minutes of meeting of the first meeting of the … · corporate affairs, rp-sg group rp -sanjiv...

54

Upload: others

Post on 20-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC
Page 2: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC
Page 3: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

MINUTES OF MEETING OF THE FIRST MEETING OF THE COMMITTEE CONSTITUTED BY

THE MINISTRY OF POWER TO REVIEW THE NATIONAL ELECTRICITY POLICY

At the outset, Chairman of the Committee, Shri Major Singh, Chairperson, CEA, welcomed

all the participants to the first meeting of the Committee constituted by the Ministry of Power to

review the National Electricity policy (NEP). The list of participants is as given in Annexure-I.

Chairperson, CEA gave a brief background of the review of the National Electricity Policy.

He stated that the National Electricity Policy was published in the year 2005 with certain

objectives. Some objectives were fulfilled and some were yet to be fulfilled. He stated that some

objectives may need a review and some additional objectives may need to be created to reflect

the changed scenario. He stated that the Committee is to consider the Recommendations of the

Working group on Power for 12th Plan, align the National Electricity Policy in line with the proposed

amendment in the Electricity Act, 2003 and Tariff Policy and seek comments from state

governments and other stakeholders. He stated that all Members may give their views. He stated

that a maximum of three meetings of the Committee were proposed to be held. He requested

Members to give new ideas, if required, based on the latest technology like super critical

technology, smart meters etc. He then requested the Member convener, Shri Pankaj Batra, Chief

Engineer, CEA, to make a presentation for the purpose of initiating discussions on the review of

the National Electricity Policy.

The Member Convener stated that comments have already been sought from all the State

Power/Energy Secretaries, out of which so far two states have given suggestions. At the same

time, internal suggestions have also been obtained from the Divisions within CEA. He then

proceeded to give the presentation. The presentation consisted of the salient features of the

existing National Electricity Policy. A copy of the presentation is at Annexure-II.

After the presentation, Chairman of the Committee requested all Members to give their

comments/suggestions. The representative from FICCI stated that among the aims and objectives

of the NEP, the following are important and should be included:

Renewable Energy Integration,

Grid Security/Ancillary Services,

Page 4: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

Encouragement of Hydro Generation,

Ideal Mix of Hydro/Thermal Generation,

Peaking Power Policy,

Demand forecasting by DISCOMs,

Transmission Reserve Margin for short term power.

In the Distribution area, separation of feeders/installation of smart metering should be

included. What should also be mentioned in the Policy should be the method of dealing with below

poverty line consumers, Design of lifeline tariff, Tariff rationalization for greater subsidy

management, etc.

The representative from APTRANSCO submitted that the NEP should be in line with the

Power For All document under preparation. It should also include Renewable capacity

enhancement, including mentioning solar power, Rural Electrification, the path to achieve targets

of feeder separation through Deendayal Upadhyaya Gram Jyoti Yojana (DDUGJY). He also

added that under the topic of generation, spinning reserve should be included. He suggested the

same could be funded from PSDF. Under the distribution head, multiple suppliers could be

mentioned.

CEO and MD Tata Power Delhi Distribution Ltd. (TPDDL) stated that what should be

brought in is accountability of Regulators, since in many cases tariff revision was not taking place

for years. He further said that radical reforms that are doable should be brought about in the NEP

and the NEP should be enforced. He further stated that they would give the inputs in writing within

a week’s time.

The representative from MAHAGENCO stated that the RPO obligation should be covered

in the NEP, as also the energy mix for grid stability as well as the Peaking Policy and spinning

reserves.

Page 5: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

Shri Shantanu Dixit from Prayas, stated that a few important topics should be chosen for

the NEP and wider consultation sought on these topics. Some of these could be as follows:

• Power For All 24/7

• Renewable Integration to the Grid

• Financial Viability of State Distribution companies

• Accountability of Regulators

• Good Supply Quality – Measurement and Monitoring

• Separation of Carriage and Content

• Complete Feeder Metering

• Energy Audit Report based on Meter readings to be published by DISCOMs

quarterly

The representative from POSOCO stated that from the system operation point of view,

flexible generation was required in order to cater to the balancing requirements of variable type

of renewable energy. All future generation should be capable of two shift operation. New coal

based plants should have flexible generation. More pumped storage plants should be erected.

