Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) Region: South Western Sydney AMU State Electorate: Liverpool Local Government Area: Liverpool Last Reviewed By: Greencap 26-AUG-2014 Last Revised By: Historical Fibro In Grounds Investigations/Events No No previous investigations have been recorded against the school. However, asbestos containing materials maybe present in grounds from time to time and caution must be exercised prior to any grounds disturbance. Miller Technology High School (8394) 9/09/2020 1/29

Upload: others

Post on 07-Nov-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Asbestos Register(Hazardous Materials and Risk Assessment)

School: Miller Technology High School (8394)

Region: South Western Sydney AMU

State Electorate: Liverpool

Local Government Area: Liverpool

Last Reviewed By: Greencap 26-AUG-2014

Last Revised By:

Historical Fibro In Grounds Investigations/Events No

No previous investigations have been recorded against the school. However, asbestos containing materialsmaybe present in grounds from time to time and caution must be exercised prior to any groundsdisturbance.

Miller Technology High School (8394) 9/09/2020 1/29

Page 2: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Preface to Asbestos RegisterLimitationsAsbestos Registers established (first surveyed 2007/08) and maintained for the Department of Education (DoE) are limited in extent, in that:

1. All inspections and surveys of materials and finishes in DoE facilities are non-disturbance, with2. Samples undertaken by hygienist to determine whether a sample is an Asbestos Containing Material (ACM),3. The hygienist may apply a single sample to like materials within a space and adjoining spaces, but not normally between buildings,4. Successive inspections have reduced any inconclusive records such as ‘assumed asbestos’ in difficult to access areas, by undertaking additional sampling

with lifting devices.5. In compliance with WHS Act 2011 and WHS Regulations 2017, additional inspections have been undertaken in ceiling spaces and sub-floor areas where

access is possible.Where the ground floor is slab on ground, no inspection is made beneath the slab.Where fibro fragments (ACM taken for sampling) are located in ceiling spaces or sub floor voids air monitoring is normally undertaken at time ofsampling, and clearance undertaken as soon as practicable.

6. No attempt has been made to identify any ACM that is hidden from view or encapsulated withinAny wall cavitySub floor area, particularly formwork for slabs in/on ground,Services (that may use ACM) such as: pipe lagging, asbestos cement pipes, flues.

7. All known ACM in Grounds (Fibro in Grounds) is made available in associated site specific asbestos management plans in DoE electronic files.Notwithstanding information provided, ACM may be present in grounds from time to time and caution must be exercised prior to any grounds disturbance.

Use of the Asbestos RegisterPrior to any disturbance works being undertaken in a building to which this asbestos register applies it will be necessary to confirm the extent of any ACM by adisturbance investigation:

If the building was built prior to 2003If any ACM has been identified in the Asbestos Register for the building.

Update of Asbestos RegistersAsbestos Register Data is updated regularly by the DoE Hygienist Panel via the Online Asbestos Register Tool (Managed by Business Systems, SchoolInfrastructure NSW). Internal users can view the latest edition of the Asbestos Register in the AMS.

Please note: The Department's external website may not contain the latest revision of the Asbestos Register.

Notes 1: VermiculiteDuring 2018/19, all vermiculite occurrences in DoE schools identified in 2007/08, were ‘composite tested’ in accordance with a safe work NSW agreedprocedure. This required multiple testing of all vermiculite occurrences.During the period 2007/08 to 2018/19, some vermiculite has been over sheeted and a warning is indicated for schools where this has happened.

Note 2: DoE website link for information is here:https://www.schoolinfrastructure.nsw.gov.au/about-us/workingwithus/schools-asbestos-register.html https://education.nsw.gov.au/about-us/strategies-and-reports/our-reports-and-reviews/schools-asbestos-register

Note 3: Material Condition AssessmentThe material condition assessment descriptors from Section 3 of the Asbestos Management Plan (AMP) is extracted below. Please read the AMP in its entirety forfurther information.

3.3.2.1 Material condition assessment

The OART records the material condition of identified ACM in the following format:

Rating Description

Good condition (1) For non-friable asbestos that is sealed and has no visible damage. This primarily related to asbestos cement (AC) sheet and vinyl tiles

Minimal damage (2) For non-friable asbestos that has a very small amount of damage, eg hairline cracks.

Some damage /unsealed (3)

For non-friable asbestos with significant breakage or several small areas where material has been damaged, revealing loose asbestosfibres. Non-friable asbestos that is unsealed.

