micoperi hadera
DESCRIPTION
Micoperi HaderaTRANSCRIPT
Micoperi HaderaSPT performed the engineering and installation of 8 Suction Mooring Piles for an STL buoy for the Hadera Field Development.The Suction Piles where installed in approx. 75 m water depth.The suction pile dimensions are:OD 9.0m x 11.5m deep (2 no.s)OD 9.0m x 18.5m deep (6 no.s)Installation was performed using SPT suction installation spread SAPS-001 from a Client offshore installation vessel