Ancillary services should also be mentioned under the NEP.

Chairperson stated that in addition to the points mentioned by the Members, there should

also be focus on R&D proposals, ring fencing of SLDCs and CTU and Data automation for working

out the power supply position accurately, since the states were showing negligible shortage,

whereas there was still substantial shortage in areas other than cities. He stated that all Members

should give their suggestions in a week’s time and the next meeting could be held in a fortnight,

after which the main points would be decided and put on the website for wider consultation. He

thanked all the Members for giving their valuable inputs.

The meeting ended with thanks to the Chair.

Page 6: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

ANNEUXRE-I

Sl.

No.

Name & Designation Organisatio

n &

Address

Mobile No. E Mail ID

1. Shri Major Singh

Chairperson

CEA [email protected]

2. Shri Somit Dasgupta

Member (E&C)

CEA [email protected]

3. Shri Pankaj Batra

Chief Engineer (F&CA)

CEA 9350981062 [email protected]

4. Shri G.C. Mukherjee

E.D. Commercial

CS&DCL 9421237834 [email protected]

5.

Shri U.K. Dhamankar

CE(RCD)

MAHAGEN

CO

9820864203 umakant.dhamankar@mahagen

co.in

6. Shri Shantanu Dixit

Prayas

(Energy

Group)

9822287602 [email protected]

7. Shri Prabir Neogi

Chairman FICCI Power

Committee & Chief Executive

Corporate Affairs, RP-SG

Group

RP-Sanjiv

Goenka

Group

9831801087 [email protected]

8. Sh.Subrahmanyam.Sistu

Director

APTRANSC

O

9441482482 [email protected]

9. Shri Praveer Sinha

CEO & MD

TPDDL sinhapraveer@tatapower-

ddl.com

10. Shri Gyanesh Bharti

Director

Min. of

Power

[email protected]

11. Shri S.S. Barpanda

AGM

NLDC,

POSOCO

9717296928 [email protected]

12. Sh.Manoj Kumar Dewan CEA 9990005376 [email protected]

Page 7: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

Deputy Director

13. Shri Rajendra Singh

Under Secretary

Min.of

Power

9968240772 [email protected]

Page 8: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

First Meeting of the Review of

National Electricity Policy

Page 9: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

AIMS & OBJECTIVES• Access to Electricity - Available for all households in next

five years

• Availability of Power - Demand to be fully met by 2012. Energy and peaking shortages to be overcome and adequate spinning reserve to be available.

• Supply of Reliable and Quality Power of specified standards in an efficient manner and at reasonable rates.

• Per capita availability of electricity to be increased to over 1000 units by 2012.

• Minimum lifeline consumption of 1 unit/household/day as a merit good by year 2012.

• Financial Turnaround and Commercial Viability of Electricity Sector.

• Protection of consumers’ interests.

Page 10: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

ISSUES IN NATIONAL ELECTRICITY

POLICY• Rural Electrification

• Generation

• Transmission

• Distribution

• Recovery of Cost of services & Targetted Subsidies.

• Technology Development and Research and Development (R&D)

• Competition aimed at Consumer Benefits

• Financing Power Sector Programmes Including Private Sector Participation.

• Energy Conservation

• Environmental Issues

• Training and Human Resource Development

• Cogeneration and Non-Conventional Energy Sources

• Protection of Consumer interests and Quality Standards

Page 11: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

RURAL ELECTRIFICATION

Page 12: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

RURAL ELECTRIFICATION

• Supply of electricity to all areas including rural areas

• Consumers, particularly those who are ready to pay a tariff which reflects efficient costs have the right to get uninterrupted twenty four hours supply of quality power.

• 56% of rural households have not yet been electrified.

• Electricity reaches poor and marginal sections of the society at reasonable rates is completed within the next five years.

• Rural Electrification Distribution Backbone (REDB) with at least one 33/11 kv (or 66/11 kv) substation in every Block

Page 13: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

RURAL ELECTRIFICATION• To connect every household on demand.

• Wherever not feasible, decentralized distributed generation facilities together with local distribution network to be provided to every household.

• REC nodal agency for implementing National Common Minimum Programme of giving access to electricity to all the households in next five years.

