miami river freight improvement · pdf fileoperating a container-on-barge, ... (495)...

41
Carlos A. Castro, District Freight Coordinator Miami River Commission January 8, 2018 | Miami, FL Miami River Freight Improvement Plan Financial Management Number: 437946 - 1 - 22 - 01

Upload: ngokhuong

Post on 10-Mar-2018

224 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Carlos A. Castro, District Freight Coordinator

Miami River Commission

January 8, 2018 | Miami, FL

Miami River FreightImprovement PlanFinancial Management Number: 437946-1-22-01

Page 2: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Agenda

▪ Study Background

▪ Technical Analysis Elements

‒ River Capacity

‒ Short Sea Shipping

‒ Transportation Network

▪ Recommendations Summary

▪ Next Steps

2

Page 3: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Study Background

3

Page 4: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Study Area

▪ NW North River Dr.

▪ NW 27th Ave.

▪ SR 836

▪ NW 36th St.

▪ Okeechobee Rd.

4

Page 5: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

The Miami River

5

Page 6: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Miami River

Urban Infill

Plan

6

Page 7: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Overview of Scope

▪ Stakeholder coordination‒ Shipping data visits

‒ Needs survey

‒ Stakeholder visits

▪ Assessment of existing conditions

▪ Corridor analysis‒ Roadway and rail needs

‒ Short Sea Shipping

‒ River Capacity

‒ Waterway needs

▪ Cost estimates

▪ Recommendations

7

Page 8: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Special StudiesRiver Capacity

▪ PURPOSE

Quantify the river throughput capacity with dynamic model

▪ Includes both channel and berthing elements

▪ Considers: speeds, tug operations, turnaround time, berth occupancy, vessel types, navigation constraints, other vessels

▪ OUTPUTS

• Berth and channel utilization for various scenarios

• Possible waterway improvements

Short Sea Shipping

▪ PURPOSE

Assess technical feasibility of operating a Container-on-Barge, or other configuration, to/from a Miami River terminal

▪ Considerations:

• Potential markets

• Service geography

• Economics

• Terminal infrastructure and equipment needs

• Working throughput capacity

▪ OUTPUTS

• Feasibility assessment

• Implementation steps

8

Page 9: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

River Capacity Analysis

9

Page 10: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Cargo and Barge Analysis

▪ Bridge Tender Data was received for lift bridges along Miami River. Study focused on:

‒ Brickell Avenue

‒ NW 17th Avenue

‒ NW 27th Avenue

▪ Scheduled vessels defined as those with schedules available on company websites.

▪ Unscheduled vessels defined as all other cargo and barge vessels.

10

Page 11: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Lift Bridge Analysis

▪ Vessels transiting bridges based on two-

hour intervals from the bridge tender data.

▪ Only those vessels requiring bridge lift.

▪ Cargo vessels are defined as cargo,

barge, and tug vessels.

▪ Non-Cargo are defined as all other types

of vessels.

11

Page 12: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Monthly Cargo Movements at

Brickell Avenue

0

20

40

60

80

100

120

IN

OU

T

TOTA

L IN

OU

T

TOTA

L IN

OU

T

TOTA

L IN

OU

T

TOTA

L IN

OU

T

TOTA

L IN

OU

T

TOTA

L IN

OU

T

TOTA

L IN

OU

T

TOTA

L IN

OU

T

TOTA

L IN

OU

T

TOTA

L IN

OU

T

TOTA

L IN

OU

T

TOTA

L

JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN

2015 2015 2015 2015 2015 2015 2016 2016 2016 2016 2016 2016

# O

F V

ESSE

L TR

AN

SITS

MONTH

UNSCHEDULED SCHEDULED

54% - Scheduled46% - Unscheduled

85 -120 Cargo Transits/Mo.

12

Page 13: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Brickell Avenue

0

20

40

60

80

100

# O

F V

ESSE

L TR

AN

SITS

TIME INTERVAL

BRICKELL AVE. AVERAGE MONTH CARGO & NON-CARGO VESSEL TRANSITS BY 2-HOUR INTERVALS

Non-Cargo

Cargo

Transits between 6am-6pm75% - Cargo

73% - Non-Cargo

Total Transits/Ave. Mo. (494)Non-Cargo 77% (380)Cargo 23% (114)

13

Brickell Bridge OpeningsCY 2010 – 4,990 (Great Recession)

July 2015 / June 2016 – 5,928+ 19% in ~ 5 years

Page 14: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

NW 17th Avenue

0

20

40

60

80

100

# O

F V

ESSE

L TR

AN

SITS

TIME INTERVAL

NW 17TH AVE. AVERAGE MONTH CARGO & NON-CARGO VESSEL TRANSITS BY 2-HOUR INTERVALS

Non-Cargo

Cargo

Transits between 6am-6pm74% - Cargo

65% - Non-Cargo

Total Transits/Ave. Mo. (495)Non-Cargo 82% (406)Cargo 18% (89)

14

Page 15: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

NW 27th Avenue

0

20

40

60

80

100

# O

F V

ESSE

L TR

AN

SITS

TIME INTERVAL

NW 27th AVE. AVERAGE MONTH CARGO & NON-CARGO VESSEL TRANSITS BY 2-HOUR INTERVALS

Non-Cargo

Cargo

Transits between 6am-6pm75% - Cargo

79% - Non-Cargo

Total Transits/Ave. Mo. (148)Non-Cargo 58% (86)Cargo 42% (62)

15

Page 16: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Dynamic Model Snapshot

Vessel dwelling in

passing area,

attempting to move

south.

Vessel dwelling in

passing area,

attempting to move

south.