Poor condition (4) For non-friable asbestos that has extensive damage. Visible asbestos debris

Friable asbestos (5) Any occurrence of friable asbestos

Miller Technology High School (8394) 9/09/2020 2/29

Page 3: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Product Material Description Extent Location MaterialCondition

RiskStatus

RemediationPriority

Result

B00A - Administration/General Learning - 1965 - Brick/BlockExterior

Underfloor Voids -Slab on Ground

Non Accessible Area

External WallStructure

Compressed AC Sheet 40 East & West GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos) , Amosite(brown asbestos) , Crocidolite (blueasbestos)

Ceiling Voids - FlatRoof

Non Accessible Area

Interior

B00A - R0001 - Public Reception - 26.26 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0002 - Administration - Clerical - 33.29 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0004 - Administration - Clerical - 15.42 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0006 - Cleaning Store - Distributed - 4.35 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0008 - Clinic - 8.36 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0009 - Office/Store - 8.35 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0010 - Staff - Toilet - 4.06 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0011 - Staff - Toilet - 4.06 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0012 - Administration - Clerical - 8.37 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0016 - Plant - .88 m2

No Asbestos

B00A - R0017 - Plant - .9 m2

No Asbestos

B00A - R0018 - Computer Learning Space - 59.48 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0019 - Printing/Photocopying - 24.05 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Miller Technology High School (8394) 9/09/2020 3/29

Page 4: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

B00A - R0020 - Commonroom - 66.52 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0021 - Archive Store - 21.05 m2

CeilingStructures/Linings

Vermiculite

Floor CoveringsRes/Textile

Vinyl Sheet

B00A - R0024 - Principal Office - 19.75 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0025 - General Storeroom - 2.99 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0026 - Staff - Toilet - 3.16 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0027 - Toilets-Boys - 13.07 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0028 - Toilets-Girls - 18.48 m2

CeilingStructures/Linings

Vermiculite

B00A - R0029 - Cleaning Supplies Store - 16.13 m2

No Asbestos

B00A - R0030 - Handwashing Facilities - .22 m2

No Asbestos

B00A - R0031 - Coffee Kiosk - 54.76 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0032 - Deputy Principal Office - 19.25 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0033 - Tea Room - 2.94 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0034 - Movement - 15.42 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0035 - Student Waiting - 13.18 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0036 - Deputy Principal Office - 27.06 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0037 - Tea Room - 2.01 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Miller Technology High School (8394) 9/09/2020 4/29

Page 5: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

B00A - R0038 - General Storeroom - 10.14 m2

No Asbestos

B00A - R0039 - Handwashing Facilities - .23 m2

No Asbestos

B00A - R0040 - External Stairs - 1.12 m2

No Asbestos

B00A - R0041 - External Stairs - 1.16 m2

No Asbestos

B00A - R0043 - External Movement - 241.19 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R0044 - Lift - 2.34 m2

No Asbestos

B00A - R0045 - Plant - 1.11 m2

No Asbestos

B00A - R1001 - General Learning Space - 53.89 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R1002 - Resources Store - 12.57 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 12m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1003 - Office/Store - 13.03 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 12m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1004 - Computer Learning Space - 73.4 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 74m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1005 - Staff Study - 9.06 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 10m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1006 - Staff Study - 9 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 9m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1007 - Resources Store - 7.26 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Miller Technology High School (8394) 9/09/2020 5/29

Page 6: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Note: No inspection of live electrical installation

Note: No inspection of live electrical installation

Floor CoveringsRes/Textile

Vinyl Tiles 8m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1008 - Interview/Office - Type 1 - 11.73 m2

Floor CoveringsRes/Textile

Vinyl Tiles 12m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R1009 - Student Lounge - 39.47 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 40m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1010 - Art Learning Space - 72.5 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 74m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1011 - General Storeroom - 39.4 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 37m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1012 - Staff Study - 40.27 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 37m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1013 - Distribution Board Cupboard - .91 m2

No Asbestos

B00A - R1014 - General Learning Space - 59.09 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles (Under FloorCovering/Carpet)

59.79m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1018 - Distribution Board Cupboard - .9 m2

No Asbestos

B00A - R1021 - Seminar - 106.71 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles (Under FloorCovering/Carpet)

106.71m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00A - R1022 - General Storeroom - 9.89 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R1023 - Student Waiting - 23.6 m2

Miller Technology High School (8394) 9/09/2020 6/29

Page 7: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R1024 - Deputy Principal Office - 10.95 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R1025 - Deputy Principal Office - 13.38 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00A - R1026 - Handwashing Facilities - .23 m2

No Asbestos

B00A - R1027 - External Stairs - 5.99 m2

No Asbestos

B00A - R1028 - Handwashing Facilities - .23 m2

No Asbestos

B00A - R1029 - External Stairs - 5.76 m2

No Asbestos

B00A - R1031 - External Movement - 128.46 m2

No Asbestos

B00B - Technological & Applied Studies/Music - 1965 - Brick/BlockExterior

Underfloor Voids -Slab on Ground

Non Accessible Area

Ceiling Voids - FlatRoof

Non Accessible Area

External WallStructure

Compressed AC Sheet 55 East & West GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos) , Amosite(brown asbestos) , Crocidolite (blueasbestos)

Interior

B00B - R0003 - Resources Store - 26.95 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R0004 - Food Technology L.S. - 72.74 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 73m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R0005 - Preparation - Materials - 12.96 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 13m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R0006 - Pantry - 12.61 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 13m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R0011 - General Learning Space - 53.67 m2