• Subsidies should be properly targeted at the intended beneficiaries in the most efficient manner.

• Institutional framework would need to be put in place not only to ensure creation of rural electrification infrastructure but also to operate and maintain supply system.

• Education and awareness programmes would be essential for creating demand for electricity and for achieving the objective of effective community participation.

Page 14: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

GENERATION

Page 15: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

HYDRO GENERATION

• Clean and renewable source of energy.

• Maximum emphasis would be laid on the full development of the feasible hydro potential in the country. 50,000 MW hydro initiative launched. DPRs for projects of 33,000 MW capacity already under preparation.

• Will facilitate economic development of States, particularly North-Eastern States, Sikkim, Uttaranchal, Himachal Pradesh and J&K.

• Debt financing of longer tenure would need to be made available for hydro projects.

• State Governments to review procedures for land acquisition, and other approvals/clearances for speedy implementation of hydroelectric projects.

• National Policy on Rehabilitation and Resettlement (R&R) would be essential.

Page 16: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

THERMAL GENERATION• Coal would continue to remain the primary fuel for meeting future

electricity demand.

• Imported coal based thermal power stations, particularly at coastal locations, would be encouraged. Use of low ash content coal would also help in reducing the problem of fly ash emissions.

• Lignite resources located in Tamil Nadu, Gujarat and Rajasthan should be increasingly utilized for power generation.

• Use of gas as a fuel for power generation would depend upon its availability at reasonable prices. Power sector consumes about 40% of the total gas in the country. New power generation capacity could come up based on indigenous gas findings. A national gas grid covering various parts of the country could facilitate development of such capacities.

• Imported LNG based power plants are also a potential source of electricity. Existing power plants using liquid fuels should shift to use of Natural Gas/LNG at the earliest to reduce the cost of generation.

• Economical for new generating stations to be located either near the fuel sources or load centres.

• Medium to long-term fuel supply agreements specially with respect to imported fuels

Page 17: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

NUCLEAR POWER

• Nuclear power to meet base load demand.

• Share of nuclear power in the overall capacity

profile will need to be increased significantly.

• Economics of generation and resultant tariff.

• Public sector investments to create nuclear

generation capacity will need to be stepped up.

Private sector partnership would also be

facilitated.

Page 18: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

NON-CONVENTIONAL ENERGY

SOURCES

• Non-conventional energy resources, mainly

small hydro, wind and bio-mass would also

need to be exploited fully.

• Efforts will be made to encourage private

sector participation through suitable

promotional measures.

Page 19: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

RENOVATION AND MODERNIZATION

• One of the major achievements of the power sector has been a significant increase in availability and plant load factor of thermal power stations.

• Renovation and modernization for achieving higher efficiency levels needs to be pursued vigorously.

• Govt. of India is providing financial support for this purpose.

• If economic operation does not appear feasible through R&M, then there may be no alternative to closure of such plants.

Page 20: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

CAPTIVE GENERATION

• Captive power plants set up by group of consumers is primarily aimed at enabling small and medium industriesor other consumers that may not individually be in a position to set up plant of optimal size in a cost effective manner.

• Surplus capacity could be supplied to the grid continuously or during certain time periods.

• Commercial arrangements would need to be instituted between licensees and the captive generators for harnessing of spare capacity energy from captive power plants.

• Appropriate Regulatory Commission shall determine tariffs when a licensee is the off-taker of power from captive plant.

Page 21: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

TRANSMISSION

Page 22: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

TRANSMISSION• While planning new generation capacities, requirement of

associated transmission capacity would need to be worked out simultaneously in order to avoid mismatch between generation capacity and transmission facilities.

• Central Govt. to facilitate continued development of the National Grid for providing adequate infrastructure for inter-state transmission of power and to ensure transfer of underutilized generation capacity from surplus regions to deficit regions.

• Network expansion should be planned and implemented keeping in view the anticipated transmission needs that would be incident on the system in the open access regime. Prior agreement with the beneficiaries would not be a pre-condition for network expansion.CTU/STU should undertake network expansion after identifying the requirements in consultation with stakeholders and taking up the execution after due regulatory approvals.

• Information dissemination and disclosure procedures should be developed by the CTU and STUs to ensure that all stakeholders are aware of the status of generation and transmission projects and plans.

