MINISTRY OF OIL
IRAQI DRILLING COMPANY
MATERIALS &PURCHASES
COMMITTEE
PURCHASING DEPARTMENT
Phone {
: 7191773- 7198278- 7198248
: 7198409- 7198185
E-mail : [email protected]
IDC/1/2015/Diverterتمذيذ تاريخ الغلق / م
DIVERTER SYSTEMبتجهيز والخاصت " " IDC/1/2015/Diverterتقرر تمذيذ مىعذ غلق المىاقصت المرقمت
COMPLETE WITH ALL ACC بذال مه يىم االربعاء 7/5/2015ليكىن وهايت الذوام الرسمي ليىم الخميس المصادف
.5/5/2015 واخر يىم لبيع اوراق المىاقصت ليكىن يىم الثالثاء 29/4/2015
المذير العام
رئيس مجلس االدارة
Extension for IDC/1/2015/Diverter
It has been decided to extend the closing date of the tender IDC/1/2015/Diverter, for Supplying
DIVERTER SYSTEM COMPLETE WITH ALL ACC to be on Thursday 7th
May, 2015 instead of
Wednesday 29th
April, 2015, The deadline for buying the tender documents is Tuesday may 5th
,
2015.
Director general
ender No: I DC/1 1201 SIDIVERTERREPUBLIC OF IRAQ
MINISTRY OF OILIRAQI DRILLING
COMPANY
or the Supply of :
IVERTER System Complete With
DIVERTER System Complete WithAs per below
30" X1K DIVERTER
x 1K Diverter (annular BOP); top
Built as API Standard RP 53 4rH
x 1K Diverter Spool Flange ; Top &
utlet Flange 9" x 3k., Bui[ as per API Spec 64
x 3K Hydraulic actuator ball valve
X 1k spacer spool Flange ; Top &
uilt as per APl, API Space 6,4
x 5k) Built asstud adapter Flange (9" x 3k) x (4 1116
API, API Spec 64
x 1K slip - on weld flange bottom con
ge size 30" x 1k, Built as per APl,APl -Spec
x 1K, Bottom connection Type Quick - lopk Top connecti
size 30" x 1k, Built as per APl, API Spec
x hose Equipped with flange size 9" X 3k, 50ft
.S.A 9"x 3k flange x 3 1/8" 5k
hock manifold 3 1/8" x 5k complete with chock
REVISED LI
Required Origin is
(1-1)
MINISTRY OF OIL
IRAQI DRILLING COMPANY
MAIN OFFICE - BAGHDAD
Section : Sait 28/04 I 201 5
I ..lt * t .as-lll oJlJ_l
Phone {
Fax
Al-Nidhal
P.O. Box
Baghdad,
lraq.
4:.lglJ",ll Jtll asJ!.i
Lb asJ-i
Street , Park Al-Saadoun,19312 Al- Dhubbat,
No.: IDC\
To: ALL PARTICIPANTS
Sub: IDC/1 /201 S/Diverter
Greetings,
Reference is made to the subject tender, please consider the foilowing:
1. Attached is the scope of inspection for the requested materiars.2. Description, item # 3: to read: 9"x3k hydraulic actuator ball valve3. Description, item # 5: to read: Double stud adapter flange (9',x3k) x
API Spec 64(4 1/6"x5k) Built as per
4. Description, item # 8: our letter # IDC/3379 on April 15, 2015 (attached), please discardthe "Max operation pressure: 8000 pSl" line.
5. Description, item # 9: to read: DSA g"x3k flange x 3 1/8,'x5k6. Description, item # 10: please refer to the attached drawing for more information.7. Line items 1,2,4,6, and 7 will remain as requested.8. Attached is a revised version of the materials list in consideration of the above
amendments.
In addition, kindly be Informed that the closing date for the subject tender is herebyextended to be Thursday the 7th of May, 2015.
Best Regards ,..
For/ DIRECTOR G
^^A
7 19177 3- 7 19827 8- 7 1982487198409- [email protected]@idc.gov. iq
DIVERTERS SYSTEM INSPECTION DURING MANUFACTURING AND ASSEMPLY SCOPE
Ins;pections and test of divertcr system shall be carricd out according
To the following documents, to ensurc that the clivertcr meets all design particulars. approvccl bythird partiy and IDC :
- Quality Control Plan (QCP);
Inspection and Test plan (ITp).
Inspection scope
The diverter system is to comply with the requirements of Apl Rp 64, Apl Rp 53, AplSpec 16D and the requirements below.
