mission mox fuel physics design— preliminary ...v-11.pdfornl/sub/00-85b99398v-11 mission mox fuel...

34
ORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating Power for Existing Balakovo Fuel Management Scheme A. M. Pavlovichev A Russian Contribution to the Fissile Materials Disposition Program

Upload: others

Post on 07-Mar-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating

ORNL/SUB/00-85B99398V-11

Mission MOX Fuel Physics Design—Preliminary Equilibrium MOX AssemblyDesign and Expected Operating Power

for Existing Balakovo FuelManagement Scheme

A. M. Pavlovichev

A Russian Contribution to theFissile Materials Disposition Program

Page 2: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating

DOCUMENT AVAILABILITY

Reports produced after January 1, 1996, are generally available free via theU.S. Department of Energy (DOE) Information Bridge:

Web site: http://www.osti.gov/bridge

Reports produced before January 1, 1996, may be purchased by members of the publicfrom the following source:

National Technical Information Service5285 Port Royal RoadSpringfield, VA 22161Telephone: 703-605-6000 (1-800-553-6847)TDD: 703-487-4639Fax: 703-605-6900E-mail: [email protected] site: http://www.ntis.gov/support/ordernowabout.htm

Reports are available to DOE employees, DOE contractors, Energy Technology DataExchange (ETDE) representatives, and International Nuclear Information System (INIS)representatives from the following source:

Office of Scientific and Technical InformationP.O. Box 62Oak Ridge, TN 37831Telephone: 865-576-8401Fax: 865-576-5728E-mail: [email protected] site: http://www.osti.gov/contact.html

This report was prepared as an account of work sponsored by anagency of the United States Government. Neither the United Statesgovernment nor any agency thereof, nor any of their employees,makes any warranty, express or implied, or assumes any legal liabilityor responsibility for the accuracy, completeness, or usefulness of anyinformation, apparatus, product, or process disclosed, or representsthat its use would not infringe privately owned rights. Reference hereinto any specific commercial product, process, or service by trade name,trademark, manufacturer, or otherwise, does not necessarily constituteor imply its endorsement, recommendation, or favoring by the UnitedStates Government or any agency thereof. The views and opinions ofauthors expressed herein do not necessarily state or reflect those ofthe United States Government or any agency thereof.

Page 3: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating

ORNL/SUB/00-85B99398V-11

MISSION MOX FUEL PHYSICS DESIGN—PRELIMINARYEQUILIBRIUM MOX ASSEMBLY DESIGN AND EXPECTED

OPERATING POWER FOR EXISTING BALAKOVO FUELMANAGEMENT SCHEME

A. M. Pavlovitchev

Date Published: September 2001

Prepared byRussian Research Center “Kurchatov Institute”

Institute of Nuclear Reactorsunder subcontract 85B-99398V

Funded byOffice of Fissile Materials Disposition

U.S. Department of Energy

Prepared forComputational Physics and Engineering Division

OAK RIDGE NATIONAL LABORATORYOak Ridge, Tennessee 37831

managed byUT-BATTELLE, LLC

for theU.S. DEPARTMENT OF ENERGYunder contract DE-AC05-00OR2272

Page 4: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 5: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 6: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 7: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 8: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 9: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 10: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 11: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 12: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 13: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 14: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 15: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 16: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 17: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 18: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 19: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 20: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 21: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 22: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 23: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 24: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 25: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 26: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 27: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 28: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 29: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating
Page 30: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating

Review of Mission MOX Fuel Physics Design—Preliminary Equilibrium MOX AssemblyDesign and Expected Operating Power for Existing Balakovo Fuel Management Schemeby D. T. Ingersoll and R. T. Santoro, Oak Ridge National Laboratory

General Comments

The work appears to be technically correct. The results presented in the figures and tables areconsistent. The main criticism of the report is that it is not a “stand-alone” document. For example,after the introduction, the results are presented with no clear indication of how the data were obtained.The author does not explain the sequence in which the calculations were carried out although he didmention the use of several codes, including attempts to benchmark them.

It is suggested that future documents either provide a complete set of references or follow a moresystematic approach such as the following:

IntroductionMethods of Calculation

Include descriptions of the codes and data and details on the reactor models.Discussion of Results

Include discussion of uncertainties.Conclusions

Corrections to Acronyms for Consistency

Change the following terms:

x “Russian authority for nuclear safety” to “Russian Authority for Nuclear Safety”x “Mixed Oxide (uranium-plutonium fuel)” to “Mixed Oxide (Uranium-Plutonium Fuel)”x “Zirconium fuel for cladding” to “Zirconium Fuel for Cladding”x “Russian water-water reactor” to “Russian Water-Water Reactor”

Text Comments

1. Page 5, paragraph 1, line 1: Add “,” after “handling.”2. Page 5, paragraph 1, line 3: Change “power value” to “energy content.”3. Page 5, paragraph 2, suggested wording for first sentence: “Options for burning weapons grade

plutonium in VVER-, BN-, HTGR-type reactors are being developed in Russia.”4. Page 5, paragraph 2, suggested wording for second sentence: “Experience in the use of mixed

uranium-plutonium fuel gained in the West along with preliminary results obtained in Russia[1–3] show that …..”

