mihirjha

Upload: subham-ghanta

Post on 29-May-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 mihirjha

    1/3

    CURRICULAM VITAE

    MIHIR KUMAR JHADesign Engineer

    Foster Wheeler

    Kolkata#+919903363154

    Email:[email protected]

    Summary

    Mihir has 4 years of experience in Design calculation, Preparation / Review of MechanicalDatasheet, Technical Bid Evaluation, Vendors' Document Review including DesignCalculation, Procedures like Hydrotest Procedure, Painting procedure, Drawings and otherspecifications for Static Equipment such as Pressure Vessel, Column, Reactor, Tank andShell and Tube Heat Exchanger.

    Have experince in Controling of Design Information for Equipment Engineering exchangedwith other disciplines, vendor and client.Equipment handled covered material of construction of CS, SS, CS+Clad, LAS, HAS etc.

    Familiar with National & International Codes and Standards like ASME Sec. VIII Div.1 &Div.2, Sec II Part A & D, API-650, API 660, API 661, TEMA, ASME B16.5, B16.47, WRC107/297, ASCE, UBC,IS:875, IS:1893, EN 10204:2004, EEMUA 143, BS 6399 etc.

    Familiar with Mechanical Design Software for Static Equipments such as PVElite,Compress, HTRI, TANK. Knowledge of softwares like AutoCAD, MATHCAD, Smart Sketch.

    Currently working as Engineer Equipment Engineering in Foster Wheeler India, since2007

    PresentQualification:

    Examination Institution Board\University Year Marks\CGPA(10)

    B.Tech (M.E) National InstituteOf Foundry &Forge Technology

    RANCHI 2001-2005 1st Year-8.312nd Year-8.383rd Year-8.454th Year-8.66

    Experience with Foster Wheeler

    2009: Sasol Technology (Pty) Limited,Water Recovery Growth Project, Secunda, South Africa.

    Equipment Engineer-StaticPreparation of Mechanical Datasheets (MDS), Material Requisitions (MR) andTechnical Bid Evaluation of Tank and Pressure Vessels.

  • 8/8/2019 mihirjha

    2/3

    2008-2009: Chevron South Africa (Pty) Limited,Flare Modernization Project, South Africa.Equipment Engineer-StaticPreparation of Mechanical Datasheets (MDS), Material Requisitions (MR) ofPressure Vessels.

    2008-2009: Shell UK Oil Products Limited, Re-rating of Vessels and Heat Exchangers,

    Stanlow, UK.Equipment Engineer-StaticPreparation of re-rating reports for Pressure Vessels, Air cooled Heat Exchangers,MAWP evaluation, Tmin reports and PVElite design calculations at re-rated designconditions

    2008: QPCC, Qatar Petrochemical Complex Project, Qatar.Equipment Engineer-StaticResponsible for preparation of Mechanical Data Sheets for Columns, Reactorsand Vessels for the following Units, Ethylene Dimerisation, Desisobutenizer,Metahesis, Ethylene Benzene, Polystyrene, Polypropylene, Naphtha Hydrotreater,BT Extraction, Aromatic Fractionations, Offsite and Utilities.

    2007-2008: IOCL, Paradip Refinery Project, India.

    Equipment Engineer-StaticPreparation of Equipment datasheets for Long Lead and Non-Long Lead items.Preliminary design Engineering of Pressure Vessels, Drums & Columns. TechnicalBid Evaluation for Drums & Columns.

    2007: Manifa Central Processing Facilities (CPF)900MBCD and Tanajib (Manifa)Equipment Engineer-StaticPreparation of Mechanical Datasheets (MDS) and Material Requisitions (MR) ofTank, Drum & Vessels. Technical Bid Evaluation for Tanks & Drums.

    Achievement:Got the Foster Wheeler GEM 2008 Award in Assisting completion of data sheet with

    hard work and involvement

    Other Experience

    2007-2007: Jacobs Engineering , Navi Mumbai, IndiaDesign Engineer-FEGResponsible for detailed design and engineering of Pressure Vessels, Columns,Reactor,and preparation of Mechanical Datasheets.

    2005-2007: Reliance, Jamnagar, India

    Engineer-MechanicalResponsible for detailed design and engineering of pressure vessels, heat exchangersand columns, preparation of requisition, technical bid evaluation, technical clarifications,vendor drawings and design calculations review and approval for construction.

    2006-2007: Jamnagar Export Refinery ProjectResponsible Engineer-MechanicalWorked as Responsible Engineer for Jamnagar Export Refinery Project doingVendors' Document Review including design calculation, procedures like

  • 8/8/2019 mihirjha

    3/3

    hydrotest procedure, painting procedure, drawings and other specifications ofStatic Equipment (Pressure Vessels, Heat Exchangers).

    2005-2006: QYI-2 HYD Project , RPL JamnagarEngineer-MechanicalSuccessfully completed the project (By- casts Air Preheater integration withLinde) in HMU-3 at Reliance Jamnagar refinery doing Co-ordination between

    Linde, By-Cast and SNC- Lavlin and Vendor Print Review of duct layout,calculation, technical specification of Expansion bellows etc.

    Strength:Self starter and strong believer of hard workExcellent team player and learnerLeadership Quality

    Permanent Address:Qtr. No.-F-305Dugda Coal WasheryDist-BokaroJharkhand

    Ph:06549-244161