Modernizing Railways Movement & Handling “ Sushil Nowal Sr. Vice President (Planning & Logistics ) JSW Steel Limited, Vijayanagar Works 1

Upload: others

Post on 01-May-2022

14 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Modernizing Railways

Modernizing Railways

“Movement & Handling “

Sushil Nowal

Sr. Vice President (Planning & Logistics )

JSW Steel Limited, Vijayanagar Works1

Page 2: Modernizing Railways

2

Contents

2

1. JSW Group Overview

2. Indian Steel Scenario

3. Challenges in Railways

4. Railway infra – Demand from Steel Industry

5. Reduction of Turnaround Time for Rakes

6. Last Mile connectivity issues & solutions

7. Optimizing SCM to reduce empty wagon movement

Page 3: Modernizing Railways

3

JSW Group Overview

A multi-billion-dollar conglomerate, with

presence across India, USA, South America

& Africa, the JSW Group is a part of the

O.P. Jindal Group with strong footprints

across core economic sectors..

Vision

Bring positive

transformation to

every life we

touch.

Cement

JSW Cementscapacity of

10.3 MMTPA.

JSW Steelcapacity of 18 MMTPA

Steel

JSW Energyoperates

4,531 MW capacity

Energy

JSW Infrastructure

Capacity- 68 MMTPA

Infrastruc

ture

JSW Ventures

Ventures

Core Businesses

JSW Foundation for Corporate Social Social Responsibility

JSW GLOBAL BUSINESS SOLUTIONS: Providing Service Support to all JSW Group

Companies

3

Page 4: Modernizing Railways

4

JSW

INFRA

GLOBAL

BUSINESS

SOLUTIONS

JSW

ENERGY LTD

Group

INFRASTRUCTU

RE

POWER

SERVICES

JSW

FOUNDATION

JSW

CEMENT

CEMENT

EXPANDING PRESENCE ACROSS KEY INFRASTRUCTURE SECTORS

JSW

STEEL LTD

STEEL

JSW Steel is India’s Largest Steel manufacturer with 18 MMTPA with 7

manufacturing facilities in India

VASIND / TARAPUR

DOLVI & SALAV

VIJAYANAGAR

KALMESHWAR

SALEM

Integrated Steel Plant

Downstream Plant

JSW Group11 Bn USD

JSW Steel Ltd.9.3 Bn USD

Vijayanagar 12 MMTPA

Dolvi 5 MMTPA

Salem 1 MMTPA

Page 5: Modernizing Railways

5

JSW Vijayanagar – Flagship of JSW Steel

5

2022

18

1999

0.8

2001

1.6

2004

2.5

2006

3.8

2009

6.8

2011

10

2017

12

Vijayanagar Steel

Works - India’s

Largest Integrated

Steel Plant

Largest Exporter of

Steel from India

2019

13

Fastest growing Steel plant in India with y-o-y growth

of 17% since 1999

Page 6: Modernizing Railways

6

RANKED 8th AMONGST TOP 37 “WORLD-CLASS” STEELMAKERS

7.95

VoestAlpine,Austria

7.427.42

JFE JAPAN

7.43

Arcelor Mittal Multi

7.49

Nippon Sumitomo,Japan

7.65

NLMKRUSSIA

7.70MMK,Russia

7.97

JSW Steel

RANKED 8th

JUN2011

RANKED 7th

AMONG THE

TOP 10

JUN2013

RANKED 5th

AMONG THE

TOP 10

JUN2014

RANKED 7th

AMONG THE

TOP 10

JUN2016

RANKED 10th

AMONG THE

TOP 10

SOURCE: World Steel Dynamics - Ranking as on June 2018 (based on 23 parameters)

8.37

POSCO S. Korea

*Weighted-Average Score

Ranking (highest is most favorable)

Expanding capacity

Location in high-growth markets

Conversion costs; yields

Labour costs

Environment & Safety

M&A, Alliances & JVs

HIG

H FA

CTO

RS

NucarUSA

JUN2015

RANKED 6th

AMONG THE

TOP 10

JUN2017

RANKED 6th

AMONG THE

TOP 10

6

Only Indian Company in the list of TOP TEN

7.65

Severstal,Russia/

USA

JUN2012

RANKED 6th

AMONG THE

TOP 10

Page 7: Modernizing Railways

7

Wide Range of Product offerings

Hot Rolled Coils HR Plates / Sheets

CRNO CRCA

Wire Rods

TMT Bars

7

Focus on value added products,

Wider portfolio

Page 8: Modernizing Railways

8

JSW VIJAYANAGAR PLANT RAIL NETWORK : 194 kms track & 52 Own Loco

RECEIPT YARD-1

NORTH YARD(FG)

TRACK HOPPER

HOT METAL YARD

BRM#2

CEMENT YARD

CHENNAIGOA

MINE HEADS

DAROJI

Page 9: Modernizing Railways

• 34 tracks , 6 Wagon tipplers &

2 twin Wagon tipplers

• 2 Track hoppers.

• 02 Railway approved weigh

bridges.

9

Infrastructure: Raw Material Receipt Yards

Page 10: Modernizing Railways

10

Infrastructure: Rail Dispatch Yard

▪ 12 loading points

▪ 2 in-motion

weigh bridges

▪ Wagon supply to

loading points at

Mills area

Page 11: Modernizing Railways

11

Infrastructure: Dispatch Yard (Cold Rolling Mills)

▪ ASRS – Auto

Storage & Retrieval

System

▪ Vertical Storage of

Steel FG – PESMEL

▪ Storage capacity –

2000 coils

▪ Coils retrieval

speed – 42 per

hour.

