ - stainless steel chamber
400 l containers incl. radon dosing system
QA/QC – the BfS (German Federal Office for Radiation Protection in Berlin) radon chambers
32 P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
WISMUT monitoring: staff and responsibilities
CEO Technical Ressort
Dep. for Environmental Monitoring and Radiation
Protection (10 experts dealing with monitoring)
Department for Remediation Technology (5)
Dep. for data mane-gement, LIMS and modelling (3)
Dep. for QA/QC (1)
Project Management (5)
Service Center Env. Monitoring (35) [sampling, doimetery maintenace, ...]) 3 Labs (central lab in Seelin-
gstaädt, labs in Schlema, Königstein) (30)
Three external laboratories (VKTA, ...)
Authorities
reporting
Almost 90 experts are dealing with env. monitoring issues (6 % of the WISMUT staff [now 1400] )
33
Some lessons learned by WISMUT I Importance of QA /QC (hard and software, staff [training] )
I Site specific monitoring (monitoring for what?)
I Purchase only instruments which fit into your infrastructure (robust, spare parts, data transfer, staff qualification,...)
I Realize, that most of the errors in environmental monito- ring are caused by sampling and sample preparation I Data management (if more than one site centralised data bases) I Apply an intelligent combination of field and lab measure- ments (screening in the field, focus on key parameters, selected lab investigations, connecting calibration, statistical analysis of field data)
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
34
Measurement approaches
Case study: Intelligent Combination of
Field and Lab Measurements for Characterisation of Large Amounts of
Uranium Production Residues at WISMUT Sites
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
35
What is the problem ?
Need of representativ
e data
Point-wise measurement
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
36
How to manage it? - The batch concept
• A batch is an assemblage of diverse items (elements, products, goods, but also samples taken from a certain amount of material) which are characterised by same features, or which have the same origin, or which went through similar technological processes.
• As a consequence, the elements / goods / samples are comparable to each other.
• Taking of randomly selected samples from this assemblage and analysis of the samples allows to determine parameters which are representative for the batch (charge).
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
37
Intelligent combination between lab and field measurements
The problem
Contamination at NORM sites may be wide-spread and not homogenously distributed
The way out:
Intelligent combination of field and lab measurements, statistical data interpretation
Step 1: Sampling, determination of the nuclide vector, identification of the index nuclide (lab measurements)
Step 2: Selection of an appropriate field (in-situ) measurement method
Step 3: Problem related „connecting“- calibra-tion between field and lab measuremts.
Step 4: In-situ measurements, quality assurance by laboratory analyses
Step 5:
Statistical interpretation of the field data
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
38
Example: Release of lowly contaminated scrap for smelting
At WISMUT
300 000 t scrap from demolition and decommissioning
Restricted release criterion: 0,5 Bq/cm² Total Alpha Surface Activity (SSK recommendation)
Scrap market price: 100 US $ per tonnes
Task: Separation of scrap for release to smelting in a steel factory
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
39
Dominating Nuclide (=1) Material Ra-226 U-238 Th-230 Rn-222 Pb-210 Waste rocks 1 0.95 0.95 0.94 0.91 U concentrated 0.0013 1 0.0013 0.0009 0.00067 Tailings 1 0.04 0.64 0.88 0.95 210Pb/210Po 0.024 0.024 0.021 0.024 1
Step 1: - make sure that the batch concept is applicable (sorting) - sampling (scratching of rust from the surface), - determination of the nuclide vector, identification of the index (key) nuclide (gamma spectrometry)
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
40
- determination of the Total Surface Alpha Activity TAA via measurement of the beta net count rate
- determination of the beta net count rate requires a double measurement (without shiel- ding – Ntot; with a 3 mm Al shielding - Nbg)
- rationale behind: In the U decay chain is a fixed ratio between alphas and betas
- alpha surface activity can under the rough field conditions (climate, rust) not precisely measured.