- Non-Destructive Testing (NDT):meet the ( ITP) PLAN (WHILE MANUFATURJPROCCEING): NDT shall be performed in accordance with the requirements specified in the
latest revision/version of original design specification and the agreed NDT plan, as well as
codes and standards specified for the inspection. A NDT report shall be traceable to the
component and clcarly refer to the actual location and position on the component.
- VISAUL AND DIMENTIONAL TEST: Visual inspection shall be carried out on all
componcnts for examination of visible defects in material and workmanship. Visual inspection
shall be documented, with reference to latest revision/vcrsion of original design specification
and the latest revision of selected and recognized codes and standards. Critical dimensions
shall be defined, confirmed, and documented. The acceptance criteria shall be within latest
revision/version of original drawings/machining tolerances or allowed wear limits.
- Hardness tes.ting, for critical components, shall be perlbrrned and the values shall mcet the
latest revision/verdion of original design specilication and or specified project requirements
pressure tcsting and functional testing
Hydrostatic test requirements testing, and corrosion protcctiin have been met for the intended
selice. All records pertaining to the design, manufacturd,.and testing shall be duly filed and
retained by the manufacturerStructural Shape and Plate Specifications.Unless otherwise
specified by the designcr, structural shapbs and platess hould conform to one of the' specifications listed in,ASTM standard
- Moulded sealing assembly that are intended to be reused shall be inspected to be in accordance
with the latcst revision/version of original maintenance procedure.
- Bcfore welding, an approved WPQIUWPS shall be presented by Contractor ancl the
WPQR/WPS shall be in accordance with the specified standards or codes and approved by' Owner and Third Party.
Material certificates shall be available for review.
Heat treatment shall follow an approved WPS, and specificd standard or code. Temperature
recording,instrument shall be used during the heat treatrnent procoss.
f t-zl
Performance test : Testing of the intended functioning of a component- Low pressure -as wtel as
rated working pressure is required. Operators to be tested as well as the main function itself.
Test, usually hydrostatic but may involve other fluids or gas, to test pressures as per the relevant
standards.Test, usually hydrostatic but may involve other fluids or gas, to test pressures as per the
relevant standards.
Corrosion-Resistant and Wear-Resistant TEST
Materials received into the manufacturing facility shall be inspected by quality controlpersonnel to ensure conformance to appropriate receiving documents and specifications.
Non-conforming materials shall be dispositioned in accordance with the manufacturer,s qualitymanual
For specific piping design requirements (including appropriate material stress level, pressure
reduction lbr joints or attachments, and operational considerations) see ANSVASMtr B3f.1and B31.3, latest edition.4.3.L.2.L Hoses and Hose Connections. Burst pressure for hoses
shall be determined by actual pressure test conducted on lot samples and certified by the hose
manufacturer. This testing shall include end connections if permanently attached. The hose
assembly shall be tested to 1.5 times the ratedd Design working pressure.
Flame Tests. The control lines, and any component of the control lines to a surface niounteddiverter located in a division (1) one area, as defined by API 500 (area classification) shall be
capable of containing the normal operating pressure in af lame temperature of 2000 degrees F
for aperiod of three minutes without a leakag(ien cludes end connections )
Chemical composition analysis (spectrography).
Diverter system equipment that can be exposed to a hydrogen sulfide environment should
comply with NACE MR-01-75: "Material Requirements Sulfide Stress Cracking Resistant
Metallic Materials lbr Oil Field Equipment" \
Cz-^'
MINISTRY OF OIL
M-AIN OFI'ICE - BAG}IDAD
5.&ifl;.,,j9
jat"a
rfssfiTtstiis
trlo.: lDCl--[]ate:*-l -*-L31t$
lio: All farticipants
Greetings,Fleference to the subject tender above, please note the following technical specificafion for items (g &1.0)in order to present your offer properly;-Itern (8): Hose technical specification are:-
' Rubber hose reinforced used for hard duty condition fire resistant (stainless steel) armor cover.*t :9"
-1 ax operation pressure: SOO0 psi, X. With stainless steel flange size ',9" ring gasket: R-49.Item {10): see the drawing attachqd.Best Regards,
For- Director G_eneral
Saad J.
Purchases manager
{
Fax : 7118285
E-m*il : [email protected] rch d6)ide_pnv.lo
II*ghdad,
I raq.
ilc)
oxo3D.
a.oG)
@
(Jl
x-1oD5.{o
Nm ('>'x J=lx d<' *Y .'t<:95 ^'j^< +
{!
+\a,i
.o
€F
4S
{F'--J
\
fL- rJ