Floor CoveringsRes/Textile

Vinyl Tiles 54m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

Miller Technology High School (8394) 9/09/2020 7/29

Page 8: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R0012 - Resources Store - 3.11 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R0013 - Staff - Toilet - 3.58 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 4m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R0014 - Staff - Toilet - 3.7 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 4m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R0015 - Staff Study - 32.51 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 33m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R0016 - Resources Store - 15.87 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 16m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R0018 - External Movement - 148.31 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R0019 - Laundry - 4.68 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R0020 - Food Technology L.S. - 97.64 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 98m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R0021 - Materials Workshop - Type 3 - 52.51 m2

CeilingStructures/Linings

Vermiculite

B00B - R0022 - Wood Technology L.S. - 59.01 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R0023 - Dust Extraction Space - 10.04 m2

No Asbestos

Miller Technology High School (8394) 9/09/2020 8/29

Page 9: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

B00B - R0024 - General Storeroom - 7.01 m2

CeilingStructures/Linings

Vermiculite

B00B - R0025 - Resources Store - 22.35 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 10m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R0026 - Plant - .92 m2

No Asbestos

B00B - R0027 - Handwashing Facilities - .21 m2

No Asbestos

B00B - R0028 - Cleaning Store - Distributed - 7.58 m2

No Asbestos

B00B - R0029 - Plant - .9 m2

No Asbestos

B00B - R0030 - Handwashing Facilities - .2 m2

No Asbestos

B00B - R0031 - External Stairs - 3.48 m2

No Asbestos

B00B - R0032 - External Stairs - 3.46 m2

No Asbestos

B00B - R0033 - Kiln Space - 22.08 m2

No Asbestos

B00B - R0034 - Metal Technology L.S. - 88.75 m2

No Asbestos

B00B - R0035 - Welding Area - 3.76 m2

No Asbestos

B00B - R0036 - Welding Area - 3.74 m2

No Asbestos

B00B - R0037 - Welding Area - 3.82 m2

No Asbestos

B00B - R0038 - Outdoor Workshop - 69.67 m2

No Asbestos

B00B - R0039 - External Movement - 37.48 m2

No Asbestos

B00B - R0040 - Lift - 2.37 m2

No Asbestos

B00B - R0041 - Plant - 1.05 m2

No Asbestos

B00B - R0042 - External Movement - 22.76 m2

No Asbestos

B00B - R0043 - Covered Vehicle Area/Porte Cochere - 24.26 m2

No Asbestos

B00B - R1003 - Music Store - 6.11 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 6.46m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1004 - Practice/Seminar - 6.28 m2

Miller Technology High School (8394) 9/09/2020 9/29

Page 10: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Note: No inspection of live electrical installation

Note: No inspection of live electrical installation

Floor CoveringsRes/Textile

Vinyl Tiles 7m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R1005 - Music Learning Space - 67.06 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 67m2 West FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1006 - Distribution Board Cupboard - .9 m2

No Asbestos

B00B - R1007 - Music Learning Space - 59.24 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 59.15m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1008 - Staff Study - 26.07 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 26.24m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1009 - Art Learning Space - 52.94 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 53m2 West FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1011 - Resources Store - 10.26 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 11m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1012 - Distribution Board Cupboard - .9 m2

No Asbestos

B00B - R1013 - Resources Store - 8.86 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 9m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1014 - Resources Store - 4.46 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 5m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1015 - Music Learning Space - 50.6 m2

Miller Technology High School (8394) 9/09/2020 10/29

Page 11: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R1016 - Project Store - Type 1 - 16.26 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R1019 - Wood Technology L.S. - 69.21 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 20m2 West FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1020 - Wood Technology Bay - 52.36 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R1021 - Wood Technology L.S. - 86.19 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00B - R1022 - Art Learning Space - 52.8 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 52.8m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1023 - Project Store - Type 1 - 21.58 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 21.58m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1024 - Handwashing Facilities - .23 m2

Wall LiningsInternal

Flat AC Sheeting 0.23m2 East GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1025 - External Stairs - 5.67 m2

No Asbestos

B00B - R1026 - Handwashing Facilities - .24 m2

Wall LiningsInternal

Flat AC Sheeting 0.24m2 East GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00B - R1027 - External Stairs - 5.61 m2

No Asbestos

B00B - R1028 - External Movement - 140.34 m2

No Asbestos

B00B - R1029 - External Movement - 33.91 m2

No Asbestos

B00C - Pupil Facilities/Physical Education - 1965 - Brick/BlockExterior

Underfloor Voids -Slab on Ground

Non Accessible Area

Ceiling Voids - FlatRoof

Non Accessible Area

Interior

B00C - R0003 - Machine Storage - 7.14 m2Miller Technology High School (8394) 9/09/2020 11/29

Page 12: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0004 - Cleaning Store - Distributed - 5.59 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0005 - Student Canteen - 54.14 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0006 - Staff - Toilet - 3.19 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0007 - Pantry - 3.66 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0008 - Sport Equipment Store - 14.42 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0009 - Sport Equipment Store - 18.53 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0010 - Sport Equipment Store - 2.02 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0011 - Sport Equipment Store - 15.82 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0012 - Cleaning Store - Distributed - 1.42 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0013 - Sport Equipment Store - 5.25 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0015 - General Storeroom - 6.71 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0017 - External Movement - 67.81 m2