5. Page 5, paragraph 3, suggested wording: “Russia has seven VVER-1000 in operation with a totalcapacity of 11GWE. Eleven of these reactors are in operation in the Ukraine and two are runningin Bulgaria. It is planned to put two additional VVER-1000 units into operation in Russia andat leas two into operation in the Ukraine before the tear 2003.”

6. Page 5, paragraph 4, suggested wording: “The core designs of all VVERs are essentially thesame. The main differences are in the number of control rods.”

7. Page 5, paragraph 5, suggested wording: “Therefore, it is used as the reference cycle…..”8. Page 5, paragraph 5, suggested wording: “Part 2 describes the main characteristics of the …..”9. Page 5, paragraph 6, suggested wording: “At present, extensive efforts are underway in Russia

on the VVER-1000 [5] advanced fuel cycle.”10. Page 5, paragraph 6, suggested wording: “…..control rods consisting of two parts: the upper

region comprised of B4C and the lower region comprised of Dy2O3·TiO2.”

Page 31: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating

11. Page 6, paragraph 1, line 1: Change “By present” to “At present.”12. Page 6, paragraph 1, line 1: Change “has” to “have.”13. Page 6, paragraph 1, suggested wording: “In Russia, the basic parameters for large-scale

implementation of advanced fuel cycles improved FAs and uranium-gadolinium fuel have beenestablished.– pilot operation of FAs with UGF is being conducted at the Balakovo NPP.––– in many VVER1000 reactors, low leakage loading patterns have been successfully used.”

14. Page 6, paragraph 3, suggested wording:“In Russia, calculational studies ……….Emphasis is placed on the most simple …….”

15. Page 6, paragraph 4, suggested wording:– Investigations by Russian and Western specialists have shown [1,2] that the ….––– …. between MOX and UOX FAs making it necessary to use …..”

16. Page 6, paragraph 4, line 2: Change “civil” to “civilian.”17. Page 7, paragraph 1, suggested wording:

“Code BIPR-7A ………samarium transients, etc., Code PERMAK-A ……power and burn-up distributions”

18. Page 7, paragraph 2, suggested wording:“……calculated errors in MOX fuelled core is a difficult task.Therefore, ……….current stage of code verification.Some years ago, ………….were engaged in code verification.”

19. Page 8, paragraph 1, suggested wording: “…..5% and 4% to lower the neutron multiplicationin fresh UOX and MOX FAs.”

20. Page 8, paragraph 5, suggested wording: “…..calculated errors associated with emergencysystems …….”

21. Page 8, paragraph 6, suggested wording: “…..Boron-10 content in the upper part of thecombined absorber was varied from natural boron to 80 wt % enriched boron.”

22. Table 1. Use the notation wt % throughout.23. Table C.1 (continuation 2), last row should read: “Lifetime of prompt neutrons, sec*10–5”24. Page 13, Fig. 4: Should define symbols on graph axes (Kq, Kv, etc.).25. Page 14, Table 2: Should specify core height values corresponding to rows.26. Page 20, first set of conclusions, suggested wording:

First bullet: “The equilibrium fuel cycle is reviewed on the basis of ………..”“The principle of direct replacement of UOX fuel with MOX …..”

Third bullet: “In the equilibrium fuel cycle, eleven UOX assemblies burn-up during threecycles, nineteen U assemblies burn-up during four cycles, and eighteen MOXassemblies (all in the core center) burn-up in three cycles.”

Fourth bullet: “……are located in parts of the UOX assemblies ………….and to additionallyflatten the power distribution.”

Fifth bullet: “…….upper part comprised of B4C and the lower part comprised ofDy2O3·TiO2.”

Sixth bullet: “Some of the irradiated samples are placed in the core periphery close to thereactor vessel to lower the neutron fluence in the vessel.”

27. Page 18, Table 4: Need to define “(RO)AP.”28. Page 20, second set of conclusions, suggested wording: “……1/3 MOX core is summarized in

Table C.1. For comparison, …….”

Page 32: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating

29. Page 21, third bullet: Change “Mox” to “MOX.”30. Page 21, suggested wording for first bullet: “…..deposition is about 270 kg in both options.”31. Page 22, suggested wording for second bullet: “prompt neutrons are 10% lower in MOX …”32. Page 23, Table C.1: Change “Annular plutonium” to “Annual plutonium.”