- using hand-held portable instruments
Step 2: Selection of an appropriate field (in-situ) measurement method
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
41
Clearance measurements on surfaces (release of equipment, machinery, scrap)
Determination of the beta netto count rate
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
42
TAA [Bq/cm2]= kβ⋅Nβ = kβ ⋅ (Ntot- Nbg)
Step 3: Problem related „connecting“- calibration between field and lab measuremts.
Simulation of the
• self-attenuation and
• backscattering
• of alpha and beta particles in the rust surface layer
not commercially available; self-made, tailored to four different radionuclide vectors
Calibration pad
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
43
Step 4: In-situ measurements, quality assurance by laboratory analyses
Screening:
Between 50 and 80 measure-ments for a scrap pile of 50 tonnes
1 scratch sample per pile for QA (gamma spectrometry)
On-site input of the data into a labtop running programme
Measurement termination after a certain level of uncer-tainty for the representative parameter(TAA) is reached
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
44
Step 5: Statistical interpretation of the field data
• investigation of the type of statistical distribution (normal [i. e. Gaussian] distribution via log-normal distribution;
note: data on environmental contamination are as a rule lognormal-distributed !
• consideration of the background
• detection of non-plausible values; exclusion of these values from data interpretation
• determination of the relevant statistic parameters (Xmean, standard deviation σ, uncertainty ∆, percentile Pα ; confidence interval for a given level of confidence α)
• decision on the base of an agreement with authorities (convention) what “representative parameter” means (for instance with respect to a clearance level, or with respect to the input for a dose estimate)
0
20
40
60
80
100
120
0,0 0,1 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1,0
[Bq/cm2]
Freq
uenc
y D
istri
butio
n
Frerquency of the DataLognorma Distribution Gaussian Distribution
5<
0
50
100
150
200
250
300
0,0 0,1 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1,0
[Bq/cm2]
Freq
uenc
y D
istri
butio
n Frequency of the DataLognormal Distribution Gaussian Distribution
< 5
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
45
Statistical evaluation of the measurement data For a normally distributed measurement quantity, the sample is characterised by es-timate of the mean value (E) and deviation (S2). Then the confidence limits for the true mean (µ) may be assessed by the relation
E tSn
E tSnn n− < µ < +− −α α, ,1 1
(1)
where t nα , −1 is the percentile of the Student distribution with n-1 degree of freedom for alpha error probability. Only the upper confidence limit defined in (1) is of rele-vance to check observance of the release level of 0.5 Bq/cm2, whereby an error probability of α = 0.05 is acceptable.
Evaluation of established frequency distributions for TAA data from various scrap heaps would suggest the use of lognormal or approximately lognormal distribution functions for the evaluation of measured data. The upper confidence limit for the true mean µ, which is essential to observe the release limit of 0.5 Bq/cm2, may then be estimated by the relation
{ }µ α< + +
−Max E E S
Sn
t Sn;exp( / ) exp ( / )ln lnln
, ln2
12 2 (2)
where Eln and Sln2 represent the estimate of the mean value and deviation of the log-
normal distribution.
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
46
0
20
40
60
80
100
120
0,0 0,1 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1,0
[Bq/cm2]
Freq
uenc
y D
istri
butio
n
Frequency of the DataLognormal Distribution Gaussian Distribution
Comparison of the TAA reference value (0,5 Bq/cm²) with the upper limit of the confidence interval (95 % confidence value)
Frequency distributions of TAA values for a heap of scrap metal of Wismut GmbH
Statistical evaluation of the measurement data
TAA mean value = 0,11 Bq/cm²
Upper confidence limit = 0,14 Bq/cm²
P. Schmidt, Monitoring and Measurement Approaches
IAEA Training Course on Remediation Infrastructure, Chemnitz, Germany, Dec. 3-7, 2012
47 IAEA Project BRA3013, Workshop, Poços de Caldas, June 2011 P. Schmidt; Environmental Monitoring at Uranium Mining and Milling Sites
47
Many Thanks For Your Attention