metro denver stand alone data center opportunity · 2016-10-17 · centurylink/qwest, at&t,...
TRANSCRIPT
BUILDING OVERVIEW
• 29,500 SF Building
• 10,000 SF Raised Floor Space
• 7,500 SF Disaster Recovery Office Space
• 30” Raised Floor
• 450 kW Existing
- Expandable to 1,125 kW of Critical Load
METRO DENVER
Church Ranch Corporate Center | 7579 W. 103rd Avenue | Westminster, CO 80021
STAND ALONE DATA CENTER OPPORTUNITY
PROPERTY FEATURES
• 29,500 SF, single-story building (slab on grade)
10,000 SF of 30” raised floor
7,500 SF of disaster recovery office space
Infrastructure/Support Area: 12,000 SF
• Land Area: 2 acres
• Year Commissioned: 2006 / Year Built: 1998
• High-density data center operations
• Heavy power and water supply
• State-of-the-art cooling systems for paramount energy efficiency
• Expansion of power and cooling infrastructure Redundancy
• Heavy parking ratio (105 spaces)
• Column Spacing: Approximately 30’ x 29’
• Secure, low profile site: Guard station & man trap in place at main
entrance, card key access, interior and exterior surveillance
• Northwest Denver U.S. 36 High-Tech Corridor Location
• Little or no threat of natural disasters
• Fire Protection
100% pre-action, dry pipe sprinkler system
VESDA fire protection in data center
Under floor leak and smoke detection
• Immediate proximity to U.S. 36 and located on Regional
Transportation District (RTD) Route
• Fully operational and available for immediate occupancy
WATER STORAGE
• Two (2) 5,000 gallon water storage tanks
• Engineered Expansion: Two (2) 12,000 gallon
underground water storage tanks
POWER & CONNECTIVITY
• Carrier neutral facility over two diversely fed redundant fiber
feeds and diverse providers:
CenturyLink/Qwest, AT&T, Level 3
• Critical HVAC Systems—provide free cooling approximately
60% of the year
2N electrical / N+1 mechanical configuration
450 KW expandable to 1.5 MW
Two (2) 500 ton cooling towers
Two (2) 200 ton McQuay centrifugal chiller
Nine (9) Liebert CRAH’s in place, N+1 configuration
Engineered Expansion: One (1) 500 ton cooling tower,
One (1) 200 ton McQuay centrifugal chiller
• Utility Power
13.2 kV service (480 / 277 Volts)
Two 2,000 kVA transformers
Xcel Energy can provide up to 4 MW of utility power
Siemens switch gear
• Generators
One (1) 1 MW diesel generator, base fuel storage tank
Engineered Expansion: Two (2) - 2 MW diesel generators
1,500 KW load bank existing
METRO DENVER
STAND ALONE DATA CENTER OPPORTUNITYChurch Ranch Corporate Center | 7579 W. 103rd Avenue | Westminster, CO 80021
• 29,500 SF Total • 10,000 SF Data Center • 7,500 SF Disaster Recovery Office • 12,000 SF Infrastructure/Support
METRO DENVER
STAND ALONE DATA CENTER OPPORTUNITYChurch Ranch Corporate Center | 7579 W. 103rd Avenue | Westminster, CO 80021
25
25
25
25
270
70
70
70
70
76
76
76
225
85
85
287
36
36
6
6
85
85
5252
119
93
470
121
121
285
285
83
7
470
E470
E470
E470
BOULDER
ERIE
BROOMFIELD
WESTMINSTER
ARVADA
WHEATRIDGE
LAKEWOOD
LITTLETON
HIGHLANDSRANCH
CENTENNIAL
DOWNTOWNDENVER
DENVER
AURORA
PARKER
GOLDEN
DACONO
BRIGHTON
LAFAYETTELOUISVILLE
THORNTON
NORTHGLENN
DENVERTECH
CENTER
COMMERCECITY
DENVERINTERNATIONAL
AIRPORT
121
WE
STCL
IFF PARKWAYPIE
RC
E STR
EE
T
36
CHURCH RANCH BO ULEVA RD
WA
DS
WO
RT
H B
OU
LE
VA
RD
WEST 108TH AVENUE
WEST 108TH AVENUE
WEST 104TH AVENUE
WE
ST
MIN
ST
ER
BO
UL
EV
A
RD
SH
ER
IDA
N B
OU
LE
VA
RDW
EST 96TH AVE
METRO DENVER
STAND ALONE DATA CENTER OPPORTUNITYChurch Ranch Corporate Center | 7579 W. 103rd Avenue | Westminster, CO 80021