Vessel moving north

to a berth.

http://www.marinetraffic.com/

16

Page 17: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Baseline Throughput

Tug Only or Cargo Move Baseline Vessel Transits

Weekly

Tug Only Transit 8

Cargo Transit North Bound 7

Cargo Transit South Bound 8

“Scheduled” (Modeled)

Transits

23

“Unscheduled” Transits 20

Total Transits 43

17

Page 18: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Growth Scenario Throughput

Tug Only or Cargo

Move

Baseline Vessel

Transits (per

week)

Baseline Vessel

Transits (per

year)

Growth Vessel

Transits (per

week)

Growth Vessel

Transits (per

year)

Tug Only Transit 8 416 26 1,352

Cargo Transit North

Bound

7 364 40 2,080

Cargo Transit South

Bound

8 416 45 2,340

“Scheduled”

(Modeled) Transits

23 1,196 111 5,772

“Unscheduled”

Transits

20 1,040 N/A N/A

Total Transits 43 2,236 111 5,772

18

Page 19: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Growth Opportunity

Cargo Vessel Growth Availability Per Week Per Year

Available Cargo Vessel Transits

(NB or SB)

42 2,184

Available Vessels (NB and SB) 21 1,092

19

Page 20: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Growth Opportunity

▪ Significant reserve capacity for cargo

movements.

▪ Demonstrated by prior shipping volume

over 2x current level.

▪ Average ship capacity is larger:

‒ Larger ships relying on high tide movement.

‒ Fewer smaller shippers.

20

Page 21: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Short Sea Shipping Analysis

21

Page 22: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Short Sea Shipping (SSS)

▪ Definition: Movement of cargo in a coastal

setting.

▪ Program would include a container-on-

barge service between PortMiami and a

marine terminal on the Miami River.

22

Page 23: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

PortMiami Potential SSS Berths

A B

AB

23

Page 24: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Unloading Location

Requirements

Short Sea Shipping

Requirement

Quantity Required

Ship to shore crane 2 cranes

Reach stack or side loader 2 cranes

Container storage 4 acres

Berth access 300 linear feet

Administrative building 1 building

Ingress/egress point 1 lane each direction

Mobile maintenance 1 truck

24

Page 25: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

SSS Throughput Capacity

▪ Based on 2 vessels per day and operating

up to 360 days per year, the SSS Program

could transport up to 64,800 TEU per year

from PortMiami.

25

Page 26: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

SSS Feasibility

▪ Miami River Capacity

‒ Potential for additional 1,092 cargo vessels per

year.

▪ Short Sea Shipping Program

‒ Potential for 64,800 TEU to move up Miami

River ~6% of current PortMiami TEU volume).

▪ Dependent upon PortMiami operating

constraints, cost differential, and inland port

strategy.

26

Page 27: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

SSS ConsiderationsMinuses

▪ Buy-in from all stakeholders required.

▪ Additional cost associated with extra move.

▪ Requires identification of suitable SSS commodity movements.

▪ Increased container dwell within the region.

▪ PortMiami loading operations are in proximity to cruise terminal.

▪ Increased bridge lifts due to added cargo volume.

27

Page 28: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

SSS ConsiderationsPluses

▪ Potential for decreased truck traffic.

▪ For locally-bound goods:

‒ Alternative to rail haul to Hialeah

‒ Alternative to truck drayage from PortMiami

▪ Possible contribution to future PortMiami

throughput needs.

▪ Complement to inland port strategy?

28

Page 29: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Transportation Network Analysis

29

Page 30: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Freight Planning Scenarios

▪ Marine shipping and industrial truck trip growth:

‒ Trend: marine shipping and industrial trip growth per 2040 LRTP growth forecast

‒ Moderate Growth: 50% additional increase in marine shipping trips over Trend; other industrial +25%

‒ Aggressive Growth: 100% additional increase in marine shipping trips – organic and/or SSS; other industrial +50%

▪ Travel model used to test network loads and capacity issues

30

Page 31: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Preliminary

Improvement Actions: Sources

▪ Programmed improvements

▪ Prior plans and studies

▪ Freight scenario network analysis

▪ Stakeholder input

▪ Other studies in progress and pending

31

Page 32: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Preliminary

Improvement Actions: Types▪ Roadway

‒ Capacity

‒ Traffic operations

‒ Infrastructure condition

▪ Transit/Bicycle/Pedestrian‒ Facilities and condition upgrades

▪ Railroad‒ Crossing improvements

▪ Marine and Intermodal‒ Bascule bridges

‒ Truck staging

‒ Truck service facility

▪ Policy‒ “Working River” land use preservation

‒ Code compliance

32

Page 33: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Roadway Elements

33

Page 34: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Roadway Elements

34

Page 35: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Transit/Bicycle/Pedestrian

Elements

35

Page 36: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Railroad Elements

36

Page 37: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Marine & Intermodal Elements

37

Page 38: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Policy Elements

38

Page 39: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Next Steps and Schedule

39

Page 40: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Next Steps and Schedule

▪ Complete report documentation

‒ Refine estimated costs

‒ Finalize implementation plan

‒ Integrate report chapters and appendices

‒ Conduct final report review

▪ Study completion – February

40

Page 41: Miami River Freight Improvement  · PDF fileoperating a Container-on-Barge, ... (495) Non-Cargo 82% (406) ... Cargo Transit North Bound 7 Cargo Transit South Bound 8

Carlos A. Castro

District Freight Coordinator

Modal Development Office

Florida Department of

Transportation - District 6

(305) 470-5238

[email protected]

Contacts

Miami River Freight Improvement Plan

Jack Schnettler

ATKINS

(305) 514-3369

[email protected]

41