No Asbestos

B00C - R0018 - Materials Store - 58.73 m2

No Asbestos

B00C - R0019 - Movement - 17.71 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0020 - External Movement - 7.24 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Miller Technology High School (8394) 9/09/2020 12/29

Page 13: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

B00C - R0021 - Multi-Purpose Space - 317.75 m2

No Asbestos

B00C - R0022 - Movement - 8.83 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0023 - Sport Equipment Store - 8.86 m2

No Asbestos

B00C - R0024 - Stairs - 4.29 m2

No Asbestos

B00C - R0025 - Movement - 8.85 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00C - R0026 - General Storeroom - 9.2 m2

No Asbestos

B00C - R0027 - Stairs - 4.11 m2

No Asbestos

B00C - R0028 - General Assistants - 37.07 m2

No Asbestos

B00C - R0029 - General Assistants - 8.29 m2

No Asbestos

B00C - R1001 - Cleaning Store - Distributed - 7.09 m2

Wall LiningsInternal

Flat AC Sheeting

B00C - R1006 - Cleaning Store - Distributed - 7.05 m2

No Asbestos

B00C - R1007 - Movement - 8.56 m2

No Asbestos

B00C - R1008 - Movement - 8.59 m2

No Asbestos

B00C - R1009 - Stairs - 14.13 m2

No Asbestos

B00C - R1010 - Toilets-Boys - 32.98 m2

Partition Walls(Cubicles)

Compressed AC Sheet

B00C - R1011 - Plant - 2.33 m2

No Asbestos

B00C - R1012 - Plant - 2.38 m2

No Asbestos

B00C - R1013 - Change - 35.07 m2

No Asbestos

B00C - R1014 - Plant - 3.63 m2

No Asbestos

B00C - R1015 - Stairs - 14.06 m2

No Asbestos

B00C - R1016 - Toilets-Girls - 36 m2

Partition Walls(Cubicles)

Compressed AC Sheet

B00C - R1017 - Plant - 2.37 m2

No Asbestos

B00C - R1018 - Change - 36.02 m2

Partition Walls(Cubicles)

Compressed AC Sheet

Miller Technology High School (8394) 9/09/2020 13/29

Page 14: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

B00C - R1019 - Plant - 2.38 m2

No Asbestos

B00D - Science Learning/General Learning - 1965 - Brick/BlockExterior

External WallStructure

Compressed AC Sheet 60 East & West GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos) , Amosite(brown asbestos) , Crocidolite (blueasbestos)

Underfloor Voids -Slab on Ground

Non Accessible Area

Ceiling Voids No Asbestos Found

Interior

B00D - R0001 - Laboratory L.S. - 92.78 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Furniture / Fixtures Flat AC Sheeting 2 North, Middle portion GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R0004 - Laboratory L.S. - 92.76 m2

Furniture / Fixtures Compressed AC Sheet 2 North, Middle portion GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R0005 - Staff Study - 65.1 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R0006 - General Storeroom - 11.37 m2

No Asbestos

B00D - R0008 - Staff - Toilet - 4.44 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 5m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R0009 - Cleaning Store - Distributed - 3.44 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 4m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R0010 - Staff - Toilet - 4.43 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 5m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R0012 - Preparation - Science - 19.11 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 20m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

Miller Technology High School (8394) 9/09/2020 14/29

Page 15: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Plant / Equipment -Fume Cupboard

Flat AC Sheeting 10 East, West, Middleportion, Variablepositions

GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R0013 - Resources Store - 6.61 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 7m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R0014 - Laboratory L.S. - 86.16 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R0015 - General Storeroom - 13.18 m2

No Asbestos

B00D - R0016 - Careers Advisers Office - 26.87 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R0017 - General Learning Space - 50.67 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R0019 - Preparation - Science - 39 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R0020 - Plant - .88 m2

No Asbestos

B00D - R0021 - Handwashing Facilities - .23 m2

No Asbestos

B00D - R0022 - Toilets-Girls - 40.86 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Partition Walls(Cubicles)

Compressed AC Sheet 15m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos) , Amosite(brown asbestos) , Crocidolite (blueasbestos)

B00D - R0023 - Plant - 1.04 m2

No Asbestos

B00D - R0024 - Toilets-Boys - 31.39 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Partition Walls(Cubicles)

Compressed AC Sheet 15m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos) , Amosite(brown asbestos) , Crocidolite (blueasbestos)

B00D - R0025 - Plant - 2.38 m2

No Asbestos

B00D - R0026 - Plant - 2.38 m2

No Asbestos

B00D - R0027 - Plant - .89 m2

No Asbestos

B00D - R0028 - Handwashing Facilities - .23 m2

No Asbestos

B00D - R0029 - External Stairs - 3.4 m2

No Asbestos

B00D - R0030 - External Stairs - 3.54 m2Miller Technology High School (8394) 9/09/2020 15/29

