Learn more about plans to improve I-84 in Canyon County. To find the Drive Idaho podcast, go to ITDPROJECTS.ORG/84CORRIDOR or subscribe on Apple Podcast, Spotify or wherever you listen to podcasts. Listen to the Drive Idaho podcast. DESIGN PROCESS ITD is conducting a long-term environmental study and traffic analysis of I-84 between Caldwell and Nampa. The Middleton and Ustick overpasses are a part of this study. ITD is in the process of working with local jurisdictions, key stakeholders and the traveling public to advance the design of the overpasses to expedite the widening of I-84. The Middleton and Ustick overpasses were built in 1966 and do not allow room for additional lanes on I-84. he Idaho Transportation Department is making plans to replace the Middleton and Ustick overpasses on I-84 in Canyon County. Replacing the overpasses will allow ITD to add lanes on the interstate, which is expected to improve safety, traffic flow and economic opportunity for many years. T MIDDLETON AND USTICK OVERPASSES

Upload: others

Post on 03-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MIDDLETON AND USTICK OVERPASSES€¦ · Your Safety • Your Mobility Your Economic Opportunity JULY 2019 USTICK RD Y L D NELSON LANE MIDDLETON RD N D CALDWELL AIRPORT CALDWELL NAMPA

Learn more about plans

to improve I-84 in Canyon County.

To find the Drive Idaho podcast, go to ITDPROJECTS.ORG/84CORRIDOR

or subscribe on Apple Podcast, Spotify or wherever you

listen to podcasts.

Listen to the Drive Idaho

podcast.

D E S I G N P R O C E S SITD is conducting a long-term environmental study and traffic analysis of I-84 between Caldwell and Nampa. The Middleton and Ustick overpasses are a part of this study.

ITD is in the process of working with local jurisdictions, key stakeholders and the traveling public to advance the design of the overpasses to expedite the widening of I-84.

The Middleton and Ustick overpasses were built in

1966 and do not allow room for additional

lanes on I-84.

he Idaho Transportation Department is making plans to replace the Middleton and Ustick overpasses on I-84 in Canyon County.

Replacing the overpasses will allow ITD to add lanes on the interstate, which is expected to improve safety, traffic flow and economic opportunity for many years.

T

MIDDLETON AND USTICK OVERPASSES

Page 2: MIDDLETON AND USTICK OVERPASSES€¦ · Your Safety • Your Mobility Your Economic Opportunity JULY 2019 USTICK RD Y L D NELSON LANE MIDDLETON RD N D CALDWELL AIRPORT CALDWELL NAMPA

Your Safety • Your MobilityYour Economic Opportunity

JULY 2019

USTICK RD

AVIATION WAY

NOTUS CANAL

RAILROAD

NELSO

N LA

NE

MID

DLETO

N R

D

CHERRY LN

CALDWELL BLVD

CALDWELLAIRPORT

CALDWELL

NAMPAN

PROJECT AREA

MIDDLETON AND USTICK OVERPASSES

T R A F F I C S T U D Y O U T C O M E S A traffic analysis was completed in 2018 for this area of I-84. The study included a detailed review of future traffic needs. The analysis concluded that future traffic needs will be addressed by widening I-84 and improving existing interchanges.

Y O U R I N P U T The community will have the opportunity to provide input about the overpass designs through an open house this summer.

S C H E D U L ESpring/Summer 2019 Develop preliminary design

Summer 2019 Gather input at community open house

Fall 2019 Complete final design

Spring 2020 Begin construction

TO LEARN MORE:I T D P R O J E C T S . O R G / 8 4 C O R R I D O RTEXT: 84Corridor to 555888 P: 208-334-8002E: [email protected]