mit kendall square initiative soma project graphics materials · mit kendall square initiative soma...

13
MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit Application Article 19 Project Review Special Permit Application Submitted by: Massachusetts Institute of Technology (MIT)

Upload: others

Post on 13-Sep-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

MIT Kendall Square Initiative

SoMa Project

Graphics Materials

July 27, 2015

Planned Unit Development Special Permit Application

Article 19 Project Review Special Permit Application

Submitted by:

Massachusetts Institute of Technology (MIT)

Page 2: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

MIT Kendall Square -

SoMa Project

Table of Contents

A. Project Overview Figures A-1 -- A-7

B. Open Space and Connections Figures B-1 -- B-28

C. Ground Floor Retail Figures C-1 -- C-4

D. Buildings, Parking & Bicycle Facilities Figures D-1 – D-85

• Building 2 D-1 – D-15

• Building 3 D-16 – D-35

• Building 4 D-36 – D-52

• Building 5 D-53 – D-68

• Building 6 D-69 – D-76

• Parking D-77 – D-83

• Bicycle Parking & Facilities D-84 – D-85

E. SoMa Renderings Figures E-1 – E-7

F. Technical Graphics Figures F-1 – F-23

• Shadow Study F-1 – F-3

• Infrastructure F-4 – F-10

• Existing Conditions Survey F-11 – F-23

G. PUD 5 Conceptual Plan Figures G-1 – G-3

Page 3: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

OWNER/ PROJECT PROPONENT

Massachusetts Institute of Technology (MIT)

LEGAL COUNSEL

Goulston & Storrs Gallucio & Watson, LLP

PROJECT MANAGEMENT

Redgate Northstar (Building 6)

BUILDING DESIGN ARCHITECTS

Elkus Manfredi Architects (Building 2) Perkins + Will Architects (Building 3)

NADAAA (Building 4) Weiss/Manfredi Architects (Building 5)

nARCHITECTS (Building 6)

LANDSCAPE ARCHITECTS

Hargreaves Associates

RETAIL AND PLACEMAKING

Graffito SP

CIVIL ENGINEERING

Nitsch Engineering

TRANSPORTATION ENGINEERING

VHB

Page 4: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

PARKING CONSULTANT

Desman Design Management

M/E/P ENGINEERING

AHA Consulting Engineers Bard Rao + Athanas Consulting Engineers

WSP ARUP

STRUCTURAL ENGINEERING

MacNamara · Salvia Robert Silman Associates Odeh Engineers

GEOTECHNICAL/GEOENVIRONMENTAL

McPhail Associates, LLC

ACOUSTICAL ENGINEERING

Acentech

SUSTAINABILITY CONSULTANT

Atelier Ten The Green Engineer

DISTRICT ENERGY CONSULTANT

JB&B

WIND CONSULTANT

RWDI Consulting Engineers

Page 5: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

SURVEYOR

Feldman

PRECONSTRUCTION SERVICES

Turner Construction Elaine Construction

COMMUNICATIONS

Solomon McCown & Company

Page 6: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

MIT Kendall Square -

SoMa Project

A. Project Overview

B. Open Space and Connections

C. Ground Floor Retail

D. Buildings, Parking & Bicycle Facilities

E. SoMa Renderings

F. Technical Graphics

G. PUD 5 Conceptual Plan

Page 7: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

FELDMAN

07/27/2015 Figure A - 1

Page 8: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

FELDMAN

07/27/2015 Figure A - 2

Page 9: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

E19

E18E17

E25

E23E15

E14

E38E39 E48

E40

E70

E53E62

E60

E52E51

E2

E1

E33E34

E55

100 Memorial Dr.

PUD 5

AREA IV

CAMBRIDGEPORT

WELLINGTON-HARRINGTON

MIT KENDALL SQUARESoMa PROJECT

0’ 500’

scale: 1” = 500’

1000’ SITE CONTEXT MAPEXISTING CONDITIONS

07/27/2015 Figure A - 3

Page 10: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

0’ 500’

scale: 1” = 500’

1000’

1

2345

6E19

E18E17

E25

E23E15

E14

E38E39 E48

E40

E70

E53E62

E60

E52E51

E2

E1

AREA IV

CAMBRIDGEPORT

PUD 5

WELLINGTON-HARRINGTON

MIT KENDALL SQUARESoMa PROJECT

SITE CONTEXT MAPPROPOSED CONDITIONS

07/27/2015 Figure A - 4

Page 11: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

Main St

Wad

swor

th S

t

Carle

ton

St

Memorial Dr

Third

St

Ames

St Broadway

Amherst St

Galil

eo G

alile

i Way

Vassar S

t

Hayw

ard

St

Main St

Deacon St

Dock

St

0’ 200’

scale: 1” = 200’

400’

CHARLES RIVER

BROAD CANAL

PUD 5PUD 5

T

T T

MIT KENDALL SQUARESoMa PROJECT

AERIALEXISTING CONDITIONS

07/27/2015 Figure A - 5

Page 12: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

\\mabos\projects\11356.00\graphics\FIGURES\SoMa Special Permit\VHB Figures.indd p5 07/23/15

0’ 200’

scale: 1” = 200’

400’ MIT KENDALL SQUARESoMa PROJECT

Source: Hargreaves Associates

CHARLES RIVER

BROAD CANAL

PUD 5

T

T

One Broadway312,704 sf

office/retail

E55172,350 sfacademicgraduatestudenthousing

E5394,304 sfacademic

E52143,950 sfacademic

E3427,333 sfacademic

E4882,000 sf

office/retail

E337,980 sf

academic

E51107,719 sfacademic

100 Memorial Drive297,701 sfresidential

E264,670 sfacademic

E14162,665 sfacademic

E15120,248 sfacademic

E17/E18/E19345,823 sfacademic

E35/E23254,200 sfacademic

RIMAC13,624 sf

commercial

CambridgeTrust

2,923 sfretail

E284,239 sfoffice

E62209,000 sfacademic

E6028,680 sfacademic

Memorial Dr

Vassar St

Gal

ileo

Gal

ilei W

ay BroadwayBroad Canal Way

Third

St

Main St

Amherst St

Ames St

Ames

St

Wad

swor

th S

t

*

*

E40106,582 sfacademic

E3942,800 sf

office/retail

E3866,446 sf

academic/retail

Hayw

ard

St

Carle

ton

St

E118,641 sfacademic

Base Plan - Existing Conditions(Gross Square Feet)

07/27/2015 Figure A - 6

Page 13: MIT Kendall Square Initiative SoMa Project Graphics Materials · MIT Kendall Square Initiative SoMa Project Graphics Materials July 27, 2015 Planned Unit Development Special Permit

0’ 200’

scale: 1” = 200’

400’

CHARLES RIVER

BROAD CANAL

PUD 5

T

T

Main St

Wad

swor

th S

t

Carle

ton

St

Memorial Dr

Third

St

Ames

St Broadway

Amherst St

Galil

eo G

alile

i Way

Vassar S

t

Hayw

ard

St

Main St

Deacon St

Dock

St

5

6

43

2

1

E40E23

E25

E17

E18

E19

E1

E2

E52

E60

E38 E39 E48

E70

E15

E14

E53

E51

E62

100 Memorial Drive

MIT KENDALL SQUARESoMa PROJECT

PUD-5PROPOSED CONDITIONS

07/27/2015 Figure A - 7