Page 16: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Note: No inspection of live electrical installation

Note: No inspection of live electrical installation

No Asbestos

B00D - R0031 - External Movement - 139.57 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R0032 - Lift - 2.57 m2

No Asbestos

B00D - R0033 - Plant - .94 m2

No Asbestos

B00D - R1001 - General Learning Space - 59.24 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 60m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R1002 - Resources Store - 12.44 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 13m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R1003 - Resources Store - 5.13 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R1004 - General Learning Space - 53.6 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 54m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R1005 - General Learning Space - 59.09 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R1008 - Computer Learning Space - 59.09 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R1009 - Distribution Board Cupboard - .9 m2

No Asbestos

B00D - R1010 - Distribution Board Cupboard - .88 m2

No Asbestos

B00D - R1011 - General Learning Space - 53.6 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 54m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R1013 - Computer Learning Space - 59.09 m2

CeilingStructures/Linings

Vermiculite

Floor CoveringsRes/Textile

Vinyl Tiles 59m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R1014 - General Learning Space - 52.8 m2

Miller Technology High School (8394) 9/09/2020 16/29

Page 17: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 53m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R1015 - General Learning Space - 52.8 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 53m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R1017 - General Learning Space - 53.24 m2

Floor CoveringsRes/Textile

Vinyl Tiles 53m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R1019 - Staff Study - 34.83 m2

Floor CoveringsRes/Textile

Vinyl Tiles 34.83m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00D - R1020 - Tea Room - 2.19 m2

No Asbestos

B00D - R1021 - Interview/Office - Type 1 - 20.04 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R1022 - Tea Room - 2.56 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00D - R1023 - Handwashing Facilities - .23 m2

No Asbestos

B00D - R1024 - Handwashing Facilities - .24 m2

No Asbestos

B00D - R1025 - External Stairs - 5.69 m2

No Asbestos

B00D - R1026 - External Stairs - 5.75 m2

No Asbestos

B00D - R1028 - External Movement - 151.16 m2

No Asbestos

B00E - Library/General Learning/Science Learning - 1965 - Brick/BlockExterior

Ceiling Voids No Asbestos Found

Underfloor Voids -Slab on Ground

Non Accessible Area

External WallStructure

Compressed AC Sheet 50 East & West GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos) , Amosite(brown asbestos) , Crocidolite (blueasbestos)

Interior

B00E - R0001 - Staff Study - 12.82 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0002 - Resources Store - 6.36 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0003 - Resources Store - 6.13 m2Miller Technology High School (8394) 9/09/2020 17/29

Page 18: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0004 - Staff Study - 39.32 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 40m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R0006 - Design L.S. - 52.7 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0007 - Resources Store - 11.55 m2

No Asbestos

B00E - R0009 - Resources Store - 32.37 m2

CeilingStructures/Linings

Vermiculite

Floor CoveringsRes/Textile

Vinyl Sheet

B00E - R0010 - General Learning Space - 52.72 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0011 - Chemical Store - 25.96 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0012 - Laboratory L.S. - 92.65 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Furniture / Fixtures Compressed AC Sheet 2 South, Middle portion GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R0013 - Resources Store - 10.16 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 11m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R0014 - Preparation - Science - 28.47 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 29m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

Plant / Equipment -Fume Cupboard

Flat AC Sheeting 2 East, West, Middleportion, Variablepositions

GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R0015 - Laboratory L.S. - 85.75 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 86m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

Miller Technology High School (8394) 9/09/2020 18/29

Page 19: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Furniture / Fixtures Compressed AC Sheet 2 South, Middle portion GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R0016 - General Storeroom - 4.17 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0019 - Seminar - 13.25 m2

No Asbestos

B00E - R0020 - Seminar - 13.25 m2

No Asbestos

B00E - R0021 - Resources Store - 13.56 m2

No Asbestos

B00E - R0022 - Library Administration - 36.13 m2

No Asbestos

B00E - R0023 - Audio Visual Workroom - 26.87 m2

No Asbestos

B00E - R0024 - Computer Room - 7 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0025 - Librarian - 12.31 m2

No Asbestos

B00E - R0027 - Plant - .59 m2

CeilingStructures/Linings

Flat AC Sheeting 1m2 Throughout GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R0028 - General Learning Space - 67.69 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 67.69m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R0029 - Resources Store - 4.26 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0030 - Cleaning Store - Distributed - 5.73 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0031 - Toilet - Lobby - 1.25 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0032 - Staff - Toilet - 3.65 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0033 - Handwashing Facilities - .19 m2

Wall LiningsInternal

Flat AC Sheeting 1.5m2 East GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R0034 - Handwashing Facilities - .18 m2

Wall LiningsInternal

Flat AC Sheeting 0.18m2 West GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R0035 - External Stairs - 2.76 m2

Miller Technology High School (8394) 9/09/2020 19/29

Page 20: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

No Asbestos

B00E - R0036 - External Stairs - 1.23 m2

No Asbestos

B00E - R0037 - External Stairs - 2.25 m2

No Asbestos

B00E - R0038 - External Movement - 178.27 m2

Wall LiningsInternal - Infill

Flat AC Sheeting

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0039 - Main Entry - 16.24 m2