▪ Efficient use of

storage area

Page 12: Modernizing Railways

12

2. Indian Steel Scenario

12

Page 13: Modernizing Railways

INDIAN STEEL PRODUCTION

JSW STEEL

79 90

5393

131

182

2017-18 2025-26

5 912

3417

43

2017-18 2025-26

LP FP Total

40%51%

70%

80%

(Est.)

(Est.)

FP

FP

• Flat Products to increase to 93 mtpa by FY26

• JSW flat product share expected to go up to 80%

(34 Mtpa) by FY26.

• Flat product - Auto, Consumer durables, General

engineering, Roofing, structural, Pipes & Tubes

• Steel Coils are more prone to damage in handling

& transportation.

• Cold Rolled product being sensitive

• Flat wagons not suitable for steel coil

transportation.

• BFNS types of wagon are currently available for the

transportation of steel coils

• JSW has deployed 2 number of BFNS rakes under

LWIS scheme.

2. Indian Steel Scenario

Indian Steel Mission 300 MTPA by 2030

All figure in Million MT

Page 14: Modernizing Railways

14

3. Challenges in Railways

14

A. Speed of Freight Trains : Present avg. 34kmph

B. Locomotive Availability & Delays due to Crew Change

C. High Capacity wagon design to move 70 mt/ wagon

D. Railway route to be strengthened from 20.3 to 25 ton axle load throughout

A. Heavy Demurrage charges on Coal – 2 , 2.5 & 3 times of normal

B. Freight increase & Terminal Charges reintroduced

C. GPLWIS : Rebate structure to be revisited. ROI over 10 years

D. Priority of rake supply to Coal Movement – affecting other users.

Page 15: Modernizing Railways

15

4. Railway infra – Demand from Steel Industry

15

Page 16: Modernizing Railways

16

• Handling through Mobile or EOT crane.

• Forklift unloading not possible

LIMITATIONS IN MATERIAL HANDLING

• OHE sidings cannot be used

• Additional lines at unloading yards

HIGHER SIDING DEVELOPMENT COST:

• It carry coils ranging from 1000 mm to 2000 mm dia.

• Locking arrangement – limited

LIMITATIONS IN COIL SIZE

Availability of Steel Coil specific wagons :

BFNSM1

BFNSM

Page 17: Modernizing Railways

17

JSW Proposal for Special Wagon :

Page 18: Modernizing Railways

18

CC of Rake : 4036 MT / Rake for 22.9 axle load – 50% extra loading effeciency

Coil arrangement in pocket : Eye towards platform / sole bar. Easier/ faster handling

Wagon with cradles for with locking and lashing arrangement for safety.

Saddles of suitable slope & height to accommodate coils from 750 mm to 2200 mm diameter.

Resilient pads/Liner on full face of loading area of saddle, avoid damage to Coils

1

2

3

4

5

Salient Features :

Page 19: Modernizing Railways

19

Operational Advantages :

• Siding can be developed at any stations with minimum expenditure

• Less land is required to develop the siding.

• Material can be handled through forklift even in track with OHE line.

Low siding development cost

• Siding closer to customer base will reduce the last mile road transportation cost

• Reduction in Delivery cost , Rail competitive than road transport, attract further volume

• Increase in no. of wagon / rake will increase evacuation rate.

Increase in Rail Share

• Lower time in rake placement and evacuation.

• Lesser - turn around time. & loading and unloading of the coils

Higher efficiency for Railways and manufacturer:

• Handling of Coil by Fork lift will make handling damages case to Zero %

Reduction in Handling damage

Page 20: Modernizing Railways

20

Provision to mount HDPE Collapsible Hood :

BENEFIT’S

100 % Protection of Coil ( Cold Rolled )

Increase in customer satisfaction level

Branding of company Products

One Step a head Initiative in Indian Railway for Steel transportation

INTERNATIONAL WAGON DESIGN

Page 21: Modernizing Railways

21

Handling through fork lift : Faster operations

Page 22: Modernizing Railways

22

4. Railway infra – Demand from Steel Industry – contd..

22

1. Fast-Track Approval mechanism for New Wagon design & development

2. Development of Railway sidings for handling Steel FG – Covered sheds

3. Maintenance or Withdrawl of Damaged wagons - Operation delays

4. CC+4, CC+6 routes may be upgraded to CC+8

Page 23: Modernizing Railways

23

5. Reduction of Turnaround Time for Rakes:

23

1. Unloading & loading in a siding to be clubbed – free time

2. Crew (GDR) may be increased to timely evacuation, lesser detention

3. Bulge/ Damaged wagons segregation from Rake

4. Incentives for faster unloading / loading – Debit / Credit hours system

5. High capacity & reliable in-motion weighbridges required

Page 24: Modernizing Railways

24

6. Last Mile connectivity issues & solutions

24

1. Leasing of Railway space for Storage yards / service centers

2. Development of link roads to Railway Sidings

3. Development of Additional Goods Sheds outside cities

4. Reduce charges on License fees & Codal Charges – Attract interest in customers

to invest in Siding development.

Page 25: Modernizing Railways

25

7. Optimizing SCM to reduce empty wagon movement

25

1. Policy on Train Examination to be revisited – Checking after every trip (losing almost 10

days every month on checking)

2. All rakes to be made Closed circuit rakes – with higher validity & kms (9000 kms / 3

months)

3. Empty flow direction policies to be approved for reverse loading in All zones

4. Reduction in Slag classification from 140 to 100, will ensure return load of all BOXN rakes

from steel plants. (Demand available – Rail freight high)

Page 26: Modernizing Railways

26

❖ THANK YOU