Page 23: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

TRANSMISSION

• The State Regulatory Commissions who have not yet notified the grid code under the Electricity Act 2003 should notify the same not later than September 2005.

• State Commissions to ensure that State-of-the art communication and data acquisition capability on a real time basis are provided at the State load dispatch centerslevel not later than June 2006.

• Non-discriminatory open access shall be provided to competing generators supplying power to licensees upon payment of transmission charge. The appropriate Commissions shall establish such transmission charges no later than June 2005.

• A view on independent system operation would be taken by the Central Government by December 2005.

• Mechanisms would be created to encourage private investment in transmission sector.

Page 24: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

DISTRIBUTION• Distribution is the most critical segment of the electricity

business chain.

• Proper restructuring of distribution utilities is essential. Adequate transition financing support would also be necessary for these utilities.

• Support should be arranged linked to attainment of predetermined efficiency improvements and reduction in cash losses and putting in place appropriate governance structure for insulating the service providers from extraneous interference.

• State Governments would need to restructure the liabilities of the State Electricity Boards to ensure that the successor companies are not burdened with past liabilities.

• Multi-Year Tariff (MYT) framework. Tariff adjustments to known indicators such as power purchase prices and inflation indices.

• Private sector participation in distribution needs to be encouraged

Page 25: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

DISTRIBUTION• SERCs shall notify regulations on open access to

distribution networks by June 2005, which stipulates that such open access would be allowed, not later than January 2009.

• Consumers who have been allowed open access may enter into agreement with any person for supply of electricity on such terms and conditions, including tariff, as may be agreed upon by them. SERCs will determine wheeling charges and cross-subsidy surcharge.

• Time-bound programme to be drawn up by the SERC for segregation of technical and commercial losses through energy audits.

• Energy accounting and declaration of its results in each defined unit, as determined by SERCs, should be mandatory not later than March 2007.

• Action plan for reduction of the losses to be drawn up.

• Standards for reliability and quality of supply.

Page 26: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

DISTRIBUTION• Government of India would notify within three months,

the requirements for compliance by applicant for second and subsequent distribution license.

• Authority should develop regulations as required under Section 55 of the Act within three months.

• All consumers to be metered within two years.

• SERCs should encourage use of pre-paid meters. In the first instance, TOD meters for large consumers with a minimum load of one MVA are also to be encouraged.

• The SERCs should also put in place independent third-party meter testing arrangements.

• Modern information technology systems may be implemented by the utilities on a priority basis, after considering cost and benefits, to facilitate creation of network information and customer data base which will help in management of load, improvement in quality, detection of theft and tampering, customer information and prompt and correct billing and collection.

Page 27: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

DISTRIBUTION• Special emphasis should be placed on consumer

indexing and mapping in a time bound manner. Support provided for information technology based systems under the Accelerated Power Development and Reforms Programme (APDRP).

• High Voltage Distribution System is an effective method for reduction of technical losses, prevention of theft, improved voltage profile and better consumer service.

• Time bound programme for implementation of SCADA and data management system should be approved by the SERCs.

• States and distribution utilities should ensure effective implementation of provisions related to theft of electricity.

• State Governments may set up Special Courts as envisaged in Section 153 of the Act.

Page 28: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

RECOVERY OF COST OF SERVICES &

TARGETTED SUBSIDIES

Page 29: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

RECOVERY OF COST OF SERVICES &

TARGETTED SUBSIDIES

• Urgent need for ensuring recovery of cost of service from consumers to make the power sector sustainable.

• Consumers below poverty line, who consume below a specified level, say 30 units per month, may receive special support in terms of tariff which are cross-subsidized. Tariffs will be at least 50 % of the average (overall) cost of supply.

• Existing cross-subsidies for other categories of consumers would need to be reduced progressively and gradually.

• State Governments may give advance subsidy.

• Efforts to ensure that the subsidies reach the targeted beneficiaries in the most transparent and efficient way.

Page 30: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

Technology Development and

Research and Development (R&D)

Page 31: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

Technology Development and R&D

• Application of IT has great potential in reducing technical & commercial losses in distribution and providing consumer friendly services. Integrated resource planning and demand side management would also require adopting state of the art technologies.

• Efforts would be made for research, development demonstration and commercialization of non-conventional energy systems.