No Asbestos

B00E - R0040 - Main Area - 286.93 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R0041 - General Storeroom - 5.34 m2

CeilingStructures/Linings

Vermiculite

B00E - R0042 - Plant - .65 m2

No Asbestos

B00E - R1001 - General Learning Space - 53.75 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 55m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1002 - General Learning Space - 67.44 m2

Floor CoveringsRes/Textile

Vinyl Tiles 67.56m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

CeilingStructures/Linings

Vermiculite

B00E - R1003 - Resources Store - 8.88 m2

CeilingStructures/Linings

Vermiculite

Floor CoveringsRes/Textile

Vinyl Tiles 9m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1004 - Resources Store - 8.57 m2

CeilingStructures/Linings

Vermiculite

Floor CoveringsRes/Textile

Vinyl Tiles 9m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1005 - Staff Study - 26.07 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 27m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1006 - Staff Study - 38.27 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Miller Technology High School (8394) 9/09/2020 20/29

Page 21: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Note: No inspection of live electrical installation

Floor CoveringsRes/Textile

Vinyl Tiles 40m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1008 - General Learning Space - 59.01 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 60m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1009 - General Learning Space - 52.72 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 54m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1010 - General Learning Space - 52.65 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 54m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1011 - Resources Store - 12.8 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 13m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1012 - General Storeroom - 6.19 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 7m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1013 - Resources Store - 6.12 m2

Floor CoveringsRes/Textile

Vinyl Tiles 7m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R1015 - General Learning Space - 59.08 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 65m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1016 - Cleaning Store - Distributed - 4.17 m2

CeilingStructures/Linings

Vermiculite

B00E - R1017 - Distribution Board Cupboard - .6 m2

No Asbestos

B00E - R1018 - General Learning Space - 53.67 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Miller Technology High School (8394) 9/09/2020 21/29

Page 22: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Note: No inspection of live electrical installation

Floor CoveringsRes/Textile

Vinyl Tiles 55m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1019 - Resources Store - 6.13 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R1020 - Office/Store - 15.61 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 14m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1021 - General Learning Space - 58.92 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 60m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1022 - General Learning Space - 52.51 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 55m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1023 - General Learning Space - 53.53 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 55m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1025 - Distribution Board Cupboard - .62 m2

No Asbestos

B00E - R1027 - General Learning Space - 52.58 m2

Floor CoveringsRes/Textile

Vinyl Tiles 52.58m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R1028 - External Stairs - 4.65 m2

No Asbestos

B00E - R1029 - Handwashing Facilities - .2 m2

Wall LiningsInternal

Flat AC Sheeting 0.2m2 East GoodCondition(1)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1030 - External Stairs - 4.42 m2

No Asbestos

B00E - R1031 - Toilet - Lobby - 1.31 m2

No Asbestos

B00E - R1032 - Staff - Toilet - 3.69 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

B00E - R1033 - Handwashing Facilities - .19 m2

No Asbestos

Miller Technology High School (8394) 9/09/2020 22/29

Page 23: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

B00E - R1034 - External Stairs - 4.39 m2

No Asbestos

B00E - R1035 - Resources Store - 26.03 m2

CeilingStructures/Linings

Vermiculite - CompositeSample - ( 40 - 70 m2) - ( X5)

Floor CoveringsRes/Textile

Vinyl Tiles 26.03m2 Throughout FriableAsbestos(5)

Low(1)

Low Priority(2-3)

Chrysotile (white asbestos)

B00E - R1036 - External Movement - 209.29 m2

No Asbestos

B00F - Multi Purpose Facilities - 1997 - Brick/BlockExterior

Ceiling Voids No Asbestos Found

Underfloor Voids No Asbestos Found

Interior

B00F - R0003 - Toilets-Disabled - 7.51 m2

No Asbestos

B00F - R0004 - Plant - .65 m2

No Asbestos

B00F - R0006 - Sport Equipment Store - 26.49 m2

No Asbestos

B00F - R0007 - Performance Store - 16.18 m2

No Asbestos

B00F - R0008 - Toilets-Boys - 10.55 m2

No Asbestos

B00F - R0009 - Other-Community Use - 16.18 m2

No Asbestos

B00F - R0010 - Other-Community Use - 10.55 m2

No Asbestos

B00F - R0011 - Control Room - 3.14 m2

No Asbestos

B00F - R0012 - Chair Store - 33.17 m2

No Asbestos

B00F - R0013 - External Movement - 7.53 m2

No Asbestos

B00F - R0014 - Movement - 41.29 m2

No Asbestos

B00F - R0015 - Staff Kitchen - 20.92 m2

No Asbestos

B00F - R0016 - Staff Kitchen - 7.94 m2

No Asbestos

B00F - R0017 - Toilets-Girls - 15.24 m2

Partition Walls(Cubicles)

