  • 8/6/2019 Mis Tics India

    1/36

    Presented by:-KIRTI

    Sonia Yadav

    Rubina Virdi

    Rajnish

    Sarla Yadav

    Rakesh Antil

    MIS PRESENTATION1

  • 8/6/2019 Mis Tics India

    2/36

    TITIcscsGroupGroup

    Telecom Infrastructure Solution Providers

    Building, Managing and Sharing Site for Telecom Sector

    2

  • 8/6/2019 Mis Tics India

    3/36

    Company Profile

    Established in 1994, TICS is a Consultancy Group offering Site

    Management Services for all Infrastructural activities related to Site

    Build Up & Operations and Maintenance for Telecom Sector.

    Mr Ardaman Singh.

    CEO TIcs Infrastructure

    Consultancy Pvt Ltd.

    TITIcscsGroupGroup

    3

  • 8/6/2019 Mis Tics India

    4/36

    TIcsTIcs

    GroupGroup

    What they Do

    Project Management Solutions

    Site Survey & Site Planning

    Soil Survey for Ground based Antenna Carriers

    Checking structural feasibility for Roof Top based Antenna

    Foundation Design for Antenna Carriers

    4

  • 8/6/2019 Mis Tics India

    5/36

    Site Specific Drawings & Documentation

    Site Specifications

    Bill of Material & Site Cost Budget

    Supervision of Civil Works, TowerErection and Electrical

    Installation

    Quality Assurance plan

    TITIcscsGroupGroup

    5

  • 8/6/2019 Mis Tics India

    6/36

    TITIcscsGroupGroup Step 2 Soil Survey for Ground Based Antenna.

    Step 1 Site Survey.

    6

  • 8/6/2019 Mis Tics India

    7/36

    Step 4 Bills of Material and Site Cost Budgeting.

    TITIcscsGroupGroup

    7

  • 8/6/2019 Mis Tics India

    8/36

    Step -5 Tower Erection and InstallationTITIcscsrr

    8

  • 8/6/2019 Mis Tics India

    9/36

    Step 3 CAD Design for the Structure.TITIcscsGroupGroup

    9

  • 8/6/2019 Mis Tics India

    10/36

    Final Outcome Tower is ready

    10

  • 8/6/2019 Mis Tics India

    11/36

    Hierarchy Level followed in Engineering Support

    and Operations and Maintenance Departments.

    From Top to Bottom

    1. Project Manager. ( Exp. 10 15 Years)

    2. Deputy Project Manager ( Exp. 5 10 Years )

    3. Project Coordinator ( Exp. 3 5 Years )

    11

  • 8/6/2019 Mis Tics India

    12/36

    3. Project Coordinator ( Exp. 3 5 Years )

    4. Engineers ( Experience 2 3 Years )

    5. JuniorEngineer ( Minimum Experience 1 year)

    6. Trainee Engineers ( Fresher's )

    12

  • 8/6/2019 Mis Tics India

    13/36

    DEPARTMENTS

    ASP

    Shashi Bhushan

    ARP-1 Rajiv

    ARP-2 Vivek

    13

  • 8/6/2019 Mis Tics India

    14/36

    Problems faced by the middle

    managers14

    Which type of antenna should be used by the

    company?

    What should be the range area for the tower?

    Checking soil condition?

    Selection of workers for a particular site?

  • 8/6/2019 Mis Tics India

    15/36

    HUMAN RESOURCE FUNCTION

    15

  • 8/6/2019 Mis Tics India

    16/36

    MAN POWER PLANNING

    Total No of Employees - 900.

    Engineering Support - 228

    Operation & Maintenance - 592

    Regular Staff 80 ( Admin, Accounts, HR,CAD, Front office)

    16

  • 8/6/2019 Mis Tics India

    17/36

    RECRUITMENT & SELECTION

    Minimum Qualification Required

    Diploma in Electronics, Computer or Infrastructure ( Civil )

    OR Degree Equivalent from any Recognized University.

    Diploma with 2 year is equivalent to FresherEngineer.

    17

  • 8/6/2019 Mis Tics India

    18/36

    Supply Side

    Various sources from where manpower is hired.

    1. Job Advertisement.

    2. Consultants

    3. Walk in

    4. Recommendations

    5. Campus Interviews.

    Most preferred source is Recommendations and least preferred is

    Consultants.

    18

  • 8/6/2019 Mis Tics India

    19/36

    Supply Side Divided.

    Campus , 25%

    Consultants , 25%

    Advertisement, 40

    %

    Reference Group

    , 10%

    19

  • 8/6/2019 Mis Tics India

    20/36

    After doing the initial Screening matching the profile with job

    specification and telephonic interviews short listing is done.

    One HR Person from Ericsson and one from the company together take

    the call for selection process.

    One Specialized person is there whos main job is to travel across the

    India and do the Short listing.