• Super critical technology, IGCC etc and large size units would be gradually introduced for generation of electricity as their cost effectiveness is established. Simultaneously, development and deployment of technologies for productive use of fly ash would be given priority and encouragement.

• Cost effective technologies would require to be developed for high voltage power flows.

• Missions will be constituted for achieving desired results in identified priority areas.

• Large power companies should set aside a portion of their profits for support to R&D.

Page 32: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

COMPETITION AIMED AT

CONSUMER BENEFITS

Page 33: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

COMPETITION AIMED AT CONSUMER

BENEFITS• To promote market development, a part of new

generating capacities, say 15% may be sold outside long-term PPAs .

• As the power markets develop, it would be feasible to finance projects with competitive generation costs outside the long-term power purchase agreement framework.

• In the coming years, a significant portion of the installed capacity of new generating stations could participate in competitive power markets.

• SERCs are advised to introduce the ABT regime at the State level within one year.

• Enabling regulations for inter and intra State trading and also regulations on power exchange shall be notified by the appropriate Commissions within six months.

Page 34: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

FINANCING POWER SECTOR

PROGRAMMES INCLUDING PRIVATE

SECTOR PARTICIPATION

Page 35: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

FINANCING POWER SECTOR PROGRAMMES

INCLUDING PRIVATE SECTOR PARTICIPATION

• Rs.9,00,000 crores at 2002-03 price level would be required to finance generation, transmission, sub-transmission, distribution and rural electrification projects.

• Power being most crucial infrastructure, public sector investments, both at the Central Government and State Governments, will have to be stepped up.

• Investments will also need to be brought in from the private sector.

• Section 63 of the Act provides for participation of suppliers on competitive basis, which will further encourage private sector investment.

• Public sector should be able to raise internal resources so as to at least meet the equity requirement of investments even after suitable gross budgetary support from the Government

Page 36: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

FINANCING POWER SECTOR PROGRAMMES

INCLUDING PRIVATE SECTOR PARTICIPATION• Appropriate surplus from Public Service should be generated

through return on investments and, at the same time, depreciation reserve created so as to fully meet the debt service obligation.

• A surcharge is to be levied on consumers switching to alternate supplies under open access to compensate the host distribution licensee for loss of the cross-subsidy element built into the tariff of such consumers. An additional surcharge may also be levied for meeting the fixed cost of the distribution licensee arising out of his obligation to supply in cases where consumers are allowed open access.

• The amount of surcharge and additional surcharge should not become so onerous that it eliminates competition.

• Surcharge be reduced progressively in step with the reduction of cross-subsidies

Page 37: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

FINANCING POWER SECTOR PROGRAMMES

INCLUDING PRIVATE SECTOR PARTICIPATION• Return on investment will, therefore, need to be

provided in a manner that the sector is able to attract adequate investments at par with, if not in preference to, investment opportunities in other sectors.

• A balance will have to be maintained between the interests of consumers and the need for investments.

• Sharing the gains of efficient operations with the consumers . This will ensure protection of consumers’ interests on the one hand and provide motivation for improving the efficiency of operations on the other.

• Restoring the financial health of the sector. Tariff rationalization would need to be ensured by the SERCs.

• Develop workable and successful models for public private partnership.

Page 38: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

ENERGY CONSERVATION

Page 39: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

ENERGY CONSERVATION

• Significant potential of energy savings through energy efficiency and demand side management measures.

• The Energy Conservation Act has been enacted and the Bureau of Energy Efficiency has been setup.

• BEE would also make available the estimated conservation and DSM potential, its staged implementation.

• Energy audits have been made compulsory for power intensive industries under the Energy Conservation Act.

• Energy conservation measures shall be adopted in all Government buildings for which saving potential has been estimated to be about 30% energy.

• Solar water heating systems and solar passive architecture can contribute significantly to this effort.

• In the field of energy conservation initial approach would be voluntary and self-regulating with emphasis on labelling of appliances. Gradually as awareness increases, a more regulatory approach of setting standards would be followed.

Page 40: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

ENERGY CONSERVATION

• In the agriculture sector, the pump sets and the water delivery system engineered for high efficiency would be promoted.

• In the industrial sector, energy efficient technologies should be used and energy audits carried out to indicate scope for energy conservation measures.