Page 33: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating

ORNL/SUB/00-85B99398V-11

INTERNAL DISTRIBUTION

1–4. B. B. Bevard 16. C. M. Hopper5. R. J. Belles 17. D. T. Ingersoll6. J. J. Carbajo 18. M. A. Kuliasha7. M. D. DeHart 19. S. B. Ludwig8. F. C. Difilippo 20. G. E. Michaels9. M. E. Dunn 21. L. J. Ott

10. R. J. Ellis 22–23. R. T. Primm III11. J. C. Gehin 24. C. E. Sanders12. S. R. Greene 25. C. C. Southmayd13. S. Goluoglu 26. D. L. Williams, Jr.14. R. F. Holdaway 27. Central Research Library15. D. Hollenbach 28. ORNL Laboratory Records-RC

EXTERNAL DISTRIBUTION

29. M. L. Adams, Department of Nuclear Engineering, Texas A&M University, Zachry 129,3133 TAMU, College Station, TX 77843

30. H. Akkurt, 2919 Cooley Building, 2355 Bonisteel Boulevard, Ann Arbor, MI 48109-210431. D. Alberstein, Office of Fissile Materials Disposition, U.S. Department of Energy, NN-63,

1000 Independence Avenue SW, Washington, DC 2058532. J. B. Briggs, Idaho National Environmental and Engineering Laboratory, P.O. Box 1625-

3855, Idaho Falls, ID 83415-385533. J. Baker, Office of Fissile Materials Disposition, U.S. Department of Energy, NN-63,

1000 Independence Avenue SW, Washington, DC 2058534. K. Chidester, Los Alamos National Laboratory, P.O. Box 1663, MS-E502, Los Alamos,

NM 8754535. W. Danker, U.S. Department of Energy, NN-62, 1000 Independence Avenue SW,

Washington, DC 2058536. T. Gould, Lawrence Livermore National Laboratory, P.O. Box 808, MS-L186, Livermore,

CA 9455137. L. Jardine, Lawrence Livermore National Laboratory, P.O. Box 808, MS-L166,

Livermore, CA 9455138. Dr. Alexander Kalashnikov, Institute of Physics and Power Engineering, 1 Bondarenko

Square, Obninsk, Kaluga Region, Russia 24902039–43. Dr. Alexander Pavlovichev, Russian Research Center $Kurchatov Institute,# Institute of

Nuclear Reactors, VVER Division, VVER Physics Department, 123182, KurchatovSquare, 1, Moscow, Russia

44. K. L. Peddicord, Associate Vice Chancellor, Texas A&M University, 120 Zachry, CollegeStation, TX 77843-3133

45. G. Radulescu, Framatom Cogema Fuels, 1261 Town Center Drive, MS-423, Las Vegas,Nevada 89143

Page 34: Mission MOX Fuel Physics Design— Preliminary ...v-11.pdfORNL/SUB/00-85B99398V-11 Mission MOX Fuel Physics Design— Preliminary Equilibrium MOX Assembly Design and Expected Operating

46. J. Thompson, Office of Fissile Materials Disposition, U.S. Department of Energy, NN-61,1000 Independence Avenue SW, Washington, DC 20585

47. F. Trumble, Westinghouse Savannah River Company, Building 730R, Room 3402, WSRC,Aiken, SC 29808

48. R. H. Clark, Duke/Cogema/Stone & Webster, 400 South Tryon Street, WC-32G, P.O. Box1004, Charlotte, NC 28202

49. S. Nesbit, Duke/Cogema/Stone & Webster, 400 South Tryon Street, WC-32G, P.O. Box 1004,Charlotte, NC 28202

50. M. S. Chatterton, Office of Nuclear Reactor Regulation, MS O10B3, U.S. Nuclear RegulatoryCommission, Washington, DC 20555-0001

51. R. W. Lee, Office of Nuclear Reactor Regulation, MS O10B3, U.S. Nuclear RegulatoryCommission, Washington, DC 20555-0001

52. U. Shoop, Office of Nuclear Reactor Regulation, MS O10B3, U.S. Nuclear RegulatoryCommission, Washington, DC 20555-0001

53. Aldo Ferri, Scandpower, Inc., 101 Lakeforest Blvd., Suite 340, Gaithersburg, MD 2087754. Nagao Ogawa; Director and General Manager; Plant Engineering Department; Nuclear Power

Engineering Corporation; Shuwa-Kamiyacho Building, 2F; 3-13, 4-Chome Toranomon;Minato-Ku, Tokyo 105-0001, Japan

55. Dr. Kiyonori Aratani; Surplus Weapons Plutonium Disposition Group; InternationalCooperation and Nuclear Material Control Division; Japan Nuclear Cycle DevelopmentInstitute; 4-49 Muramatsu, Tokai-mura, Naka-gun, Ibaraki-ken, Japan

56. Boris E. Volkov; Head of Division; EDO Gidropress; 21 Ordzhonikidze Street; Podolsk,Moscow District, Russia 142103

57. Dr. Alexandre Ermolaev; Balakovo Nuclear Power Plant, Saratov Region, Balakovo-26,Russia, 413866