Flat AC Sheeting

Wall LiningsInternal

Flat AC Sheeting

B00F - R0018 - Toilets-Boys - 12.42 m2

Wall LiningsInternal

Flat AC Sheeting

Partition Walls(Cubicles)

Flat AC Sheeting

B00F - R0019 - Multi-Purpose Space - 497.71 m2

Miller Technology High School (8394) 9/09/2020 23/29

Page 24: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

No Asbestos

B00F - R0020 - Movement - 1.48 m2

No Asbestos

B00F - R0021 - Stairs - 1.25 m2

No Asbestos

B00F - R0022 - Stage - 121.35 m2

No Asbestos

B00F - R0023 - Stairs - 1.27 m2

No Asbestos

B00F - R0024 - Movement - 2.61 m2

No Asbestos

B00F - R0025 - Ramp - 18.78 m2

No Asbestos

B00F - R0026 - Garden Store Room - 5.86 m2

No Asbestos

B00F - R0027 - Garden Store Room - 14.17 m2

No Asbestos

B00G - Physical Education - 2004 - SteelExterior

Ceiling Voids No Asbestos Found

Underfloor Voids -Slab on Ground

Non Accessible Area

Interior

B00G - M0001 - Fitness Laboratory - 22.54 m2

No Asbestos

B00G - M0002 - Stairs - 3.76 m2

No Asbestos

B00G - R0001 - Fitness Laboratory - 121.65 m2

No Asbestos

B00G - R0002 - Stairs - .66 m2

No Asbestos

B00H - Mechanical Services - 2010 - SteelExterior

Underfloor Voids -Slab on Ground

Non Accessible Area

Ceiling Voids No Asbestos Found

Interior

B00H - R0001 - Workshop - 174.76 m2

No Asbestos

B00H - R0002 - General Learning Space - 30.77 m2

No Asbestos

B00H - R0003 - Outdoor Workshop - 70.18 m2

No Asbestos

B00H - R0004 - External Movement - 35.83 m2

No Asbestos

B00I - Other - 2011 - Brick/BlockExterior

Underfloor Voids No Asbestos Found

Ceiling Voids No Asbestos Found

Interior

B00I - R0001 - Toilets-Disabled - 11.09 m2

Miller Technology High School (8394) 9/09/2020 24/29

Page 25: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

No Asbestos

B00Y - Electrical Services - 1965 - Brick/BlockExterior

Ceiling Voids No Asbestos Found

Underfloor Voids -Slab on Ground

Non Accessible Area

Interior

B00Y - R0001 - Main Switchroom - 8.2 m2

No Asbestos

B00Y - R0002 - Stairs - 3.13 m2

No Asbestos

B00Y - R0003 - External Movement - 1 m2

No Asbestos

B00Y - R9001 - Stairs - 3.13 m2

No Asbestos

B00Y - R9002 - Other-Vacant - 11.56 m2

No Asbestos

B00Z - Building Services - 1965 - Brick/BlockExterior

Eaves Linings Flat AC Sheeting

Underfloor Voids Requires Inspection

Ceiling Voids Requires Inspection

Interior

B00Z - R0001 - Plant - 6.46 m2

Material - Stored /Debris Material

Flat AC Sheeting

Miller Technology High School (8394) 9/09/2020 25/29

Page 26: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Demountables

OS 600 11690 - Learning Unit - Small - Placement Date : 06-JAN-2000Exterior

Eaves Linings Flat AC Sheeting 8.64m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

Interior

R1- General Learning Space

End Wall Panel Flat AC Sheeting 50m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 55m2 Assumed Asbestos

OS 521 11770 - Staff Study - Placement Date : 09-OCT-1996Exterior

Eaves Linings Flat AC Sheeting 11.52m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

Interior

R1- Staff Room

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 55m2 Assumed Asbestos

R2- Staff Toilet

Toilet Partitions Compressed AC Sheet 6m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 4m2 Assumed Asbestos

R3- Staff Toilet

Toilet Partitions Compressed AC Sheet 6m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 4m2 Assumed Asbestos

R4- Lobby

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 10m2 Assumed Asbestos

OS 601 11774 - Learning Unit - Standard/Withdrawal - Placement Date : 30-JUN-1995Exterior

Eaves Linings Flat AC Sheeting 11.52m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

Interior

R1- Entry

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 8m2 Assumed Asbestos

R2- General Learning Space

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 55m2 Assumed Asbestos

R3- Store

Ceiling Structures/Linings Flat AC Sheeting 10m2 Assumed Asbestos

OS 601 12320 - Learning Unit - Standard/Withdrawal - Placement Date : 07-JAN-2000Exterior

Eaves Linings Flat AC Sheeting 11.52m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

Interior

R1- Entry

Miller Technology High School (8394) 9/09/2020 26/29

Page 27: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 8m2 Assumed Asbestos

R2- General Learning Space

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 55m2 Assumed Asbestos

R3- Store

Ceiling Structures/Linings Flat AC Sheeting 10m2 Assumed Asbestos

OS 601 12346 - Learning Unit - Standard/Withdrawal - Placement Date : 05-JAN-1999Exterior