• In order to reduce the requirements for capacity additions, the difference between electrical power demand during peak periods and off-peak periods would have to be reduced. Suitable load management techniques should be adopted for this purpose. Differential tariff structure for peak and off peak supply is a solution.

• Role of Energy Service Companies would be enlarged.

• A national campaign for bringing about awareness about energy conservation would be essential to achieve efficient consumption of electricity.

Page 41: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

ENVIRONMENTAL ISSUES

Page 42: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

ENVIRONMENTAL ISSUES

• Comprehensive Environmental Impact Assessment and implementation of Environment Action Plan (EAP).

• Catchment area treatment for hydro projects would also be ensured and monitored.

• Setting up of coal washeries will be encouraged. Suitable steps would also be taken so that utilization of fly ash is ensured as per environmental guidelines.

• Municipal solid waste energy projects in urban areas and recovery of energy from industrial effluents will also be encouraged with a view to reducing environmental pollution apart from generating additional energy.

Page 43: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

TRAINING AND HUMAN

RESOURCE DEVELOPMENT

Page 44: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

TRAINING AND HUMAN RESOURCE

DEVELOPMENT

• it is important that the electricity industry has

access to properly trained human resource.

Therefore, augmentation of training

infrastructure so that adequate well-trained

human resource is made available.

• Industry to establish training infrastructure in

the field of electricity distribution, regulation,

trading and power markets.

Page 45: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

COGENERATION AND NON-

CONVENTIONAL ENERGY SOURCES

Page 46: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

COGENERATION AND NON-

CONVENTIONAL ENERGY SOURCES• Promoting competition within such projects.

• SERCs to provide suitable measures for connectivity with grid and sale of electricity to any person and also specify RPO.

• Share of electricity from non-conventional sources would need to be increased.

• Such purchase by distribution companies shall be through competitive bidding process.

• Industries in which both process heat and electricity are needed are well suited for cogeneration of electricity.

• Significant potential for cogeneration exists in the country, particularly in the sugar industry.

• Cogeneration system also needs to be encouraged in the overall interest of energy efficiency.

Page 47: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

PROTECTION OF CONSUMER

INTERESTS AND QUALITY

STANDARDS

Page 48: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

PROTECTION OF CONSUMER

INTERESTS AND QUALITY STANDARDS• Appropriate Commission should regulate utilities based on

pre-determined indices on quality of power supply underStandards of Performance.

• Parameters should include frequency and duration of interruption, voltage parameters, harmonics, transformer failure rates, waiting time for restoration of supply, percentage defective meters and waiting list of new connections.

• Reliability Index (RI) of supply of power to consumers should be indicated by the distribution licensee. Road mapfor declaration of RI to be drawn by up SERCs.

• Setting up of grievance redressal forum by the licensees as also the regulations regarding the Ombudsman and also appoint/designate the Ombudsman within six months.

Page 49: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

COORDINATED DEVELOPMENT

Page 50: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

COORDINATED DEVELOPMENT

• A well-coordinated approach would be necessary for development of the power sector.

• State Governments have a major role, particularly in creation of generation capacity, state level transmission and distribution.

• State Governments need to ensure the success of reforms and restoration of financial health in distribution.

• Mechanisms like “Coordination forum” and “Advisory Committees” to facilitate consultative process.

• Appropriate Governments need to take steps to attract regulatory personnel with required background.

• Provision of financial autonomy to the Regulatory Commissions.

Page 51: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

Thank You

Page 52: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

Report of The Working Group on

Power for Twelfth Plan (2012-17)

Page 53: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

GENERATION CAPACITY

Page 54: MINUTES OF MEETING OF THE FIRST MEETING OF THE … · Corporate Affairs, RP-SG Group RP -Sanjiv Goenka Group 9831801087 prabir.neogi@rp -sg.in 8. Sh.Subrahmanyam.Sistu Director APTRANSC

GENERATION CAPACITY

• Based on capacity addition planned, there may

not be power shortage in the country by the end

of 12th Plan on an All-India basis; however,

individual states may have power shortage.

• To address this problem, States/UTs must

estimate their power requirement and availability

• of power from different sources/states and must

tie up power requirement, if any, so that

• they do not face shortages.