MEP WORKS
OVERVIEW
![Page 2: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/2.jpg)
MEP MECHANICAL ELECTRICAL PLUMBING
![Page 3: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/3.jpg)
Projects
Needs tender drawings to be submitted to authority having jurisdiction for reviewing and approving so the owner can start his project.
MEP PREPARING AND DESIGNING STAGE
![Page 4: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/4.jpg)
Consultants
Prepares tender package for the owner of the project.
Tender package Contains:
design drawings
Bill of quantity (BOQ)
Vendor list
Method of measurements
specification
MEP PREPARING AND DESIGNING STAGE
![Page 5: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/5.jpg)
MEP TENDERS
Tender work
The owner searching for a contractor with the lowest cost and best technicalities.
So all possible contractors submits there offers with two component:
Financial offer
Technical offer
And this is up to the contractor
![Page 6: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/6.jpg)
MEP APPROVALS
![Page 7: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/7.jpg)
MEP APPROVALS
![Page 8: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/8.jpg)
MEP APPROVALS
• Material approval
All suppliers and manufacturers of any thing (technical offer).
• Shop drawing approval
Submitted from the contractor to the consultant for reviewing and approving
![Page 9: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/9.jpg)
MEP APPROVALS
![Page 10: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/10.jpg)
By the contractor
1.Supplying
2.Material inspection request MIR
3.Storing
4.Installation
5.Inspection requests IR
MEP SITE WORKS
![Page 11: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/11.jpg)
By the contractor
1.Supplying
MEP SITE WORKS
![Page 12: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/12.jpg)
MIR
Submitted by the contractor to the consultant for being sure that each peace is just like the approved materials in the technical offers.
IR
By the contractor to the consultant after installation to review and be sure that the installations are just like approved shop drawings.
Consultant work in site is called supervision.
MEP SITE WORKS
![Page 13: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/13.jpg)
After finishing all the systems in the project the contractor hands it over to the owner with the approval from the super visor.
And from this a guarantee and maintenance year starts.
MEP HAND OVER
![Page 14: MEP Works Overview](https://reader035.vdocuments.site/reader035/viewer/2022082210/55cf969b550346d0338c9d56/html5/thumbnails/14.jpg)
THANK YOUWe looking for helping you