  • 8/16/2019 Module Review (1)

    1/16

    6CN011 Contract Law and

    Dispute Resolution (Qatar)

    Module Review 2

    30 March 2012

  • 8/16/2019 Module Review (1)

    2/16

    2

    FIDIC: The Priority ofContract Documents (Clause

    1.5)1  !he Contract "#ree$ent

    2  !he Letter o% acceptance

    3  !he Letter o% !ender&  !he 'articular Conditions

     !he eneral Conditions

    6  !he *peci+cation

    ,  !he drawin#s

    -  !he schedules

    . "n/ %urther docu$ents

  • 8/16/2019 Module Review (1)

    3/16

    3

     !he $plo/er (Clause 2)

    *o$e Roles o%  No$inatin# n#ineer ivin# possession o% the site on ti$e (21) tainin# plannin# per$issions %or the

    'er$anent wor4s 'rovidin# assistance to otain per$its (22) Cooperate with the Contractor5 #enerall/ nsurin# own personnel co$pl/ with sa%et/

    reuire$ents 7 protect the environ$ent (23) Ma4in# pa/$ent upon certi+cation 'rovide to the Contractor evidence o%

    +nancial arran#e$ent to pa/ the Contract

    price (2&)

  • 8/16/2019 Module Review (1)

    4/16

     !he n#ineer is e8pected to $a4ecertain 9Deter$inations: under

    Clause 3 o% the ;

  • 8/16/2019 Module Review (1)

    5/16

    Resource Mana#e$ent

    *ta= and Laour Contractor shall arran#e to hire5 pa/5

    $aintain sta= (61)

    Re$uneration and conditions o%en#a#e$ent shall not e lower thanthose prevailin# (62)

    Contractor shall not poach sta= %ro$ the

    $plo/er:s or#anisation (63) Contractor to co$pl/ with laour laws

    (6&)

    tc

  • 8/16/2019 Module Review (1)

    6/16

    6

     !he 'ro#ra$$e (-3)  !he n#ineer reuires pro#ra$$e to

    1 r#anise their o>ce re drawin#s5

    schedules5 no$inated s?c:s2 r#anise their en#ineerin# sta= and

    inspectors

    3

    Monitor the contractor:s pro#ress& stalish the cash @ow (%or the

    $plo/er)

    Monitor clai$s %or e8tensions o% ti$e

  • 8/16/2019 Module Review (1)

    7/16,

     !he 'ro#ra$$e (-3)  !he Contractor reuires pro#ra$$e

    to

    1 r#anise sucontractors5

    2 'rocure plant5 laour and $aterials

    3 'lan and control the wor4s

    & stalish the asis o% clai$s stalish the cash @ow

  • 8/16/2019 Module Review (1)

    8/16-

    8tension o% ti$e %or co$pletion

    (-&) rounds %or eot include

    " variation or other sustantial chan#e

    in uantit/ Dela/ under suAclause o% these

    conditions

    8ceptionall/ adverse cli$aticconditions *horta#es in personnel or #oods caused

    / epide$ic or #overn$ent actions Dela/ caused / the e$plo/er

  • 8/16/2019 Module Review (1)

    9/16.

    8tension o% ti$e %or co$pletion

    (-&)  !he %ollowin# clauses carr/ an

    entitle$ent to an e8tension o% ti$e plus

    cost and a reasonale pro+t 1. Dela/ed drawin#s and instructions 21 Ri#ht o% access to the site &, *ettin# out

    ,& !estin# 103

  • 8/16/2019 Module Review (1)

    10/1610

    Contract 'rice and 'a/$ents (Clause

    1&) "pplication %or interi$ 'a/$ent

    Certi+cates to consider (1&3) sti$ated contract value "dBust$ent %or chan#es in le#islation and

    chan#es in cost Deduction o% retention "dvanced pa/$ents

    'lant and $aterials intended %or the wor4s Clai$s and disputes Deductions o% other certi+cates

    N Contractor to suppl/ 6 copies

    $onthl/

  • 8/16/2019 Module Review (1)

    11/16

    Termination by Employer (Cl 15)

    $plo/er can also ter$inate i%Contractor

    • *ucontracts the wor4s

    • "ssi#ns the contract• eco$es an4rupt or insolvent

    • De$onstrates ein# corrupt (rier/5

    etc)

    • ;urther $plo/er can ter$inate /

    reason o% convenience (1)

  • 8/16/2019 Module Review (1)

    12/16

    uspension an! termination bythe Contractor

    1 Contractor can stop (*uspend) wor4or slowAdown5 Ea%ter 2- da/s:noticeF5 i% $plo/er does not

     – issue pa/$ent certi+cate – 'rovide evidence o% ;inancial

    "rran#e$ent

    2 Contractor can %urther

    1 !er$inate the Contract i% the $plo/erdoes not recti%/ (1) aove

    2 Clai$ %or losses therein

     –. n#ineer to a#ree or deter$ine $atters

  • 8/16/2019 Module Review (1)

    13/1613

    Clai$s (clause 20)  Contractor:s Clai$s (201)

    Contractor to #ive notice within 2- da/s Adescriin# the circu$stances 2- da/s o% eco$in# aware or 2- da/s Contractor should have een aware

    Contractor %or%eits the ri#ht to a clai$ %or%ailin# to #ive a notice within 2- da/s

    Contractor should 4eep conte$porar/ recordsin support o% clai$s ither on site or at location(s) acceptale to

    n#ineer n#ineer allowed to inspect docu$ents5 %ollowin# a

  • 8/16/2019 Module Review (1)

    14/16

    Claim " Timin#

    Contractor to su$it clai$ within &2 da/s o%eco$in# (or should have eco$e) aware Contractor can clai$ on a continuous asis G i%

    the source o% clai$ has a continuous e=ect n#ineer to respond to a clai$ within &2 da/s

    Decision H 1) "pproved or 2) Disapprove n#ineer $a/ reuest %urther details alon#

    with the decision n#ineer to estalish (an/) additional ti$e or

    cost to which the Contractor is entitled "pproved pa/$ent(s) incorporated in (ne8t)

    'a/$ent Certi+cate 1&

  • 8/16/2019 Module Review (1)

    15/16

     !utorial Question 1 STECH Developments Ltd. is surprised and embarrassed to

    receive a claim for loss and expense and extension of time in

    respect of a project completed five years ao.

     !ssumin t"at t"e contract for t"e construction of t"e project#or$s incorporated t"e %&D&C form' advise STECH #"o #as t"e

    Employer under t"e contract.

    1

  • 8/16/2019 Module Review (1)

    16/16

     !utorial Question 2 (ibuilder Ltd. entered into a construction contract #it" a

    )an$eetex (an$' a *S conlomerate for t"e +desin and

    construction, of its European Head -ffice in Do"a. T"e contract

    incorporated an arbitration areement referrin all futuredisputes to arbitration in Do"a.

    (ibuilder served notice to refer a payment dispute to

    adjudication and applied to t"e &CS – /atar (ranc" to

    nominate an adjudicator. )an$eetex "as responded t"at it is not

    ready to participate in any mic$y mouse arbitration. !dvise)an$eetex on t"e adjudication process and t"e li$ely outcome if

    it refuses to participate.