    20

  • 8/6/2019 Mis Tics India

    21/36

    PAYROLL

    Timings 10 to 6 pm

    Overtime incentives applicable.

    Accountsfinance

    department

    HR(ericsson)will prepare

    Pay rolls

    Mailing

    21

  • 8/6/2019 Mis Tics India

    22/36

    Orientation and Induction

    Two to three days are kept for Orientation programme and followed by

    7 to 10 days for Training . [ on the job training ].

    Another week time is given to candidate for travelling and

    Accommodation. So in all one month time is there before a person can

    actually start contributing and assigned any work.

    22

  • 8/6/2019 Mis Tics India

    23/36

    Probation and Final Placements.

    1. Fresher's - this period is about 6 months.

    2. Ex perienced - One year.

    Transfer Policy - Any candidate can be located anywhere in India.

    [ Most important aspect , before giving appointment letter consent ofprospective candidate is taken that he can be posted any where ,

    however in most cases a candidate from south India will be posted in

    somewhere south India only ]

    23

  • 8/6/2019 Mis Tics India

    24/36

    Operation & MaintenanceDepartment Function

    24

  • 8/6/2019 Mis Tics India

    25/36

    Functions

    1. Keep the Site Alive.

    [ Site cannot be shut down for any of the reason like :

    Electricity Problem , Fuel , Raw material or Manpower . ]

    2. First level ofElectronic Equipment Installed Maintenance.

    [ If for any reason any Electronic Equipment go down or stop

    functioning properly it will inform Project Manager ofEquipment

    Supplier & he will rectify the Problem ]

    25

  • 8/6/2019 Mis Tics India

    26/36

    Engineer Support Function

    1. Site build up Activity :

    a) Site Survey & Site Planning

    b) Soil Survey for Ground based Antenna Carriers

    c) Checking structural feasibility for Roof Top based Antenna

    d) Foundation Design for Antenna Carriers e) Site Specific Drawings & Documentation

    f) Installation.

    26

  • 8/6/2019 Mis Tics India

    27/36

    Demand Forecasting

    Their Main client is Ericsson , From which they

    get maximum work.

    1. How much work is Assigned by Ericsson to

    Tics Pvt ltd. is depend on how much work is

    Ericsson is getting from major Players in

    Indian Telecom Industry.

    27

  • 8/6/2019 Mis Tics India

    28/36

    Purpose Of Forecasting28

    Planning & scheduling production(towers)

    Acquiring inputs (labour, raw material and capital)

    Making provision for finances

  • 8/6/2019 Mis Tics India

    29/36

    Growth Pattern.

    According to all studies it is known that in this financial year nearly

    30,000 sites will be installed throughout India. ( 2010 11 )

    [ this figure is reached by taking care into account previous data,

    growth projected by TRAI. ]

    Note : Ericsson will have 20 % of the share of this entire market.

    Means 20 % of 30,000 = 6000 Sites.Other players in this sector are : Nokia , Siemens , Alcatel and

    one Chinese playerHuawai & Zteck.

    29

  • 8/6/2019 Mis Tics India

    30/36

    Tics will have around 35 to 40 % of Ericsson share.

    [ Past experience , good relations with company , reliable sources. ]

    Based on this information work load analysis is done. How much

    manpower will be required to carry out this work.

    [ An increase of around 10 to 15 % in Manpower requirement ]

    As if now Tics is handling Operation & Maintenance of around

    10,000 sites with the help of 592 employees.

    30

  • 8/6/2019 Mis Tics India

    31/36

    Once any project is assigned by Ericsson , any where in India ,

    company is given an average of 4 weeks of time to complete the task

    For the completion of project old & experienced staff is selected

    by the department heads.

    Manpower is selected is such a way that work in pipeline is notaffected at all.

    31

  • 8/6/2019 Mis Tics India

    32/36

    Major Players in Telecom Industry.

    1. BSNL

    2. VSNL

    3. Bharti Airtel.

    4. Vodafone.

    5. Tata Tele Services

    6. Reliance Info comm.

    7. Aircel.8. Idea Cellular.

    9 Spice.

    10 Alcatel

    32

  • 8/6/2019 Mis Tics India

    33/36

    Flow of information

    ericsson

    Shashibhushan

    Ticsemployee

    33

  • 8/6/2019 Mis Tics India

    34/36

    Promotion Policy :

    Form Trainee Engineer to Engineer it takes around 3 years.

    From Engineer to Project Manager [ Selection policy , confidential ]

    34

  • 8/6/2019 Mis Tics India

    35/36

    Continuous Training

    1. If there is introduction on any new equipments , new technology or

    any kind of new innovations or any new process in introduced than

    company sends its employees for technical training.

    [ Basically a place is chosen for training purpose , all the trainee than

    called upon and one expert technical person impart the knowledge

    which is on the job training only. ]

    35

  • 8/6/2019 Mis Tics India

    36/36

    TITIcscsGroupGroup

    Thank you