Eaves Linings Flat AC Sheeting 11.52m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

Interior

R1- Entry

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 8m2 Assumed Asbestos

R2- General Learning Space

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 55m2 Assumed Asbestos

R3- Store

Ceiling Structures/Linings Flat AC Sheeting 10m2 Assumed Asbestos

OS 601 12347 - Learning Unit - Standard/Withdrawal - Placement Date : 05-JAN-1999Exterior

Eaves Linings Flat AC Sheeting 11.52m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

Interior

R1- Entry

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 8m2 Assumed Asbestos

R2- General Learning Space

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 55m2 Assumed Asbestos

R3- Store

Ceiling Structures/Linings Flat AC Sheeting 10m2 Assumed Asbestos

OS 501 12715 - Admin Staff/Principal/Deputy/Dup/Clinic - Placement Date : 16-FEB-2007Exterior

Eaves Linings Flat AC Sheeting 31.68m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

Interior

R1- Entry

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 25m2 Assumed Asbestos

R10- Staff Toilet

Toilet Partitions Compressed AC Sheet 4m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 2m2 Assumed Asbestos

R11- Cleaning Supplies

Ceiling Structures/Linings Flat AC Sheeting 2m2 Assumed Asbestos

R12- Handicap toilet

Miller Technology High School (8394) 9/09/2020 27/29

Page 28: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

Ceiling Structures/Linings Flat AC Sheeting 2m2 Assumed Asbestos

R13- Clerk

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 16m2 Assumed Asbestos

R2- Clinic-Waiting

Ceiling Structures/Linings Flat AC Sheeting 16m2 Assumed Asbestos

R3- Security Store

Ceiling Structures/Linings Flat AC Sheeting 12m2 Assumed Asbestos

R4- Duplicating Wookroom

Ceiling Structures/Linings Flat AC Sheeting 12m2 Assumed Asbestos

R5- Clerical Office

Ceiling Structures/Linings Flat AC Sheeting 16m2 Assumed Asbestos

R6- Staff Room

Ceiling Structures/Linings Flat AC Sheeting 58m2 Assumed Asbestos

R7- Deputy Principal

Ceiling Structures/Linings Flat AC Sheeting 16m2 Assumed Asbestos

R8- Principal

Ceiling Structures/Linings Flat AC Sheeting 20m2 Assumed Asbestos

R9- Staff Toilet

Toilet Partitions Compressed AC Sheet 4m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 2m2 Assumed Asbestos

OS 600 13409 - Learning Unit - Small - Placement Date : 17-JAN-2000Exterior

Eaves Linings Flat AC Sheeting 8.64m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

Interior

R1- General Learning Space

End Wall Panel Flat AC Sheeting 50m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 55m2 Assumed Asbestos

OS 601 13526 - Learning Unit - Standard/Withdrawal - Placement Date : 22-SEP-1999Exterior

Eaves Linings Flat AC Sheeting 11.52m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

Interior

R1- Entry

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 8m2 Assumed Asbestos

R2- General Learning Space

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 55m2 Assumed Asbestos

R3- Store

Ceiling Structures/Linings Flat AC Sheeting 10m2 Assumed Asbestos

OS 601 13669 - Learning Unit - Standard/Withdrawal - Placement Date : 21-SEP-1999Exterior

Eaves Linings Flat AC Sheeting 11.52m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

InteriorMiller Technology High School (8394) 9/09/2020 28/29

Page 29: Miller Technology High School (8394) · Asbestos Register (Hazardous Materials and Risk Assessment) School: Miller Technology High School (8394) ... Samples undertaken by hygienist

R1- Entry

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 8m2 Assumed Asbestos

R2- General Learning Space

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 55m2 Assumed Asbestos

R3- Store

Ceiling Structures/Linings Flat AC Sheeting 10m2 Assumed Asbestos

OS 601 13690 - Learning Unit - Standard/Withdrawal - Placement Date : 22-SEP-1999Exterior

Eaves Linings Flat AC Sheeting 11.52m2 Assumed Asbestos

Landing Compressed AC Sheet 1.2m2 Assumed Asbestos

Step Treads Compressed AC Sheet 1.08m2 Assumed Asbestos

Interior

R1- Entry

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 8m2 Assumed Asbestos

R2- General Learning Space

End Wall Panel Flat AC Sheeting 18m2 Assumed Asbestos

Ceiling Structures/Linings Flat AC Sheeting 55m2 Assumed Asbestos

R3- Store

Ceiling Structures/Linings Flat AC Sheeting 10m2 Assumed Asbestos

NS 020 13909 - Staff Study/Store - Placement Date : 04-NOV-2009

Note: This refurbished demountable may have asbestos present in remnant mastic in window frames.

No Asbestos Found

OS 600 14301 - Learning Unit - Small - Placement Date : 05-JUL-2007No Asbestos Found

OS 600 14686 - Learning Unit - Small - Placement Date : 05-JUL-2007No Asbestos Found

Miller Technology High School (8394) 9/09/2020 29/29